Renovation of Sterile Processing Area, NH100
Solicitation number
N4008518B6154
Issued by

About this file

N4008518B6154_Amendment0003.pdf

View the file

Other files

File Type Posted
Amendment0005_N4008518B6154.pdf PDF
Amendment0004_N4008518B6154.pdf PDF
N4008518B6154_Amendment0002.pdf PDF
N4008518B6154_Amendment0001.pdf PDF
Solicitation_N4008518B6154.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5426286

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project 16-0050 Renovation of Sterile Processing Area, NH100

This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge the amendment may constitute grounds for rejection of a bid.

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518B6154

X 9B. DATED (SEE ITEM 11)

08-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Jul-2018

CODE

NAVFAC MID ATLANTIC

ROICC CAMP LEJEUNE

1005 MICHAEL ROAD

CAMP LEJEUNE NC 28547-2521

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518B6154

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

1. Replace Specification Section 01 11 00, Paragraph 1.2.1 Project Description with the following: The work includes the renovation of the Sterile Processing Department (SPD). Extensive demolition will be required within and without the boundaries of the SPD and include but are not limited to: existing ceilings systems including all support structures, wall finishes, gypsum board (where needed; all other gypsum wall board will remain in place), doors, door hardware and door frames, all windows and window frames, all existing corner guards, wall protection railings and bases, all sheet resilient flooring and coved base material, including backing material, AHU-28 and AHU-28A air handling systems, ductwork and piping, existing mass notification and fire alarm devices and lights and will all be replaced; replace the existing UV light (see sheet M503, detail A1 for location); new UV light shall meet the following: Maximum operating pressure of 150 psig; operating water temperature - 40 - 80F; operating ambient air temperature - 35 - 110F; 1 UV lamp; electrical requirements to match existing; 1" flange inlet and outlet connections; hot water sanit. with sensor - 170 - 194F; disinfection flowrate @ 94% UVT- 10 gpm; disinfection flowrate @ 99% UVT - 12 gpm; access to the main bank of elevators (elevator lobby N 100) must always be available for Hospital staff and patients throughout the duration of construction; the staff elevators (elevator lobby N 130) must remain open to Hospital staff and patients throughout the duration of construction; corridors C 147 and C 168 must be available for use by Hospital staff throughout the duration of construction; construction barriers will be needed at the project boundaries; temporary trailers (requirements as indicated in the table below) to house hospital staff impacted by this project are to be provided and located at the existing basketball courts and incidental related work.

Trailer

Minimum Area

(SF)

Summary of Spaces (See Note 4)

Telecom Outlets (Per specs)

Power Outlets (Duplex)

Lighting HVAC (See Notes 1, 2, and 3)

1 2,840 1,620 SF Open Office Area w/ nineteen (19) workstations

120 SF hard wall private office w/ one (1) workstation

340 SF hard wall enclosure w/the following spaces:

Per Spec Section 27 10 00, 33 82 00, and Trailer-

As required by UFC 3- 520-1

Lighting levels shall be per

UFC 3-

530-01

78Fdb/5 cooling

68F heating

-two (2) 100SF private offices, one (1) workstation each.

-140 SF open office w/ two (2) workstations.

150SF open seating/waiting area

50SF male restroom w/ toilet and sink.

50SF female restroom w/ toilet and sink

350SF storage room

160SF conference room

PEB

Portable Armory

2 1,919 1,275 SF hard wall enclosure w/ two (2) workstations

444 SF hard wall enclosure w/ two (2) workstations

One (1) 10’x15’ telecom room to support all trailers

One (1) 50SF unisex restroom with toilet and sink

Per Spec Section 27 10 00, 33 82 00, and Trailer-

PEB

Portable Armory

As required by UFC 3- 520-01

Lighting levels shall be per

UFC 3-

530-01

78Fdb/5 cooling

68F heating

3 2,090 1,200 SF hard wall private offices -twelve (12) 100 SF private offices w/ one(1) workstation per office

540 SF open office area with five (5) workstations

150 SF conference room

100 SF storage room

150 SF open seating/waiting area

50 SF male restroom w/ toilet and sink

50 SF female restroom w/ toilet and sink

Per Spec Section 27 10 00, 33 82 00, and Trailer-

PEB

Portable Armory

As required by UFC 3- 520-01

Lighting levels shall be per

UFC 3-

530-01

78Fdb/5 cooling

68F heating

4 2,875 1,750 SF open office area w/ twenty-five (25) workstations

700 SF hard wall enclosure -seven (7) 100 SF private offices, w/ one (1) workstation

Per Spec Section 27 10 00, 33 82 00, As required by UFC 3- 520-01

Lighting levels shall be per

UFC 3-

530-01

78Fdb/5 cooling

68F heating per office

235 SF conference room

90 SF storage room

50 SF male restroom w/ toilet and sink

50 SF female restroom w/ toilet and sink and Trailer-

PEB

Portable Armory

Note 1: provide outdoor air and/or exhaust air per UFC 3-410- 01.

Note 2: 1 programmable thermostat per each air conditioning unit provided.

Note 3: minimum of 2 HVAC zones; telecommunications room to have independent air conditioning and is not included in the minimum number of HVAC zones calculation.

Note 4: a workstation is defined as an office cubicle, 70-80 SF each, depending upon the space allowed in the information provided. Cubicle furniture set shall consist of computer desk, desk w/ cabinet above, filing cabinet, and an office chair.

2. On Drawing ES100 - Omit General Sheet Notes 1 and 2. Note 3 revised as follows:

“The contractor shall install (2) 4” conduits from the Trailer 2 (as shown on C101) telecomm room, on top of the concrete, to edge of concrete pad. Conduits shall be stubbed straight down into the earth 12”-18” at the edge of the pad near the telecomm pedestal (shown on ES100). The contractor shall submit, to Base Telephone and the AE, telecomm diagrams for each trailer. Telecomm drawings shall include the telecomm room layout and elevation diagram. All work shall comply with Specification Sections 27 10 00, 33 82 00, and General Interim document (attached).

3. SPD AREA SPECIFIC (Refer to the attached sketch: “NH100 16-0050 TELECOMM

LOCATIONS EXISTING AND NEW”). NOTE: SPD space is serviced via several telecomm spaces/rooms. Refer to the attached, “NH100 16-0050 CONST AND TELECOMM CLOSET PERIMETERS.” The diagram shows which telecommunication room that supports each area within the construction project area. All new cabling within the SPD space shall be installed to those corresponding telecommunications spaces.

All new pathway, per 27 10 00, shall be installed in the SPD area. Pathways will be continuously supported via 1 ¼” conduit stubbed up to New basket tray or homerun conduit from work area outlet within the SPD area and stubbed out to the existing telecomm pathway outside the SPD area.

All existing telecomm locations within the SPD area shall be replaced with new, per 27 10 00. Cabling shall be removed from the existing work area outlets to corresponding telecommunications space, to include terminations at patch panels within the telecommunication space.

Additional telecomm locations shall be installed per the attached diagram, “NH100 16-0050 TELECOMM LOCATIONS EXISTING AND NEW” represented by red triangles.

All abandoned telecommunications cabling shall be removed.

4. On drawing EP111 – Add note 10 to read, “Contractor shall install new cable tray to support all existing and all new telecommunication cabling within renovated space.

Cable tray and new cabling will be installed in accordance (IAW) with Base Telephone Specification 27 10 00. Existing telecommunication cabling that cannot be routed into new cable tray, or gets damaged during renovations, will be removed (from work area to telecomm room, to include terminations at both ends) and replaced by contractor. All existing cabling requiring replacement will be installed IAW Base Telephone Spec Section 27 10 00. Contractor will certify/test all telecommunications infrastructure within renovated space (new, replaced and/or preserved) and provide test results to Base Telephone.

5. The contractor will be responsible for removing, storing, and reinstalling the existing project area office furniture. The amount of existing furniture is consistent with the amount of furniture to be provided with the temporary trailers. The contractor shall photograph, tag, and record the location of the existing furniture. The contractor shall provide an electronic copy of the furniture condition pictures and locations to the government on a CD. The contractor shall protect each item removed from damage.

The contractor shall store the furniture in a humidity controlled environment. For example: off-site storage and/or on-site conex boxes with built-in dehumidification and/or desiccant systems or other suitable method that meets these objectives. All associated costs for any of the systems selected by the contractor shall be included in the bid package, included but not limited to: rental, purchase, transportation to and from, installation, maintenance, repairs, disposal of, etc.

Maintain relative humidity and ventilation levels throughout the life of the storage items in such a manner to prevent the degradation of the stored furniture, including but not limited to: affecting its wood components, rust, mold growth, etc.

Any degraded furniture items shall be replaced in kind by the contractor at no cost to the government.

Conex containers shall be water tight and in good condition to allow the dehumidification or desiccant system to operate optimally.

The contractor shall provide power to operate equipment as necessary. All electrical connections shall comply will all applicable codes and base standards.

The contractor shall remove from the Marine Corp Base at the conclusion of the project all items used for furniture storage.

The contractor shall photograph/document the existing conditions where conex boxes will be placed during construction. These areas shall be returned to original condition at the conclusion of the project (grass, gravel, etc.).

6. Replace the original M-503 sheet with the attached M-503 sheet.

7. Replace the original E-610 sheet with the attached E-610 sheet.

8. The following specification sections are either in addition to or replacing the original specification sections:

23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems 23 09 00 Instrumentation and Control for HVAC 23 09 13 Instrumentation and Control Devices for HVAC 23 09 23.13 Bacnet Direct Digital Control Systems for HVAC 27 10 00 Building Telecommunications Cabling System 33 82 00 Telecommunications Outside Plant (OSP)

9. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 26-Jul-2018 02:00 PM to 09-Aug-2018 02:00 PM.

(End of Summary of Changes)

SECTION 27 10 00 Page 1

SECTION 27 10 00

BUILDING TELECOMMUNICATIONS CABLING SYSTEM

06/17

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D709 (2016) Standard Specification for

Laminated Thermosetting Materials

ELECTRONIC COMPONENTS INDUSTRY ASSOCIATION (ECIA)

ECIA EIA/ECA 310-E (2005) Cabinets, Racks, Panels, and

Associated Equipment

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 100 (2000; Archived) The Authoritative

Dictionary of IEEE Standards Terms

INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)

ICEA S-83-596 (2016) Indoor Optical Fiber Cables

ICEA S-90-661 (2012) Category 3, 5, & 5e Individually

Unshielded Twisted Pair Indoor Cables for

Use in General Purpose and LAN

Communications Wiring Systems Technical

Requirements

NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)

NECA/BICSI 568 (2006) Standard for Installing Building

Telecommunications Cabling

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

ANSI/NEMA WC 66 (2013) Performance Standard for Category 6 and Category 7 100 Ohm Shielded and

Unshielded Twisted Pairs

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017) National Electrical Code

TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)

TIA-1152 (2009) Requirements for Field Test

Instruments and Measurements for Balanced

Twisted-Pair Cabling

SECTION 27 10 00 Page 2

TIA-455-21 (1988a; R 2012) FOTP-21 - Mating

Durability of Fiber Optic Interconnecting

Devices

TIA-492AAAA (2009b) 62.5-um Core Diameter/125-um

Cladding Diameter Class 1a Graded-Index

Multimode Optical Fibers

TIA-526-14 (2015c) OFSTP-14A Optical Power Loss

Measurements of Installed Multimode Fiber

Cable Plant

TIA-526-7 (2015a) OFSTP-7 Measurement of Optical

Power Loss of Installed Single-Mode Fiber

Cable Plant

TIA-568-C.0 (2009; Add 1 2010; Add 2 2012) Generic

Telecommunications Cabling for Customer

Premises

TIA-568-C.1 (2009; Add 2 2011; Add 1 2012) Commercial

Building Telecommunications Cabling

Standard

TIA-568-C.2 (2009; Errata 2010; Add 2 2014; Add 1

2016) Balanced Twisted-Pair

Telecommunications Cabling and Components

Standards

TIA-568-C.3 (2008; Add 1 2011) Optical Fiber Cabling

Components Standard

TIA-569 (2015d) Commercial Building Standard for

Telecommunications Pathways and Spaces

TIA-570 (2012c) Residential Telecommunications

Infrastructure Standard

TIA-606 (2012b; Add 1 2015) Administration

Standard for the Telecommunications

Infrastructure

TIA-607 (2011b) Generic Telecommunications Bonding and Grounding (Earthing) for Customer

Premises

TIA/EIA-598 (2014d) Optical Fiber Cable Color Coding

TIA/EIA-604-10 (2002a) FOCIS 10 Fiber Optic Connector

Intermateability Standard - Type LC

TIA/EIA-604-12 (2000) FOCIS 12 Fiber Optic Connector

Intermateability Standard Type MT-RJ

TIA/EIA-604-2 (2004b; R 2014) FOCIS 2 Fiber Optic

Connector Intermateability Standard

TIA/EIA-604-3 (2004b; R 2014) Fiber Optic Connector

SECTION 27 10 00 Page 3

Intermateability Standard (FOCIS), Type SC and SC-APC, FOCIS-3

U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)

FCC Part 68 Connection of Terminal Equipment to the

Telephone Network (47 CFR 68)

UNDERWRITERS LABORATORIES (UL)

UL 1286 (2008; Reprint Feb 2015) Office Furnishings

UL 1666 (2007; Reprint Jun 2012) Test for Flame

Propagation Height of Electrical and

Optical-Fiber Cables Installed Vertically in Shafts

UL 1863 (2004; Reprint Sep 2016) UL Standard for

Safety Communication Circuit Accessories

UL 444 (2008; Reprint Apr 2015) Communications

Cables

UL 467 (2013) Grounding and Bonding Equipment

UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations

UL 514C (2014; Reprint Dec 2014) Nonmetallic

Outlet Boxes, Flush-Device Boxes, and

Covers

UL 723 (2008; Reprint Aug 2013) Test for Surface

Burning Characteristics of Building

Materials

UL 969 (1995; Reprint Sep 2014) Standard for

Marking and Labeling Systems

1.2 RELATED REQUIREMENTS

Section 01 33 00 SUBMITTAL PROCEDURES, Section 26 20 00 INTERIOR

DISTRIBUTION SYSTEM and Section 33 82 00 TELECOMMUNICATIONS, OUTSIDE PLANT

(OSP) apply to this section with additions and modifications specified herein.

Contact Camp Lejeune Base Telephone (aka Telecommunications Support

Division or TSD)for special requirements on classified service cabling and color, unofficial service, under slab cabling, using water block, and any item not covered in this document.

Buildings with Special Network Requirements such as Secured Internet

Protocol, Classified networks, Commercial network, Charter cable, MCCS.org, Boingo, and Naval Blue Network may require additional guidance outside this specification. Secured areas or secured networks in non-secured areas may require Protected Distribution System which is also outside this specification. Classified networks may require shielded twisted pair, distinct color, and has separation requirements outside this specification, SECTION 27 10 00 Page 4 and shall be in accordance with current CNSSAM TEMPEST RED/BLACK

Installation documentation. In these cases contact Telecommunications

Support Division G-6 MCIEAST-MCB CAMLEJ for additional guidance at (910)

451-9439 or (910) 451-4760.

Contact AHJ for special requirements on classified service, unofficial service, under slab cabling, using water block, and any item not covered in this document.

1.3 DEFINITIONS

Unless otherwise specified or indicated, electrical and electronics terms used in this specification shall be as defined in TIA-568-C.1, TIA-568-C.2, TIA-568-C.3, TIA-569, TIA-606 and IEEE 100 and herein.

1.3.1 Main Distribution Frame (MDF)

A physical structure at a central location for terminating permanent backbone cables to interconnect with service provider (SP) equipment at the activity minimum point of presence. The MDF generally includes vendor specific components to support voice and data circuits, building surge protector assemblies, main cross connect blocks, equipment support frames, and fire rated plywood backboard. Depending upon local site conditions, the MDF and BDF may be the same space.

1.3.2 Building Distribution Frame (BDF)

A structure with terminations for connecting backbone, campus, and horizontal cabling. The BDF generally includes a cross connect, equipment support frame or lockable terminal cabinet, cable supports, and fire rated plywood backboard. The BDF shall include building protector assemblies when used for campus backbone or SP cabling.

1.3.3 Intermediate Distribution Frame (IDF)

An intermediate termination point for horizontal wiring and cross connections within telecommunications rooms. Shall be connected to MDF with both fiber and copper. Secure Internet Protocol (SIPR) vault or cabinet is considered an IDF.

1.3.4 Communications Room (CR) (telephone room TR or Distribution Room DR)

An enclosed space for communications equipment, terminations, and cross connect wiring for horizontal cabling. Telecommunications Room (TR) and

Communications Room (CR) are used interchangeably in this section and are considered to have the same meaning.

1.3.5 Campus Distributor (CD)

A distributor from which the campus backbone cabling emanates.

(International expression for main cross-connect (MC) also known as central office or Area Distribution Node.)

1.3.6 Building Distributor (BD)

A distributor in which the building backbone (customer owned outside plant) cables terminate and at which connections to the campus backbone cables may be made. (International expression for intermediate cross-connect (IC).)

SECTION 27 10 00 Page 5

1.3.7 Floor Distributor (FD)

A distributor used to connect horizontal cable and cabling subsystems or equipment. (International expression for horizontal cross-connect (HC).)

1.3.8 Telecommunications Room (TR)

An enclosed space for housing telecommunications equipment, cable, terminations, and cross-connects. The room is the recognized cross-connect between the backbone cable and the horizontal cabling.

1.3.9 Entrance Facility (EF) (Telecommunications) (can be same as communications room)

An entrance to the building for both private and public network service cables (including wireless) including the entrance point at the building wall and continuing to the equipment room.

1.3.10 Equipment Room (ER) (Telecommunications) (can be same as communications room)

An environmentally controlled centralized space for telecommunications equipment that serves the occupants of a building. Equipment housed therein is considered distinct from a telecommunications room because of the nature of its complexity.

1.3.11 Open Cable

Cabling that is not run enclosed in a raceway as defined by NFPA 70. This refers to cabling that is "open" to the space in which the cable has been installed and is therefore exposed to the environmental conditions associated with that space, such as wire basket tray, cable tray, J-hooks, D-rings, or bridal rings. D rings should only be used in the communications room for cable management and J-hooks/bridal rings shall not be used.

1.3.12 Open Office

A floor space division provided by furniture, moveable partitions, or other means instead of by building walls, normally over 100 square feet.

1.3.13 Pathway

A physical infrastructure utilized for the placement and routing of telecommunications cable.

1.4 SYSTEM DESCRIPTION

The building telecommunications cabling and pathway system shall include permanently installed backbone and horizontal cabling, horizontal and backbone pathways, service entrance facilities, work area pathways, telecommunications outlet assemblies, conduit, raceway, and hardware for splicing, terminating, and interconnecting cabling necessary to transport telephone data, and other communications systems (including LAN A/V, intercom, PA, CATV, CCTV, and WiFi) between equipment items in a building.

The horizontal system shall be wired in a star topology from the telecommunications work area to the floor distributor/IDF or building distributor/MDF or campus distributor or communications room at the center or hub of the star. The backbone cabling and pathway system includes

SECTION 27 10 00 Page 6 intrabuilding and interbuilding interconnecting cabling, pathway, and terminal hardware. The intrabuilding backbone provides connectivity from the floor distributors to the building distributors or to the campus distributor and from the building distributors to the campus distributor as required. The backbone system shall be wired in a star topology with the campus distributor (Area Distribution Node) at the center or hub of the star. The interbuilding backbone system provides connectivity between the campus distributors and is specified in Section 33 82 00 TELECOMMUNICATIONS

OUTSIDE PLANT (OSP). Provide telecommunications pathway systems referenced herein as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. The telecommunications contractor must coordinate with MCB CL Base Telephone

(TSD) concerning access to and configuration of telecommunications spaces.

The telecommunications contractor may be required to coordinate work effort within the telecommunications spaces with the electrical sub and general contractor, ROICC and MCB CL Base Telephone (TSD).

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability

Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-02 Shop Drawings

Telecommunications drawings; G

Telecommunications Space Drawings; G

In addition to Section 01 33 00 SUBMITTAL PROCEDURES, provide shop drawings in accordance with paragraph SHOP DRAWINGS.

SD-03 Product Data

Telecommunications cabling (backbone and horizontal); G

Patch panels; G

Telecommunications outlet/connector assemblies; G

Equipment support frame; G

Connector blocks; G

Submittals shall include the manufacturer's name, trade name, place of manufacture, and catalog model or number. Include performance and characteristic curves. Submittals shall also include applicable federal, military, industry, and technical society publication references. Should manufacturer's data require supplemental information for clarification, the supplemental information shall be submitted as specified in paragraph REGULATORY REQUIREMENTS and as required in Section

01 33 00 SUBMITTAL PROCEDURES.

SD-06 Test Reports

Telecommunications cabling testing; G

SECTION 27 10 00 Page 7

SD-07 Certificates

Telecommunications Contractor Qualifications; G

Key Personnel Qualifications; G

Manufacturer Qualifications; G

Test plan; G

SD-09 Manufacturer's Field Reports

Factory reel tests; G

SD-10 Operation and Maintenance Data

Telecommunications cabling and pathway system Data Package 5; G

SD-11 Closeout Submittals

Record Documentation; G

1.5.1 Additional Submittal Requirements

All submittals of material, equipment and design must be approved by the

Telecommunications Support Division (TSD) prior to installing any telecommunications wiring, equipment, or power to support communications.

1.6 QUALITY ASSURANCE

1.6.1 Shop Drawings

In exception to Section 01 33 00 SUBMITTAL PROCEDURES, submitted plan drawings shall be a minimum of 279 by 432 mm 11 by 17 inches in size using a minimum scale of one mm per 100 mm 1/8 inch per foot. Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Drawings shall indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices. Submittals shall include the nameplate data, size, and capacity. Submittals shall also include applicable federal, military, industry, and technical society publication references.

1.6.1.1 Telecommunications Drawings

Provide registered communications distribution designer (RCDD) approved, drawings in accordance with TIA-606. The identifier for each termination and cable shall appear on the drawings. Drawings shall depict final telecommunications installed wiring system infrastructure in accordance with TIA-606. The drawings should provide details required to prove that the distribution system shall properly support connectivity from the EF telecommunications and ER telecommunications, CD's, BD's, and FD's to the telecommunications work area outlets. Provide a plastic laminated schematic of the as-installed telecommunications cable system showing cabling, CD's, BD's, FD's, and the EF and ER for telecommunications keyed

SECTION 27 10 00 Page 8 to floor plans by room number. Mount the laminated schematic in the EF telecommunications space as directed by the Contracting Officer. The following drawings shall be provided as a minimum:

a. T1 - Layout of complete building per floor - Building Area/Serving Zone

Boundaries, Backbone Systems, and Horizontal Pathways. Layout of complete building per floor. The drawing indicates location of building areas, serving zones, vertical backbone diagrams, telecommunications rooms, access points, pathways, grounding system, and other systems that need to be viewed from the complete building perspective.

b. T2 - Serving Zones/Building Area Drawings - Drop Locations and Cable

Identification (ID’S). Shows a building area or serving zone. These drawings show drop locations, telecommunications rooms, dedicated electrical, access points and detail call outs for common equipment rooms and other congested areas.

c. T4 - Typical Detail Drawings - Faceplate Labeling, Firestopping, Americans with Disabilities Act (ADA), Safety, Department of

Transportation (DOT). Detailed drawings of symbols and typicals such as faceplate labeling, faceplate types, faceplate population installation procedures, detail racking, and raceways.

1.6.1.2 Telecommunications Space Drawings

Provide T3 drawings in accordance with TIA-606 that include telecommunications rooms plan views, pathway layout (cable tray, racks, ladder-racks, etc.), mechanical/electrical layout, and cabinet, rack, backboard and wall elevations. Drawings shall show layout of applicable equipment including incoming cable stub or connector blocks, building protector assembly, outgoing cable connector blocks, mechanical/electrical, patch panels and equipment spaces and cabinet/racks. Drawings shall include a complete list of equipment and material, equipment rack details, proposed layout and anchorage of equipment and appurtenances, and equipment relationship to other parts of the work including clearance for maintenance and operation. Drawings may also be an enlargement of a congested area of

T1 or T2 drawings.

1.6.2 Telecommunications Contractor Qualifications

Work under this section shall be performed by and the equipment shall be provided by the approved telecommunications contractor and key personnel.

Qualifications shall be provided for: the telecommunications system contractor, the telecommunications system installer, and the supervisor (if different from the installer). A minimum of 30 days prior to installation, submit documentation of the experience of the telecommunications contractor and of the key personnel.

1.6.2.1 Telecommunications Contractor

The telecommunications contractor shall be a firm which is regularly and professionally engaged in the business of the applications, installation, and testing of the specified telecommunications systems and equipment. The telecommunications contractor shall demonstrate experience in providing successful telecommunications systems within the past 3 years of similar scope and size. Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations for the telecommunications contractor. Also IAW Section on QC Specialists; a

SECTION 27 10 00 Page 9

Telecommunications Systems QC Specialist may be required on site, full time with 10 years minimum experience in telecom installation and experience.

Specialist shall be very familiar with UFGS Divisions 27, 28, 33 concerning communications systems work and installation.

1.6.2.2 Key Personnel

Provide key personnel who are regularly and professionally engaged in the business of the application, installation and testing of the specified telecommunications systems and equipment. There may be one key person or more key persons proposed for this solicitation depending upon how many of the key roles each has successfully provided. Each of the key personnel shall demonstrate experience in providing successful telecommunications systems within the past 3 years.

Supervisors and installers assigned to the installation of this system or any of its components shall be Building Industry Consulting Services

International (BICSI) Registered Cabling Installers, Technician Level.

Submit documentation of current BICSI certification for each of the key personnel.

In lieu of BICSI certification, supervisors and installers assigned to the installation of this system or any of its components shall have a minimum of 3 years experience in the installation of the specified copper and fiber optic cable and components. They shall have factory or factory approved certification from each equipment manufacturer indicating that they are qualified to install and test the provided products. Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations for each of the key personnel. Documentation for each key person shall include at least two successful system installations provided that are equivalent in system size and in construction complexity to the telecommunications system proposed for this solicitation. Include specific experience in installing and testing telecommunications systems and provide the names and locations of at least two project installations successfully completed using optical fiber and copper telecommunications cabling systems. All of the existing telecommunications system installations offered by the key persons as successful experience shall have been in successful full-time service for at least 18 months prior to the issuance date for this solicitation. Provide the name and role of the key person, the title, location, and completed installation date of the referenced project, the referenced project owner point of contact information including name, organization, title, and telephone number, and generally, the referenced project description including system size and construction complexity.

Indicate that all key persons are currently employed by the telecommunications contractor, or have a commitment to the telecommunications contractor to work on this project. All key persons shall be employed by the telecommunications contractor at the date of issuance of this solicitation, or if not, have a commitment to the telecommunications contractor to work on this project by the date that the bid was due to the Contracting Officer.

Note that only the key personnel approved by the Contracting Officer in the successful proposal shall do work on this solicitation's telecommunications system. Key personnel shall function in the same roles in this contract, as they functioned in the offered successful experience. Any substitutions for the telecommunications contractor's key personnel requires approval from The Contracting Officer.

SECTION 27 10 00 Page

1.6.2.3 Minimum Manufacturer Qualifications

Cabling, equipment and hardware manufacturers shall have a minimum of 3 years experience in the manufacturing, assembly, and factory testing of components which comply with TIA-568-C.1, TIA-568-C.2 and TIA-568-C.3.

1.6.3 Test Plan

Provide a complete and detailed test plan for the telecommunications cabling system including a complete list of test equipment for the components and accessories for each cable type specified, 60 days prior to the proposed test date. Include procedures for certification, validation, sample report, and testing.

1.6.4 Regulatory Requirements

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70, manufacturer recommendations/installation manual, best known industry practices, and industry standards, unless more stringent requirements are specified or indicated.

1.6.5 Standard Products

Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.

Modification of manufacturer's standard products such as painting faceplates is not authorized.

1.6.5.1 Alternative Qualifications

Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than

6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.

1.6.5.2 Material and Equipment Manufacturing Date

Products manufactured more than 1 year prior to date of delivery to site shall not be used, unless specified otherwise.

1.7 DELIVERY AND STORAGE

Provide protection from weather, moisture, extreme heat and cold, dirt, dust, and other contaminants for telecommunications cabling and equipment

SECTION 27 10 00 Page placed in storage.

1.8 ENVIRONMENTAL REQUIREMENTS

Connecting hardware shall be rated for operation under ambient conditions of

0 to 60 degrees C 32 to 140 degrees F and in the range of 0 to 95 percent relative humidity, noncondensing. All telecommunications spaces shall follow TIA-569 design.

1.9 WARRANTY

The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.10 MAINTENANCE

1.10.1 Operation and Maintenance Manuals

Commercial off the shelf manuals shall be furnished for operation, installation, configuration, and maintenance of products provided as a part of the telecommunications cabling and pathway system, Data Package 5.

Submit operations and maintenance data in accordance with Section 01 78 23

OPERATION AND MAINTENANCE DATA and as specified herein not later than 2 months prior to the date of beneficial occupancy. In addition to requirements of Data Package 5, include the requirements of paragraphs

TELECOMMUNICATIONS DRAWINGS, TELECOMMUNICATIONS SPACE DRAWINGS, and RECORD

DOCUMENTATION. Ensure that these drawings and documents depict the as-built configuration. Also provide copies of all telecommunications manuals to TSD.

1.10.2 Record Documentation

Provide T5 drawings including documentation on cables and termination hardware in accordance with TIA-606. T5 drawings shall include schedules to show information for cut-overs and cable plant management, patch panel layouts and cover plate assignments, cross-connect information and connecting terminal layout as a minimum. T5 drawings shall be provided in hard copy format and on electronic media (PDF and AutoCAD 2016 format).

Provide the following T5 drawing documentation as a minimum:

a. Cables - A record of installed cable shall be provided in accordance with TIA-606. The cable records shall include only the required data fields in accordance with TIA-606. Include manufacture date of cable with submittal.

b. Termination Hardware - A record of installed patch panels, cross-connect points, distribution frames, terminating block arrangements and type, and outlets shall be provided in accordance with

TIA-606. Documentation shall include the required data fields as a minimum in accordance with TIA-606.

PART 2 PRODUCTS

2.1 COMPONENTS

Components shall be UL or third party certified. Where equipment or materials are specified to conform to industry and technical society

SECTION 27 10 00 Page 12 reference standards of the organizations, submit proof of such compliance.

The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard. Provide a complete system of telecommunications cabling and pathway components using star topology.

Provide support structures and pathways, complete with outlets, cables, connecting hardware and telecommunications cabinets/racks. Cabling and interconnecting hardware and components for telecommunications systems shall be UL listed or third party independent testing laboratory certified, and shall comply with NFPA 70 and conform to the requirements specified herein.

2.2 TELECOMMUNICATIONS PATHWAY

Provide telecommunications pathways in accordance with TIA-569 and as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Provide system furniture pathways in accordance with UL 1286.

2.2.1 Pathways Aboard Camp Lejeune Greater Area, Including MCAS New River

Pathway shall be conduit, cable tray, or modular access flooring that provides protection for cabling. Under floor duct, free laying and wireway shall not be used. Cantilever-type center hung tray or Poke-Thru devices shall not be used. J-hooks/D-rings/bridal rings and other open face type cable pathways are not authorized except in minor renovations or to continue like existing system. Provide grounding and bonding as required by TIA-607. Cable tray wiring shall comply with NFPA 70. All conduits entering the communications room should be grouped and consolidated.

Conduits can be "Home Run" or stubbed to cable tray using approved pull boxes after every 180 degrees of bends, all shall have bonding bushing/plastic insert, and shall extend down from the ceiling to 3 to 4 inches of the ladder rack or 3 to 4 inches onto the backboard, and will be bonded to the TMGB or TGB by a minimum number 6 green sheathed stranded conductors. All penetrations will be sealed in accordance with code

(fire-stopping). A minimum of two 3 inch conduits overhead will be installed between the main communications room and other communication rooms (IDFs), if installed below slab they are considered OSP and fall under Section 33 82 00 TELECOMMUNICATIONS, OUTSIDE PLANT (OSP).

Distribution Enclosures shall not be used as a pull box and will only be approved for their intended use.

2.2.2 Work area Pathways

Comply with TIA-569, except minimum 1 1/4 inch diameter conduit will be used. System furniture pathways shall comply with UL 1286. In system furniture that blocks access to or is distant from the communications wall outlets: each system furniture desk/cubical shall be equipped with system furniture communications outlets that are plugged into the communications wall outlets. All ports should be extended into the furniture.

2.2.3 Pull Boxes

Construct of galvanized sheet steel with screw-fastened covers. Minimum size of boxes shall be not less than 5 inches wide by 5 inches in length by

2 7/8 inches deep for individual 1 1/4 inch diameter conduit; minimum size

SECTION 27 10 00 Page 13 of boxes shall be not less than 12"W x 48"L x 5"D for 3" conduit, 15"W x

60"L x 8"D for 4" conduit per TIA-569. Provide pull boxes where length of conduit exceeds 100 feet or where there are more than two 90 degree bends, or equivalent. Align conduit ends on opposite sides of pull boxes as in a pull through, do not turn or change direction in pull boxes. Provide pull boxes in straight lengths of conduit. Electrical pull points, LC, LB, condulets, distribution enclosures, and splice boxes, are not pull boxes and are not authorized.

2.3 TELECOMMUNICATIONS OUTLET BOXES

Communications outlet boxes shall be placed in all work areas and any areas that can be converted to work areas; so any furniture package configuration will have a connection with a 6' base cord. Recommended practice is 6" to the left or right of (the outside edge of) electrical outlet box in workable office areas or any area that could be converted into workable office area such as a large storage closet; also any conference room should have one floor box and one box just above the ceiling. Boxes shall be standard type 5 inches square by 2-7/8 inches deep for CAT6 with 1-1/4 inch diameter side knock-outs, with a single gang plaster ring. Mount flush in finished walls or just above ceiling tile at height indicated by drawings.

Outlet boxes for wall-mounted telephones shall be 2 by 4 by 2-1/8 inches deep with 1 CAT6 cable terminated in a standard CAT6 studded wall phone plate; mounted at ADA required height. Outlet boxes for work counter area shall be mounted at a height 48 inches above finished floor. Outlet boxes installed for CCTV, Wireless access points, and CATV shall contain 2 CAT 6 cables. Outlet boxes installed in floor shall be communications floor boxes large enough to support a surge of users with proper cable protection and ports that are in multiples of 4 and not parallel to the floor. For raised access flooring, boxes shall be below the floor with an access cover flush with the floor. Tombstones or boxes below floor that require removal of the floor panels to access are not allowed. Floor boxes and under slab cabling should not be used on the first floor or in wet areas. Tele electric poles or furniture managed pathways fed from above the wet area should be used. Multi-user Telecommunications Outlet Assembly i.e.

Multimedia Outlet Assemblies (MUTOA) should be placed where best suited for the furniture used in open office spaces and maintain clearance more than

6" from electrical or 2nd MUTOA for proper operation.

2.4 TELECOMMUNICATIONS CABLING

Cabling shall be UL listed for the application and shall comply with

TIA-568-C.0, TIA-568-C.1, TIA-568-C.2, TIA-568-C.3 and NFPA 70. Provide a labeling system in accordance with the manufacturer and local AHJ guidance for cabling as required by TIA-606 and UL 969. Confirm labeling is compatible with Base Telephone requirements. Ship cable on reels or in boxes bearing manufacture date for unshielded/shielded twisted pair

(UTP/STP) in accordance with ICEA S-90-661 and optical fiber cables in accordance with ICEA S-83-596 for all cable used on this project. Cabling manufactured more than 12 months prior to date of installation shall not be used.

2.4.1 Backbone Cabling

2.4.1.1 Backbone Copper

Copper backbone and riser cable shall be solid conductor, 24 AWG, 100 ohm, 25 to 100 -pair, Category 3, UTP, in accordance with ICEA S-90-661, TIA-568-C.1, TIA-568-C.2 and UL 444, formed into 25 pair binder groups

SECTION 27 10 00 Page 14 covered with a gray thermoplastic jacket and overall metallic shield if required for additional protection. Cable shall be imprinted with manufacturers name or identifier, flammability rating, gauge of conductor, transmission performance rating (category designation) at regular length marking intervals in accordance with ICEA S-90-661. Sufficient pair count of CAT 3 or 5, as required shall be installed between the MDF and each of the IDF's. Provide plenum (CMP), riser (CMR), or general purpose (CM or

CMG) communications rated cabling in accordance with NFPA 70. Substitution of a higher rated cable shall be permitted in accordance with NFPA 70. Any backbone copper run in under slab conduit shall be rated for outdoor use in accordance with AHJ and have lightning protection at both ends.

2.4.1.2 Backbone Optical Fiber

Provide in accordance with ICEA S-83-596, TIA-568-C.3, UL 1666 and NFPA 70.

Cable shall be imprinted with fiber count, fiber type and aggregate length at regular intervals not to exceed 1 meter 40 inches.

Provide the number of strands indicated, (but not less than 12 strands between the main telecommunication room and each of the other telecommunication rooms or secure racks), of single-mode(OS1), tight buffered fiber optic cable.

Provide tight buffered fiber optic multimode, 62.5/125-um diameter(OM1) cable, conforming to TIA-492AAAA as indicated (but not less than 12 strands of multimode between the main communication room and each of the other communications rooms and secure racks).

Provide plenum (OFNP), riser (OFNR), or general purpose (OFN or OFNG) rated non-conductive, fiber optic cable in accordance with NFPA 70. Substitution of a higher rated cable shall be permitted in accordance with NFPA 70. The cable cordage jacket, fiber, unit, and group color shall be in accordance with TIA/EIA-598.

Provide plenum (OFNP), riser (OFNR), or general purpose (OFN or OFNG) rated non-conductive, fiber optic cable in accordance with NFPA 70. Substitution of a higher rated cable shall be permitted in accordance with NFPA 70. The cable cordage jacket, fiber, unit, and group color shall be in accordance with TIA/EIA-598.

2.4.2 Horizontal Cabling

Provide horizontal cable in compliance with NFPA 70 and performance characteristics in accordance with TIA-568-C.1.

2.4.2.1 Horizontal Copper

Provide a minimum of four horizontal copper cables to each work area outlet

(faceplate), UTP, 100 ohm in accordance with TIA-568-C.2, UL 444, ANSI/NEMA WC 66, ICEA S-90-661. Provide four each individually twisted pair, minimum size 24 AWG conductors, Category 6 or 6A, with a green thermoplastic jacket for all unclassified ports (color and cable type for classified services shall be in accordance with current CNSSAM TEMPEST

RED/BLACK Installation documentation including Table 1…