N4008519R9156_Project_Information_Form_19R9156.docx
DOCX document 24 KB Posted
- Solicitation number
- N4008519R9156
About this file
This document contains a sources sought notice for a federal construction project. The Naval Facilities Engineering Command, Mid-Atlantic is seeking small businesses capable of performing construction services for Design-Build P-1495 at Camp Lejeune in North Carolina. The project scope includes construction of four new buildings and two additions, along with utility work, site work, and required demolition. Interested small businesses must submit a capabilities package by May 10, 2019 demonstrating experience on similar projects over $50,000 square feet in size involving new construction of industrial and administrative buildings, with one project including structural concrete work. The contract value is estimated between $25-100 million, and the contractor must self-perform at least 15% of the cost. Responses to this sources sought notice will help the agency determine whether to set aside this procurement for small businesses.
N4008519R9156_Project_Information_Form_19R9156.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008519R9156_Matrix_N4008519R9156.xlsx | XLSX spreadsheet | |
| N4008519R9156_Contractor_Information_Form_19R9156.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – PROJECT INFORMATION FORM
Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.
| 1. |
| Contractor Name: |
| 2. | ||||
| Project No. (check one): | ||||
| |_| 1 | |_| 2 | |_| 3 | |_| 4 | |_| 5 |
| 3. |
| Contract Number: |
| Delivery/Task Order No.: |
| Project Number: |
| Title: |
| Location: |
| 4. |
| Award Date (mm/dd/yy): |
| 5. |
| Final Contract Price: |
| $ |
| Completion Date (mm/dd/yy): |
| (includes all options and mods) |
| Project is % complete (as of submission due date) |
| This is the |_| total project |_| subcontract price. |
| 6. | ||
| Type of work: | ||
| |_| New Construction | |_| Repair | |_| Renovation |
| 7. |
| Customer/Owner Name: |
| Point of Contact Name/Title: (person with project knowledge) |
| POC Phone Number: |
| POC Email Address: |
| 8. | |
| Were you the Prime contractor for this project? | |
| |_| Yes | |_| No |
| Were you a subcontractor for this project? | |
| |_| Yes | |_| No |
| If subcontractor, who was the Prime contractor? |
| 9. |
| Type of Contract (check all that apply): |
|_| Design-Build |_| Design-Bid-Build (fully designed project)
| |_| Other (explain): |
| If Design-Build, provide the following information: |
| |_| Design accomplished in-house |
| Lead design firm name: |
| Years working together: |
| Address: |
10. Provide a detailed description of the project:
11. Percentage of work you self-performed on this project: %.
Provide a detailed description of the work your firm self-performed on this project:
Form may be expanded. Please DO NOT change content of the form
File details come from the government source that posted it. Updated .