View the file

Other files

File Type Posted
N4008520R0127 Amendment 0001.pdf PDF
SECTION J-0200000.pdf PDF
J-0200000-07 ELINS.xls XLS spreadsheet
Functional Assessment Plans (FAP).pdf PDF
Solicitation - N40085-20-R-0127.pdf PDF
SECTION J-1500000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BY FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION #40085-16-D-5004
EXHIBIT A - CLIN 9000
LINE ITEM 0001 - RECURRING - Base Period (8 Months)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A012
ELIN /Sub ELINGREEN BAY PREVENTATIVE MAINTENANCEQuantityUnit of IssueUnit PriceTotalCAC
A001 - 1502000 Facility Investment (GREEN BAY)
A001AAPerform Emergency Trouble Calls (HVAC and Plumbing) Spec 3.1.15EA$0.00$0.009210
A001ABPerform Service Trouble Calls (HVAC and Plumbing) Spec 3.1.24EA$0.00$0.009210
A001ACPerform Emergency Trouble Calls (Boiler Maintenance) Spec 3.1.13EA$0.00$0.009210
A001ADPerform Service Trouble Calls (Boiler Maintenance) Spec 3.1.23EA$0.00$0.009210
A001AEPerform Service Trouble Calls (Building Electrical Test and Maintenance)3EA$0.00$0.009210
A001AFDevelop and Implement PM Program, (HVAC) Spec Item 3.2.18MO$0.00$0.009210
A001AGDevelop and Implement PM Program, (BOILERS and UPV's) Spec Item 3.2.38MO$0.00$0.009210
A001AHDevelop and Implement PM Program, (FIRE PROTECTION) Spec Item 3.2.58MO$0.00$0.009210
A001AJDevelop and Implement PM Program, All other Spec Items in 3.28MO$0.00$0.009210
A001AKInspection, Testing, and Certification Program, Spec Item 3.38MO$0.00$0.009210
Sub total$0.00
ELIN /Sub ELINGREEN BAY PREVENTATIVE MAINTENANCE (MARINE ONLY)QuantityUnit of IssueUnit PriceTotalCAC
A002 - 1502000 Facility Investment (GREEN BAY MARINES)
A002AAPerform Emergency Trouble Calls5EA$1,000.00$5,000.009210
A002ABPerform Service Trouble Calls5EA$2,500.00$12,500.009210
A002ACDevelop and Implement PM Program - (All Equipment, Lifts, WHE, OWS)8MO$0.00$0.009210
A002ADSupply Propane and Maintain all Propane Tanks and components (Annexx 1501031)8MO$0.00$0.009210
Sub total$17,500.00
ELIN /Sub ELINMILWAUKEE PREVENTATIVE MAINTENANCEQuantityUnit of IssueUnit PriceTotalCAC
A003 - 1502000 Facility Investment (MILWAUKEE)
A003AAPerform Emergency Trouble Calls (HVAC and Plumbing) Spec 3.1.15EA$0.00$0.009210
A003ABPerform Service Trouble Calls (HVAC and Plumbing) Spec 3.1.24EA$0.00$0.009210
A003ACPerform Emergency Trouble Calls (Boiler Maintenance) Spec 3.1.13EA$0.00$0.009210
A003ADPerform Service Trouble Calls (Boiler Maintenance) Spec 3.1.23EA$0.00$0.009210
A003AEPerform Service Trouble Calls (Building Electrical Test and Maintenance)3EA$0.00$0.009210
A003AFDevelop and Implement PM Program, (HVAC) Spec Item 3.2.18MO$0.00$0.009210
A003AGDevelop and Implement PM Program, (BOILERS and UPV's) Spec Item 3.2.38MO$0.00$0.009210
A003AHDevelop and Implement PM Program, (FIRE PROTECTION) Spec Item 3.2.58MO$0.00$0.009210
A003AJDevelop and Implement PM Program, All other Spec Items in 3.28MO$0.00$0.009210
A003AKInspection, Testing, and Certification Program, Spec Item 3.38MO$0.00$0.009210
Sub total$0.00
TOTAL ST BASE YEAR (8 Months)$17,500.00
ELIN / Sub ELINGREEN BAY CUSTODIALQuantityUnit of IssueUnit PriceTotalCAC
A004 - (COL3 Base Measures) - 1503010 Custodial9220
A004AAFor spaces other than those specified as Prestige in the Custodial Inventory provided in J-1503010-05, COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503010-03.8MO$0.00$0.00
Sub total$0.00
ELIN / Sub ELINGREEN BAY PEST CONTROLQuantityUnit of IssueUnit PriceTotalCAC
A005 - (COL3 Base Measures) - 1503020 Pest Control9220
A005AAFor spaces listed in the Frequencies for Scheduled Work provided in J-1503010-05, COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503020-04.8MO$0.00$0.00
Sub total$0.00
ELIN / Sub ELINMILWAUKEE PEST CONTROLQuantityUnit of IssueUnit PriceTotalCAC
A006 - (COL3 Base Measures) - 1503020 Pest Control
A006AAFor spaces listed in the Frequencies for Scheduled Work provided in J-1503010-05, COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503020-04.8MO$0.00$0.00
Sub total$0.00
ELIN / Sub ELINGREEN BAY INTEGRATED SOLID WASTE MANAGEMENTQuantityUnit of IssueUnit PriceTotalCAC
A007- (COL3 Base Measures) - 1503030 Integrated Solid Waste Management9410
A007AAFor Green Bay NOSC location, COL3 Base Measures as specified per the Common Output Level Standards listed in C-1503030 Spec Item 3.8MO$0.00$0.00
Sub total$0.00
ELIN / Sub ELINMILWAUKEE INTEGRATED SOLID WASTE MANAGEMENTQuantityUnit of IssueUnit PriceTotalCAC
A008 - (COL3 Base Measures) - 1503030 Integrated Solid Waste Management9410
A008AAFor Mlwaukee NOSC location, COL3 Base Measures as specified per the Common Output Level Standards listed in C-1503030 Spec Item 3.8MO$0.00$0.00
Sub total$0.00
ELIN / Sub ELINGREEN BAY GROUNDS MAINTENANCE AND LANDSCAPINGQuantityUnit of IssueUnit PriceTotalCAC
A009 - (COL3 Base Measures) - 1503050 Grounds Maintenance and Landscaping92NS
A009AAFor areas/acreage other than those specified as Prestige listed in the Site Maps provided in J-1503050-03, COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503050-02.7MO$0.00$0.00
Sub total$0.00
ELIN / Sub ELINMILWAUKEE GROUNDS MAINTENANCE AND LANDSCAPINGQuantityUnit of IssueUnit PriceTotalCAC
A010 - (COL3 Base Measures) - 1503050 Grounds Maintenance and Landscaping92NS
A010AAFor areas/acreage other than those specified as Prestige listed in the Site Maps provided in J-1503050-03, COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503050-02.7MO$0.00$0.00
Sub total$0.00
ELIN / Sub ELINGREEN BAY PAVEMENT CLEARANCEQuantityUnit of IssueUnit PriceTotalCAC
A011 - (COL3 Base Measures) - 1503060 Pavement Clearance92NS
A011AAFor areas/locations listed in the Site Maps provided in J-1503060-02, COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503060-03. This ELIN includes all Pavement Clearance services.1MO$0.00$0.00
Sub total$0.00
ELIN / Sub ELINMILWAUKEE PAVEMENT CLEARANCEQuantityUnit of IssueUnit PriceTotalCAC
A012 - (COL3 Base Measures) - 1503060 Pavement Clearance92NS
A012AAFor areas/locations listed in the Site Maps provided in J-1503060-02, COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503060-03. This ELIN includes all Pavement Clearance services.1MO$0.00$0.00
Sub total$0.00
TOTAL FX BASE YEAR$0.00
LINE ITEM 0002 - RECURRING - Base Period OPTION (COL4 Base Measures)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A013 - 1503010 Custodial (GREEN BAY)9220
A013AAFor spaces other than those specified as Prestige in the Custodial Inventory provided in J-1503010-05, decrease in services from COL3 Base Measures specified per the Common Output Level Standards listed in J-1503010-03.8MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0003 - RECURRING - Base Period OPTION (COL4 Additional Measures 1)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A014 - 1503010 Custodial (GREEN BAY)9220
A014AAFor spaces other than those specified as Prestige in the Custodial Inventory provided in J-1503010-05, decrease in services from COL3 Base Measures specified per the Common Output Level Standards listed in J-1503010-03.8MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0004 - RECURRING - Base Period OPTION (COL4 Additional Measures 3)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A015 - 1503010 Custodial (GREEN BAY)9220
A015AAFor spaces other than those specified as Prestige in the Custodial Inventory provided in J-1503010-05, decrease in services from COL3 Base Measures specified per the Common Output Level Standards listed in J-1503010-03.8MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0005 - RECURRING - Base Period OPTION (COL3 Additional Measures 1)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A016 - 1503010 Custodial (GREEN BAY)9220
A016AAFor spaces other than those specified as Prestige in the Custodial Inventory provided in J-1503010-05, increase in services from COL3 Base Measures specified per the Common Output Level Standards listed in J-1503010-03.8MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0006 - RECURRING - Base Period OPTION (COL3 Additional Measures 3)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A017 - 1503010 Custodial (GREEN BAY)9220
A017AAFor spaces other than those specified as Prestige in the Custodial Inventory provided in J-1503010-05, increase in services from COL3 Base Measures specified per the Common Output Level Standards listed in J-1503010-03.8MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0007 - RECURRING - Base Period OPTION (COL4 Base Measures)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A018 - 1503050 Grounds Maintenance and Landscaping (GREEN BAY)92NS
A018AAFor areas/acreage other than those specified as Prestige in the Site Maps provided in J-1503050-03, decrease in services from COL3 Base Measures as per the Common Output Level Standards listed in J-1503050-02.7MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0008 - RECURRING - Base Period OPTION (COL4 Additional Measures 2)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A019 - 1503050 Grounds Maintenance and Landscaping (GREEN BAY)92NS
A019AAFor areas/acreage other than those specified as Prestige in the Site Maps provided in J-1503050-03, decrease in services from COL3 Base Measures as per the Common Output Level Standards listed in J-1503050-02.7MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0009 - RECURRING - Base Period OPTION (COL3 Additional Measures 2)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A020- 1503050 Grounds Maintenance and Landscaping (GREEN BAY)92NS
A020AAFor areas/acreage other than those specified as Prestige in the Site Maps provided in J-1503050-03, increase in services from COL3 Base Measures as per the Common Output Level Standards listed in J-1503050-02.7MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0010 - RECURRING - Base Period OPTION (COL4 Base Measures)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A021 - 1503050 Grounds Maintenance and Landscaping (MILWAUKEE)92NS
A021AAFor areas/acreage other than those specified as Prestige in the Site Maps provided in J-1503050-03, decrease in services from COL3 Base Measures as per the Common Output Level Standards listed in J-1503050-02.7MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0011 - RECURRING - Base Period OPTION (COL4 Additional Measures 2)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A022 - 1503050 Grounds Maintenance and Landscaping (MILWAUKEE)92NS
A022AAFor areas/acreage other than those specified as Prestige in the Site Maps provided in J-1503050-03, decrease in services from COL3 Base Measures as per the Common Output Level Standards listed in J-1503050-02.7MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00
LINE ITEM 0012 - RECURRING - Base Period OPTION (COL3 Additional Measures 2)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
A023 - 1503050 Grounds Maintenance and Landscaping (MILWAUKEE)92NS
A023AAFor areas/acreage other than those specified as Prestige in the Site Maps provided in J-1503050-03, increase in services from COL3 Base Measures as per the Common Output Level Standards listed in J-1503050-02.7MO$0.00$0.00
Sub total$0.00
TOTAL FFP WORK$0.00

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

BY IDIQ

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
SOLICITATION #40085-16-D-5004
EXHIBIT A - CLIN 9000
LINE ITEM 0013 - NON-RECURRING - Base Period (8 Months)
PROVIDE PRICES FOR FACILITY INVESTMENT - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A749
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Perform Emergency Trouble Calls (HVAC and Plumber) Green BayResponse within 2 hours is required at all other times including after normal work hours, weekends, or holidays. Emergency trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contactor shall complete emergency trouble calls within 24 hours of receipt. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested up to the threshold limit. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall maintain sufficient materials and equipment on hand to support trouble call work. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Emergency trouble calls shall be completed within 48 hours.4EA$0.009210
A701Perform Service Trouble Calls (HVAC and Plumber) Green BayThe Contractor shall respond to service trouble calls within 48 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Service trouble calls shall be completed within 10 calendar days.3EA$0.009210
A702Perform Emergency Trouble Calls (Boiler Maintenance) Green BayResponse within 2 hours is required at all times including after normal work hours, weekends, or holidays. Emergency trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contactor shall complete emergency trouble calls within 24 hours of receipt. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested and, up to the threshold limit When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall maintain sufficient materials and equipment on hand to support trouble call work. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Emergency trouble calls shall be completed within 48 hours.2EA$0.00
A703Perform Service Trouble Calls (Boiler Maintenance) Green BayThe Contractor shall respond to service trouble calls within 48 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Service trouble calls shall be completed within 10 calendar days.2EA$0.00
A704Perform Service Trouble Calls (Building Electrical Test and Maintenance) Green BayThe Contractor shall respond to service trouble calls within 48 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Service trouble calls shall be completed within 10 calendar days.2EA$0.009210
A705Unit Priced Labor Work - HVAC Green BayProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (HVAC). MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A706Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. Green BayProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (HVAC) These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 6,000.00$6,000.009210
A707Unit Priced Labor Work - Plumbing Green BayProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (Plumbing). MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A708Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. Green BayProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (Plumbing). These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 700.00$700.009210
A709Unit Priced Labor Work - Boiler Repair Green BayProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (Boiler Repair and Maintenance).
MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A710Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. Green BayProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (Boiler Repair and Maintenance).These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 2,700.00$2,700.009210
A711Unit Priced Labor Work - Electrical Green BayProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (Electrical Test and Maintenance). MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A712Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. Green BayProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (Electrical Test and maintaince). These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 2,000.00$2,000.009210
A713Unit Priced Labor Work - Locksmith and misc. Carpentry Green BayProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (Locksmith and misc. Carpentry). MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A714Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. Green BayProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (Locksmith and misc. Carpentry). These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 1,500.00$1,500.009210
A715Perform Emergency Trouble Calls (HVAC and Plumber) MilwaukeeResponse within 2 hours is required at all other times including after normal work hours, weekends, or holidays. Emergency trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contactor shall complete emergency trouble calls within 24 hours of receipt. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested up to the threshold limit. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall maintain sufficient materials and equipment on hand to support trouble call work. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Emergency trouble calls shall be completed within 48 hours.4EA$0.009210
A716Perform Service Trouble Calls (HVAC and Plumber) MilwaukeeThe Contractor shall respond to service trouble calls within 48 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Service trouble calls shall be completed within 10 calendar days.3EA$0.009210
A717Perform Emergency Trouble Calls (Boiler Maintenance) MilwaukeeResponse within 2 hours is required at all times including after normal work hours, weekends, or holidays. Emergency trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. The Contactor shall complete emergency trouble calls within 24 hours of receipt. The Contractor shall respond to emergency trouble calls with the appropriate personnel and equipment to commence work immediately. The Contractor shall remain at the work site until the emergency has been arrested and, up to the threshold limit When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government immediately and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall maintain sufficient materials and equipment on hand to support trouble call work. Multiple trouble calls may be issued to cover work that exceeds the threshold of an emergency trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Emergency trouble calls shall be completed within 48 hours.2EA$0.00
A718Perform Service Trouble Calls (Boiler Maintenance) MilwaukeeThe Contractor shall respond to service trouble calls within 48 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Service trouble calls shall be completed within 10 calendar days.2EA$0.00
A719Perform Service Trouble Calls (Building Electrical Test and Maintenance) MilwaukeeThe Contractor shall respond to service trouble calls within 48 hours of notification for calls received on Monday through Thursday. Respond the following Monday for calls received on a Friday. The Contractor shall complete service trouble calls within 9 working days of receiving the call. Service trouble calls are limited to a dollar value of up to 4 hours labor and $100.00 material. Trouble calls may be labor only, material only or labor and material as long the total dollar value of the trouble call is not exceeded. When repair work is expected to exceed the threshold limit, the Contractor shall notify the Government within two hours and provide an estimate of the cost of completion to the KO for further direction. The Contractor shall submit to the Government a written report of each trouble call by 0900 on the work day following completion of the trouble call. Multiple trouble calls may be issued to cover work that exceeds the threshold of a service trouble call. In no case will the combined trouble calls exceed 32 hours labor or $2500.00 in total cost. Service trouble calls shall be completed within 10 calendar days.2EA$0.009210
A720Unit Priced Labor Work - HVAC MilwaukeeProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (HVAC). MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A721Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. MilwaukeeProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (HVAC) These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 6,000.00$6,000.009210
A722Unit Priced Labor Work - Plumbing MilwaukeeProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (Plumbing). MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A723Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. MilwaukeeProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (Plumbing). These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 700.00$700.009210
A724Unit Priced Labor Work - Boiler Repair MilwaukeeProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (Boiler Repair and Maintenance).
MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A725Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. MilwaukeeProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (Boiler Repair and Maintenance).These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 2,700.00$2,700.009210
A726Unit Priced Labor Work - Electrical MilwaukeeProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (Electrical Test and Maintenance). MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A727Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. MilwaukeeProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (Electrical Test and maintaince). These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 2,000.00$2,000.009210
A728Unit Priced Labor Work - Locksmith and misc. Carpentry MilwaukeeProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. (Locksmith and misc. Carpentry). MUST BE NEGOTIATED BY KO USING ETO PROCESS.20HR$0.009210
A729Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. MilwaukeeProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. (Locksmith and misc. Carpentry). These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 1,500.00$1,500.009210
A730Interior Window CleaningThe Contractor shall clean all interior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. All main building interior glass is included.1EA$0.009210
A731Exterior Window CleaningThe Contractor shall clean all exterior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. When screens are present, they are removed for glass cleaning and properly reinstalled. All main building exterior glass is included.1EA$0.009210
A732Window Blind CleaningBlinds shall cleaned. If removed for cleaning, blinds are returned to their original location within two working days. (Per blind cost)24EA$0.009210
A733Stripping, Coating, and Buffing - 4 CoatsThe Contractor shall strip and relax floors to ensure that floors are clean and sightly. Floors are cleaned, free of previously applied wax, and have a uniform gloss finish. Four Coats provides for approximately 3.5 months of wear.12000SF$0.009220

92G0 A734 Carpet and Rug Deep Cleaning The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Shampooed carpets are free of dirt and spots are removed. 6000 SF $0.00 9220 92G0 A735 Unit Priced Labor Work - Custodial Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order to perform Custodial and related labor. MUST BE NEGOTIATED BY KO USING ETO PROCESS. 20 HR $0.00 9220 92G0 A736 Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS. 1 LS $0.00 9220 92G0 A737 Infestation Bee, Wasp, Hornet, and Stinging Arthropod Control Provide labor and materials to control stinging arthropod infestations in and around buildings, structures, and areas. Pests include, but are not limited to, bees, wasps, hornets, carpenter bees, cicada killers, yellow jackets, and solitary wasps (mud daubers, umbrella wasps). European honeybee swarms/nests: Contractor shall contact state or local authorities to determine if local beekeepers can remove honeybee swarms/nests. Time Period to Respond: 4 hours. If swarm, respond immediately at discretion of KO. Complete work per time periods specified in J-1503020-01. (additional service call) EA Infestation $0.00 9220 92G0

A738Fire Ant ControlProvide labor and materials to prevent and control fire ants indoors and outdoors. Sites include all developed and semi-developed areas and other designated sites. Time Period to Respond: Indoors: Immediately. Outdoors: 1 day. Complete work per time periods specified in J-1503020-01. (additional service call)Indoors: 1,000 SF
Outdoors: 0.25 acre$0.009220

92G0 A739 Commensal Rodents In and Around Buildings and Structures Provide labor and materials to prevent and control rodents indoors or within 75 linear feet of the exterior walls of designated buildings and structures. Rodent pests include, but are not limited to Norway rats, roof rats, house mice, and field mice. Service requires removal of dead animals. Time Period to Respond: Indoors: 1 day. Outdoors: 3 working days. Complete work per time periods specified in J-1503020-01. (additional service call) 5,000 SF $0.00 9220 92G0 A740 Pest Vertebrate Control Provide labor and materials to control pest vertebrate animals including, but not limited to, feral dogs and cats, squirrels, skunks, snakes, opossums, raccoons, and mongoose. Comply with local laws and regulations. Time Period to Respond: Within 24 hours. Emergency (animal possibly rabid) or indoors, immediately. Complete work per time periods specified in J-1503020-01. Includes disposal or relocation. (additional service call) EA $0.00 9220 92G0 A741 Ant Control Provide labor and materials to prevent and control ants in and around buildings and structures. Time Period to Respond: 3 working days Complete work per time periods specified in J-1503020-01. (additional service call) 5,000 SF $0.00 9220 92G0

A742Cockroach ControlProvide labor and materials to prevent and control all cockroaches. Time Period to Respond: 3 days. Complete work per time periods specified in J-1503020-01. (additional service call)5,000 SF$0.009230
A743Miscellaneous Arthropod Pest ControlProvide labor and materials to prevent and control nuisance arthropod pests in and around buildings and structures. Excludes but is not limited to spiders, silverfish, scorpions, crickets, centipedes, millipedes, boxelder bugs, mites, beetles, etc. (Excludes ants, cockroaches, filth flies, and bees/wasps/hornets covered in separate sections.) Time Period to Respond: 3 days. Complete work per time periods specified in J-1503020-01. (additional service call)5,000 SF$0.009230
A744General WasteThe Contractor shall remove general waste from containers to ensure refuse is properly collected. (8 Yards of waste, additional pickup)EA$0.009410
A745Bulky WasteThe Contractor shall remove bulky waste to ensure it is properly collected. (8 Yards of bulky waste, additional pickup)EA$0.009410
A746Special Event Grass CuttingGrass shall be mowed and trimmed to a uniform height of 3 inches throughout entire site. Clippings and debris shall be removed. Entire property to be cut. Complete all work within 3 calendar days.EA$0.0092NT
A747Special Event EdgingEdging to provide a uniform edged cut. All clippings shall be removed. All edging to be completed around entire property. Complete all work within 3 calendar days.EA$0.0092NS
A748Unit Priced Labor Work - LandscapingProvide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order for Landscaping and related labor. MUST BE NEGOTIATED BY KO USING ETO PROCESS.40HR$0.0092NS
A749Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO USING ETO PROCESS.1LS$ 7,000.00$7,000.0092NS
TOTAL PRICE Base Year$32,800.00

SUMMARY

RecurringNon-RecurringTotal
CLIN 0001$CLIN 0002$
CLIN 0003$CLIN 0004$
CLIN 0005$CLIN 0006$
CLIN 0007$CLIN 0008$
CLIN 0009$CLIN 0010$
Total RP$Total NRP$
Total$

BASE FFP

ATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
CONTRACT N40085-20-R-0127
EXHIBIT A
LINE ITEM 0001 - RECURRING - BASE YEAR (12-1-2020 THRU 11-30-2021)
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A044
Contractor shall price the ELINS as shown.
All Marine ELIN's are for the VMF (Vehicle Maintenance Facility) and their associated areas only. Pavement Clearance shall be for VMF lot only where indicated in Section J Site plans.
NAVY RESERVE FACILITIES ADMINISTRATION BUILDINGS
ELIN /Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
A001CNIC (GREEN BAY) - Sub Annex 1502000 Facility Investment
A001AAEmergency Service Orders, Spec Item 3.1.16EA$0.00
A001ABUrgent Service Orders, Spec item 3.1.26EA$0.00
A001ACRoutine Service Orders, Spec Item 3.1.38EA$0.00
A001ADPM Program, Spec Item 3.212MO$0.00
A001AEInspection, Testing, and Certification Program, Spec Item 3.312MO$0.00
SUB-TOTAL CNIC (GREEN BAY) (ST)$0.00
A002 - CNIC/MFR (GREEN BAY) (COL 3) -1503010 Custodial
For spaces other than those specified as Prestige in the Custodial Inventory provided in J-1503010-05, COL 3 as specified per the Common Output Level Standards listed in J-1503010-03.12MO$0.00
E002AA - CNIC (GREEN BAY) (COVID MOD) -1503010 Custodial
For spaces identified in Section J, J-1503010-05 highlighted as COVID related cleaning. Green Bay has 642 SF of common area to be addressed for additional cleaning.3MO$0.00
A003 - CNIC (GREEN BAY) (COL 3) - 1503020 Pest Control
For spaces listed in the Frequencies for Scheduled Work provided in J-1503020-05, COL 3 as specified per the Common Output Level Standards listed in J-1503020-04.12MO$0.00
A004 - CNIC/MFR (GREEN BAY) (COL 3) - 1503030 Integrated Solid Waste Management
For Green Bay NOSC location, COL 3 as specified per the Common Output Level Standards listed in C-1503030 Spec Item 3.12MO$0.00
A005 - CNIC/MFR (GREEN BAY) (COL 3) - 1503050 Grounds Maintenance and Landscaping
For areas/acreage other than those specified as Prestige listed in the Site Maps provided in J-1503050-03, COL 3 as specified per the Common Output Level Standards listed in J-1503050-02.7MO$0.00
A006 - CNIC/MFR (GREEN BAY) (COL 3) - 1503060 Pavement Clearance
For areas/locations listed in the Site Maps provided in J-1503060-02, COL 3 as specified per the Common Output Level Standards listed in J-1503060-03. This ELIN includes all Pavement Clearance services.5MO$0.00
SUB-TOTAL (GREEN BAY) (FX)$0.00
TOTAL CNIC/MFR (GREEN BAY) (ST+FX)$0.00
A007CNIC (MILWAUKEE) Spec Item 3 Milwaukee Sub Annex 1502000
A007AAEmergency Service Orders, Spec Item 3.1.16EA$0.00
A007ABUrgent Service Orders, Spec item 3.1.26EA$0.00
A007ACRoutine Service Orders, Spec Item 3.1.38EA$0.00
A007ADPM Program, Spec Item 3.212MO$0.00
A007AEInspection, Testing, and Certification Program, Spec Item 3.312MO$0.00
SUB-TOTAL CNIC (MILWAUKEE) (ST)$0.00
A008 - CNIC (MILWAUKEE) (COL 3) - 1503020 Pest Control
For spaces listed in the Frequencies for Scheduled Work provided in J-1503020-05, COL 3 as specified per the Common Output Level Standards listed in J-1503020-04.12MO$0.00
A009 - CNIC/MFR (MILWAUKEE) (COL 3) -1503030 Integrated Solid Waste Management
For Milwaukee NOSC location, COL 3 as specified per the Common Output Level Standards listed in C-1503030 Spec Item 3.12MO$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .