AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to proivde responses to Pre-Proposal Inquiries (PPIs)
(See Continuation Pages)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Nov-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008517R5010
X 9B. DATED (SEE ITEM 11)
19-Sep-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Nov-2017
CODE
NAVFAC MID ATLANTIC
IPT NORTH
9324 VIRGINIA AVENUE
BLDG Z-144
NORFOLK VA 23511
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008517R5010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
CONTINUATION SHEET
NAVFAC SPECIFICATIONS
The following specification sections are revised as of 13 NOV 2017:
1.1 CONTRACT SPECIFICATIONS
PROJECT TABLE OF CONTENTS
APPENDICES TO SPECIFICATIONS PAGE 3
DELETE the title for Appendix D and REPLACE with “Appendix D Rock Probes Structural Repairs at Berth 11A, Berth 11B and 11C, PNSY, February 2017 and Berth 11 Existing Wharf Structure Reference Drawings”
APPENDIX D
ADD reference drawings for existing Berth 11Existing Wharf Structure Reference Drawings after the Probe for P- 58.
DIVISION 02 EXISTING CONDITIONS
SECTION 02 82 16.00 22 ENGINEERING CONTROL OF ASBESTOS CONTAINING
MATERIALS (PWD ME)
DELETE the last sentence in the first paragraph of paragraph 1.3.1 and REPLACE it with "The Contractor shall assume for bidding purposes that all pipe, trench, and tunnels to be demolished and removed within the areas identified on the drawings as having Asbestos Containing Materials (ACM) and/or the presence of ACM dust shall be handled in accordance with the requirements of this specification section.”
DIVISION 31 EARTHWORK
SECTION 31 23 00.00 22 EXVACATION AND FILL (PWD ME)
DELETE the first sentence in paragraph 3.1.1 and REPLACE it with "Provide shoring, bracing, cribbing, trench boxes, underpinning, and sheeting as required to support excavations and to protect electrical and mechanical services, utilities and structures."
SECTION 31 62 16.16 STEEL H-PILES
DELETE the entire paragraph 3.4 and REPLACE it with “3.4 NOT USED”.
1.2 CONTRACT DRAWINGS
The following drawings are revised as of 13 NOV 2017:
NAVFAC Drawing No. 12754223 REPLACE G-303 PHASING SECTION - SHEET 1 OF 2 with revised sheet accompanying this amendment.
(Revised Temporary Platform Note 2, to clarify the size of the existing steel edge beam along the outboard side of Berth 11.)
NAVFAC Drawing No. 12754225 REPLACE H-001 HAZARDOUS MATERIAL GENERAL NOTES with revised sheet accompanying this amendment. (Revised Table of Asbestos Containing Materials to be Abated to add a line for the section of trench to be demolished shown on drawing CD106.)
NAVFAC Drawing No. 12754262 REPLACE CD102 SITE DEMOLITION PLAN - BERTH 11B with revised sheet accompanying this amendment.
(Revised Demolition Keynote 3 to correct drawing reference. Revised the rail removal limits and deleted the Support of Excavation callout and legend.)
NAVFAC Drawing No. 12754279 REPLACE CS102 CIVIL SITE PLAN - BERTH 11B with revised sheet accompanying this amendment. (Revised limits surface restoration.)
NAVFAC Drawing No. 12754312 REPLACE CF107 FRESH WATER PLAN - BUILDING 178 with revised sheet accompanying this amendment.
(The size of the reducer in Keynote 11 has been revised.)
NAVFAC Drawing No. 12754351 REPLACE S-301 BERTH 11B & 11C TUNNEL SECTION with revised sheet accompanying this amendment.
(Revised elevation of existing fill below deck and clarified the type of fill material below the wharf deck. Added part plan and section detailing existing fill slope transition to the return bulkhead at the west end of Berth 11C.)
NAVFAC Drawing No. 12754352 REPLACE S-302 BERTH 11A TUNNEL SECTION with revised sheet accompanying this amendment. (Revised elevation of existing fill below deck and clarified the type of fill material below the wharf deck.)
NAVFAC Drawing No. 12754355 REPLACE S-504 BERTH 11 UTILITY TUNNEL DETAILS – SHEET 1 OF 3 with revised sheet accompanying this amendment. (Revised precast tunnel joint details.)
NAVFAC Drawing No. 12754355 REPLACE S-403 ELECTRICAL SUBSTATION RETAINING WALLS with revised sheet accompanying this amendment. (Revised retaining wall footing limits at west end of Substation 8 South to eliminate conflict with electrical manhole.)
NAVFAC Drawing No. 12754370 REPLACE S-511 DRY DOCK 1 TUNNEL DETAILS - SHEET 1 OF 2 with revised sheet accompanying this amendment. (Revised the symbol for the material beneath the stone fill.)
NAVFAC Drawing No. 12754373 REPLACE S-514 BUILDING 178 ELECTRICAL PLATFORM DETAILS with revised sheet accompanying this amendment. (Added top of slab elevation to the 4” slab on grade shown in Section B3.)
NAVFAC Drawing No. 12754429 REPLACE MP101 PURE WATER PLAN - BERTH 11C with revised sheet accompanying this amendment.
((Removed General Note 3 and replaced it with “3. Not Used”. Corrected typos in General Notes 4 and 5.)
NAVFAC Drawing No. 12754430 REPLACE MP102 PURE WATER PLAN - BERTH 11B with revised sheet accompanying this amendment.
(Removed General Note 3 and replaced it with “3. Not Used”. Corrected typos in General Notes 4 and 5.)
NAVFAC Drawing No. 12754431 REPLACE MP103 PURE WATER PLAN - BERTH 11A with revised sheet accompanying this amendment.
(Removed General Note 3 and replaced it with “3. Not Used”. Corrected typos in General Notes 4 and 5.)
NAVFAC Drawing No. 12754514 REPLACE ED603 ONE-LINE DIAGRAM - DEMOLITION - SHEET 3 OF 3 with revised sheet accompanying this amendment. (Revised Demolition Keynote 2 to confirm that the Government will provide spare breaker in
LC17.)
---END---
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization has changed from
NAVFAC MID ATLANTIC
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
to
NAVFAC MID ATLANTIC
IPT NORTH
9324 VIRGINIA AVENUE
BLDG Z-144
NORFOLK VA 23511
(End of Summary of Changes)
SOLICITATION NO. N40085 17 R 5010
PROJECT TITLE/LOCATION: P371, Utilities Investment for Nuclear Facilities
PRE PROPOSAL INQUIRY FORM
Page Section Para.
5 028216.002
1.3.1 Please clarify the intent of the last sentence in the first paragraph: 'The
Contractor shall assume for bidding purposes that all pipe, trench, and tunnel to be demolished will require demolition and disposal as asbestos containing material.' - Is this intended only for the silt and steam/ condensate pipe in the Berth 1 & 2 tunnel and trenches, or does this apply to all demolitions project-wide?
This statement is not intended to apply to all pipe, trench and tunnels required to be demolished/removed on the project and the paragraph will be revised to clarify this. The areas this sentance is intended for, includes the pipes and trenches around Berth 1 and 2 for the limits shown on the plans. Refer to Keynote 7 on CD106, Keynote 10-04 on CD104 and Keynote 3 on CD107.
The Table entitled "Asbestos Containing Material to be Abated" on drawing H-001 will be revised and will include an additional section of trench.
4 01 50 00.00
2.1.3 Section 01 50 00.00 22, Par. 2.1.3-B, indicates that PNSY will provide temporary pure water services at Berth 11. General Notes on Drawings MP 101, MP102, and MP103 appear to call for the contractor to install temporary pure water connections and piping.
Please clarify the scope that the contractor is responsible for vs.
PNSY.
The PNSY will provide temporary Pure Water Services at Berth11, as stated in the Section 01 50 00.00 22, Par. 2.1.3-B and on drawing G-113 (see note 2). Note 3 on drawings MP101, MP102 and MP103 will be revised accordingly. 4
9 31 62 16.16 3.4 Please provide Appendix B, Natural Resource Compliance Requirements
All the pile driving on the project will occur behind a bulkhead and noise monitoring will not be required. Section 316216.16 Paragraph 3.4 will be revised to clarify this. Consequently, the Natural Resource Compliance Requirements document will not be required or provided.
S-108, S- 514 and
ES-523
Notes 2 & 3 on S-108 call for a 4" floor slab and a 4" equipment pad for a vault box in Building 178. The floor slab is shown in cross section B3/S-514, but not the vault pad. However, the floor slab and vault pad are shown on ES-523, but the elevation on this sheet is about 3' higher. Please clarify if an additional retaining wall is needed to elevate the vault pad above the existing slab.
The 4" slab shown on B3/S-514 and ES-523 is the same slab and shall have the same top of slab elevation. The top of this 4" thick slab is Elevation 13.72'. This elevation will be added to Section B3/S-514.
CD-106 Note 8 Please provide as-built details for the existing slab and foundation that is to be demolished.
The existing slab and foundation is comprised of the following: Plan dimensions are approximately 25'-0"x 28'-0"; Slab is 1'-0" thick reinforced concrete with #6@12" each way, top and bottom and; Foundation is 1' wide by 3'-4" deep reinforced concrete grade walls with #6@12" each way, each face.
CD-106
& V-103
STMH 409 is to be demolished. This structure is not listed on the "steam structures" table on sheet V-103. Please provided data?
Steam structure is shown on detail C5/MD402. Size of structure shall be assumed to be 7ft x 7ft x 8ft deep. 4
REFERENCE QUESTION GOVERNMENT RESPONSE Posted on Amend No.
October 2017
PRE PROPOSAL INQUIRY FORM
Page Section Para. Amend No.
CD-106
& CD-
107 &
MD-302
Sheet CD-106 & CD-107 shows demoliton of an existing steam tunnel. Sheet MD-302 shows a cross section of the tunnel with an electric ductbank adjacent to it. Is the tunnel and ductbank monolithic? Please provide as-built details for the actual dimensions and reinforcing.
As shown on C4/MD302 the steam tunnel and electrical ductbank shall be assumed to have been constructed monolithically. The combined structure is assumed to be 3 feet deep by 5 feet wide. The reinforcement of this existing structure is unknown. Contractors shall assume #5 at 12 inches around the perimeter of the duct bank and the walls and roof of the tunnel.
CF-107 Note 11 Calls for 12"x 6" reducer. Pipe appears to be 8". Please confirm reducer is to be 12"x8".
Confirmed, the reducer shall be 8"x6". The drawing will be revised to reflect this.
CD-102 Drawing CD-102 note 3 references drawing CS404, detail A4. This detail is missing. Please provide detail.
The detail referenced in Note 3 should be A2 on CD501. The note will be revised.
ED603 Reference Drawing ED603, Note 2: LC1-6 (800A) Shall be dropped into LC1 vault, reconfigured into two 400 A circuits and reconnected.
Can we assume that there is a spare breaker in place to be utilized or will we be required to furnish one?
A spare breaker shall be used in LC 1 and it will be government furnished.
CD-102 Reference Drawing CD-102 from Addendum #1 directs to install contractor designed support of excavation as needed. It also references the electrical duct bank on Drawing ES-202. It appears on Drawing CD-102 that the purpose of the SOE is to support the existing tracks that are not being replaced from stations 7+92 to 8+65 however Drawing ES-202 shows manhole AC-3083 at station 8+05 and manhole AC-3082 to be at station 8+18. The plan view on Drawing ES-103 shows these manholes at station 11+30 (+/-). Please clarify the intent of the support of excavation shown on CD-102.
Based on the revision that extended sitework demolition limits back to existing manholes, the length of existing tracks that were to be left in place and supported by the SOE has reduced significantly. Therefore, the SOE shown on drawing CD102 (added via Amendment 0001) will be deleted and this short section of rail will be removed and replaced to facilitate the installation of the electrical duct bank. Drawing CD102 will be revised.
Please note that the stations shown on the profiles on ES202 and the baseline on CD102 are from two different baselines. The stationing on ES202 is a baseline along the duct bank with a starting station of STA 0+00 at MH AC- 313A, while the stationing on CD102 is the Berth 11 Baseline provided along th t li f th t l il th B th 11 h f t t
ES201 Reference Drawing ES201- Electrical Duct Bank Substation 8 North to Dry Dock 1 Profile - excavation depth of 13-14 ft. going under existing utilities and duct banks. Will support of excavation be required between stations 0+00 and 0+45?
The contractor is responsible to protect existing utilities as stated in the contract, including specification Section 02 41 00 paragraph 1.3.3, which states the contractor is to "Protect electrical and mechanical services and utilities….Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required." Thus, based on the Contractor's means and methods, if SOE is required to protect the existing utilities and structures, it shall be provided.
Regarding the excavation and fill specification Section 31 23 00.00 22, the first sentence of paragraph 3.1.1 will be replaced with the following:
"Provide shoring, bracing, cribbing, trench boxes, underpinning, and sheeting as required to support excavations and to protect existing electrical and mechanical services, utilities and structures."
PRE PROPOSAL INQUIRY FORM
Page Section Para. Amend No.
01 35
26.00 22 Specification section 01 35 26.00 22 section 1.16 states that the contractor is to schedule operations that involve the use of equipment with output of high noise levels for weekends or after duty working hours. Section 01 57 19.00 22 section 3.17 directs to confine any operations that may generate excessive noise to the period between 7 AM and 5 PM, Monday through Friday. Please clarify this discrepancy.
Section 01 57 19.00 22 is correct. Noise generating activities, especially significant noise, must not be conducted outside of normal working hours.
Is the contractor required to touch up the coal tar epoxy coating on the master pile after removal of the top sections?
The pile tops do not need to be touched up or re-coated.
If touch up of the existing master pile coal tar epoxy is required, is the contractor required to blast clean for surface preparation or is mechanical surface preparation acceptable?
The pile tops do not need to be touched up or re-coated.
S-501 Detail C5 on drawing S-501 shows a gusset plate to be field cut and welded to the existing girders. Please clarify what the sizes are of the existing girders.
Going from west to east, the existing edge beam from Bent D' to Bent 1 is a 24WF74. The existing edge beam from Bent W to Bent Q is a 16WF45. 4
S-301 Drawing S-301 shows the existing fill below deck to be elevation 2.0 +/- and drawing G-303 shows the existing fill to be at elevation 2.2 +/- . Please clarify which elevation is correct.
We confirm that the elevation shown on G-303 is correct. The existing fill shall be assumed to be at Elevation 2.2 +/-. Please note that at the west end of Berth 11, the fill below deck slopes down to the return bulkhead and has a 3 ft. thick rip rap protection on the slope. Drawing S-301 has been revised to show this local below deck condition at the west end of Berth 11.
S-511 Please provide section details of the existing LC-17 foundation. The existing foundations for the LC17 fencing are 4'-6" deep circular concrete footing with a diameter that varies between 12" and 24". The footings are located at each fence post and gate post.
Please clarify the material below the stone at the electrical duct bank shown on Detail C2 of drawing S-511 (shown to the right of the existing crane rail abandoned).
The material shown beneath the stone is filter fabric. The symbol will be corrected. 4
S-403 In reference to S-403 and CS-402, it appears the depth of the new electrical manhole in Substation 8 South will conflict with the layout of the new foundation footing. Please clarify.
Within the limits of the new electrical manhole in Substation 8 South, the retaining wall footing can be omitted and the retaining wall will span horizontally between return walls. Provide 1" minimum clear between the manhole and any portion of the wall footing.
Do the Natural Resource Compliance Requirements apply? If so, please provide Appendix B and clarify.
All the pile driving on the project will occur behind a bulkhead and noise monitoring will not be required. Section 316216.16 Paragraph 3.4 will be revised to clarify this. Consequently, the Natural Resource Compliance Requirements document will not be required or provided.
PRE PROPOSAL INQUIRY FORM
Page Section Para. Amend No.
S-504 At the Berth 11 precast utility tunnel, it will not be possible to apply joint sealant to the bottom and sea-side exterior wall joints as shown on detail A3/S-504. The 'Berth 11 Repairs Bulkhead' and the bearing gravel below will restrict access after the sections are set. Please advise.
We feel that the joint sealant can be installed. However, in lieu of the joint sealant, the Contractor may substitute the following detail: Provide a compressible rubber gasket in a recess set back from the outside face of the tunnel. The detail shall result in sufficient seal compression to make it watertight after the precast sections are brought to their final position.