J-0200000-11_ISWM_ELINS.xls
XLS spreadsheet 880 KB Posted
- Solicitation number
- N4008519R9135
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N40085-19-R-9135_Amdt0005.pdf | ||
| 1503030_C__1_Section_updated_5-30-2019.doc | DOC document | |
| N40085-19-R-9135_Amdt0004.pdf | ||
| 1503030_J_1_updated_5_29_2019.doc | DOC document | |
| 1503030_F_1_updated_5_29_2019.doc | DOC document | |
| SIGN_IN_SHEET.pdf | ||
| N40085-19-R-9135_Amdt0003.docx.pdf | ||
| N40085-19-R-9135_Amdt0002.pdf | ||
| N40085-19-R-9135_Amdt0001.pdf | ||
| J-0200000-14_PAST_PERFORMANCE_QUESTIONNAIRE.pdf | ||
| J-0200000-13_CORPORATE_EXPERIENCE_FORM.pdf | ||
| J-0200000-07.pdf | ||
| N40085-19-R-9135.pdf | ||
| J-0200000-08.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| Exhibit Summary | |||
| PERIOD | RECURRING WORK | NON-RECURRING WORK | RECURRING + NONRECURRING |
| BASE PERIOD | |||
| OPTION ONE | |||
| OPTION TWO | |||
| OPTION THREE | |||
| OPTION FOUR | |||
| TOTAL CONTRACT COST |
ELINs-BASE-Recurring
| ATTACHMENT J-0200000-11 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION: N40085-19-R-9135 | |||||
| EXHIBIT A - CLIN 0001 | |||||
| Line Item 0001 Recurring Price - Base Period | |||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs A001 through A0034 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| A001 | Marine Air Corps Station Beaufort( MCAS) | ||||
| A001AA | Integrated Solid Waste Management | 12 | MO | ||
| A002 | Townsend Bombing Range | ||||
| A002AA | Integrated Solid Waste Management | 12 | MO | ||
| A003 | Bureau Of Medicine And Surgery (BUMED) at MCAS | ||||
| A003AA | Integrated Solid Waste Management | 12 | MO | ||
| A004 | Laurel Bay Housing (LB) | ||||
| A004AA | Integrated Solid Waste Management | 12 | MO | ||
| A005 | Naval Support Facility Beaufort | ||||
| A005AA | Integrated Solid Waste Management | 12 | MO | ||
| TOTAL RECURRING WORK BASE YEAR |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELINs-Base-Non-Recurring
| ATTACHMENT J-0200000-11 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION: N40085-19-R-9135 | ||||||
| EXHIBIT A - CLIN 0002 | ||||||
| Line Item 0002 Non-Recurring Quantity Price - Base Period | ||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs A700 through A712 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Provide a 4 CY Front Load Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 4 CY dumpster upon notification and remove dumpster when notified. | 6 | EA |
| A701 | 4 CY General Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general waste from 4 CY dumpster to ensure refuse is properly collected and disposed. | 10 | EA |
| A702 | Provide a 8 CY Front Load Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 8 CY dumpster upon notification and remove dumpster when notified. | 6 | EA |
| A703 | 8 CY General Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general waste from 8 CY dumpster to ensure refuse is properly collected and disposed. | 10 | EA |
| A704 | Provide a 20 CY Roll-Off Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 20 CY roll-off dumpster upon notification and remove dumpster when notified. | 10 | EA |
| A705 | 20 CY General Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general waste from 20 CY roll-off dumpster to ensure refuse is properly collected and disposed. | 10 | EA |
| A706 | Provide a 40 CY Roll-Off Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 40 CY roll-off dumpster upon notification and remove dumpster when notified. | 10 | EA |
| A707 | 40 CY General/Construction Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general and/construction waste from 40 CY roll-off dumpster to ensure refuse is properly collected and disposed. | 15 | EA |
| A708 | Three (3) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a three (3) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 3 | EA |
| A709 | Seven (7) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a seven (7) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for waste for an 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 5 | EA |
| A710 | Fifteen (15) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a fifteen (15) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 2 | EA |
| A711 | Thirty (30) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a thirty (30) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 2 | EA |
| A712 | Relocate Dumpsters when destructive weather is imminent | Empty all MCAS Beaufort and Laurel Bay dumpsters, and relocate. |
There are 9 dumpsters in Laurel Bay - Relocate to old Laurel Bay TrailerPark
| There are 51 dumpsters on the Air Station - Relocate to the old Pine Grove housing area on the Air Station. | 120 | EA | |
| TOTAL NON-RECURRING WORK PRICE BASE YEAR |
ELINs-1st Option-Recurring
| ATTACHMENT J-0200000-11 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION: N40085-19-R-9135 | |||||
| EXHIBIT B - CLIN 0003 | |||||
| Line Item 0003 Recurring Work Price - First Option Period | |||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES -RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs B001 through B005 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| B001 | Marine Air Corps Station Beaufort( MCAS) | ||||
| B001AA | Integrated Solid Waste Management | 12 | MO | ||
| B002 | Townsend Bombing Range | ||||
| B002AA | Integrated Solid Waste Management | 12 | MO | ||
| B003 | Bureau Of Medicine And Surgery (BUMED) at MCAS | ||||
| B003AA | Integrated Solid Waste Management | 12 | MO | ||
| B004 | Laurel Bay Housing (LB) | ||||
| B004AA | Integrated Solid Waste Management | 12 | MO | ||
| B005 | Naval Support Facility Beaufort | ||||
| B005AA | Integrated Solid Waste Management | 12 | MO | ||
| TOTAL RECURRING WORK OPTION 1 YEAR |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELINs-1st Option Non-Recurring
| ATTACHMENT J-0200000-11 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION: N40085-19-R-9135 | ||||||
| EXHIBIT B - CLIN 00004 | ||||||
| Line Item 0004 Non-Recurring Work Price - First Option Period | ||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs B700 through B712 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Provide a 4 CY Front Load Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 4 CY dumpster upon notification and remove dumpster when notified. | 6 | EA |
| B701 | 4 CY General Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general waste from 4 CY dumpster to ensure refuse is properly collected and disposed. | 10 | EA |
| B702 | Provide a 8 CY Front Load Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 8 CY dumpster upon notification and remove dumpster when notified. | 6 | EA |
| B703 | 8 CY General Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general waste from 8 CY dumpster to ensure refuse is properly collected and disposed. | 10 | EA |
| B704 | Provide a 20 CY Roll-Off Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 20 CY roll-off dumpster upon notification and remove dumpster when notified. | 10 | EA |
| B705 | 20 CY General Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general waste from 20 CY roll-off dumpster to ensure refuse is properly collected and disposed. | 10 | EA |
| B706 | Provide a 40 CY Roll-Off Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 40 CY roll-off dumpster upon notification and remove dumpster when notified. | 10 | EA |
| B707 | 40 CY General/Construction Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general and/construction waste from 40 CY roll-off dumpster to ensure refuse is properly collected and disposed. | 15 | EA |
| B708 | Three (3) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a three (3) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 3 | EA |
| B709 | Seven (7) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a seven (7) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for waste for an 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 5 | EA |
| B710 | Fifteen (15) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a fifteen (15) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 2 | EA |
| B711 | Thirty (30) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a thirty (30) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 2 | EA |
| B712 | Relocate Dumpsters when destructive weather is imminent | Empty all MCAS Beaufort and Laurel Bay dumpsters, and relocate. |
There are 9 dumpsters in Laurel Bay - Relocate to old Laurel Bay TrailerPark
| There are 51 dumpsters on the Air Station - Relocate to the old Pine Grove housing area on the Air Station. | 120 | EA | |
| TOTAL NON-RECURRING WORK PRICE 1ST OPTION YEAR |
ELINs-2nd Option-Recurring
| ATTACHMENT J-0200000-11 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION: N40085-19-R-9135 | |||||
| EXHIBIT C - CLIN 0005 | |||||
| Line Item 0005 Recurring Work Price - 2nd Option Period | |||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES -RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs C001 through C005 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| C001 | Marine Air Corps Station Beaufort( MCAS) | ||||
| C001AA | Integrated Solid Waste Management | 12 | MO | ||
| C002 | Townsend Bombing Range | ||||
| C002AA | Integrated Solid Waste Management | 12 | MO | ||
| C003 | Bureau Of Medicine And Surgery (BUMED) at MCAS | ||||
| C003AA | Integrated Solid Waste Management | 12 | MO | ||
| C004 | Laurel Bay Housing (LB) | ||||
| C004AA | Integrated Solid Waste Management | 12 | MO | ||
| C005 | Naval Support Facility Beaufort | ||||
| C005AA | Integrated Solid Waste Management | 12 | MO | ||
| TOTAL RECURRING WORK OPTION 2 YEAR |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELINs-2nd Option Non-Recurring
| ATTACHMENT J-0200000-11 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION: N40085-19-R-9135 | ||||||
| EXHIBIT C - CLIN 0006 | ||||||
| Line Item 0006 Non-Recurring Work Price 2nd Option Period | ||||||
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT SERVICES - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | ||||||
| ELINs C700 through C712 | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| C700 | Provide a 4 CY Front Load Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 4 CY dumpster upon notification and remove dumpster when notified. | 6 | EA |
| C701 | 4 CY General Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general waste from 4 CY dumpster to ensure refuse is properly collected and disposed. | 10 | EA |
| C702 | Provide a 8 CY Front Load Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 8 CY dumpster upon notification and remove dumpster when notified. | 6 | EA |
| C703 | 8 CY General Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general waste from 8 CY dumpster to ensure refuse is properly collected and disposed. | 10 | EA |
| C704 | Provide a 20 CY Roll-Off Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 20 CY roll-off dumpster upon notification and remove dumpster when notified. | 10 | EA |
| C705 | 20 CY General Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general waste from 20 CY roll-off dumpster to ensure refuse is properly collected and disposed. | 10 | EA |
| C706 | Provide a 40 CY Roll-Off Dumpster |
| Available on DoD FedMall | The Contractor shall provide a 40 CY roll-off dumpster upon notification and remove dumpster when notified. | 10 | EA |
| C707 | 40 CY General/Construction Waste Services |
| Available on DoD FedMall | The Contractor shall remove and dispose general and/construction waste from 40 CY roll-off dumpster to ensure refuse is properly collected and disposed. | 15 | EA |
| C708 | Three (3) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a three (3) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 3 | EA |
| C709 | Seven (7) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a seven (7) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for waste for an 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 5 | EA |
| C710 | Fifteen (15) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a fifteen (15) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 2 | EA |
| C711 | Thirty (30) Business Day Integrated Solid Waste Management Service For MCRD Parris Island, SC |
| Available on DoD FedMall | The Contractor shall provide Integrated Solid Waste Management services at Marine Corps Recruit Depot, Parris Island, SC for a thirty (30) business day period. Services are required from 0700 hours to 1700 hours each day. The driver and truck shall be on site at 07:00 AM the next business day when notified by the KO prior to 2:00 PM. Notification after 2:00 PM will require the truck and driver to be on site the second business day. Notification prior to 5:00 PM on a Friday will require the driver and truck to be on site by 7:00 AM Monday morning. The contractor vehicles shall be able to support the collection and disposal of waste for 8 CY front load dumpsters. Historically, one driver/ per 40 cubic yarder truck/ per day, services an average of 45 eight cubic yard containers at the Marine Corps Recruit Depot, Parris Island, SC. Average mileage per truck per day is 150 miles. This includes the two round trips to the landfill, and route mileage. The contractor will not be responsible for the disposal fees. At the end of each business day, the contractor shall submit the weight ticket to the MCRD Parris Island Contract Officer Representative (COR). | 2 | EA |
| C712 | Relocate Dumpsters when destructive weather is imminent | Empty all MCAS Beaufort and Laurel Bay dumpsters, and relocate. |
There are 9 dumpsters in Laurel Bay - Relocate to old Laurel Bay TrailerPark
| There are 51 dumpsters on the Air Station - Relocate to the old Pine Grove housing area on the Air Station. | 120 | EA | |
| TOTAL NON RECURRING WORK RICE 2ND OPTION YEAR |
ELINs-3rd Option-Recurring
| ATTACHMENT J-0200000-11 | |||||
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION: N40085-19-R-9135 | |||||
| EXHIBIT D - CLIN 0007 | |||||
| Line Item 0007 Recurring Work Price -3rd Period | |||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES -RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs D001 through D005 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| D001 | Marine Air Corps Station Beaufort( MCAS) | ||||
| D001AA | Integrated Solid Waste Management | 12 | MO | ||
| D002 | Townsend Bombing Range | ||||
| D002AA | Integrated Solid Waste Management | 12 | MO | ||
| D003 | Bureau Of Medicine And Surgery (BUMED) at MCAS | ||||
| D003AA | Integrated Solid Waste Management | 12 | MO | ||
| D004 | Laurel Bay Housing (LB) | ||||
| D004AA | Integrated Solid Waste Management | 12 | MO | ||
| D005 | Naval Support Facility Beaufort | ||||
| D005AA | Integrated Solid Waste Management | 12 | MO | ||
| TOTAL RECURRING WORK OPTION 3 YEAR |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.