AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) Provide Responses to Pre-Proposal Inquiries (PPI)
2) Provide Changes to Specifications and Draw ings
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008517R5010
X 9B. DATED (SEE ITEM 11)
19-Sep-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Nov-2017
CODE
NAVFAC MID ATLANTIC
IPT NORTH
9324 VIRGINIA AVENUE
BLDG Z-144
NORFOLK VA 23511
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008517R5010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0005
NAVFAC SPECIFICATIONS
The following specification sections are revised as of 17 NOV 2017:
1.1 CONTRACT SPECIFICATIONS
No changes.
1.2 CONTRACT DRAWINGS
The following drawings are revised as of 17 NOV 2017:
NAVFAC Drawing No. 12754382 REPLACE S-523 DRY DOCK 1 TO MH 381A PART PLAN AND SECTION with revised sheet accompanying this amendment. (Revised dimensions shown on Section A2 to show a 4’-10” wide utility trench. Added the existing crane rail support beam to Section B4.)
---END---
PRE-PROPOSAL INQUIRIES:
REFERENCE QUESTION GOVERNMENT RESPONSE
Page Section Para.
At the Berth 11 precast utility tunnel, it will not be possible to apply joint sealant to the bottom and sea-side exterior wall joints as shown on detail A3/S-504. The 'Berth 11 Repairs Bulkhead' and the bearing gravel below will restrict access after the sections are set. Please advise.
Same query was answered with Amendment 004. To repeat, we feel that the joint sealant can be installed.
However, in lieu of the joint sealant, the Contractor may substitute the following detail: Provide a compressible rubber gasket in a recess set back from the outside face of the tunnel. The detail shall result in sufficient seal compression to make it watertight after the precast sections are brought to their final position.
Will the installation of the H-Pile or demolition work require mitigation measures under the Marine Mammal Protection Act?
All the pile driving and demolition work on the project will occur behind a bulkhead and mitigation measures under the Marine Mammal Protection Act are not required.
Will the contractor be required to prepare application information or materials associated with obtaining any authorizations under the Marine Mammal Protection Act?
No. All the pile driving and demolition work on the project will occur behind a bulkhead and mitigation measures under the Marine Mammal Protection Act are not required.
Based on the layout of the existing historic quay walls on Drawing G- 121, it appears there are multiple areas of conflict between the quay walls and the new foundation walls for Substation 8N, Substation 8S, and the Berth 2 Shore Power Load House as well as multiple utility trenches. For bidding purposes, what are we to assume for elevations and dimensions of the existing quay walls so we can determine how much is to be removed.
The Contractor should refer to Appendix C - 'Archeological Monitoring and Recordation of Historic Quay Wall at Berths 1 and 2' for documentation of the existing details, stone arrangement and rough dimensions of historic granite wall segments exposed during a previous construction contract. At some locations the top course was encountered approx.
2' +/- below existing grade. The width of the top 3 wall courses varied, with some exposed areas measuring 6' to 8' +/- in overall width. It is likely the wall width increases with depth due to wall batter.
Due to the revised proposal due date of 22 November 2017, being the day before Thanksgiving (one of the busiest travel days of the year), and the fact that proposing contractors will be traveling from outside of Virginia to deliver their proposals, we request that the proposal due date be extended to 29 November 2017.
The schedule does not allow for any further extensions to the proposal due date. Personal delivery of the proposal is not a requirement.
In reference to drawing S-523, detail C4 shows the width of the new utility tunnel to be 4’-10”+/-.
Detail A2 on the same drawing shows the width to be 4’-3”. Please clarify which dimension is correct.
The 4'-10" dimension is correct. The horizontal dimension shown on Section (A2/S-523) should be 4'-10" with a 3'- 10" inside dimension.
Drawing H-001 states that there is 90 CY of asbestos to be abated from the pipe insulation in the concrete trench on drawing CD- 104 (Option 10). We cannot come up with this volume, where is this quantity generated from?
The overall trench dimensions were used to develop the estimated quantities presented on drawing H-001. See detail B3 on SD302, where the upper section is assumed to be 3'x4' and the lower section 4'x5' with an overall length of 75 feet.
Drawing S-523, Detail B4, shows an existing crane rail adjacent to the new utility tunnel. Can the work for the new tunnel be performed during a crane outage at this location? If not, please provide crane surcharge loads and rail section details in order to design appropriate temporary support of excavation.
The crane rail in this area is structurally supported by a pile supported concrete beam and will not impose surcharge on any excavations required in this area.
In reference to Drawing CD-106, please provide enclosure, slab and foundation details for the existing nuclear electrical load house that is to be removed.
The existing slab and foundation is comprised of the following: Plan dimensions are approximately 25'-0"x 28'-0"; Slab is 1'-0" thick reinforced concrete with #6@12" each way, top and bottom and; Foundation is 1' wide by 3'- 4" deep reinforced concrete grade walls with #6@12" each way, each face. The enclosure is a metal building, comprised of tube columns, wide flange roof beams and metal panel cladding and roof.
(End of Summary of Changes)
| Amendment_0005 |
| 1378626_dwg_amendment 0005_structural |
| STRUCTURAL |
| S-523 - DRY DOCK 1 TO MH 381A PART PLAN AND SECTION |