Bid_Schedule.docx
DOCX document 23 KB Posted
- Attached to
- DESIGN-BID-BUILD (DBB), REPAIR TRESTLE 1A BOX BEAMS, NAVAL WEAPONS STATION EARLE, COLTS NECK, NJ
- Solicitation number
- N4008518R8720
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0006.pdf | ||
| Amendment_0005_18R8720.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| T1A_ATT_SHT.pdf | ||
| Amendment_0002.pdf | ||
| T1A_SV_Photos.pdf | ||
| 1561849_Amend002_Bid_Set_DWGs_with_Amend001_Signed.pdf | ||
| 1561849_DWG_Amd001.pdf | ||
| 1561849_SPC_Amd001.pdf | ||
| Amendment_1.pdf | ||
| RFP.pdf | ||
| Drawings-Full_Set.pdf | ||
| Specs.pdf | ||
| N4008518R8720_Pre_Solicitation_Notice.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NWS Earle Trestle 1A Repairs 1561849
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work, complete in accordance with the drawings and specifications, but excluding work described in Contract Line Items (CLIN) 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, and 0002.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0001AA |
| 0001AA |
| Price for the entire work, complete in accordance with the drawings and specifications but excluding work described in items 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, 0001AH, 0001AI, and 0002. |
| $ |
CLIN 0001AB. Price for foundation piling complete in accordance with drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| ESTIMATED QUANTITY |
| TOTAL PRICE FOR CLIN 0001AB (UNIT PRICE X NO. UNITS) |
| 0001AB |
| All 24" diameter steel pipe piles |
| Linear feet |
| $ |
| 1340 |
| $ |
CLIN 0001AC. Price for dynamic pile load tests, complete in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| ESTIMATED QUANTITY |
| TOTAL PRICE FOR CLIN 0001AC (UNIT PRICE X NO. UNITS) |
| 0001AC |
| Dynamic pile load test for 24" diameter steel pipe piles (includes restrike. |
| Each |
| $ |
| 2 |
| $ |
CLIN 0001AD. Price for providing the complete three (3) layer CFRP Strengthening System on the underside of the box beams for flexural strengthening, including the protective top coat, in accordance with the drawings and specifications and in accordance with the following schedule.
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| ESTIMATED CONCRETE BEAM STRENGTHENING SURFACE AREA |
| TOTAL PRICE FOR CLIN 0001AD (UNIT PRICE X NO. UNITS) |
| 0001AD |
| All Type 3 Flexural CFRP System installation, including topcoat |
| Square feet |
| $ |
| 13,700 |
| $ |
CLIN 0001AE. Price for providing the complete Type 2 CFRP Strengthening System on the underside of the box beams for flexural strengthening, including the protective top coat, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| ESTIMATED CONCRETE BEAM STRENGTHENING SURFACE AREA |
| TOTAL PRICE FOR CLIN 0001AE (UNIT PRICE X NO. UNITS) |
| 0001AE |
| All Type 2 Flexural CFRP System installation, including topcoat |
| Square feet |
| $ |
| 43,300 |
| $ |
CLIN 0001AF. Price for providing the complete Type 1 CFRP Strengthening System on the underside of the box beams for flexural strengthening, including the protective top coat, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| ESTIMATED CONCRETE BEAM STRENGTHENING SURFACE AREA |
| TOTAL PRICE FOR CLIN 0001AF (UNIT PRICE X NO. UNITS) |
| 0001AF |
| All Type 1 Flexural CFRP System installation, including topcoat |
| Square feet |
| $ |
| 6,300 |
| $ |
CLIN 0001AG. Price for providing the complete CFRP Strengthening System on the box beams for shear strengthening, including the protective top coat, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| QUANTITY |
| TOTAL PRICE FOR CLIN 0001AG (UNIT PRICE X NO. UNITS) |
| 0001AG |
| All of the shear CFRP System installation, including topcoat |
| Lump Sum |
| $ |
| 1 |
| $ |
CLIN 0001AH. Price for providing concrete spall repairs, including concrete removal, surface preparation, galvanic anodes, and placement of repair concrete, in accordance with the drawings and specifications and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| ESTIMATED QUANTITY |
| TOTAL PRICE FOR CLIN 0001AH (UNIT PRICE X NO. UNITS) |
| 0001AH |
| Concrete Spall Repairs |
| cubic foot |
| $ |
| 500 |
| $ |
CLIN 0001AI. Price for providing all required project bonds and in accordance with the following schedule:
| CLIN |
| ITEM |
| UNIT |
| UNIT PRICE |
| ESTIMATED QUANTITY |
| TOTAL PRICE FOR CLIN 0001AI (UNIT PRICE X NO. UNITS) |
| 0001AI |
| Project Bonds |
| Lump Sum |
| $ |
| 1 |
| $ |
| Total Cost of CLIN 0001 (0001AA through 0001AI) |
| $ |
CLIN 0002 Option Item No. 1 - Price includes the following:
Price for providing all work in connection with the Box Beam Load Tests, complete in accordance with the drawings and specifications.
| CLIN |
| DESCRIPTION |
| TOTAL PRICE FOR CLIN 0002 |
| 0002 |
| Providing load testing on two trapezoidal box beams supporting the railroad on Trestle 1A |
| $ |
| Total Cost of CLIN 0001 & CLIN 0002 |
| $ |
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA, 0001AB, 0001AC, 0001AD, 0001AE, 0001AF, 0001AG, and 0001AH. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government reserves the unilateral right to award CLIN 0002 to the Contractor at the proposed price within 120 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001 and CLIN 0002. No provision is made for economic price adjustment. If Option is exercised, the contract completion date remains 1,420 calendar days after award of the contract.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the Option(s).
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
e. If CLIN 0002 is exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document -- Document 00 22 13.00 20 Page 5