Attach_3_-_1.14.3_-_CONTRACTOR_PRODUCTION_REPORT.pdf
PDF 24 KB Posted
- Attached to
- Replace Dock Levelers Bldgs 6, 8, and 9 Federal contract opportunity
- Solicitation number
- N4008518R6501
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4008518R65010001.pdf | ||
| Attach_1_-_1.14.1_-_Activity_Hazard_Analysis.pdf | ||
| N4008518R6501.pdf | ||
| Attach_2_-_1.14.2_-_Mobile_Construction_Equipment_Checklist.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4296/1 (9/98) SHEET 1 OF 1
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
CONTRACT NO TITLE AND LOCATION
REPORT NO
CONTRACTOR SUPERINTENDENT
AM WEATHER PM WEATHER MAX TEMP (F) MIN TEMP (F)
WORK PERFORMED TODAY
Schedule Activity No.
WORK LOCATION AND DESCRIPTION EMPLOYER NUMBER TRADE HRS
WAS A JOB SAFETY MEETING HELD THIS DATE?
(If YES attach copy of the meeting minutes) YES NO
TOTAL WORK HOURS ON JOB
SITE,
THIS DATE, INCL CON'T SHEETS JOB
SAFETY WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report) YES NO
CUMULATIVE TOTAL OF WORK
HOURS FROM PREVIOUS
REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.) YES NO
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.) YES NO
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
Schedule
LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED SAFETY REQUIREMENTS HAVE BEEN MET.
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Submittal # Description of Equipment/Material Received
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Owner Description of Construction Equipment Used Today (incl Make and Model) Hours Used
REMARKS
CONTRACTOR/SUPERINTENDENT DATE
| CONTRACTOR PRODUCTION REPORT |
| WORK PERFORMED TODAY |
| JOB |
File details come from the government source that posted it.