Amendment 0002 - M 602.pdf
PDF 86 KB Posted
- Solicitation number
- N4008520R0002
About this file
This document includes an amendment to a mechanical drawing schedule and related federal contract opportunity solicitation. The mechanical drawing schedule amendment provides details on electric unit heaters, infrared heaters, supply air devices, and a vacuum pump schedule for an expansion and renovation project. The related federal contract opportunity solicitation is for an indefinite delivery, indefinite quantity multiple award construction contract in the Philadelphia and Mechanicsburg, Pennsylvania regions. It is being issued as an 8(a) small business set-aside with a NAICS code of 236220 and size standard of $39.5 million. The solicitation is for both design-build and design-bid-build project delivery methods. The contracting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE
CONSTR. CONTR.
SHEET
NAVFAC DRAWING
DES DRW CHK
SATISFACTORY TO
APPROVE
ACTIVITY
FOR COMMANDER
SEAL
A/E INFO
OF
EPROJECT
A
B
C
D
1 2 3 4
A
B
C
D
D E P A R
TM
E N T O F
TH
E
N A V Y
N A V A L F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DRAWFORM REVISION: 10 MARCH
PM-DM
BRANCH MANAGER:
CHIEF ENG/ARCH
FIRE PROTECTION
R
1100 NORTH GLEBE
SUITE
ARLINGTON, VIRGINIA
571.218.100
FAX:
1 2 3 4 5
PES
CSS
WGW
MBL
:2 :4
P M
M-602 10476
12773667
1564988
NO NO BZ
H
VA
C S C H E D U
LE
S
BU
IL
D I
NG
B
EX
PA
N S
IO
N
A N D
RE
N O
VA
TI
O N
N
AV
A L F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
C O
M M
AN
D
, M
ID
- A
TL
A N
TI
C M
EC
H
AN
IC
SB
U
RG
PA
N
AV
A L S U
PP
O
RT
A C T I
VI
TY
ELECTRIC UNIT HEATER SCHEDULE (UH)
MARK LOCATION SERVING
BASIS OF DESIGN
TYPE
HEATING
CAPACITY
(KW) CFM
OUTLET
VELOCITY
(FPM)
AIR TEMP
RISE (F)
MAX
MOUNTING
HEIGHT
HEAT
THROW (FT)
ELECTRICAL DATA
WEIGHT
(LBS) NOTESMANUFACTURER MODEL FLA V PH Hz UH-1 6 ELECTRICAL ROOM 6 ELECTRICAL ROOM MODINE HER ELECTRIC 3 380 430 25 °F 8' - 0" 12 14 A 208 2 60 34 UH-2 9 BREAK ROOM 9 BREAK ROOM MODINE HER ELECTRIC 3 380 430 25 °F 8' - 0" 12 14 A 208 2 60 34 UH-3 7 HEATER ROOM 7 HEATER ROOM MODINE HER ELECTRIC 3 380 430 25 °F 8' - 0" 12 14 A 208 2 60 34
INFRARED HEATER SCHEDULE (IRH)
MARK SERVING
BASIS OF DESIGN
TYPE INPUT (MBH)
FLUE SIZE
(IN)
GAS CONNECTION
NPT (IN)
NPG PRESSURE (IN WC) MIN TUBE LENGTH
BTWN BURNERS (FT)
ELECTRICAL DATA WEIGHT
(LBS) NOTESMANUFACTURER MODEL MIN MAX V PH Hz FLA IRH-1-10 1 MAINTENANCE ROBERTS GORDON CRV-B-8 GAS-FIRED 80 4 1.5 5 14 30 120 1 60 0.0 75
SUPPLY AIR DEVICE SCHEDULE
MARK
BASIS OF DESIGN
CFM
DIFFUSER
DAMPER NOTES
MANUFACTURER MODEL MODULE
SIZE DUCT SIZE NO. VANES
S1 TITUS DL-SV 1920 40X12 40X12 2 NONE
INFRARED HEATERS VACUUM PUMP SCHEDULE (P)
MARK SERVING
BASIS OF DESIGN
DRIVE TYPE RPM
ELECTRICAL DATA
NOTES
MANUFACTURER MODEL HP V PH Hz
P-1 INFRARED HEATING SYSTEM ROBERTS GORDON EP-200 DIRECT 3450 3/4 115 1 60 1
P-2 INFRARED HEATING SYSTEM ROBERTS GORDON EP-200 DIRECT 3450 3/4 115 1 60 1
NOTES:
1. MODULATING VACUUM PUMP FOR INFRARED HEATING SYSTEM.
GENERAL NOTES
1. REFER TO M-001, M-002 AND FOR SYMBOLS, ABBREVIATIONS AND GENERAL
NOTES.
2. REFER TO E-601 FOR MECHANICAL - ELECTRICAL DATA SCHEDULES.
M
AR
K D
E S C
R
IP
TI
O
N D
AT
E
AP
PR
LOUVER SCHEDULE
MARK
MODELMANUFACTURER
BASIS OF DESIGN
RUSKIN ELF6375DXHL-1
TYPE
DRAINABLE
FUNCTION
INTAKE
UNIT SERVED
ERV-1-OA
WIDTH x HEIGHT
DIMENSIONS, INCHES
41 x 37
AIRFLOW DATA
CFM
1,920
FREE AREA, SF
5.74
VELOCITY, FPM
PRESS. DROP (IN. W. C.)
0.015
NOTES
1, 2, 3, 4 RUSKIN ELF6375XHL-2 -- EXHAUST ERV-1-EA 41 x 37 1,920 5.74 340 0.015 1, 2, 3, 4 RUSKIN ELF6375DXHL-3 DRAINABLE INTAKE EF-1 72 x 18 2,930 5.74 600 0.050 1, 2, 3, 4 RUSKIN ELF6375XHL-4 -- EXHAUST PIT EXHAUST 40 x 36 3,500 5.74 619 0.060 1, 2, 3, 4 RUSKIN ELF6375DXHL-4A DRAINABLE INTAKE PIT INTAKE 40 x 36 3,500 5.74 749 0.080 1, 2, 3, 4 RUSKIN ELF6375XHL-5 -- EXHAUST EF-2 10 x 8 162 5.74 450 0.030 1, 2, 3, 4
NOTES:
1. PROVIDE INSECT SCREEN.
2. MOTORIZED DAMPER.
3. DIMENSIONS BASED ON ARCHITECTURAL DRAWINGS. FOR INSTALLATION OF LOUVER, PROVIDE A FILLER MARGIN TO FIT OPENING.
4. VERIFY DIMENSIONS PRIOR TO ORDERING LOUVER.
File details come from the government source that posted it. Updated .