Amendment_1.pdf
PDF 386 KB Posted
- Attached to
- DESIGN-BID-BUILD (DBB), REPAIR TRESTLE 1A BOX BEAMS, NAVAL WEAPONS STATION EARLE, COLTS NECK, NJ
- Solicitation number
- N4008518R8720
About this file
Amendment_1.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0006.pdf | ||
| Amendment_0005_18R8720.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| T1A_ATT_SHT.pdf | ||
| Amendment_0002.pdf | ||
| T1A_SV_Photos.pdf | ||
| 1561849_Amend002_Bid_Set_DWGs_with_Amend001_Signed.pdf | ||
| 1561849_DWG_Amd001.pdf | ||
| 1561849_SPC_Amd001.pdf | ||
| RFP.pdf | ||
| Drawings-Full_Set.pdf | ||
| Specs.pdf | ||
| Bid_Schedule.docx | DOCX document | |
| N4008518R8720_Pre_Solicitation_Notice.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THE PROPOSAL DUE DATE REMAINS 19 JULY 2018
The purpose of this amendment is to:
1. Provide revised draw ings.
2. Provide revised specifications.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008518R8720
X 9B. DATED (SEE ITEM 11)
05-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jun-2018
CODE
NAVFAC MID ATLANTIC
9324 VIRGINIA AVENUE
BLDG Z-144
NORFOLK VA 23511
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R8720
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
Amendment 0001
CONTINUATION SHEET
DOCUMENT 00 01 15 LIST OF DRAWINGS
1.3.1 Reference Drawings
NAVFAC Dwg No. 12706695 through 12706953, Design-Build for RM13-0728 Repair Utilities, are added to the list of drawings and accompany this amendment.
On NAVFAC Dwg. No. 12768380 (G101) At “PROPOSED CONSTRUCTION SEQUENCE NOTES”, change “(WORK TO BE COMPLETED 900 DAYS AFTER CONTRACT AWARD)” to read “(WORK TO BE COMPLETED 1300 DAYS AFTER COMPLETING
PHASE 3)
PROJECT TABLE OF CONTENTS
Section 01 58 00, PROJECT IDENTIFICATION, is added to the Project Table of Contents Section 01 78 23, OPERATION AND MAINTENANCE DATA, is added to the Project Table of Contents Section 01 78 24.00 20, FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI), is added to the Project Table of Contents
SECTION 01 14 00 WORK RESTRICTIONS
1.5 VESSEL ACCESS
In the second to last paragraph, delete “they” and replace with “all contractor personnel.”
SECTION 01 35 13 SPECIAL PROJECT PROCEDURES
3.2 EXPLOSIVE SAFETY PROCEDURES, is added to the Section
3.2.1 Safety During Ordnance Transport
The contractor shall stop work and secure the job site when a train or truck carrying ordnance traverses Trestle 1A.
Contractor will be provided 24 hours' notice prior to movement of ordnance on Trestle 1A. Work stoppage should last between 1 to 2 hours.
SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
3.6.5 Use of Explosives
Delete this paragraph in its entirety and replace with the following:
“Use of explosives will not be permitted.”
3.9 EXPLOSIVE SAFETY PROCEDURES, is added to the Section
3.9.1 Safety During Ordnance Transport
The contractor shall stop work and secure the job site when a train or truck carrying ordnance traverses Trestle 1A.
Contractor will be provided 24 hours' notice prior to movement of ordnance on Trestle 1A. Work stoppage should last approximately 2 to 3 hours.
N4008518R8720
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
1.5 SPECIAL ENVIRONMENTAL REQUIREMENTS
Delete this paragraph in its entirety and replace with the following:
“In addition to the requirements set forth elsewhere in the contract and its included permits, the contractor shall comply with the following restrictions:
a. No pile driving activities shall occur during the months of March through October of any calendar year.
b. The contractor shall provide a minimum of three trained marine mammal observers at all times during pile driving operations. Submit a Marine Mammal Observation Plan for approval prior to construction. The marine mammal observers shall be dedicated to the observation of marine mammals during pile driving and shall have no other construction or navigation related tasks. Marine mammal observers shall be able to communicate directly with the construction team at all times in order to alert the construction team to the presence of marine mammals approaching or within the observation zones. The contractor shall immediately shut down pile driving operations if any marine mammals are observed approaching or within the observation zones.
c. During impact pile driving operations, the marine mammal observation zone shall extend to a distance of 222 meters from the pile in all directions. Impact pile driving operations shall incorporate a soft start. Contractor shall conduct an initial set of three strikes from the impact hammer at 40 percent energy, followed by a 1-minute waiting period, then two subsequent three strike sets. Soft start shall be required for impact driving at the beginning of the day, and at any time following a cessation of impact pile driving of thirty minutes or longer. The three observers shall be stationed so that the entire observation area is under visual surveillance.
d. During vibratory pile driving operations, the marine mammal observation zone shall extend to a distance of 4,462 meters from the pile in all directions. One observer shall be stationed on an elevated platform on the pier/ trestle complex and the remaining two observers shall each be stationed on separate vessels so that the entire observation area is under visual surveillance.
e. Should weather conditions or sea state preclude monitoring of the entire ensonified area, pile driving shall not occur until conditions improve.
3.11 SOUND INTRUSION
In the second sentence, delete “without written permission from the Contracting Officer, and then only during the designated times.”
SECTION 31 62 23.13 STEEL PIPE PILES
1.3 SUBMITTALS
SD-02 Shop Drawings Add a “G” after “Installation” so it reads “Installation; G” SD-03 Product Data Add a “G” after “Driving” so it reads “Driving; G” Add a “G” after “Equipment” so it reads “Equipment; G” SD-06 Test Reports Add a “G” after “Material Tests” so it reads “Material Tests; G” SD-11 Closeout Submittals Add a “G” after “Driving Record” so it reads “Driving Record; G”
(End of Summary of Changes)