N40085-18-R-6448_Amendment_0002.pdf
PDF 117 KB Posted
- Attached to
- Building 107 East Loading Dock Rehabilitation at Naval Support Activity (Mechanicsburg, PA)
- Solicitation number
- N4008518R6448
About this file
N40085-18-R-6448_Amendment_0002.pdf
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 107 East Loading Dock Rehabilitation Solicitation N4008518R6448 Naval Support Activity, Mechanicsburg, PA Amendment 0002
NAVAL FACILITIES ENGINEERING COMMAND, MID-ATLANTIC
PWD PENNSYLVANIA, FACILITIES ENGINEERING AND ACQUISITION DIVISION
BUILDING 1, PHILADELPHIA BUSINESS CENTER
PHILADELPHIA, PA 19112
POC: Anthony Zampetti (215) 897-8877
HUBZONE DESIGN-BUILD (DB), DESIGN-BID-BUILD (DBB) INDEFINITE DELIVERY,
INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
FOR FACILITIES IN THE NORTH INTEGRATED PRODUCT TEAM (IPT) AREA OF
RESPONSIBILITY (AOR) TO INCLUDE CONNECTICUT, DELAWARE, ILLINOIS, INDIANA,
MAINE, MARYLAND, MASSACHUSETTS, NEW HAMPSHIRE, NEW JERSEY, NEW YORK,
PENNSYLVANIA, RHODE ISLAND, AND VERMONT
PROPOSED TASK ORDER:
N4008518R6448
Building 107 East Loading Dock Rehabilitation at
Naval Support Activity
Mechanicsburg, PA
Amendment 0002
This amendment dated July 11, 2018 provides government responses to additional requests for information (RFIs). As a result of this amendment, the proposal due date remains
UNCHANGED: Thursday, July 12, 2018 at 2:00 pm Local Time.
Responses to RFIs 0002
1. The old clay pipe could crack or collapse when the contractor compacts/proof rolls the existing fill material above the pipe.
Response 1: We do not believe that there will be an issue with the pipe collapsing during compaction. Existing storm sewer pipe is reinforced concrete and not terra cotta (clay) as identified in the RFI. Contractor to take necessary precautions not to damage the pipe.
2. Could the design layout be changed to install a contraction joint every 20’-0” instead of every 60’-0”?
Response 2: Contraction joint spacing is to be maintained as shown on contract drawings.