Amendment_02_IFB_N4008519B4001.pdf
PDF 199 KB Posted
- Attached to
- DEMOLISH COAL AND ASH HANDLING SYSTEMS, BUILDING 152, MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA
- Solicitation number
- N4008519B4001
About this file
This document is an amendment to a solicitation for demolition services. The solicitation is for demolishing coal and ash handling systems in Building 152 at the Marine Corps Air Station in Cherry Point, North Carolina. The amendment provides responses to six questions received from potential offerors. It clarifies that equipment can be removed using conventional demolition procedures but must comply with specified safety and protection requirements. It also notes that coal bunkers, hoppers and stacks are lined with stainless steel and carbon steel. The amendment directs offerors to project drawings and specifications for details on the scope of demolition and preparation of areas for storage. Backfill material requirements are also referenced. Additionally, the amendment includes two new FAR provisions relating to telecommunications and video surveillance services and equipment. Offerors must acknowledge receipt of this amendment with their bid submission.
The related federal contract opportunity provides additional details on the solicitation. Specifically, it seeks demolition of coal and ash handling systems in Building 152 at the Marine Corps Air Station in Cherry Point. The contracting agency is listed as the Department of the Navy Naval Facilities Engineering Command. No further description or pricing terms are provided.
Amendment_02_IFB_N4008519B4001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_03_IFB_N4008519B4001.pdf | ||
| Amendment_01_IFB_N4008519B4001.pdf | ||
| Solicitation_N4008519B4001.pdf | ||
| DrawingsAsOne_Part_1.pdf | ||
| Specs_19B4001.pdf | ||
| DrawingsAsOne_Part_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5628143
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519B4001
X 9B. DATED (SEE ITEM 11)
23-Jul-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N4008519B4001 Demolish Coal and Ash Handling Systems B-152, MCAS Cherry Point, NC
This amendment is issued to answ er RFIs.
Time for receipt of bids remains unchanged.
See continuation page(s).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Aug-2019
CODE
NAVFAC MID ATLANTIC
FEAD CHERRY POINT
BLDG 163 CURTIS ROAD
PSC BOX 8006
CHERRY POINT NC 28533-0006
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519B4001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by reference:
52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
AUG 2019
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
The following have been added by full text:
AMENDMENT 02 RFI RESPONSE
IMPORTANT
This amendment must be acknowledged when your bid is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the bid.
Amendment 02 – Demolish Coal and Ash Handling Systems, Bldg. 152, MCAS Cherry Point, NC
RFI #2: Can equipment such as precipitators and conveyor supports be cut and pulled using conventional demolition procedure?
Response: Reference Specification 02 41 00 Demolition, Paragraphs 1.3.1 Existing Construction Limits and Protections, 1.3.4 Facilities, and 1.7.2 Protection of Personnel. Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments.
RFI #3: Are Stacks and Coal Bunkers lined? If so, what are they lined with?
Response: All Coal Bunkers, Hoppers, and Stacks are lined with stainless steel and skinned on the outside with carbon steel. Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments.
RFI #4: Is area next to boiler to be completely gutted out or just the boiler? Referencing Sheet MD101A, for example, the Demolition Notes refer to "associated equipment & appurtenances". However, the exact scope is unclear. To what extents are utilities (pipe, conduit, ductwork, etc.) be removed to? For example, is ductwork simply to be removed to nearest hanger, or is it to be followed and removed to the extent of its origin? We would like to be clear that ONLY darkened hidden lines are the scope of demolition for each drawing and perhaps, a description clarifying what "associated equipment & appurtenances" refers to specifically.
Response: Reference NAVFAC Drawing 12767250 General Notes, Demolition. Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments.
RFI #5: Have the tunnels, pits, conveyors and boilers, etc. been cleaned down of residual coal, coal dust, etc. or are we expected to wash down all coal handling equipment/facilities prior to removal and torch cutting?
Response: Reference Specification Section 02 41 00 Demolition, Paragraph 3.1.6.1 Preparation for Storage.
Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments.
N4008519B4001
RFI #6: Can RR ballasts be used for backfill?
Response: Reference Specification Section 31 23 00.00 20 Excavation and Fill, Paragraph 2.1.4 Backfill and Fill Material. Submit Proposals in accordance with RFP, Specifications, Drawings, and all Amendments.
The following provision and clause have been added:
FAR 52.204-24 – Added FAR 52.204-25 – Added
(End of Summary of Changes)