Amendment 0001.pdf
PDF 22 KB Posted
- Solicitation number
- N4008520B0101
About this file
This amendment modifies a solicitation for an indefinite delivery, indefinite quantity contract to provide paving services at Albany, Georgia. Key changes include revising the solicitation to be a small business set-aside, providing a revised line item schedule requiring unit pricing to include all costs, and removing bonding requirements from the bid submission. Responses to prior questions indicate task orders will include separate statements of work and construction timelines with liquidated damages, and confirm design is not required as part of the contractor's scope. The bid due date remains June 30, 2020 with electronic submission required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REVISED IDIQ ELIN SCHDULE FY 20.xlsx | XLSX spreadsheet | |
| Attachment - PPI Log.xlsx | XLSX spreadsheet | |
| IDIQ Specs MCLB Albany.pdf | ||
| IDIQ ELIN Schedule Base FY20 4 Option Years.xlsx | XLSX spreadsheet | |
| IFB PAVING.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is:
1. REVISE Block 10 of SF 1442 - This solicitation is a SMALL BUSINESS SET ASIDE - Delete "unrestricted'
2. A REVISED ELIN BID SCHEDULE IS PROVIDE AND SHALL BE USED FOR BID SUBMISSION.
3. REVISE Bonding Requirements (see continuation page)
4. Provide responses to PPIs.
The due date for bids remains JUNE 30, 2020. SEE INSTRUCTIONS FOR SUBMITTING BIDS ELECTRONICALLY. NO HAND CARRIED BIDS
WILL BE ACCEPTED.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520B0101
X 9B. DATED (SEE ITEM 11)
27-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jun-2020
CODE
NAVFAC MID ATLANTIC
MARINE CORPS IPT
9324 VIRGINIA AVE
NORFOLK VA 23511
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008520B0101
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
AMENDMENT 0001 –
1. DELETE THE WORD “UNRESTRICTED” in BLOCK 10 of the SF 1442. This is a SMALL BUSINESS SET ASIDE.
2. A REVISED ELIN SCHEDULE IS PROVIDED AND SHALL BE
USED IN BID SUBMISSION. The schedule was revised to indicate that bidders shall include all costs for travel, supervision, materials, labor, equipment, overhead, general conditions, profit in the UNIT PRICES.
3. PAGE 7 of the SOLICITATION “BONDING REQUIREMENTS/BID
SUBMISSION INSTRUCTIONS – BID BONDS/PAYMENT AND
PERFORMANCE BONDS ARE NOT REQUIRED AS A PART OF
THIS BID. Pursuant to FAR 28, bid bonds and payment and performance bonds may be required as part of future task orders under the resultant contract.
4. RESPONSES TO PPIs are provided below:
RESPONSES TO PPIs
AMENDMENT 0001
Date Submitted
REFERENCE QUESTION RESPONSES
Page Section Para.
6/16/2020 How would the design process work?
Each task order comes with its own design or should Contractor include design costs in Estimate?
Task order comes with SOW and related drawings.
Contractor not required to design.
6/16/2020 For how long does the task order need to be warranted after completion?
12 month construction warranty
6/16/2020 16 FAR Clause 52.211-12 leaves up to the Contracting Officer to define Liquidated Damages' amount. No LD info was found on Bid Docs. How much is it? If any?
Each task order has separate construction time and LDs
6/16/2020 Is there a specific Bid Bond form to use?
A bid bond will NOT be required as a part of the bid.
Pursuant to
FAR 28.101-1,
Bid Guarantees are not required unless payment and performance bonds are required.
However, future task orders may require bid and payment and performance bonds.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .