Amendment_01_IFB_N4008519B4001.pdf

PDF 147 KB Posted

Attached to
DEMOLISH COAL AND ASH HANDLING SYSTEMS, BUILDING 152, MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA
Solicitation number
N4008519B4001
Issued by

About this file

This document is an amendment to a solicitation for demolition services at a Marine Corps facility. The amendment provides responses to contractor questions to clarify requirements for the solicitation. Specifically, it confirms that attendance at a pre-bid site visit was not mandatory in order to submit a bid response. However, contractors are still expected to inspect the site to fully understand the nature and location of work. The amendment emphasizes contractors are responsible for properly estimating difficulty and costs, and that failure to take reasonable actions to understand site conditions will not relieve the contractor of performance obligations. The solicitation number is provided as N4008519B4001 and involves demolishing coal and ash handling systems at Building 152 of the Marine Corps Air Station in Cherry Point, North Carolina. The issuing agency is the Department of the Navy, Naval Facilities Engineering Command.

Amendment_01_IFB_N4008519B4001.pdf

View the file

Other files

File Type Posted
Amendment_03_IFB_N4008519B4001.pdf PDF
Amendment_02_IFB_N4008519B4001.pdf PDF
Solicitation_N4008519B4001.pdf PDF
DrawingsAsOne_Part_1.pdf PDF
Specs_19B4001.pdf PDF
DrawingsAsOne_Part_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5628143

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008519B4001 - Demolish Coal and Ash Handling Systems B-152, MCAS Cherry Point, NC

This amendment is issued to answ er an RFI.

Time for receipt of bids remains unchanged.

See contination page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519B4001

X 9B. DATED (SEE ITEM 11)

23-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Aug-2019

CODE

NAVFAC MID ATLANTIC

FEAD CHERRY POINT

BLDG 163 CURTIS ROAD

PSC BOX 8006

CHERRY POINT NC 28533-0006

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519B4001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 01 RFI RESPONSE

IMPORTANT

This amendment must be acknowledged when your bid is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the bid.

Amendment 01 – Demolish Coal and Ash Handling Systems, Bldg. 152, MCAS Cherry Point, NC

RFI #1: I was wondering if the pre bid was mandatory to bid on this project.

Response: The question presented is vague. The Government assumes the question is in reference to the site visit that was scheduled and performed on 13 August 2019 at 10:00 AM local time. Sufficient time was provided to allow all interested parties to attend and no other site visit will be scheduled.

It is not mandatory to attend the site visit to submit a bid.

However, Offers are urged and expected to inspect the site where the work will be performed.

Any failure of the Contractor to take the actions reasonably necessary to ascertain the nature and location of the work; the investigation and satisfaction by the Contractor as to the general and local conditions which can affect the work or its cost, and will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.

Refer to FAR 52.236-27, Site Visit (Construction), FAR 52.236-2, Differing Site Conditions, FAR 52.236-3, Site Investigations and Conditions Affecting the Work, and Spec Section 01 80 00 Part 1 General , paragraph 1.2.2 Site Visit in the solicitation.

(End of Summary of Changes)