Att_1_BidForm_InstlHVACWaterTreat.pdf

PDF 32 KB Posted

Attached to
Bid Results 1419 Install HVAC Water Treatment Equipment
Solicitation number
N4008520B2506
Issued by

About this file

This document contains a bid form and related federal contract opportunity notice. The bid form solicits bids from contractors to install HVAC water treatment equipment at various buildings at the Portsmouth Naval Shipyard in Kittery, Maine. It includes line items for materials, labor, equipment, and total costs. The federal contract opportunity notice indicates this is a total small business set-aside with an anticipated award amount between $250,000 and $500,000. Interested parties should monitor FBO.gov in November 2019 for release of the request for proposal, which will include a proposed due date of December 6, 2019. The project scope involves providing all labor, equipment, materials, transportation, and supervision to install HVAC water treatment equipment at buildings inside and outside the controlled industrial area at the shipyard.

Bid Form

View the file

Other files

File Type Posted
1419 HVAC Equipment.pdf PDF
Att 5_DWG_InsHVACWaterTreat.pdf PDF
HVAC RFI 01 responses.docx DOCX document
SOW_InstallHVACWaterTreatmentEquipment rev.pdf PDF
N4008520B2506 Amd 1.pdf PDF
Att 3_TechSpecs_InstallHVACWaterTreat rev.pdf PDF
Att_7_ISRL_InstallHVACWaterTreat.XLSX XLSX spreadsheet
Att_5_Drawing.pdf PDF
Att_4_SubReg_HVACWaterTreat.xls XLS spreadsheet
N4008520B2506.pdf PDF
Att_2_PNSYDIV1_Specs_32019.pdf PDF
SOW_InstallHVACWaterTreatmentEquipment.pdf PDF
Att_3_TechSpecs_InstallHVACWaterTreat.pdf PDF
Att_6_eOMSI_sample.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Install HVAC Water Treatment Equipment

BID FORM

Install HVAC Water Treatment Equipment

PROJECT LOCATION

Portsmouth Naval Shipyard Kittery, Maine

CONTRACTOR:

DATE:

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0001AA A.Welded Hot Taps 1 LS 0001AB B. Bypass Assemblies 1 LS 0001AC C. Installation on site 1 LS

0001AD D. ACM 1 LS

0001AE E Title## 1 LS Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0001 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

NOTE:

Refer to Scope of Work.

CLIN 0001 - BASE BID QUANTITY

Install HVAC Water Treatment Equipment

PROJECT LOCATION

Portsmouth Naval Shipyard Kittery, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0002AA A.Welded Hot Taps 1 LS 0002AB B. Bypass Assemblies 1 LS 0002AC C. Installation on site 1 LS

0002AD D. ACM 1 LS

Sub-KTR Performance Value (1) $ -

Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ -

General Home Office Overhead (G&A) (%) $ -

Profit (%) $ -

Bond (%) $ -

CLIN 0002 FIRM FIXED PRICE PROPOSAL AMOUNT (4) $ -

CLIN 0002 - OPTION 01 QUANTITY

Install HVAC Water Treatment Equipment

PROJECT LOCATION

Portsmouth Naval Shipyard Kittery, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0 A.Welded Hot Taps 1 LS 0 B. Bypass Assemblies 1 LS 0 C. Installation on site 1 LS

0 D. ACM 1 LS

0 0 0 0 0 0 0 0

Sub-KTR Performance Value (1) $ - Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ - General Home Office Overhead (G&A) (%) $ -

Profit (%) $ - Bond (%) $ -

CLIN 0003 - OPTION 02 QUANTITY

Install HVAC Water Treatment Equipment

PROJECT LOCATION

Portsmouth Naval Shipyard Kittery, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0 A.Welded Hot Taps 1 LS 0 B. Bypass Assemblies 1 LS 0 C. Installation on site 1 LS

0 D. ACM 1 LS

0 0 0 0 0 0 0 0

Sub-KTR Performance Value (1) $ - Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ - General Home Office Overhead (G&A) (%) $ -

Profit (%) $ - Bond (%) $ -

CLIN 0004 - OPTION 03 QUANTITY

Install HVAC Water Treatment Equipment

PROJECT LOCATION

Portsmouth Naval Shipyard Kittery, Maine

CONTRACTOR:

DATE:

NOTE:

Refer to Scope of Work.

MATERIAL LABOR EQUIPMENT LINE ITEM

ITEM DESCRIPTION NUMBER UNIT COST COST COST TOTAL

0 A.Welded Hot Taps 1 LS 0 B. Bypass Assemblies 1 LS 0 C. Installation on site 1 LS

0 D. ACM 1 LS

0 0 0 0 0 0 0 0

Sub-KTR Performance Value (1) $ - Prime KTR Div 01 & Project Management Costs (2) $ -

Subtotal (3) $ - General Home Office Overhead (G&A) (%) $ -

Profit (%) $ - Bond (%) $ -

CLIN 0005 - OPTION 04 QUANTITY

(4) BID FORM

File details come from the government source that posted it. Updated .