This document contains a schedule for an indefinite delivery, indefinite quantity contract for paving services at Marine Corps Logistics Base Albany, Georgia. The schedule lists 60 line items for various paving, demolition, drainage, and marking tasks, with quantities and reference specifications but no pricing. The line items cover concrete and asphalt installation and removal, base preparation, drainage, striping, and associated work. The schedule is for a base year and four option years and will be used to issue individual task orders under the IDIQ contract solicited by Naval Facilities Engineering Command as solicitation number N4008520B0101. Award is expected to a single contractor to provide all listed paving and pavement marking services over the five-year period at the Marine Corps base in Albany, Georgia.

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
Attachment - PPI Log.xlsx XLSX spreadsheet
IDIQ Specs MCLB Albany.pdf PDF
IDIQ ELIN Schedule Base FY20 4 Option Years.xlsx XLSX spreadsheet
IFB PAVING.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year FY20

IDIQ PAVING - BASE YEAR
MCLB ALBANY, GA

WORK ORDER #

PROJECT TITLE:

DATE:

UNIT
ITEM NO.DESCRIPTIONQUANTITYUNITPRICEAMOUNT
1CONCRETE BUMPER STRIP45EA$0.00$0.00
(SEE SECTION 32 16 19)
2CURBS & GUTTERS200LF$0.00$0.00
(SEE SECTION 32 16 19)
34" CONCRETE SLABS1,000SY$0.00$0.00
(SEE SECTION 32 16 19)
46" CONCRETE SLABS2,500SY$0.00$0.00
(SEE SECTION 32 13 13.06)
5HAND TROWEL FOR 6" CONCRETE SLABS700SY$0.00$0.00
(SEE SECTION 32 13 13.06)
68" CONCRETE SLABS600SY$0.00$0.00
(SEE SECTION 32 13 13.06)
712" CONCRETE SLABS - 650 psi FLEX < 500 SY400SY$0.00$0.00
(SEE SECTION 32 13 13.06)
812" CONCRETE SLABS - 650 psi FLEX >499 SY1200SY$0.00$0.00
(SEE SECTION 32 13 13.06)
9REINFORCEMENT WIRE3,000SY$0.00$0.00
(SEE SECTION 32 13 13.06 AND 32 16 19)
10CLEARING AND GRUBBING5,000SY$0.00$0.00
(SEE SECTION 31 11 00)
11GRASSING4,000SY$0.00$0.00
(SEE SECTION 32 92 19)
12SODDING1000SY$0.00$0.00
(SEE SECTION 32 92 23)
13AGGREGATE BASE - 8"4,000SY$0.00$0.00
(SEE SECTION 32 11 23)
14AGGREGATE BASE - 6"500SY$0.00$0.00
(SEE SECTION 32 11 23)
15CLAY/SAND FILLING1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
16PRIME COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
17BINDER COURSE - 2" - < 300SY100SY$0.00$0.00
(SEE SECTION 32 12 16)
18BINDER COURSE - 2" - > 299 SY and < 600 SY400SY$0.00$0.00
(SEE SECTION 32 12 16)
19BINDER COURSE - 2" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
20BINDER COURSE - 2" - > 999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
21TACK COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
22WEARING COURSE - 1" - < 300 SY200SY$0.00$0.00
(SEE SECTION 32 12 16)
23WEARING COURSE - 1" - > 299 SY and < 600 SY500SY$0.00$0.00
(SEE SECTION 32 12 16)
24WEARING COURSE - 1" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
25WEARING COURSE - 1" - >999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
26FOG SEAL2,000SY$0.00$0.00
(SEE SECTION 32 12 36.13)
27STRIPING - 4" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
28STRIPING - 6" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
29STRIPING - 4" WIDE - THERMOPLASTIC PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
30STRIPING - 6" WIDE - THERMOPLASTIC PAINT3,000LF$0.00$0.00
(SEE SECTION 32 17 23)
31HANDICAP LOGO - 36" - WATER BASED PAINT35EA$0.00$0.00
(SEE SECTION 32 17 23)
32ALPHANUMERIC MARKING - 12" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
33ALPHANUMERIC MARKING - 18" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
34ARROW - 4' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
35ARROW - 6' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
36STRIPING REMOVAL500LF$0.00$0.00
(SEE SECTION 32 17 23)
37ASPHALT DEMOLITION100CY$0.00$0.00
(SEE SECTION 02 41 00)
38CONCRETE DEMOLITION, PLAIN3,000CY$0.00$0.00
(SEE SECTION 02 41 00)
39CONCRETE DEMOLITION, REINFORCED1,500CY$0.00$0.00
(SEE SECTION 02 41 00)
40SOIL EXCAVATION1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
41CURB DEMOLITION200LF$0.00$0.00
(SEE SECTION 02 41 00)
42COLD MILLING OF ASPHALT - 1" TO 3"1000SY$0.00$0.00
(SEE SECTION 32 01 16.71)
43SEALING CRACKS IN ASPHALT500LF$0.00$0.00
(SEE SECTION 32 01 17.61)
44SAW CUTTING CONCRETE1,200LF$0.00$0.00
(PER INCH OF DEPTH)
45SAW CUTTING ASPHALT1,500LF$0.00$0.00
(PER INCH OF DEPTH)
46JOINT COMPOUND SEALER5,000LF$0.00$0.00
(SEE SECTION 32 01 19)
47REBAR/FORM - #3, #41,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
48REBAR/FORM - #5, #61,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
49CRACK REPAIR LESS THAN 6" WIDE - EPOXY COMPOUND1,000LF$0.00$0.00
(SEE SECTION 32 01 19)
50STEEL PIPE BOLLARD INSTALLATION:
8' LONG - 6" DIA, BOLLARD, WITH CONC. FILLED HOLE 18" DIA., 3' DEEP10EA$0.00$0.00
8' LONG - 8" DIA. BOLLARD, WITH CONC. FILLED HOLE 24" DIA., 3' DEEP10EA$0.00$0.00
(SEE SECTION 05 50 13)

51 RAISE MANHOLES (6'' LIFTS) 10 LT $0.00 $0.00

52 LEVEL/REPAIR HAND HOLES 10 EA $0.00 $0.00

53 INSTALL DOWELS IN EXISTING CONCRETE 500 EA $0.00 $0.00

54 INSTALL DOWELS IN NEW CONCRETE 500 EA $0.00 $0.00

55 INSTALL KEYWAYS IN 6" CONCRETE SLAB 300 FT $0.00 $0.00

56INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 4' DEPTH MAX.
(SEE SECTION 33 40 00)
57INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 8' DEPTH MAX.
(SEE SECTION 33 40 00)
58PRECAST CONCRETE STRUCTURE WITH LID/GRATE70VF$0.00$0.00
4' MIN to 8' MAX
(SEE SECTION 33 40 00)
59PREFABRICATED CONCRETE WASHOUT FACILITY6EA$0.00$0.00
(SEE SECTION 32 13 13.06)
60GEOTEXTILE500SY$0.00$0.00
(SEE SECTION 31 05 19)

SUBTOTAL

GENERAL CONDITIONS, OH, and PROFIT shall be Included in Line Item Price

TOTAL TOTAL: $0.00

* NOTE #1 ASPHALT DEMOLITION IS BASED ON 4" DEPTH.

* NOTE #2 CONCRETE DEMOLITION IS BASED ON LINE ITEM DEPTHS.

* NOTE #3 EXPLANATION OF UNIT ABBREVIATIONS:
EA - EACH SF - SQUARE FOOT SY - SQUARE YARD

LF - LINEAR FT CY - CUBIC YARD LS - LUMP SUM

LBS - POUNDS FT - FOOT VF - VERTICAL FEET

Option Year 1

IDIQ PAVING - OPTION YEAR 1
MCLB ALBANY, GA

WORK ORDER #

PROJECT TITLE:

DATE:

UNIT
ITEM NO.DESCRIPTIONQUANTITYUNITPRICEAMOUNT
1CONCRETE BUMPER STRIP45EA$0.00$0.00
(SEE SECTION 32 16 19)
2CURBS & GUTTERS200LF$0.00$0.00
(SEE SECTION 32 16 19)
34" CONCRETE SLABS1,000SY$0.00$0.00
(SEE SECTION 32 16 19)
46" CONCRETE SLABS2,500SY$0.00$0.00
(SEE SECTION 32 13 13.06)
5HAND TROWEL FOR 6" CONCRETE SLABS700SY$0.00$0.00
(SEE SECTION 32 13 13.06)
68" CONCRETE SLABS600SY$0.00$0.00
(SEE SECTION 32 13 13.06)
712" CONCRETE SLABS - 650 psi FLEX < 500 SY400SY$0.00$0.00
(SEE SECTION 32 13 13.06)
812" CONCRETE SLABS - 650 psi FLEX >499 SY1200SY$0.00$0.00
(SEE SECTION 32 13 13.06)
9REINFORCEMENT WIRE3,000SY$0.00$0.00
(SEE SECTION 32 13 13.06 AND 32 16 19)
10CLEARING AND GRUBBING5,000SY$0.00$0.00
(SEE SECTION 31 11 00)
11GRASSING4,000SY$0.00$0.00
(SEE SECTION 32 92 19)
12SODDING1000SY$0.00$0.00
(SEE SECTION 32 92 23)
13AGGREGATE BASE - 8"4,000SY$0.00$0.00
(SEE SECTION 32 11 23)
14AGGREGATE BASE - 6"500SY$0.00$0.00
(SEE SECTION 32 11 23)
15CLAY/SAND FILLING1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
16PRIME COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
17BINDER COURSE - 2" - < 300SY100SY$0.00$0.00
(SEE SECTION 32 12 16)
18BINDER COURSE - 2" - > 299 SY and < 600 SY400SY$0.00$0.00
(SEE SECTION 32 12 16)
19BINDER COURSE - 2" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
20BINDER COURSE - 2" - > 999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
21TACK COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
22WEARING COURSE - 1" - < 300 SY200SY$0.00$0.00
(SEE SECTION 32 12 16)
23WEARING COURSE - 1" - > 299 SY and < 600 SY500SY$0.00$0.00
(SEE SECTION 32 12 16)
24WEARING COURSE - 1" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
25WEARING COURSE - 1" - >999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
26FOG SEAL2,000SY$0.00$0.00
(SEE SECTION 32 12 36.13)
27STRIPING - 4" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
28STRIPING - 6" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
29STRIPING - 4" WIDE - THERMOPLASTIC PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
30STRIPING - 6" WIDE - THERMOPLASTIC PAINT3,000LF$0.00$0.00
(SEE SECTION 32 17 23)
31HANDICAP LOGO - 36" - WATER BASED PAINT35EA$0.00$0.00
(SEE SECTION 32 17 23)
32ALPHANUMERIC MARKING - 12" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
33ALPHANUMERIC MARKING - 18" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
34ARROW - 4' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
35ARROW - 6' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
36STRIPING REMOVAL500LF$0.00$0.00
(SEE SECTION 32 17 23)
37ASPHALT DEMOLITION100CY$0.00$0.00
(SEE SECTION 02 41 00)
38CONCRETE DEMOLITION, PLAIN3,000CY$0.00$0.00
(SEE SECTION 02 41 00)
39CONCRETE DEMOLITION, REINFORCED1,500CY$0.00$0.00
(SEE SECTION 02 41 00)
40SOIL EXCAVATION1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
41CURB DEMOLITION200LF$0.00$0.00
(SEE SECTION 02 41 00)
42COLD MILLING OF ASPHALT - 1" TO 3"1000SY$0.00$0.00
(SEE SECTION 32 01 16.71)
43SEALING CRACKS IN ASPHALT500LF$0.00$0.00
(SEE SECTION 32 01 17.61)
44SAW CUTTING CONCRETE1,200LF$0.00$0.00
(PER INCH OF DEPTH)
45SAW CUTTING ASPHALT1,500LF$0.00$0.00
(PER INCH OF DEPTH)
46JOINT COMPOUND SEALER5,000LF$0.00$0.00
(SEE SECTION 32 01 19)
47REBAR/FORM - #3, #41,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
48REBAR/FORM - #5, #61,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
49CRACK REPAIR LESS THAN 6" WIDE - EPOXY COMPOUND1,000LF$0.00$0.00
(SEE SECTION 32 01 19)
50STEEL PIPE BOLLARD INSTALLATION:
8' LONG - 6" DIA, BOLLARD, WITH CONC. FILLED HOLE 18" DIA., 3' DEEP10EA$0.00$0.00
8' LONG - 8" DIA. BOLLARD, WITH CONC. FILLED HOLE 24" DIA., 3' DEEP10EA$0.00$0.00
(SEE SECTION 05 50 13)

51 RAISE MANHOLES (6'' LIFTS) 10 LT $0.00 $0.00

52 LEVEL/REPAIR HAND HOLES 10 EA $0.00 $0.00

53 INSTALL DOWELS IN EXISTING CONCRETE 500 EA $0.00 $0.00

54 INSTALL DOWELS IN NEW CONCRETE 500 EA $0.00 $0.00

55 INSTALL KEYWAYS IN 6" CONCRETE SLAB 300 FT $0.00 $0.00

56INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 4' DEPTH MAX.
(SEE SECTION 33 40 00)
57INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 8' DEPTH MAX.
(SEE SECTION 33 40 00)
58PRECAST CONCRETE STRUCTURE WITH LID/GRATE70VF$0.00$0.00
4' MIN to 8' MAX
(SEE SECTION 33 40 00)
59PREFABRICATED CONCRETE WASHOUT FACILITY6EA$0.00$0.00
(SEE SECTION 32 13 13.06)
60GEOTEXTILE500SY$0.00$0.00
(SEE SECTION 31 05 19)

SUBTOTAL

GENERAL CONDITIONS, OH, and PROFIT shall be included in Line Item Price

TOTAL TOTAL: $0.00

* NOTE #1 ASPHALT DEMOLITION IS BASED ON 4" DEPTH.

* NOTE #2 CONCRETE DEMOLITION IS BASED ON LINE ITEM DEPTHS.

* NOTE #3 EXPLANATION OF UNIT ABBREVIATIONS:
EA - EACH SF - SQUARE FOOT SY - SQUARE YARD

LF - LINEAR FT CY - CUBIC YARD LS - LUMP SUM

LBS - POUNDS FT - FOOT VF - VERTICAL FEET

Option Year 2

IDIQ PAVING - OPTION YEAR 2
MCLB ALBANY, GA

WORK ORDER #

PROJECT TITLE:

DATE:

UNIT
ITEM NO.DESCRIPTIONQUANTITYUNITPRICEAMOUNT
1CONCRETE BUMPER STRIP45EA$0.00$0.00
(SEE SECTION 32 16 19)
2CURBS & GUTTERS200LF$0.00$0.00
(SEE SECTION 32 16 19)
34" CONCRETE SLABS1,000SY$0.00$0.00
(SEE SECTION 32 16 19)
46" CONCRETE SLABS2,500SY$0.00$0.00
(SEE SECTION 32 13 13.06)
5HAND TROWEL FOR 6" CONCRETE SLABS700SY$0.00$0.00
(SEE SECTION 32 13 13.06)
68" CONCRETE SLABS600SY$0.00$0.00
(SEE SECTION 32 13 13.06)
712" CONCRETE SLABS - 650 psi FLEX < 500 SY400SY$0.00$0.00
(SEE SECTION 32 13 13.06)
812" CONCRETE SLABS - 650 psi FLEX >499 SY1200SY$0.00$0.00
(SEE SECTION 32 13 13.06)
9REINFORCEMENT WIRE3,000SY$0.00$0.00
(SEE SECTION 32 13 13.06 AND 32 16 19)
10CLEARING AND GRUBBING5,000SY$0.00$0.00
(SEE SECTION 31 11 00)
11GRASSING4,000SY$0.00$0.00
(SEE SECTION 32 92 19)
12SODDING1000SY$0.00$0.00
(SEE SECTION 32 92 23)
13AGGREGATE BASE - 8"4,000SY$0.00$0.00
(SEE SECTION 32 11 23)
14AGGREGATE BASE - 6"500SY$0.00$0.00
(SEE SECTION 32 11 23)
15CLAY/SAND FILLING1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
16PRIME COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
17BINDER COURSE - 2" - < 300SY100SY$0.00$0.00
(SEE SECTION 32 12 16)
18BINDER COURSE - 2" - > 299 SY and < 600 SY400SY$0.00$0.00
(SEE SECTION 32 12 16)
19BINDER COURSE - 2" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
20BINDER COURSE - 2" - > 999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
21TACK COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
22WEARING COURSE - 1" - < 300 SY200SY$0.00$0.00
(SEE SECTION 32 12 16)
23WEARING COURSE - 1" - > 299 SY and < 600 SY500SY$0.00$0.00
(SEE SECTION 32 12 16)
24WEARING COURSE - 1" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
25WEARING COURSE - 1" - >999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
26FOG SEAL2,000SY$0.00$0.00
(SEE SECTION 32 12 36.13)
27STRIPING - 4" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
28STRIPING - 6" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
29STRIPING - 4" WIDE - THERMOPLASTIC PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
30STRIPING - 6" WIDE - THERMOPLASTIC PAINT3,000LF$0.00$0.00
(SEE SECTION 32 17 23)
31HANDICAP LOGO - 36" - WATER BASED PAINT35EA$0.00$0.00
(SEE SECTION 32 17 23)
32ALPHANUMERIC MARKING - 12" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
33ALPHANUMERIC MARKING - 18" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
34ARROW - 4' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
35ARROW - 6' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
36STRIPING REMOVAL500LF$0.00$0.00
(SEE SECTION 32 17 23)
37ASPHALT DEMOLITION100CY$0.00$0.00
(SEE SECTION 02 41 00)
38CONCRETE DEMOLITION, PLAIN3,000CY$0.00$0.00
(SEE SECTION 02 41 00)
39CONCRETE DEMOLITION, REINFORCED1,500CY$0.00$0.00
(SEE SECTION 02 41 00)
40SOIL EXCAVATION1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
41CURB DEMOLITION200LF$0.00$0.00
(SEE SECTION 02 41 00)
42COLD MILLING OF ASPHALT - 1" TO 3"1000SY$0.00$0.00
(SEE SECTION 32 01 16.71)
43SEALING CRACKS IN ASPHALT500LF$0.00$0.00
(SEE SECTION 32 01 17.61)
44SAW CUTTING CONCRETE1,200LF$0.00$0.00
(PER INCH OF DEPTH)
45SAW CUTTING ASPHALT1,500LF$0.00$0.00
(PER INCH OF DEPTH)
46JOINT COMPOUND SEALER5,000LF$0.00$0.00
(SEE SECTION 32 01 19)
47REBAR/FORM - #3, #41,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
48REBAR/FORM - #5, #61,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
49CRACK REPAIR LESS THAN 6" WIDE - EPOXY COMPOUND1,000LF$0.00$0.00
(SEE SECTION 32 01 19)
50STEEL PIPE BOLLARD INSTALLATION:
8' LONG - 6" DIA, BOLLARD, WITH CONC. FILLED HOLE 18" DIA., 3' DEEP10EA$0.00$0.00
8' LONG - 8" DIA. BOLLARD, WITH CONC. FILLED HOLE 24" DIA., 3' DEEP10EA$0.00$0.00
(SEE SECTION 05 50 13)

51 RAISE MANHOLES (6'' LIFTS) 10 LT $0.00 $0.00

52 LEVEL/REPAIR HAND HOLES 10 EA $0.00 $0.00

53 INSTALL DOWELS IN EXISTING CONCRETE 500 EA $0.00 $0.00

54 INSTALL DOWELS IN NEW CONCRETE 500 EA $0.00 $0.00

55 INSTALL KEYWAYS IN 6" CONCRETE SLAB 300 FT $0.00 $0.00

56INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 4' DEPTH MAX.
(SEE SECTION 33 40 00)
57INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 8' DEPTH MAX.
(SEE SECTION 33 40 00)
58PRECAST CONCRETE STRUCTURE WITH LID/GRATE70VF$0.00$0.00
4' MIN to 8' MAX
(SEE SECTION 33 40 00)
59PREFABRICATED CONCRETE WASHOUT FACILITY6EA$0.00$0.00
(SEE SECTION 32 13 13.06)
60GEOTEXTILE500SY$0.00$0.00
(SEE SECTION 31 05 19)

SUBTOTAL

GENERAL CONDITIONS, OH, and PROFIT shall be included in Line Item Price

TOTAL TOTAL: $0.00

* NOTE #1 ASPHALT DEMOLITION IS BASED ON 4" DEPTH.

* NOTE #2 CONCRETE DEMOLITION IS BASED ON LINE ITEM DEPTHS.

* NOTE #3 EXPLANATION OF UNIT ABBREVIATIONS:
EA - EACH SF - SQUARE FOOT SY - SQUARE YARD

LF - LINEAR FT CY - CUBIC YARD LS - LUMP SUM

LBS - POUNDS FT - FOOT VF - VERTICAL FEET

Option Year 3

IDIQ PAVING - OPTION YEAR 3
MCLB ALBANY, GA

WORK ORDER #

PROJECT TITLE:

DATE:

UNIT
ITEM NO.DESCRIPTIONQUANTITYUNITPRICEAMOUNT
1CONCRETE BUMPER STRIP45EA$0.00$0.00
(SEE SECTION 32 16 19)
2CURBS & GUTTERS200LF$0.00$0.00
(SEE SECTION 32 16 19)
34" CONCRETE SLABS1,000SY$0.00$0.00
(SEE SECTION 32 16 19)
46" CONCRETE SLABS2,500SY$0.00$0.00
(SEE SECTION 32 13 13.06)
5HAND TROWEL FOR 6" CONCRETE SLABS700SY$0.00$0.00
(SEE SECTION 32 13 13.06)
68" CONCRETE SLABS600SY$0.00$0.00
(SEE SECTION 32 13 13.06)
712" CONCRETE SLABS - 650 psi FLEX < 500 SY400SY$0.00$0.00
(SEE SECTION 32 13 13.06)
812" CONCRETE SLABS - 650 psi FLEX >499 SY1200SY$0.00$0.00
(SEE SECTION 32 13 13.06)
9REINFORCEMENT WIRE3,000SY$0.00$0.00
(SEE SECTION 32 13 13.06 AND 32 16 19)
10CLEARING AND GRUBBING5,000SY$0.00$0.00
(SEE SECTION 31 11 00)
11GRASSING4,000SY$0.00$0.00
(SEE SECTION 32 92 19)
12SODDING1000SY$0.00$0.00
(SEE SECTION 32 92 23)
13AGGREGATE BASE - 8"4,000SY$0.00$0.00
(SEE SECTION 32 11 23)
14AGGREGATE BASE - 6"500SY$0.00$0.00
(SEE SECTION 32 11 23)
15CLAY/SAND FILLING1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
16PRIME COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
17BINDER COURSE - 2" - < 300SY100SY$0.00$0.00
(SEE SECTION 32 12 16)
18BINDER COURSE - 2" - > 299 SY and < 600 SY400SY$0.00$0.00
(SEE SECTION 32 12 16)
19BINDER COURSE - 2" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
20BINDER COURSE - 2" - > 999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
21TACK COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
22WEARING COURSE - 1" - < 300 SY200SY$0.00$0.00
(SEE SECTION 32 12 16)
23WEARING COURSE - 1" - > 299 SY and < 600 SY500SY$0.00$0.00
(SEE SECTION 32 12 16)
24WEARING COURSE - 1" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
25WEARING COURSE - 1" - >999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
26FOG SEAL2,000SY$0.00$0.00
(SEE SECTION 32 12 36.13)
27STRIPING - 4" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
28STRIPING - 6" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
29STRIPING - 4" WIDE - THERMOPLASTIC PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
30STRIPING - 6" WIDE - THERMOPLASTIC PAINT3,000LF$0.00$0.00
(SEE SECTION 32 17 23)
31HANDICAP LOGO - 36" - WATER BASED PAINT35EA$0.00$0.00
(SEE SECTION 32 17 23)
32ALPHANUMERIC MARKING - 12" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
33ALPHANUMERIC MARKING - 18" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
34ARROW - 4' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
35ARROW - 6' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
36STRIPING REMOVAL500LF$0.00$0.00
(SEE SECTION 32 17 23)
37ASPHALT DEMOLITION100CY$0.00$0.00
(SEE SECTION 02 41 00)
38CONCRETE DEMOLITION, PLAIN3,000CY$0.00$0.00
(SEE SECTION 02 41 00)
39CONCRETE DEMOLITION, REINFORCED1,500CY$0.00$0.00
(SEE SECTION 02 41 00)
40SOIL EXCAVATION1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
41CURB DEMOLITION200LF$0.00$0.00
(SEE SECTION 02 41 00)
42COLD MILLING OF ASPHALT - 1" TO 3"1000SY$0.00$0.00
(SEE SECTION 32 01 16.71)
43SEALING CRACKS IN ASPHALT500LF$0.00$0.00
(SEE SECTION 32 01 17.61)
44SAW CUTTING CONCRETE1,200LF$0.00$0.00
(PER INCH OF DEPTH)
45SAW CUTTING ASPHALT1,500LF$0.00$0.00
(PER INCH OF DEPTH)
46JOINT COMPOUND SEALER5,000LF$0.00$0.00
(SEE SECTION 32 01 19)
47REBAR/FORM - #3, #41,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
48REBAR/FORM - #5, #61,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
49CRACK REPAIR LESS THAN 6" WIDE - EPOXY COMPOUND1,000LF$0.00$0.00
(SEE SECTION 32 01 19)
50STEEL PIPE BOLLARD INSTALLATION:
8' LONG - 6" DIA, BOLLARD, WITH CONC. FILLED HOLE 18" DIA., 3' DEEP10EA$0.00$0.00
8' LONG - 8" DIA. BOLLARD, WITH CONC. FILLED HOLE 24" DIA., 3' DEEP10EA$0.00$0.00
(SEE SECTION 05 50 13)

51 RAISE MANHOLES (6'' LIFTS) 10 LT $0.00 $0.00

52 LEVEL/REPAIR HAND HOLES 10 EA $0.00 $0.00

53 INSTALL DOWELS IN EXISTING CONCRETE 500 EA $0.00 $0.00

54 INSTALL DOWELS IN NEW CONCRETE 500 EA $0.00 $0.00

55 INSTALL KEYWAYS IN 6" CONCRETE SLAB 300 FT $0.00 $0.00

56INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 4' DEPTH MAX.
(SEE SECTION 33 40 00)
57INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 8' DEPTH MAX.
(SEE SECTION 33 40 00)
58PRECAST CONCRETE STRUCTURE WITH LID/GRATE70VF$0.00$0.00
4' MIN to 8' MAX
(SEE SECTION 33 40 00)
59PREFABRICATED CONCRETE WASHOUT FACILITY6EA$0.00$0.00
(SEE SECTION 32 13 13.06)
60GEOTEXTILE500SY$0.00$0.00
(SEE SECTION 31 05 19)

SUBTOTAL

GENERAL CONDITIONS, OH, and PROFIT shall be included in Line Item Price

TOTAL TOTAL: $0.00

* NOTE #1 ASPHALT DEMOLITION IS BASED ON 4" DEPTH.

* NOTE #2 CONCRETE DEMOLITION IS BASED ON LINE ITEM DEPTHS.

* NOTE #3 EXPLANATION OF UNIT ABBREVIATIONS:
EA - EACH SF - SQUARE FOOT SY - SQUARE YARD

LF - LINEAR FT CY - CUBIC YARD LS - LUMP SUM

LBS - POUNDS FT - FOOT VF - VERTICAL FEET

Option Year 4

IDIQ PAVING - OPTION YEAR 4
MCLB ALBANY, GA

WORK ORDER #

PROJECT TITLE:

DATE:

UNIT
ITEM NO.DESCRIPTIONQUANTITYUNITPRICEAMOUNT
1CONCRETE BUMPER STRIP45EA$0.00$0.00
(SEE SECTION 32 16 19)
2CURBS & GUTTERS200LF$0.00$0.00
(SEE SECTION 32 16 19)
34" CONCRETE SLABS1,000SY$0.00$0.00
(SEE SECTION 32 16 19)
46" CONCRETE SLABS2,500SY$0.00$0.00
(SEE SECTION 32 13 13.06)
5HAND TROWEL FOR 6" CONCRETE SLABS700SY$0.00$0.00
(SEE SECTION 32 13 13.06)
68" CONCRETE SLABS600SY$0.00$0.00
(SEE SECTION 32 13 13.06)
712" CONCRETE SLABS - 650 psi FLEX < 500 SY400SY$0.00$0.00
(SEE SECTION 32 13 13.06)
812" CONCRETE SLABS - 650 psi FLEX >499 SY1200SY$0.00$0.00
(SEE SECTION 32 13 13.06)
9REINFORCEMENT WIRE3,000SY$0.00$0.00
(SEE SECTION 32 13 13.06 AND 32 16 19)
10CLEARING AND GRUBBING5,000SY$0.00$0.00
(SEE SECTION 31 11 00)
11GRASSING4,000SY$0.00$0.00
(SEE SECTION 32 92 19)
12SODDING1000SY$0.00$0.00
(SEE SECTION 32 92 23)
13AGGREGATE BASE - 8"4,000SY$0.00$0.00
(SEE SECTION 32 11 23)
14AGGREGATE BASE - 6"500SY$0.00$0.00
(SEE SECTION 32 11 23)
15CLAY/SAND FILLING1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
16PRIME COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
17BINDER COURSE - 2" - < 300SY100SY$0.00$0.00
(SEE SECTION 32 12 16)
18BINDER COURSE - 2" - > 299 SY and < 600 SY400SY$0.00$0.00
(SEE SECTION 32 12 16)
19BINDER COURSE - 2" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
20BINDER COURSE - 2" - > 999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
21TACK COAT1,000SY$0.00$0.00
(SEE SECTION 32 12 16)
22WEARING COURSE - 1" - < 300 SY200SY$0.00$0.00
(SEE SECTION 32 12 16)
23WEARING COURSE - 1" - > 299 SY and < 600 SY500SY$0.00$0.00
(SEE SECTION 32 12 16)
24WEARING COURSE - 1" - > 599 SY and < 1000 SY700SY$0.00$0.00
(SEE SECTION 32 12 16)
25WEARING COURSE - 1" - >999 SY1200SY$0.00$0.00
(SEE SECTION 32 12 16)
26FOG SEAL2,000SY$0.00$0.00
(SEE SECTION 32 12 36.13)
27STRIPING - 4" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
28STRIPING - 6" WIDE - WATER BASED PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
29STRIPING - 4" WIDE - THERMOPLASTIC PAINT1,000LF$0.00$0.00
(SEE SECTION 32 17 23)
30STRIPING - 6" WIDE - THERMOPLASTIC PAINT3,000LF$0.00$0.00
(SEE SECTION 32 17 23)
31HANDICAP LOGO - 36" - WATER BASED PAINT35EA$0.00$0.00
(SEE SECTION 32 17 23)
32ALPHANUMERIC MARKING - 12" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
33ALPHANUMERIC MARKING - 18" - WATER BASED PAINT25EA$0.00$0.00
(SEE SECTION 32 17 23)
34ARROW - 4' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
35ARROW - 6' - THERMOPLASTIC PAINT30EA$0.00$0.00
(SEE SECTION 32 17 23)
36STRIPING REMOVAL500LF$0.00$0.00
(SEE SECTION 32 17 23)
37ASPHALT DEMOLITION100CY$0.00$0.00
(SEE SECTION 02 41 00)
38CONCRETE DEMOLITION, PLAIN3,000CY$0.00$0.00
(SEE SECTION 02 41 00)
39CONCRETE DEMOLITION, REINFORCED1,500CY$0.00$0.00
(SEE SECTION 02 41 00)
40SOIL EXCAVATION1,000CY$0.00$0.00
(SEE SECTION 31 00 00)
41CURB DEMOLITION200LF$0.00$0.00
(SEE SECTION 02 41 00)
42COLD MILLING OF ASPHALT - 1" TO 3"1000SY$0.00$0.00
(SEE SECTION 32 01 16.71)
43SEALING CRACKS IN ASPHALT500LF$0.00$0.00
(SEE SECTION 32 01 17.61)
44SAW CUTTING CONCRETE1,200LF$0.00$0.00
(PER INCH OF DEPTH)
45SAW CUTTING ASPHALT1,500LF$0.00$0.00
(PER INCH OF DEPTH)
46JOINT COMPOUND SEALER5,000LF$0.00$0.00
(SEE SECTION 32 01 19)
47REBAR/FORM - #3, #41,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
48REBAR/FORM - #5, #61,000LBS$0.00$0.00
(SEE SECTION 32 13 13.06)
49CRACK REPAIR LESS THAN 6" WIDE - EPOXY COMPOUND1,000LF$0.00$0.00
(SEE SECTION 32 01 19)
50STEEL PIPE BOLLARD INSTALLATION:
8' LONG - 6" DIA, BOLLARD, WITH CONC. FILLED HOLE 18" DIA., 3' DEEP10EA$0.00$0.00
8' LONG - 8" DIA. BOLLARD, WITH CONC. FILLED HOLE 24" DIA., 3' DEEP10EA$0.00$0.00
(SEE SECTION 05 50 13)

51 RAISE MANHOLES (6'' LIFTS) 10 LT $0.00 $0.00

52 LEVEL/REPAIR HAND HOLES 10 EA $0.00 $0.00

53 INSTALL DOWELS IN EXISTING CONCRETE 500 EA $0.00 $0.00

54 INSTALL DOWELS IN NEW CONCRETE 500 EA $0.00 $0.00

55 INSTALL KEYWAYS IN 6" CONCRETE SLAB 300 FT $0.00 $0.00

56INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 4' DEPTH MAX.
(SEE SECTION 33 40 00)
57INSTALL STORM DRAIN LINE150LF$0.00$0.00
16"/24" RCP 8' DEPTH MAX.
(SEE SECTION 33 40 00)
58PRECAST CONCRETE STRUCTURE WITH LID/GRATE70VF$0.00$0.00
4' MIN to 8' MAX
(SEE SECTION 33 40 00)
59PREFABRICATED CONCRETE WASHOUT FACILITY6EA$0.00$0.00
(SEE SECTION 32 13 13.06)
60GEOTEXTILE500SY$0.00$0.00
(SEE SECTION 31 05 19)

SUBTOTAL

GENERAL CONDITIONS, OH, and PROFIT shall be included in Line Item Price

TOTAL TOTAL: $0.00

* NOTE #1 ASPHALT DEMOLITION IS BASED ON 4" DEPTH.

* NOTE #2 CONCRETE DEMOLITION IS BASED ON LINE ITEM DEPTHS.

* NOTE #3 EXPLANATION OF UNIT ABBREVIATIONS:
EA - EACH SF - SQUARE FOOT SY - SQUARE YARD

LF - LINEAR FT CY - CUBIC YARD LS - LUMP SUM

LBS - POUNDS FT - FOOT VF - VERTICAL FEET