Attachment_1_-_Bid_Schedule.docx

DOCX document 20 KB Posted

Attached to
REPLACEMENT OF ACM PANELS AT BUILDING 7
Solicitation number
N4008518R2111
Issued by

View the file

Other files

File Type Posted
ATTACHMENT_2_-_VETTING_REQUEST_TEMPLATE_2017_.xlsx XLSX spreadsheet
Attachment_2A_-_SITE_VISIT_INFORMATION.docx DOCX document
RFP_Replace_ACM_Panels_at_Bldg_7.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL FORM

REQUEST FOR PROPOSAL (RFP) N40085-18- R-2111

Contractor price shall include the necessary labor, materials, equipment, management, supervision, and administration to accomplish the project in reference to solicitation N40085-18- R-2111 One lump sum price shall be provided for the following project:

This contract will be awarded as one lump sum. Base price includes the price for the entire work for labor, materials, equipment, management, supervision to complete in accordance with the requirement of the Request for Proposal (RFP) N40085-18- R-2111 for Replacement of ACM Panels at Bldg 7 at Naval Station Newport, Newport RI.

CLIN
Description
Unit of Issue
Unit Price
Total
0001
Entire work for labor, materials, equipment, management, supervision, for replacement of ACM Panels at Bldg 7, complete in accordance with the drawings and specifications
1 JOB

Grand Total for Item 0001 $_______________________________

In the event there is a difference between a unit price and the total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity.

CONTRACT LINE ITEM NOTES:

General

1. Failure to enter a price for any of the items will result in the proposal being rejected as unacceptable. The lump sum price above shall be deemed to include all costs required for the specified work, completed in accordance with the drawings and specifications, including all labor, materials, equipment, tools, management, supervision, disposal, and related items.

AMENDMENT ACKNOWLEDGED:

Amendment No.
Date

Vendor: ______________________________________________

Name: _______________________________________________

Signed:_______________________________________________

Date: ________________________________________________

File details come from the government source that posted it.