HelixHouse.pdf
PDF 2 MB Posted
- Attached to
- REPAIR NORTH AND SOUTH HELIX HOUSE ICE SHIELDS
- Solicitation number
- N4008517R5068
About this file
HelixHouse.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0005.pdf | ||
| Amendment_4.pdf | ||
| Amendment_3.pdf | ||
| ICE_SHIELD_ATTENDEES.pdf | ||
| Amendment_1.pdf | ||
| Attachment_C_-_Price_Proposal_Form.docx | DOCX document | |
| Attachment_B_-_Past_Perf_Questionnaire.docx | DOCX document | |
| Attachment_A_-_Construc_Exp_Proj_Data_Sheet.docx | DOCX document | |
| N4008517R5068_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to:
1. Post responses to PPI's
2. To extend the proposal due date to January 4, 2018.
3. Incorporate three photo attachements
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Dec-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008517R5068
X 9B. DATED (SEE ITEM 11)
17-Nov-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Dec-2017
CODE
NAVFAC MID ATLANTIC
IPT NORTH
9324 VIRGINIA AVENUE
BLDG Z-140
NORFOLK VA 23511
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008517R5068
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 28-Dec-2017 02:00 PM to 04-Jan-2018 02:00 PM.
The Issued By organization has changed from
NAVFAC MID ATLANTIC
IPT NORTH
9324 VIRGINIA AVENUE
BLDG Z-144
NORFOLK VA 23511
to
NAVFAC MID ATLANTIC
IPT NORTH
9324 VIRGINIA AVENUE
BLDG Z-140
NORFOLK VA 23511
(End of Summary of Changes)
SOLICITATION NO. N40085-17-R-5068
PROJECT TITLE/LOCATION: North and South Helix House Ice Shield Replacement
PRE-PROPOSAL INQUIRY FORM
Page Section Para.
0001 12/5/2017
Drawing Set 3 of 4, Structural:A2/
SF501 and
A2-C2 & A-A
/SF503
The 20" column on Truss T6 has gusset plates top and bottom that slide through slots in the pipe and then connect internally, with some of these connections being skewed. We do not believe we can reach 30" into the column to perform the required welding and testing. This would mean we would need to start the slots from the ends of the column and slide the prefabricated gusset weldments into the slots which would leave approximately 13" of open slots on the lower end and 2" on the upper end of the column. Please advice if this is acceptable, or if there is an alternate method.
Prefabricating the skewed gusset plates and sliding them into slots at the ends of the column as noted is structurally acceptable. As described in the structural drawings, all members shall be sealed to prevent water infiltration.
To meet this requirement using the approach described above, we recommend extending the gusset plates to the ends of the slots and providing a continuous weld between the gusset plate and the pipe along the length of the slot to provide a watertight seal.
0002 12/8/2017
G-102 of
Option 3
Plans
Item 0001u states to remove and support rigid galvanized steel electrical conduits. Please clarify if the intent is to temporarily remove and support, then reinstall the conduit back to it's initial location.
Yes, the intent is to temporarily remove and support, and reinstall the conduit back to its initial location. 2
0003 12/8/2017 Drawing G-
Item 0001g -It appears that there are 2 A-
Frames per canopy area with 2 penetration pockets per each A-Frame for a total of 12 base bid penetration pockets; however the base bid quantity is 24 penetrations per Helix House.
Please clarify.
Revise Base Bid Quantity for Item
0001g to 12 and Option 1 Quantity for Item 0001g to 12.
0004 12/8/2017 Drawing G-
Item 0001c thru e - Note 2 of details A3 & C3 on drawing SD206 states the maximum area of demolition is 72"x72" or 36 sf. If there are 9 areas for the ice shield penetrations, the maximum demolition area is 324 sf. Detail C3 on SD207 shows a demolition area of 2'x2' or 4 sf for the A-Frame penetrations and if there are
12 areas, the area of demolition is equal to 48 sf.
This produces a total area of demolition of 372
sf. Please clarify the locations of the remaining quantity for these items.
The area of demolition on Sheet
SD206 is in reference to the limit of concrete deck demolition. The extent of roofing and roof pavers removal will be greater to facilitate the roofing repairs indicated on
Sheets AE120 through AE502.
0005 12/8/2017
Detail B2 on
Drawing
SF509
The drawings require welds of the existing cap plates to the columns that the new ice shield legs are attached to, to be reinforced as required.
Does the penetration through the concrete deck have to be large enough to accommodate a person to reach under to see and do the welding or is there another means of access to the underside of the cap plates?
The reference columns are exterior to the existing buildings and all welds at underside of cap plate are currently exposed. Demolition of the existing roof slab should not be required to inspect the existing welds.
0006 12/8/2017
G-102 of
Option 3
Plans
Item 0001u states to remove and support rigid galvanized steel electrical conduits. Please clarify if the intent is to temporarily remove and support, then reinstall the conduit back to it's initial location.
Yes, the intent is to temporarily remove and support, and reinstall the conduit back to its initial location. (FYI, this is a duplicate question. See question 0002.)
REFERENCEQuestion
No.
QUESTION GOVERNMENT RESPONSE
Date
Received
Posted on
Amend No.
July 2011
PRE-PROPOSAL INQUIRY FORM
Page Section Para.
Question
No.
QUESTION GOVERNMENT RESPONSE
Date
Received
Posted on
Amend No.
0007 12/14/2017
Price Proposal
Form and
Drawing G-
Section 1.3 of the Price Proposal Form list several unit prices that are to be used to adjust the contract price if the quantities vary from the quantities provided on drawing G-004. Drawing
G-004 list quantities for the Base Bid, Base Bid
(Add), Option 1 and Option 1 (Add). Under which bid items are the quantities for the Base
Bid (Add) and Option 1 (Add) to be included?
Base Bid (Add): 0001a, include in
Item 000107. 0001b, include in
Item 000110. 0001c through
0001l, include in Item 000109.
Option 1 (Add): 0001a, include in
Item 000207. 0001b, include in
Item 000210. 0001c through
0001l, include in Item 000209.
0008 12/14/2017
17 of 136 of the Option 3
Specifications and G-102 of
Option 3
Plans
1.1.6
Page 17 of 136, Section 1.1.6 of the Option 3 specification states that item 000303 includes the applicable Unit Price Items 0001a through
0001t. The quantities for those items shown on
G-102 of the Option 3 plans includes "Option 2" and "Option 2 (Add)" quantities. Please clarify if pricing for this item should be based on the sum of these two quantities, and if not, where to account for the two separate quantities.
Base pricing on the sum of these two quantities.
0009 12/14/2017
S-001 of
Option 3
Plans
Temporary
Shoring/
Bracing Notes
Please provide photos and/or drawings of the interior of the South Helix House Southwest
Tower to aid in the analysis of shoring/bracing requirements.
Please see attached photos.
Available drawings are included in
Attachment 3 of the specification. 2
0010 12/14/2017 6 Section
00100-
Bidding
Schedule/Instr uctions to
Bidders
Proposal
Delivery
Information
The Instructions to Offerors - Proposal Delivery
Information gives an address for mail or hand-delivery of our price and non-price proposals with an e-mail address provided for an optional delivery method for Attachment C- Price
Proposal. With the current submittal due date of
December 28, 2017 being within the busy holiday season would it be acceptable to have all submissions delivered via e-mail?
Please refer to proposal delivery information on page 6, electronic submissions of proposals will not be accepted, aside from the requiremetn to submit one (1) CD
ROM with the price and non-price proposal, and with excetption of
Attachment C-Price Proposal Form.
The proposal submission date has been extended to January 4, 2018.
0011 12/14/2017
G-102 of
Option 3
Plans
Item 0001n on drawing G-102 of the Option 3 plans states that each repair includes 6.8 SF each for the gusset plate and shim plate replacement.
Please clarify how the 6.8 SF is calculated.
The average size of the gusset plates to be replaced is 6.8 aquare feet. Some gusset plates to be replaced will be larger and some will be smaller. The new gusset plate sizes shall match the existing gusset plate sizes and must be field measured / verified by the
Contractor.
0012 12/14/2017
SF603 of
Option 3
Plans
Item 0001n is referenced in both the
Bracing/Girt Connection Repair Criteria at Wide
Flange Columns and the Floor Level Multi
Connection Repair Criteria. Due to the differences in criteria and details for the repairs, please provide two bid item numbers and quantities for these repairs that make up Item
0001n.
Divide 0001n into two categories
[0001n(a) and 0001n(b)]:
0001n(a): Bracing / Girt
Connection Repair Criteria at Wide
Flange Columns (Base: 41 square feet, Add: 7 squre feet).
0001n(b): Floor Level Multi-
Connection Repair Criteria (Base:
34 square feet, Add: 7 squre feet).
0013 12/14/2017
Would NAVFAC consider extending the proposal due date to allow additional time for completion of the proposal for this challenging project?
Proposal due date is exteded to
January 4, 2018.
PRE-PROPOSAL INQUIRY FORM
Page Section Para.
Question
No.
QUESTION GOVERNMENT RESPONSE
Date
Received
Posted on
Amend No.
0014 12/15/2017
Detail B2 on
Drawing
SF510 of the
Option 3
Drawings
Detail B2 on SF510 shows removing rivets where the connection plates will interfere with existing rivets. Please confirm that these holes are to be left as is with no filling required.
Holes are to be left as is with no filling.
0015 12/15/2017
Detail B2 on
Drawing
SF510 of the
Option 3
Drawings
Detail B2 on SF510 shows a 3/4" steel plate typical at braces. The overall length of this plate is not given. Please provide the length of the
3/4" repair plate.
Plate length in detail B2/SF510 is 1'-
8-1/8". Exact plate length will vary depending on brace location and gusset plate size to be field measured / verified by the
Contractor.
0016 12/15/2017
The lead documentation only addresses the ice shield areas, and not the Option 3 tower repairs.
Should we assume a presence of lead at the
South Helix House Southwest Tower, particularly where existing gusset plates and/or angles are removed?
Refer to Specification Attachment 2
(Option 3) specification section 02
83 13.00 20.
0017 12/13/2017
We request that the proposal due date be extended by 2-weeks to January 11, 2017.
Proposal due date is exteded to
January 4, 2018. (FYI, this is a duplicate question. See question
0013.)
0018 12/15/2017 1 Solicitation Block 10
In the Solicitation, it states that this RFP uses
NAICS Code 237130 which is set aside small business standard $36,500,000. It also states that the Acquisition is being solicited as Full and
Open Competiiton. As I understand, this implies that any firm whose gross average annual revenues over the past 3 years do not exceed $36.5 million dollars are entitled to bid on this project. And, that any company whose gross average annual revenues over the past 3 years are greater than $36.5 million are excluded from bidding this opportunity. Please clarify.
This solicitation is advertised as
Full and Open Competition where any firm under the NAICS Code
237130 is eligible to propose.
0019 12/15/2017 6 Solicitation
Proposal
Delivery
Information
The current delivery date for the price, and non-price proposal, is Thursday December 28, 2017.
Most of our potential suppliers and fabricators have indicated that many of their staff are on vacation at this time of the year. Given the technical nature of this proposal, in addition to the vacation time of our potenital suppliers we are requesting a bid extension of 14 calendar days.
Proposal due date is exteded to
January 4, 2018. (FYI, this is a duplicate question. See question
0013 and 0017)
0020 12/15/2017 SF450 Drawings Drawing
Sheet SF450 and, SF451 show 3D drawings of the Ice Shields are there any 3D models available for use in this project? If so can you supply them please
A Revit model was created to produce the contract documents and can be made available to the selected contractor. However, the
Revit model is to be used for reference only and the contractor may use the model at their own risk. It is TT's policy to require a
BIM transfer agreement to be signed prior to releasing our BIM models.
PRE-PROPOSAL INQUIRY FORM
Page Section Para.
Question
No.
QUESTION GOVERNMENT RESPONSE
Date
Received
Posted on
Amend No.
0021 12/15/2017 G002 / G004 Drawings Drawing
Drawing G002, General Project Notes # 13 states "Asbestos containing Materials are not expected to be encountered during the execution of the work." Yet, the Unit Price Quantity
Schedule item 0001M on sheet G0004 requests a square footage price for the removal of asbestos during the base bid construction phase.
Please provide specific detasils of the type and location(s) of the anticipated asbestos materials.
As the note indicates, asbestos containing materials are not expected to be encountered, therefore, information on the type(s) and location(s) cannot be provided. The unit price is included so that if an unforseen material is encountered, there is a monetary amount in place for payment purposes.
0022 12/18/2017 G-004
Please confirm that the bid quantities shown on the schedule on sheet G-004 represent the intended pay quantities for the Base and Option
1 Items. Also, is it the intent to have us also carry the quantities listed in the columns labeled as (add) in the corresponding base and option 1 bids?
The indicated quantities on Sheet G-
004 represent the Government's anticipated / calculated quantities for the Base Bid and Option 1.
Include the (add) quantities in the pricing for the Base Bid and Option
1.
0023 12/18/2017 07 52 00
We have been told by the existing roof installer that the roof warranties have been cancelled due to roof damage that occurred a few years ago.
If there is no current roof warranty, what will the contractor be responsible for in terms of warranty preservation?
The Contractor would not be responsible for an existing voided warranty; however, any new or corrective roofing work performed by the Contractor in the implementation of the project would need to meet the roofing system manufacturer's requirements and inspections.
| Amendement 2 |
| Helix House PPI Responses |
| PPI Responses |
| SW Tower 1 |
| SW Tower 2 |
| SW Tower 3 |
File details come from the government source that posted it.