AMENDMENT 0002.pdf
PDF 141 KB Posted
- Solicitation number
- N4008520R0002
About this file
This solicitation seeks proposals for a Design-Build/Design-Bid-Build Indefinite Delivery/Indefinite Quantity Multiple Award Construction Contract for the Philadelphia and Mechanicsburg, Pennsylvania regions. The contract has a NAICS code of 236220 and size standard of $39.5 million. It is an 8(a) set-aside for the Pennsylvania area issued by the Department of the Navy Naval Facilities Engineering Command. The scope includes general construction projects such as renovations, repairs, and new buildings. The period of performance is one base year with four option years. This solicitation establishes a pool of five contractors to compete for future task orders. Offerors must demonstrate experience with relevant construction and design projects. Proposals are due by June 16, 2020 and submitted electronically with instructions provided in the document.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION NO. N40085-20-R-0002, DESIGN-BUILD (DB) / DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY / INDEFINITE QUANTITY (IDIQ), MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR PENNSYLVANIA
The purpose of this amendment is to provide responses to Pre-Proposal Inquiries and the follow ing supplemental attachments: SECTION 09 90 00, M 602, and BUILDING 608B HAZARDOUS MATERIAL SURVEY..
The proposal due date has been extended to Tuesday, 16 June 2020, not later than 2:00 PM EST.
See Continuation Page(s).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 37
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0002
X 9B. DATED (SEE ITEM 11)
08-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Jun-2020
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008520R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
Contractor
PPI#
Section of RFP or Page Number
Paragraph Reference
Drawing Number
Question RESPONSE Amendment #
Factor 4 (i)
Please confirm that, in lieu of CPARS, we may include in the proposal PPQs that we previously received from our clients. Thank you.
Propose in accordance with the Factor 4 Solicitation Submittal Requirements outlined on page 14 of the solicitation.
3-ring binders
Would the government consider e-mail submittal for the proposal due to
COVID
restrictions?
Page 7 of the RFP authorizes and instructs all proposals to be submitted electronically.
The Contractor must also submit a hard copy in addition to the electronic copy. Also noted on page 15,
5.2.3 "All proposals SHALL be provided via electronic submission" You may submit one (1) hard copy of the price binder and one (1) hard copy of the non-cost/price factors binder both marked “Original”. No CD- ROM is required.
SF1442 13.A
The solicitation calls for physical delivery of the proposal to Norfolk, VA.
Given the current COVID-19 hazards and restrictions can this be changed to electronic delivery?
See PPI #2 Response 0002
SF1442 13.A
The solicitation has a bid due date of 9 June 2020. Given that staffing at supplier and subcontractor offices required for bidding this work is limited at this time due to
COVID-19
restrictions. Can the bid deadline be extended by two weeks to allow for more complete and accurate proposals?
Proposal due date extended to 16 June 2020.
0 22 13.00 Pg1 Total Price for CLIN Description
The description of the “seed project” price references the “building expansion” only while descriptions of the project elsewhere include existing building renovations. Please confirm whether the seed project price includes the existing building renovations or is just for the building expansion.
Seed project includes both, the expansion and renovation portions of the building.
A Dwgs
Drawings refernce use of existing building roofer who holds warranty. Please provide contact info for existing building roofer.
Installer warranty is expired.
Manufacturer warranty as follows: FIRESTONE
BUILDING PRODUCTS
250 W 96TH ST
INDIANAPOLIS, IN 46260,
I-800-428-4442
WARRANTY # RO106816
EXPIRATION 11/23/2036
C-001, C-002
Site drawings do not define extent of asphalt paving.
Please clarify.
Limits of asphalt paving is remains the same as existing.
The limits of paving which is same as existing is shown is on sheet C-001..
C-003
Detail is shown for gate but is unclear where this is located on plans
Location of Gate is shown on plans where the proposed fence is on the North side of building.
p.15 5.2.3 N/A
Can we get clarification on the submission method (hard copy or online), and would an online submission only be considered as we anticipate lockdown measures extending into June?
See PPI #2 Response. Both are required.
Amendment-
Please identify where each photo is taken on the plans. See photo attached?
See Amendment 0001 Document Entitled "NAVFAC Photo Log 608B May 7, 2020" for a full list.
Amendment-
Can’t a site visit be held. It would help determine staging areas?
Due to COVID-19 and the restrictions on gatherings and travel, a formal site visit will not be held.
Phase Plan G-004
We don't see how this building can be occupied during demolition-asbestos and lead abatement! Please clarify!
Portion of the building must remain accessible during construction for servicing of equipment. Reference Phasing Plan on G-004.
Civil C-001, C-002
Please indicate where the contractors staging area will be located: for Equipment/Parking as there will be minimum of 25-30 workers on site during construction.
Building 608B is located away from main traffic roads at NSA Mechanicsburg.
Laydown/staging adjacent to the building should not be a problem. Final areas to be coordinated post-award with the COR.
Specifica tions
The FINISHES Section of the specifications des not including anything for painting. Please advise what should be done in regard to general painting.
See attached: SECTION 09 90 00
Spec 096723 & Dwg A-602
The specification section 096723 describes a Metallic Type Conductive/Spark Resistant concrete floor finish. The Finish Schedule on dwg A-602 lists Resinous Flooring finish and Sealed Concrete finish.
Please clarify where the metallic type floor finish is to be installed.
These types of floors require wiring in the slab itself connected to grounding systems. The metallic flooring application is only listed as an exclusion to the warranty for the flooring.
The flooring is not being applied to a metallic floor;
therefore does not apply to this project
Pg 5of69 Item 1.3.4
Solicitati on
Please clarify the award process in regard to the seed project award. Will NAVFAC select the 5 IDIQ firms AND award the seed project or will NAVFAC rebid (or BAFO) the seed project with the 5 firms selected.
NAVFAC will select the 5 MACC Contractors and award the seed project to 1 of the five firms simultaneously.
Pg 14 of 69, Item (i)
Solicitati on
Please confirm under (4) Factor, Past Performance, line 5 that the Past Performance Questionnaires" should be Attachment D instead of B.
PPQ is labeled Attachment B on beta.SAM but inadvertently titled "D" when the document is opened.
01 45 35 1.2
Paragraph 1.2 of section 01 45 35 states that the Statement of Special Inspections and the Schedule of Special Inspections are an attachment to this section, but there is no attachment. What is the Statement of Special Inspections and Schedule of Special Inspections?
Special Inspections will be limited to a schedule of structural special inspections on sheet S-003.
02 82 13.00 10 1.4
Paragraph 1.4 states that the owner is to provide the 'Asbestos licensed by the City of Philadelphia' while later in the specification the Contractor is stated to hire an
The Contractor is responsible for providing an independent Industrial Hygienist.
independent Industrial Hygenist and to conduct onsite testing. Is the owner or the contractor responsible for providing the abatement monitor?
05 12 00 1.3
AISC certified fabricators and erectors are required per section 05 12 00.
The list of AISC approved fabricators and erectors is very limited and will result in less competition. Can the requirements for AISC certified fabricators and erectors be removed?
AISC certification is required.
09 29 00 3.4
Level 5 finish for GWB is specified in paragraph 3.4.
Given that this is an industrial use space, can GWB finish be changed to Level 3 or 4?
Level 4 0002
21 13 13.00 20 2.1.1
Paragraph 2.1.1 states both that piping less than 8 inches in diameter shall be schedule 40 and schedule 10 for piping 3 inches in diameter and larger. What is the pipe to be used between 3 inches and 8 inches diameter?
Steel pipe shall be Schedule 40 for all sizes. General note 16 on FX001 states “ALL
PIPING TO BE SCHEDULE
40 BLACK STEEL WITH
CUT GROOVE OR
THREADED PIPE.”
08 81 00 2.3.2
Section 08 81 00 paragraph 2.3.2 calls for insulated glazing units to be a maximum U value of 0.27 while section 08.51.13 paragraph 1.11.4 calls for a maximum U value of 0.38. What is the maximum U value for glazing?
Set the u value of the glass to match the windows 0.27
08 81 00 2.3.2
Section 08 81 00 paragraph 2.3.2 calls for insulated glazing units to be a maximum SHGC value of 0.54 while section 08 51 13 paragraph 1.11.4 calls for a maximum SHGC value of 0.40.
What is the maximum U value for the glazing?
Set the SHGC value of the glass to match the windows 0.27
09 90 00
There are references in several specification sections to a section 09 90 00, but no 09 90 00 painting specification is provided. Will section 09 90 00 be provided?
See attached: SECTION 09 90 00
Section 2
General Overview of the Seed Project
The initial project (seed project) to be awarded as the first task order along with the basic contract will be Design-Bid-Build (DBB), Renovate and Expand
B608B, NSA
Mechanicsburg, Pennsylvania. The anticipated scope of work is to provide all engineering, design,..." Please clarify if this is a Design-Bid-Build project where the design fully complete or a Design-Build project. If this is a Design-Bid-Build project, what "engineering & design" work will be required for this project?
This is a Design-Bid-Build project.
Pg 14 of 69 Solicitati on
Our proposal will include a Design- Build project under the Contractor experience section.
Our A/E would like to include the same project under the Design experience section. Since the A/E was a subcontractor to us, (the Prime Contractor), who should complete the PPQ for the A/E, the Owner/Agency or us...the Prime?
Owner/Agency would complete the PPQ.
There is no partition schedule shown. Can you clarify how far the interior gypsum goes up, specifically above the gyp ceiling in the arched area?
Does the gyp go from the ceiling to the deck, or does it stop at the ceiling?
Rated partition and perimeter wall extend to underside of deck. Only furring partition extend 6" about the dropped ceiling, if there is no ceiling then the furring must extend to underside of deck.
DWG A-
101 Note
Note 17 on DWG A-101 states to Patch and Repair the floor for a smooth surface?
For bidding purposes, can you quantify this? Does this require a basic skim coat over the entire floor, a skim coat over part of the floor, does it require a 1/4" of Ardex or something else?
This covers the entire existing concrete slab (per note 17 on A-101) this will be approximately +/- 8200sf.
DWG
ED-601
A note on DWG ED-601 states:
"Equipment to be removed and retain by the client". Does this mean the client will remove and the client will retain? Or does this mean the GC is to remove and the client is to retail? If this is client removed, can you note when the equipment will be removed?
Contractor to remove. 0002
RFP page 6 (2.
GENERAL
OVERVIEW
OF THE
SEED
PROJECT)
2.1 N/A
The RFP states on page 6 that the seed project "anticipated scope of work is to provide all engineering, design…" but the RFP on page 6 in the same paragraph also stated "The initial project (seed project) to be award as the first task order along with the basic contract will be "Design-Bid-Build (DBB)". Is the intention for the seed project to be a design-build or a design-bid-build?
Design-Bid-Build 0002
RFP page 14
(4) Factor, Past Performanc e (i) Solicitation Submittal Requireme nts
N/A
RFP, page 14 states: “The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.”
May we use completed PPQs from previous proposals as some of our clients who managed the projects are no longer with the Government.
Previously filled out PPQ’s by the Owner/Agency are acceptable.
RFP page 14
(4) Factor, Past Performanc e (i) Solicitation Submittal Requireme nts
N/A
RFP page 14 states "if a completed AE Contractor Performance Assessment Reporting System
(CPARS)
evaluation is
Yes 0002 available, it shall be submitted with the proposal for each project included in Factor 2 for Design Experience." For design-build projects the PPQs and CPARS reflect the design and construction of the entire project. As such, for the AE CPAR or PPQ may we use the CPAR or PPQ for the entire project?
RFP page 14
(4) Factor, Past Performanc e (i) Solicitation Submittal Requireme nts
N/A
RFP page 14 states "if a completed AE Contractor Performance Assessment Reporting System
(CPARS)
evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for Design Experience."
Currently, Factor 2 is Safety. Should design experience be included as Factor 2? If so, should we name Safety as Factor 3, Management Approach as Factor 4, and Past Performance as Factor 5?
Should read "Factor 2 for Design Experience". Same for Construction experience.
Factor 2 is Safety.
RFP page 9 Non-Price Binder
N/A
May text in tables be 10-point font Times New Roman?
Propose per the RFP. 0002
12773594 2 G-
BUILDIN
G CODE
ANALYSI
S, SYMBOLS
AND
LEGENDS
1277359 4 2 G-
Please confirm note 5 on G-002 is accurate (minimal ABA for door hardware).
General Note #5 is correct:
the entire building 608 does not meet the ABA requirements, but new work specially the new door hardware must meet ABA requirements.
37 RFP page 6 (2.
GENERAL
OVERVIEW
OF THE
SEED
PROJECT)
2.1 N/A
Please clarify the duration of the SEED project.
455 calendar days 0002
Attachment E Spec (page 46 of 1198)
01 33 00 Submittal Procedures
N/A
01 33 00 allows government 30 working days/6 weeks for submittal review. Is this accurate?
15 working days for Government review
Attachment E Spec (page 120 of 1198)
01 33 29 N/A
Are we to comply with all requirements for 01 33 29 Sustainability Notebook and other Measurement and verification requirements?
Yes 0002
Attachment E Spec (page 140 of 1198)
1.7.1.1 Site
Safety and Health Officer
(SSHO)
Please confirm the SSHO can be “dual-hatted” to take responsibility for the QC Manager responsibilities. It is understood that the SSHO cannot be the Superintendent.
Confirmed 0002
Attachment E Spec 1.5 QC Organization (page 186 of 1198)
1.5.5 Special Inspector
Please clarify the requirements for the Special Inspector? What will they be responsible for that the QCM and CxA wouldn’t oversee?
Assumption is steel and concrete inspections.
Structural provides schedule of structural special inspections on sheet S-003.
Page 8 of Attachment D
N/A C-002
Please clarify any permitting/entitlem ents responsibilities associated with site work. It is inferred that an approved E&S plan exists (Note 1/C-002)
Erosion and sediment control plan shown here in this approved set is the plan to follow. Please follow local jurisdiction guidelines for any permitting/entitlements responsibilities associated with site work.
Attachment E Spec
N/A N/A
Are there any landscaping responsibilities, beyond stabilization after site work is complete?
There are no landscaping proposed beyond stabilization after site work is completed.
Page 15 of Attachment D
AD-211
ELEVATI
ON
DEMOLIT
ION
PICTURES
AD-211
ELEVA
TION
DEMOL
ITION
PICTUR
ES
4/AD-211 Building to remain occupied during construction. Is this accurate? Due to the extent of the renovation, it will be difficult to keep services intact while also maintaining occupant and worker safety.
See PPI #12 0002
Page 45 of Attachment D
S-101
SLAB
AND
FOUNDA
TION
PLAN
S-101
SLAB
AND
FOUND
ATION
PLAN
1/S101 allows for the re-installation of the existing track if approved by the COR. When will this approval take place (before or after removal)?
Provide new 131# rail. Do not reuse old rail.
Attachment E Spec (page
3.3
ELECTRI
CAL
WORK
Is it the intent of the project to re-connect all existing fire alarm devices or is the intent to bring the building into code compliance?
The intent was NOT to bring the project up to current code compliance. Existing reporting/communication with the base system to remain as it currently operates. Existing notification will be maintained throughout the existing facility, except where new notification was indicated on plans. New notification is provided within the expanded area by clear strobes and horns for fire alarm signals. New monitoring/controls to be provided as indicated on plans.
Attachment E Spec (page 1190 of 1198)
3.2
TRACK
CONSTRU
CTION
AND
OUT-OF-
FACE
RELAY3.2
.1 Unloading the Materials
Please confirm there is no requirement for modifications or installation of any conveying/crane equipment.
There is no requirement for modifications or installation of any conveying/crane equipment.
Attachment E Spec
N/A N/A
It doesn’t appear that there are any blast impact requirements for the windows, please confirm.
608-B is Low occupancy, and is exempt from blast requirements for windows.
Attachment D
DWG
N/A S-203
S-203 indicates HSS tubing at the windows. This detail infers blast impact requirements for the windows, however, the glazing specification does not discuss blast impact requirements.
Please clarify if the new windows need to meet blast impact parameters.
Windows do not need to meet blast impact parameters.
5.2
5.2.1 & 5.2.3
N/A
Reference section
5.2. Section 5.2.1
provides requirements for 3-ring binders for both volumes, but section 5.2.3 requests all proposals to be
Both are required. See
PPI#2.
provided electronically.
Please clarify if hard copies or electronic copies are required (or both).
5.2 5.2.1 N/A
If hard copies are required, is hand delivery acceptable or is it required the hard copy needs to be mailed?
Hand delivery is currently not acceptable due to additional restrictions in place for COVID-19.
Pg. 14 4(i) N/A
The titles of the Attachment files do not correlate with the titles written on the documents.
Example: After opening Attachment B Past Performance Questionnaire, it says “Attachment D” at the top. Can you please confirm if we should go off of the file title or document title?
See PPI#17 0002
5.2 5.2.1 N/A
If physically dropping off the hard copies of the proposal, would we need a base pass?
See PPI#51 0002
Pg. 57 01 00 00 N/A
Will there be a DOD code provided for the
DOD SAFE
website proposal drop-off?
Your firm will need to request a code be sent prior to the deadline.
Spec-34-11-00 page-1
Please verify the existing rail on site is adequate for the new rail work as shown. Inspection required on site!
See PPI#45 0002
DWG E-
Drawing E-601 “Electrical – Mechanical Connection Schedule” No. 23 DS-Air Compressor shows multiple remarks/schedule notes for this equipment connection. Notes 1 & 5 state to provide a local disconnect/combo starter for this equipment. Note 4 states that the combination motor starter disconnect safety switch is provided by the manufacturer.
Electrical contractor to install. These notes are shown under the same equipment and are also combined on other equipment connections per the schedule. The above is just an example. Please clarify who is furnishing and installing the disconnects/motors starters etc as different information is given.
Clarification of Mechanical Connection schedule is provided below: CU-1 W/P fused disc switch(208V- 2P) by E/C. Control panel and starter furnished with the Unit by M/C.
ACU-1 Connection from CU-1 via a NF disc switch (208V-2P) by E/C.
ERV-1 NF disc switch (208V-2P) by E/C. Control panel and VFD's by M/C.
IAC-1-6 NF disc switch (480V-3P) by E/C. Control panel and starter furnished with the Unit by M/C.
DF-1,2 NF disc switch (208V-2P) by E/C. Starter furnished with fan by M/C.
F-1,2 Manual motor starter switch (120V) by E/C.
P-1,2 Manual motor starter switch (120V) by E/C.
IRH-1-10 Manual motor starter switch (120V) by E/C.
UH-1,2,3 Manual motor starter switch (208V-2P) by E/C.
Air Cmpr Combination starter Switch (208V-2P) by E/C.
SING-1 W/P NF disc switch (480V-3P) by E/C.
Control panel furnished with Unit by Plmb/C.
PP-1 W/P combination starter switch (480V-3P) by E/C. Note:
E/C shall confirm with M/C each Unit-furnished control panels, starters and VFD's above, prior to purchasing switches and starters.
11100 1.2.1
This paragraph states that there are three sets of railroad tracks to the addition. The plans only show two sets of tracks to the addition.
Which of these is to be followed for preparing our proposal?
Two sets of tracks to the addition is correct
11100 1.7
Can we be provided with a list of what is to be salvaged on this project?
Unless qualified or called out in the body of these construction document's drawings and specifications, there are no additional Items in this project to be segregated, itemized and delivered.
Do the Superintendent and QCM/SSHO have to be direct employees of the General Contractor awarded this project?
Yes 0002
15000 3.3.2
Paragraph 3.3.2.a states that the Contractor will be charged for utilities at the prevailing rate. Paragraph 3.3.2.b states “Reasonable amounts of the following utilities will be available to the Contractor without charge.”
Electric Potable Water
Which of these paragraphs is to be
Electric and Portable water will be provided at reasonable amounts without charge.
followed while preparing our proposal?
150003.6
Are we to provide a Temporary Government Field Office on this project?
No 0002
99723
Where is this system to be installed? Finish schedule only indicates Sealed Concrete and Chemical Resistant Resinous Flooring.
Please clarify what system?
If the question is about sealed concrete and Chemical Resistant Resinous flooring, then both has been keyed in the Room Finish Schedule on Drawing A-602.
“Construction Experience:
Offerors shall submit a minimum of three (3) up to a maximum of five
(5) relevant construction projects as the prime contractor that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the projects proposed for this MACC.
Design Experience:
Offerors shall submit a minimum of three (3) up to a maximum of five
(5) relevant projects as the designer of record that best demonstrate your experience in a diverse range of design tasks similar in size, scope and complexity to the projects proposed for this MACC.”
Please clarify if we are to submit a total of 10 relevant projects or 5 for Factor One
Construction Experience and Design Experience are separate. So a minimum of 3 up to maximum of 5 relevant construction projects and a minimum of 3 up to a maximum of 5 relevant design projects.
Solicitation, Page 8, Non-price Factors;
Page 15, Section 5.2.3
“Non-price Factors: Non-price binder: The offeror shall submit one (1) original electronically, marked “Original” in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments.
Additionally, the offeror shall submit one (1) hard copy Original, marked “Original”;
one (1) CD-ROM; and two (2) copies, marked “Copy”, in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments. All hard copies shall be in separate 3-ring binders. All submissions shall including the following:”
“ 5.2.3 All proposals shall be provided via electronic submission to: Brittany Cristelli, Contract Specialist, at brittany.cristelli@navy.mil via
DOD SAFE
https://safe.apps.mil/” Please confirm that this is an electronic submission only.
See PPI#2 Reponses. Both are required.
Solicitation, Page 10;
Factor 1:
Design Experience
“Offerors shall clearly set out the Architect-Engineer firm that is proposed to be utilized as the Designer of Record (DOR) for future task orders under this MACC.
Provide the full name of the firm, address, DUNS number, and CAGE code. The designated firm will be required to be utilized as the DOR on future design-build task orders under the resulting MACC, unless a substitution is approved by the Contracting Officer for the proposed task order. To evidence this, offerors must submit a letter of commitment from the design firm proposed.” May we submit more than one letter of commitment with multiple design firms?
Yes 0002
Solicitation, Page 9; Factor
Experience:
Projects submitted for the Offeror shall be completed within the past five
(5) years of the date of issuance of this RFP. Please clarify if projects that are in progress, but substantially
Projects must be complete within the past five (5) years of the date of the issuance of the RFP.
complete may be utilized.
Spec section 23 05 93 1.5.9.3
Spec section 23 05 93 1.5.9.3 references participation in the commissioning process as specified in spec section (01 91
00.15 TOTAL
BUILDING
COMMISSIONIN
G), however the commissioning spec section is not included within the provided spec package.
The reference to the TAB involvement is to be deleted from the Div 23 section.
Spec section 01 45 00.00 20 1.5.2.1
Spec section 01 45
00.00 20 1.5.2.1 references the duties of the Commissioning Authority (CA).
What systems are intended to be commissioned?
Systems to be Commissioned and the assigned Duties are prescibed in 1.5.9.3 TAB Specialist Responsibilities of Section:SECTION 23 05 93 and 3.7 PERFORMANCE
VERIFICATION TESTING
of SECTION 23 09 00
INSTRUMENTATION
AND CONTROL FOR
HVAC
Spec section 01 45 00.00 20 1.5.2.1
Spec section 01 45
00.00 20 1.5.2.1 references the duties of the Commissioning Authority (CA).
What personnel and/or contractors are required to participate in the commissioning process?
Systems to be Commissioned and the assigned Duties are prescibed in 1.5.9.3 TAB Specialist Responsibilities of Section:SECTION 23 05 93 and 3.7 PERFORMANCE
VERIFICATION TESTING
of SECTION 23 09 00
INSTRUMENTATION
AND CONTROL FOR
HVAC
RFP – Pg. 11 of 69
Design Experience
Please clarify that the projects submitted for Design Experience must be 100% design complete and not necessarily 100% construction or entire project complete.
Yes, Design must be 100% complete.
RFP – Pg. 14 of 69
Past Performanc e
Will the contracting office fill out Past Performance Questionnaires and CPARS for delivery orders performed on the previous contract for Mechanicsburg, PA.
You are responsible for getting the Agency POC to fill out PPQ’s for previous work.
RFP – Pg. 7 and 8 of 69
Evaluation Factors for Award
Please advise if hard copies of price proposal including the bid bond, and technical proposal are to be submitted on page 7 and 8.
Electronic price proposal and bid bonds are acceptable.
M101
On drawing M101, two motorized dampers are indicated and also louvers are mentioned in the keynotes. These are not mentioned on the schedule.
Please provide a schedule for them or make and model/size.
Attached Sheet M-602 updated with added louver schedule.
Who is responsible for supplying, installing the propane tanks? Where are the propane tanks going to be installed? Who is responsible for the piping from the tanks to the building?
New propane tanks to be leased from propane supplier.
Propane supplier to provide/install tanks on pad provided under contractor scope (indicated on civil plans). General contractor to provide guidance for trades on scope delineation.
S-101
Clarify the limits of the RR track and ties removal. Drawing S-101, Note 16 shows the existing
The track between grids 5 and 6 (Track 5) is to be demolished from the existing edge of slab along grid C to the splice 6'-3"(VIF) south of the building addition, tracks getting removed. On Drawing AD-101, Note 15 does not show these existing tracks getting removed. Please clarify.
indicated by note 5B on the track between grid 4 and 5 (Track 4). Track 5 is concealed by gravel, and it is unknown if a similar splice is on this track. See RFI 76, 104, 105, and 106.
S-001
Drawing S-001, Demolition & Salvage Notes, 2.- Current bid form does not provide an add price for installing new railing if the existing rails cannot be reused.
The base bid shall assume removal, salvage, and installation of new 131# rail.
S-102
Drawing S-102, Note 3- Please clarify the size of the void space beneath the existing floor (depth, width, etc.)?
Void space is 4'-6" deep, to be verified in field. Extent of void space is indicated by hatched area in attached sketch. Cementitious fill of the pit is included in Note 3 and Note 7 on S-102.
S-301
Drawing S-301, Detail C4- Please provide additional information for the proposed CIP metal nosings. What is the width, and do they need anodized?
Provide Cast Iron nosing, 3" width, with concealed cast anchor or wing anchor, nuts, and bolts.
S-501
Please clarify the design of the proposed 12’ x 20’ propane tank conc.
pad and 5’ x 5’ concrete pad at the south east end of the building. Are we to use the Exterior Equipment Pad Detail (C1) on drawing S-501 or another detail?
Detail C1/S-501 to be used with both exterior concrete pads. Both pads to be 1'-0" thick. 5x5 concrete pad to be located so that slab turn-down does not conflict with building wall footing.
C-001
Drawing C-001 calls for the Ex.
CO at the north end of the building to be relocated. Please provide the location of where the cleanout needs to be relocated.
The C.O. should be relocated if it is in conflict with the proposed Fence, Install C.O.
at a location nearest to existing location, provide one foot clearance from propsed fense.
C-001
Drawing C-001, do we need to install two (2) new bollards at the new power waystation on the south end of the building between the RR Tracks?
Install Two New Bollards at the location as shown on the plan to protect new power waysation.
S-501
Drawing S-501, Detail D4- Interior Equipment Detail: Are there any interior concrete equipment pads on this project? We do not see any proposed pads on either the electrical or mechanical drawings.
Interior pad is required for Transformer, located in electrical room, shown on E- 110 and E-501.
A-101
Drawing A-101, Note 17- Patch/repair floor: Please provide repair dimension or an estimated quantity to include in the bid.
This covers the entire existing concrete slab (per note 17 on A-101) this will be approximetly +/- 8200sf.
Window manufacturer’s information is not indicated in the specifications.
Please provide this information.
Specification does not specify any manufacture.
Only covers design criteria that minimum 3 manufacture can provide.
Is all excavation classified or unclassified?
All excavation is unclassified 0002
No door hardware detail is provided on drawings.
Please provide.
Door schedule A-603 noted Hardware (HDWR) for each door. Refer to specification section 08 71 00 for hardware set.
AD-101
General Demo Notes, Line 5 References a Hazmat Report but did not see the report attached.
Will the hazmat report be provided?
See attached: BUILDING
608B HAZARDOUS
MATERIAL SURVEY
PREFINAL 20180514
Verify phasing for UH 1-3, says 2 but only available in 1 and 3
The phase 2 on drawing M- 602 means, one phase or single phase-208V. not three phase. Please connect to 2 pole 20A breakers in panels as shown.
Can you provide Air Curtain support/mounting detail
Air curtain to be hung with threaded rod per manufacturer's requirements.
Hang air curtain from air curtain support framing shown on S-303. If additional intermediate attachment points are required, provide C8x11.5. See attached sketch.
Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate?
Please be advised the Department of the Navy does not fill out proffered tax exempt forms nor does it provide a tax exempt number for your use in securing the necessary tax exemptions from your state because only the state revenue office has the legal cognizance and the authority to render an opinion regarding the propriety of such a tax exemption.
Where will the designated parking area be for workers accessing the construction site?
See PPI#13 0002
Does the Government have a fire alarm servicer that they currently work with? What is the name and contact information of the person or persons that will need to be coordinated with for security and fire alarm and suppression systems work and/or disruptions?
No service contract. All panels are Simplex.
Coordination for security, fire alarm, or any suppression systems work and/or disruptions will need to be worked through the PWD, NAVY Fide Department and the client.
Who is responsible for the utlity locations?
The Contractor 0002
Due to current potentially significant tariffs being placed on the importation of building materials such as wood or steel by the current Presidential Executive Branch, if a tariff is placed after bid time and before award will the government consider a price escalation on a contract value for products such as steel or wood should the executive branch levee tariffs effecting such materials? Most of these materials would still have been Buy American compliant as the tariffs would
No 0002 increase pricing on all steel or wood materials, regardless of origin.
As a result of the effect of COVID- 19 throughout the U.S., and the resulting Federal, State and local governments’ responses / requirements of safe distancing and potential advocations of working remotely and/or complete organization closures, please advise how the Government intends to address delays resulting there as it pertains to the current solicitation schedule for this and all future projects.
Propose in accordance with the RFP.
Is AISC (American Iron and Steel Certification ) required for the structural steel fabrication and/or erection for this project?
AISC certification is required.
S-101
The plans refer to replacing existing railroad tracks if they’re not salvageable. If that is required, what is the type of rail that is currently being used and would the replacement be “in kind”?
Provide new 131# rail. Do not reuse old rail.
Drawing C-
Cleanout to Grade Detail- Can 6” PVC SDR 35 Pipe be used in lieu of 6” Cast Iron pipe? The new 6” lateral piping is
PVC SDR 35.
6" PVC SDR 35 pipe can be used.
Civil C-001
Indicates 2-1000 gal propane tanks.
Yet HVAC controls indicates natural gas. Please verify what is required for the building HVAC system. And where is the gas lines to the building?
The label “ Proposed 12’x20’ propane Tank” on civil plan C-001 refers to concrete pad only, not the type of gas to be used for HVAC system, the label “PROPANE TANK” refers only to the type of tank not the type of gas to be used for the HVAC system.
Plumbing plans govern here for the type of gas to be used for the HVAC system.
The connection from the tanks is shown on the civil plan C-001 from the back of the 2-1000 gal proposed propane tanks to the building with a dash line and is label as “ SYNTHETIC NATURAL GAS”. Note 6 on sheet P-101 covers more detailed information on this new piping.
Drawing S-101- Note 5a
Shows Six New Rail Joint locations which are to be cut and drilled for the installation of Contractor Furnished Joint Bars and Note 5b shows Two Existing Joints that are to be reused. We have the following Questions - A.) Since we would have to furnish Six Pair of New Joint Bars, Track Bolts, Nuts and Washers at these locations, can you advise what the existing Rail Section is? B.) On the other end of the track
A) Provide new 131# rail.
B) Remove additional rail to existing splice location.
Splices shall be staggered.
Salvage and reuse existing splice components to extent practical.
C) Thermite field weld all joints at embedded track in accordance with specification 34 11 00.
replacement, Note 5b shows an two existing joints to be removed and replaced. It is directly opposite one of the New Joints referenced in Note 5a. General Railroad Practice does not allow bolted joints directly across from each other. They usually must be staggered at least 13’ apart. We would advise to go back along the existing rail to the existing joint and make this a 5b joint also. This should involve only removing an additional 16 to 19’ of rail at the most on one side. Please advise. C.) Four out of the Six locations listed in Note 5a will be within the new concrete slab.
General Railroad Practice does not permit bolted joints within the limits of any embedded track as this will become an impact point and the bolts cannot be retightened. The Mainline Railroads do not permit bolted joints within the limits or any closer than 15’ of embedded track or highway road crossings. We feel all eight joints should be Thermite Field Welded in accordance with standard Railroad Specifications.
Please advise.
Drawing S-301 Detail A1
Rail Foundation Section shows a fabricated rail support system for Embedded Track.
The Railroad Industry has a
The proposed method and detail is acceptable. Bid shall include all required components and accessories for installation of leveling beam. Leveling beam and
Standard for this application called Steel Leveling Beams that can be purchased from several different Suppliers. This detail shows the Jack Screws drilled and grouted in the first pour concrete. We have never seen this on this type of installation. Usually after the first pour is complete, the General Contractor installs and ties the bottom matt of Rebar. The Railroad Contractor then installs the Steel Leveling Beams and Rail to preliminary line and grade. The General Contractor then completes all rebar and form work.
A pre-pour check list is completed ant the Railroad Contractor makes any final adjustment to the line and grade. The General then makes the final pour. With the jack screws embedded in the bottom pour, any final adjustments would be difficult.
We have attached a Standard Steel Beam Support Drawing from one of the suppliers as well as a Jobsite Photo of a project we completed for the new Trolly Line in Washington, DC for your reference. A.) Can we eliminate embedding the Jack Screws into the bottom pour and use the standard Pointed Jack Screws shown on the attached Iron Horse Drawing.
components to be designed to project specific requirements.
SECTION 34
11 00 Page 1
1.1.8 Rail
Grounds
“1.1.8 Rail Grounds - Rail grounds, including grounding rods, connecting cables, and hardware shall be included in the lump sum price.”
A.) Please advise if any grounding is required.
B.) If grounding is required, please provide quantities and details.
Railroad track grounding and bonding is required. Railroad track grounding and bonding is to be provided as required by the railroad track Supplier/Installer.
SECTION 34
11 00 PAGE
1.4.2 Welding
"1.4.2 Welding Perform welding udner the direct supervision of an experienced welding suprvisor or foreman." A) While we recommend field welding all joints, you currently do not show any welding required on the contract drawing. Please advise if field welding will be required.
Field weld all joints at embedded track in accordance with Spec 34 11
00. See RFI 100.
SECTION 34
11 00 Page 1 and SECTION 34 11 00 Page
1.1.1 Rail
and PART
EXECUTI
ON 3.1
REMOVA
L, SALVAGE
, AND
DISPOSITI
ON OF
MATERIA
LS
"1.1.1 Rail Rail will be paid on a lump sum price based on quantity indicated on the drawings, cutting and drilling the rail, installing the rail, and removing excess or scrap rail from government property, and providing new rail if deemed necessary.
Re-use existing rail if deemed to be in adequate condition after removal. The base bid shall be based on re-using existing rail.
Ref PPI#76 0002
Include an add price for new rail.”
AND "PART 3
EXEUCTION 3.1
REMOVAL,
SALVAGE AND
DISPOSITION OF
MATERIALS"
After removal of existing tracks, it is permissible to salvage and re-use rail materials deemed acceptable by the Contracting Officer for the new Work. The base bid shall be based on providing all new materials and a credit price included for re-use of salvaged materials." AS
THESE
SPECIFICATIO
NS ARE IN
CONFLICT
WITH EACH
OTHER,
PLEASE
CLARIFY
Summary - Recommended tracking methods based on project requirements - The drawings and scope show two 42.38’ sections of track to remove and rebuild.
We do not feel this will give adequate clearance for the equipment needed to construct the new footers and building extension without running over and damaging the existing track. We feel that at least 78’ of existing track needs to be removed.
All the old rail and OTM should be scrapped. Sort
Rail removal and replacement shown on drawings is the minimum required. Any additonal protection, removal, and replacement required to complete construction and accomodate equipment shall be included in the bid. Base bid shall include removal, salvage, and installation of new 131# rail.
through and keep the best 20 crossties to rebuild the 36’ area of Ballasted Track..
Furnish 4 each New 115RE 80’ long rails with blank ends for welding. Furnish New 115RE tie Plates with Spikes for the Ballasted Portion.
Install the Steel Support Beams, Wood Ties, Plates, Spikes, Rail and Thermite Weld all 8 Connections. Once the Embedded track is complete, add sufficient stone ballast to surface, tamp, line, and dress the ballasted track to make a smooth transition to the existing track. Please confirm if recommended Method (including removing track 78’ out to prevent damage during construction) for rail placement can be accepted as basis of work and pricing.
The drawings and scope show two 42.38’ sections of track to remove and rebuild. WE
WILL BID
ACCORDINGLY.
HOWEVER - We do not feel this will give adequate clearance for the equipment need to construct the new footers and building extension without running over and damaging the existing track.
We feel that at least 60’ of existing track needs to be removed.
Rail removal and replacement shown on drawings is the minimum required. Any additional protection, removal, and replacement required to complete construction and accommodate equipment shall be included in the bid.
Base bid shall include removal, salvage, and install new 131# rail.
Does the Navy maintain a list of preferred vendors & subcontractors that ca be shared with all qualified bidders for this project?
Government does have a list of preferred vendors or subcontractors.
(End of Summary of Changes)