Amendment_0001.pdf
PDF 157 KB Posted
- Attached to
- Design-Bid-Build, RM10-4183 Replace Dry Dock 2 Caisson at Norfolk Naval Shipyard (NNSY), Portsmouth, VA
- Solicitation number
- N4008519R9226
About this file
This document provides an amendment to a solicitation and related federal contract opportunity. The amendment revises the request for proposal for replacing the Dry Dock 2 caisson at the Norfolk Naval Shipyard in Portsmouth, Virginia. Key details include responses to pre-proposal inquiries, revisions to specifications including replacing Schedule 80 with Schedule 10S stainless steel piping, and extending the proposal due date to October 22, 2019. The contract award date is planned for March 2020, with a period of performance of 1096 calendar days. The work involves demolishing existing structures and installing new concrete and armor plating. Epoxy injection grout must meet specified technical requirements.
Amendment_0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002.pdf | ||
| Solicitation_N4008519R9226.pdf | ||
| Attachment_A_-_Pre-Proposal_Inquiry_Form.xlsx | XLSX spreadsheet | |
| Attachment_C_-_Construction_Experience_Project_Data_Sheet.docx | DOCX document | |
| Attachment_B_SECNAV_5512_1_11787.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008519C9226, REPLACE DRYDOCK 2 CAISSON AT NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VA
SEE BLOCK 14 CONITINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Oct-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9226
X 9B. DATED (SEE ITEM 11)
28-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Oct-2019
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9226
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES
The purpose of this amendment is to incorporate the following:
1. Response to PPIs.
2. Revisions to RFP (See Amendment 0001 Continue sheet below)
3. Proposal due date has been extended from Wednesday, 16 October 2019 @ 1400 EST to Tuesday, 22 October
2019 @ 1400 EST.
1. RESPONSE TO PPIS
PPI#
(AQ)
Submitted By
(AQ)
Reference Question
(AQ)
Government Response
(AQ/PM/DM/DOR)
Page/Dwg
(AQ)
Section
(AQ)
Paragraph
(AQ)
1 SS701
The repair quantity chart indicates 0.82 CU FT of epoxy for each seat repair. Is this
0.82 CU FT for each
joint location?
The 0.82 cubic foot of epoxy is for each joint repair, see also the bid schedule, Section 00 22 13.00
20, CLIN 0001AC
From the date of award until demobilization on September 15, 2020, how many calendar days for construction will the contractor be given for the topside demolition and new concrete work?
Bid per RFP
3 SS103 40 05 13 2.3.1.1
Drawing SS103 indicates 10" SCH'D 80 type 316L SS pipe and the spec section for process piping systems indicates schedule 10S. Please clarify.
Schedule 80, Bid per Amendment 0001
4 SS205
Drawing SS205 states to provide 3/4" Monel 400 Nickel Copper clad plate to extend the caisson seat armor plates. Due to the Monel 400 plate not being commercially available, 1/2" 316 SS plates with 316 SS studs were successfully installed for a similar caisson seat armor plate extension on the "Dry Dock #3 Repair Safety Wall/Guardrails" project in 2014. Due to disimmilar metals, a thin bond break (rubber or teflon) is installed between the existing nickel copper plate and the 316 SS plate. Is the 316 SS plate with a bond breaker an acceptable alternative to the stated requirements on Dry Dock 2?
Yes, but thickness must match existing.
Bid per Amendment
5 SS701
Notes 3 and 4 on drawing SS701 state to inject epoxy between armor plate segments and within cracked and spalled concrete near edges of armor plates.
No epoxy material specification was found. Please provide information on the type of epoxy to be used for injection repairs.
Crack Injection Epoxy, Bid per
Amendment 0001
2. REVISIONS TO RFP
CONTINUATION SHEET
SECTION 05 59 20 CAISSON SEAT ARMOR PLATING
Globally in this section replace AWS D1.5/D1.5M with AWS D1.6/D1.6M
1.3 SUBMITTALS
Under SD-03 Product Data add the following:
“Epoxy Injection Grout; G”
2.1.1 Structural Fabrications
Replace paragraph 2.1.1 with the following:
“2.1.1 Structural Fabrications
ASTM A240 Alloy 316L (UNS S31603) stainless steel material must be straight before being laid off or worked.
Perform straightening by methods that will not impair the metal. Material will be rejected for sharp kinks or bends.
Material with welds will not be accepted except where welding is definitely specified, indicated or otherwise approved. Use approved dies, press brakes or bending rolls to make bends. Take precautions to avoid overheating the metal where heating is required and allow it to cool in a manner that will not impair the original properties of the metal. Obtain approval prior to flame cutting material, other than structural steel, indicated on detail drawings.
Accurately shear material and neatly finish all portions of the work. Provide square and true corners unless otherwise shown. Fillet re-entrant cuts to a minimum radius of 1 inch. Provide finished members free of twists, bends and open joints.”
2.1.1.2 Nickel-Copper Fabrication
Replace paragraph 2.1.1.2 with the following:
“2.1.1.2 Stainless Steel Fabrication
Stainless Steel alloy may be cut by mechanically guided or hand-guided torches, provided an accurate profile with a surface that is smooth and free from cracks and notches is obtained. Prepare surfaces and edges in accordance with AWS D1.6/D1.6M, Workmanship Clause. Hand-guided cuts must be chipped, ground or machined to sound metal.”
At the end of Part 2 add the following:
“2.3 EPOXY
2.3.1 Epoxy Injection Grout
A low viscosity epoxy resin system pumped under pressure into cracks. The epoxy adhesive must be a two component, 100 percent solids, moisture insensitive structural epoxy suitable for pressure injection or hand application. The manufacturer shall offer technical services and provide a representative at the jobsite for product training prior to product installation upon 14 days advance notice.
The epoxy adhesive shall meet all the following typical performance criteria when cured at 73 degrees F:
ASTM C881, Types I, II, IV and V, Grade 3, Classes B & C Property Test Method Criteria
Gel Time ASTM C881/C881M 40 Minutes
Flexural Strength ASTM D790 5,500 psi
Shear Strength ASTM D732 3,500 psi
Bond Strength, 2 days ASTM C882/C882M 2,200 psi
Bond Strength, 14 days ASTM C882/C882M 4,600 psi
Compressive Strength ASTM D695 10,000 psi
Compressive Modulus ASTM D695 280,000 psi
Water Absorption ASTM D570 0.10 percent
3.1.2 Alignment and Setting
Replace Paragraph 3.1.2 with the following:
“3.1.2 Alignment and Setting
Each structural unit attached to structures fabricated according to this specification must be accurately aligned by the use of Type 316 Stainless Steel shims or other approved methods so that no distortion of any member occurs before it is fastened in place. The alignment of all parts with respect to each other must be true within the respective tolerances required. Shims may remain with the final installation. Electrically insulate Stainless from Monel Armor Plating with 1/16-inch min thick UHMW-PE or Contracting Officer approved method of electrical isolation of dissimilar metals. “
At the End of Part 3.1 add the following:
“3.1.3 Epoxy Injection Grout Prepare surface for grouting with high pressure water blasting or other suitable methods, with the intent to remove all marine growth and voids from joints between the armor plates. Do not install epoxy injection grout if the temperature is not within the range of application temperatures recommended by the manufacturer of the product.
Apply a surface seal over all exterior faces of the joint that can be reached to contain the injection adhesive in the crack. Install the injection entry and venting ports using flush mounted or drilled fittings per manufacturers instructions. Space ports in accordance with manufacturers instructions, verify spacing with an above water crack, justifying complete application to Contracting Officer by sounding area with a 22-ounce hammer. Install product at manufacturers recommended pressure. For horizontal cracks apply injection by proceeding from one end of the crack (joint) to the other until the void is fully sealed. Remove ports and remove the surface seal by grinding or other acceptable means after the injected epoxy has cured.”
SECTION 40 05 13 PROCESS PIPING
2.3.1.1 Stainless Steel Pipe
Delete this paragraph in its entirety and replace with the following:
“2.3.1.1 Stainless Steel Pipe
Stainless steel pipe intended for general corrosive service shall meet the requirements of ASTM A312/A312M, seamless, Grade TP316L , Schedule 80 with dimensions conforming to ASME B36.19M.”
(End of Summary of Changes)