N4008519R9156_Matrix_N4008519R9156.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- N4008519R9156
About this file
This document provides details on a sources sought notice for a design-build contract opportunity. The Naval Facilities Engineering Command, Mid-Atlantic is seeking small businesses capable of performing construction services for a new operations and support complex for the 5th Battalion, 10th Marines, High Mobility Artillery Rocket System at Camp Lejeune, North Carolina. The project scope includes four new buildings, two building additions, and a new high explosive magazine, along with associated site and utility work. Interested small businesses should submit past project experience demonstrating new construction of industrial and administrative buildings, as well as structural concrete work, by May 10, 2019 to be considered for the design-build contract anticipated for award in December 2019.
N4008519R9156_Matrix_N4008519R9156.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008519R9156_Project_Information_Form_19R9156.docx | DOCX document | |
| N4008519R9156_Contractor_Information_Form_19R9156.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Example
| # | Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | |||
| (year) | Was your firm Prime or Sub? | DB or DBB | DoD / Fed | Project Size (cumulative 50,000 SF or > for multiple covered structures) | New construction of multiple industrial building(s) and/or administrative building(s) simultaneously or sequentially on a campus style project site | Each submitted project does not require demonstrated experience with all of the following elements, but collectively, experience with all elements must be established throughout the submitted relevant projects. |
(a) Experience with new construction of at least one (1) industrial building;
| (b) Experience with new construction of at least one (1) administrative building; and | (c) Experience with at least one (1) project with structural reinforced concrete. | |||||||||
| 1 | ||||||||||
| 2 | ||||||||||
| 3 | ||||||||||
| 4 | ||||||||||
| 5 | ||||||||||
| General Information: | Bonding Capacity | DUNS | Cage | Address | SB Status | POC | POC Contact Information | Annual Revenue | #Offices |
File details come from the government source that posted it. Updated .