This solicitation seeks vehicle and equipment maintenance, repair, and alteration services for the Naval Facilities Engineering Command Mid-Atlantic Hampton Roads area. Services include disassembly, reassembly, inspection, cleaning, repairs, refinishing, painting, corrosion control, electrical work, air conditioning, and repairs to vehicles ranging from 1/4 ton to 40 tons such as sedans, buses, trucks, forklifts, and construction equipment from various manufacturers. The performance work statement details the required services for vehicles and equipment. Offerors must submit proposals by May 11, 2020. The solicitation is designated for small businesses and seeks an indefinite delivery, indefinite quantity contract for non-recurring services to support NAVFAC Mid-Atlantic's Hampton Roads area of responsibility, which includes Naval Station Norfolk, Naval Air Station Oceana, Naval Weapons Station Yorktown, and Joint Expeditionary Base Little Creek-Fort Story.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| N40085-20-R-0012.pdf | ||
| J-1700000 Vehicle and Equipment Maintenance.pdf | ||
| J-0200000-05 - ELINs.xls | XLS spreadsheet | |
| J-0200000 Management and Administrative.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FACILITIES SUPPORT SERVICES FOR VEHICLE AND EQUIPMENT MAINTENANCE, REPAIR AND ALTERATIONS AT VARIOUS LOCATIONS IN
THE HAMPTON ROADS AREA OF VIRGINIA.
This Amendment is issued to correct the proposal due date on the Standard Form 33 to 11 MAY 2020 and incorproate revisions to Sections E, H, and I.
All other terms and conditions remain unchanged.
See continuation pages.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0012
X 9B. DATED (SEE ITEM 11)
09-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Apr-2020
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008520R0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 11-Apr-2020 02:00 PM to 11-May-
2020 02:00 PM.
SECTION E - INSPECTION AND ACCEPTANCE
The following have been modified:
E.3 – GOVERNMENT QUALITY (QA)
E.3 GOVERNMENT QUALITY ASSURANCE (QA)
In accordance with the FAR 52.246-4, "INSPECTION OF SERVICES - FIXED PRICE" clause, Section E, each phase of the services rendered under this contract is subject to Government inspection, during the Contractor's operations and after completion of the tasks. The Government's Quality Assurance Surveillance Program is not a substitute for Quality Control by the Contractor. All findings of unsatisfactory or non-performed work will be administered in accordance with "Consequences Of Contractor’s Failure to Perform Required Services” located in Section H. All costs associated with rework are the responsibility of the Contractor. The Government reserves the right to choose the inspection methods to be used in implementing its Quality Assurance Program and to vary the inspection methods utilized during the work, without notice to the Contractor.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
H.5 CONSEQUENCES
H.5 – Consequences Of Contractor’s Failure to Perform Required Services
The Contractor shall perform all of the contract requirements. The Government will inspect and assess Contractor performance in accordance with FAR 52.246-4, INSPECTION OF SERVICES
– FIXED PRICE and the Section E provision entitled GOVERNMENT PERFORMANCE ASSESSMENT. The Government will require reperformance, withhold payment, or seek other suitable consideration for unsatisfactory or non-performed work. When defects can’t be corrected by re-performance, the Government may reduce the price to reflect the reduced value of services performed.
(a) PROCEDURES. In the case of unsatisfactory or nonperformed work, the Government:
(1) may give the Contractor written notice of observed deficiencies prior to withholding payment for unsatisfactory or non-performed work and/or assissing liquidated damages. Such written notice shall not be a prerequisite for withholding payment for nonperformed work. The Government may specify, as provided for below, that liquidated damages can be assessed against the Contractor. Such liquidated damages are to compensate the Government for administrative costs and other expenses resulting from the unsatisfactory or nonperformed work.
(2) may, at its option, allow the Contractor an opportunity to re-perform the unsatisfactory or nonperformed work, at no additional cost to the Government. In the case of daily work, corrective action must be completed within two hours of notice to the Contractor. In the case of other work, corrective action must be completed within twenty-four hours of notice.
In addition, the Government can assess liquidated damages, as referenced above, in the amount of 15 percent of the value of all observed defects. The original inspection results of the Contractor's work will not be modified upon re-inspection. However, the Contractor will be paid for satisfactorily re-performed work.
(3) shall withhold from the Contractor’s invoice all amounts associated with the unsatisfactory or nonperformed work at the prices set out in the Schedule or provided by other provisions of this contract, unless the Contractor is required to re-perform and satisfactorily complete the work. In addition, the Government can assess liquidated damages, as referenced above, in the amount of 15 percent of the value of all observed defects.
(4) may, at its option, perform the work by Government personnel or by other means. The
Government will reduce the amount of payment to the Contractor, by the amount paid to any Government personnel (based on wages, retirement and fringe benefits) plus material, or by the actual costs incurred to accomplish the work by other means. If the actual costs cannot be readily determined, the prices set out in the Schedule will be used as the basis for the deduction.
In addition, the Government can assess liquidated damages, as referenced above, in the amount of 15 percent of the computed cost.
(b) The Contractor is responsible for maintaining an effective Quality Control Program during the course of the contract. Failure to maintain adequate quality control may result in Termination for Default.
(c) Re-performance by the Contractor does not waive the Government's right to terminate for nonperformance in accordance with FAR clause 52.249-8, “DEFAULT (FIXED-PRICE SUPPLY AND SERVICE)” of Section I and all other remedies for default as may be provided by law.
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
(End of clause)
The following have been deleted:
52.232-18 Availability Of Funds APR 1984
(End of Summary of Changes)
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 11 May 2020
X
A X B X C
D
EX
X G F 90 - 102
103 - 111 X H 112 - 118
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 118
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N40085 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 9
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
10 - 53 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
54 - 56 57 - 65
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 66 - 69 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 70 - 71 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
72 - 88
PART II - CONTRACT CLAUSES
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
09 Apr 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
| Amendment 00001 |
| Untitled Extract Pages |
File details come from the government source that posted it. Updated .