N40085-20-R-2111.pdf
PDF 419 KB Posted
- Solicitation number
- N4008520R2111
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N40085-20-R-2111-0003.pdf | ||
| N40085-20-R-2111-0004.pdf | ||
| N40085-20-R-2111-0002.pdf | ||
| N40085-20-R-2111-0001.pdf | ||
| N40085-20-R-2111_Attachments.pdf | ||
| PPI_Form.xls | XLS spreadsheet | |
| N40085-20-R-2111_Scope_of_Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 12:00 PM local time 15 May 2020
X
A X B
C D
EX
X G F 37 - 54
55 - 56 X H 57 - 63 kenneth.d.seymour@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C2 1 63
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N40085 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KENNETH D. SEYMOUR 847-688-5395 X248
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 5 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 6 - 30 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
31 - 36
PART II - CONTRACT CLAUSES
NAVFAC MID ATLANTIC
PWD GREAT LAKES - FEAD
310 SEABEE WAY
GREAT LAKES IL 60088-2814
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
ACQR5759101
5. DATE ISSUED
07 Apr 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N4008520R2111
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Project Repave Parking Lot/Alley, Bldg. 104
FFP
Contractor shall supply all labor, materials, equipment, transportation and supervision necessary to prove a full-depth repair of the parking lot and alley adjacent to Building 104 located onboard Naval Station Great Lakes, IL. Remove asphalt pavement to the aggregate base. Haul away and sweep area clean of debris.
Regrade base and provide additional crushed aggregate as necessary to provide positive drainage to existing storm inlets and away from adjacent buildings.
FOB: Destination
PURCHASE REQUEST NUMBER: ACQR5759101
NET AMT
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 180 dys. ADC 1 N/A
FOB: Destination
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than .180 calendar days after date of award. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $105.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Section G - Contract Administration Data
Section H - Special Contract Requirements
WAGE DETERMINATION
General Decision Number: IL20200008 02/07/2020
Superseded General Decision Number: IL20190008
State: Illinois
Construction Types: Building and Residential
Counties: Du Page, Grundy, Kane, Kendall, Lake, McHenry and Will Counties in Illinois.
BUILDING AND RESIDENTIAL PROJECTS (does not include landscape projects).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/17/2020 2 01/24/2020 3 02/07/2020
ASBE0017-005 06/01/2019
Rates Fringes
ASBESTOS WORKER/INSULATOR
includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 50.50 27.80 Fire Stop Technician.............$ 40.40 24.54
HAZARDOUS MATERIAL HANDLER
includes preparation, wetting, stripping, removal, scrapping vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not.............$ 37.80 24.54
BOIL0001-003 05/01/2017
DU PAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES
Rates Fringes
BOILERMAKER......................$ 46.18 29.58
BRIL0014-001 06/01/2016
DU PAGE, GRUNDY, LAKE, and WILL COUNTIES
Rates Fringes
BRICKLAYER.......................$ 44.88 26.62
BRIL0021-002 06/01/2017
Rates Fringes
MARBLE SETTER....................$ 44.63 26.83
BRIL0021-008 06/01/2017
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 44.38 25.84
TILE FINISHER....................$ 38.56 22.10
TILE SETTER......................$ 45.49 25.72
BRIL0021-010 06/01/2017
Rates Fringes
MARBLE FINISHER..................$ 33.95 26.03
BRIL0027-002 06/01/2016
KANE, KENDALL, and MCHENRY COUNTIES
Rates Fringes
BRICKLAYER.......................$ 44.88 26.62
CARP0555-003 06/01/2018
DUPAGE ANE LAKE COUNTIES
Rates Fringes
CARPENTER
Building....................$ 47.35 32.83 Heavy & Highway.............$ 47.35 32.83
CARP0555-004 10/01/2018
Residential
DU PAGE and LAKE COUNTIES
Rates Fringes
CARPENTER........................$ 38.11 32.83
CARP0555-006 06/01/2018
WILL COUNTY
BUILDING
Rates Fringes
Carpenter; Millwright;
Piledrivermen....................$ 47.35 35.11
CARP0555-007 10/01/2018
WILL COUNTY
RESIDENTIAL
Rates Fringes
CARPENTER........................$ 38.11 32.83
CARP0555-009 06/01/2018
KANE, KENDALL, AND McHENRY COUNTIES
BUILDING
Rates Fringes
CARPENTER
Carpenter, Floor Layer, Lather, Millwright, and Piledriver..................$ 47.35 32.84
CARP0555-010 10/01/2018
KANE, KENDALL, and McHENRY COUNTIES
RESIDENTIAL
Rates Fringes
CARPENTER........................$ 38.11 32.83
CARP0555-012 10/01/2017
GRUNDY COUNTY
Rates Fringes
CARPENTER
Carpenter, Millwright, Piledriver, and Soft Floor Layer Building...................$ 46.35 31.30 Residential................$ 37.11 31.29
ELEC0009-002 06/03/2018
WILL COUNTY
Rates Fringes
Line Construction Groundman...................$ 40.48 61.52% Lineman and Equipment Operator....................$ 51.90 61.52%
ELEC0117-002 06/03/2019
KANE (Northern Half) and McHENRY COUNTIES
Rates Fringes
ELECTRICIAN
Building....................$ 49.99 34%+16.80
ELEC0117-003 10/29/2018
KANE (Northern Half), and McHENRY COUNTIES
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 40.20 33.18%+14.28
Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC0117-004 09/03/2018
KANE (Northern Half) and McHENRY COUNTIES
Rates Fringes
ELECTRICIAN
Residential.................$ 40.41 33.67%+15.66
ELEC0150-002 11/04/2019
LAKE COUNTY
Rates Fringes
ELECTRICIAN
Building....................$ 40.00 38.49 Residential.................$ 41.13 30.53
ELEC0150-003 11/04/2019
LAKE COUNTY
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 39.00 31.60
Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC0176-003 06/01/2019
Grundy and Will Counties
ELECTRICIAN
Residential.................$ 42.42 31.79
ELEC0176-008 06/01/2018
GRUNDY and WILL COUNTIES
Rates Fringes
ELECTRICIAN
Building....................$ 43.50 39.26
ELEC0176-015 06/01/2018
GRUNDY and WILL COUNTIES
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 36.00 30.58
Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC0461-002 11/04/2019
KANE (Southern Half) AND KENDALL COUNTIES
Rates Fringes
ELECTRICIAN
Building....................$ 47.72 32.39 Residential.................$ 43.07 28.87
ELEC0461-005 11/04/2019
KANE (Southern Half), AND KENDALL COUNTIES
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 40.73 29.77
Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEC0701-002 11/04/2019
DUPAGE COUNTY
Rates Fringes
ELECTRICIAN
Building....................$ 41.00 105.86% Residential.................$ 39.60 81.43%
ELEC0701-003 06/04/2018
DU PAGE COUNTY
Rates Fringes
ELECTRICIAN
ELECTRICAL TECHNICIAN.......$ 33.82 104.42%
Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.
ELEV0002-002 01/01/2020
DU PAGE, KANE, KENDALL, LAKE, & WILL COUNTIES
Rates Fringes
ELEVATOR MECHANIC................$ 58.47 34.765+a+b
FOOTNOTES:
a) PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.
b) Employer contributes 8% of regular hourly rate as vacation pay credit for employee with more than 5 years of service, and 6% for employee with less than 5 years service
ELEV0015-002 01/01/2020
McHENRY COUNTY
Rates Fringes
ELEVATOR MECHANIC................$ 51.09 34.765+a+b
FOOTNOTES:
A. Employer contributes 8% of regular basic hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for under 5 years of service.
B. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, Veterans' Day and Christmas Day.
ELEV0055-001 01/01/2020
GRUNDY COUNTY
Rates Fringes
ELEVATOR MECHANIC................$ 47.72 34.765+a+b
FOOTNOTES:
A. Employer contributes 8% of regular basic hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for under 5 years of service.
B. Paid Holidays: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving; Veterans' Day & Christmas Day
* ENGI0150-026 06/01/2019
BUILDING and RESIDENTIAL
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 51.10 41.00
GROUP 2....................$ 49.80 41.00
GROUP 3....................$ 47.25 41.00
GROUP 4....................$ 45.50 41.00
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader;
Autograde*; Backhoes with Caisson attachment*:Batch Plant*;
Benoto(Requires two Engineers); Boiler and Throttle Valve;
Caisson Rigs*; Central Redi-Mix Plant*; Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve;
Concrete Breaker (Truck Mounted)*; Concrete Conveyor;
Concrete Conveyor, Truck Mounted; Concrete Paver over 27E
cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*;
Cranes, (GCI and similar type Requires two operators only);
Creter Crane; Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating; Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor;
Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36"" and Over)*; Roto Mill Grinder (Less Than 36"")*; Scoops-Tractor Drawn; Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.
GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Brick Forklift;
Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over); Conveyor, Portable; Forklift Trucks; Greaser Engineer; Highlift Shovels or Front End loaders under 2 1/4 cu yd; Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed; Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*; Rollers; Steam Generators; Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour); Winch Trucks with ""A"" Frame.
GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250;
Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3"" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points;
Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)
GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers *-Requires Oiler
IRON0001-014 06/01/2019
DU PAGE (Eastern 1/4), LAKE, AND MCHENRY (Hebron, Woodstock, and East thereof) COUNTIES
IRONWORKER
Sheeter.....................$ 50.88 39.37 Structural and Reinforcing..$ 50.63 39.37
IRON0063-003 06/01/2018
LAKE, DUPAGE (Eastern 1/4) and McHENRY (HEBRON, WOODSTOCK &
EAST THEREOF) COUNTIES
IRONWORKER, ORNAMENTAL...........$ 48.05 35.93
IRON0063-004 06/01/2018
LAKE, DUPAGE (Eastern 1/4), and McHENRY (HEBRON, WOODSTOCK &
EAST THEREOF) COUNTIES
Fence Erector...............$ 40.88 28.74
IRON0136-002 07/01/2018
LAKE, DUPAGE (Eastern 1/4) and McHENRY (HEBRON, WOODSTOCK & East thereof) COUNTIES
Machinery Movers; Riggers;
Machinery Erectors..........$ 41.00 33.96 Master Riggers..............$ 43.50 33.96
IRON0393-002 06/01/2019
DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), and MCHENRY
(SOUTHEAST 1/4) COUNTIES
IRONWORKER.......................$ 47.00 36.79
IRON0444-002 06/01/2018
DUPAGE (ARGONNE & VIC), GRUNDY, KENDALL (Southern Part), and
WILL COUNTIES
IRONWORKER.......................$ 43.00 38.20
IRON0498-006 06/01/2019
McHENRY COUNTY (Northwest Part)
Rates Fringes
IRONWORKER.......................$ 40.25 40.53
LABO0002-003 06/01/2018
DU PAGE COUNTY
Rates Fringes
LABORER
GROUP 1....................$ 42.72 28.19
GROUP 2....................$ 42.72 28.19
GROUP 3....................$ 42.80 28.19
GROUP 4....................$ 42.82 28.19
GROUP 5....................$ 42.87 28.19
GROUP 6....................$ 42.92 28.19
GROUP 7....................$ 42.95 28.19
GROUP 8....................$ 43.05 28.19
GROUP 9....................$ 43.07 28.19
GROUP 10....................$ 43.17 28.19
GROUP 11....................$ 43.00 28.19
GROUP 12....................$ 43.72 28.19
LABORER CLASSIFICATIONS
GROUP 1: Building laborers, Plasterer tenders, Pumps for Dewatering & other Unclassified Laborers
GROUP 2: Fireproofing and fire shop laborers
GROUP 3: Cement gun laborers and hose
GROUP 4: Chimney over 40 feet; Scaffold laborers;
Weldman-wreckers Burners
GROUP 5: Cement gun nozzle (gunite) laborers; Windlass and capstan person
GROUP 6: Stone derrickmen and handlers
GROUP 7: Jackhammermen, Power driven concrete saws and other power equipment
GROUP 8: Firebrick & boiler laborers
GROUP 9: Chimney on fire brick; Caisson Diggers; Well Point system men
GROUP 10: Boiler setter plastic laborers
GROUP 11: Jackhammermen on fire brick work only
GROUP 12: Dosimeter (any device) monitoring nuclear exposure); Asbestos abatement laborers; Toxic and Hazardous waste removal laborers
LABO0075-001 06/01/2017
GRUNDY AND WILL COUNTIES
Rates Fringes
LABORER
GROUP 1.....................$ 41.20 27.47
GROUP 2.....................$ 41.20 27.47
GROUP 3.....................$ 41.28 27.47
GROUP 4.....................$ 41.40 27.47
GROUP 5.....................$ 41.40 27.47
GROUP 6.....................$ 41.55 27.47
GROUP 7.....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1 - Mortar mixers, handling asphalt shingles;
Scaffolds; Sewer and trench work (ground level down to 8 feet); Catch basin and manhole diggers, mesh handling on road work; Cement and mineral filler handler; Concrete puddlers; Batch dumpers (cement & asphalt); Vibrator operators; Sand and stone wheelers to mixer Handlers);
Concrete wheelers; Airtamping hammermen; Concrete & paving breakers; Rock drillers/Jackhammermen; Chipping hammermen 1-Bag mixer; Asphalt laborer; Chain and power saws; Pit men; Fencing laborers; Mason tenders (mortar and brick wheeler); Kettlemen & tarmen, tank cleaners; Scaffold and staging laborers; Pot Firemen (tarmen); Heaters tender for any purpose; Water pumps (portable water pumps shall be tended by laborers if the employer determines tending is required); Rip rap; Handling of slab steel road forms in any manner, except road form setting, setting center strips, Contraction and expansion joints (road work);
Unloading and handling of lumber, brick, transite materials, cast iron water pipe, reinforced concrete rods, sewer and drain tile, railroad tiles and all other creosoted materials; paving blocks and concrete forms;
Handling of insulation of any type; all work involving the unloading of materials, fixtures, or furnishing, whether crated or uncrated; all mortar and composition mixers of sewer work; track laborers; Chimney and silo laborers working at a height of 1 to 48 feet; All laborers working on swinging suspended, or any type or make of scaffolding 1 to 48 feet; All laborers working inside a sphere or any type or make of tank; Working inside a sphere or any type or make of tank from bottom to a height of 48 feet; Form strippers (any type); Mechanical or motorized buggies, for concrete or masons employers; Use of skid steer loads or any other machinery which replaces the wheelbarrow or buggy; Handling multiple concrete duct or any other type of pipe used in public utility work unless otherwise specified herein; Snapping of wall ties and removal of rods; drilling of anchor bolt holes; Concrete or asphalt clipper type saws and self-propelled saws; Shoulder and grade laborers; All hydraulic electric and air or any other type of tools;
Grouting and caulking; Cleaning lumber, Nail pulling, Deck hand; Dredgehand; Shore laborer; Bankmen on Floating Plant;
Tool and material checkers; Signalmen and Flagmen on all construction work; Cleaning of debris; Removal of trees;
Concrete curing, temporary concrete protection regardless of manner or materials used; Laborers on Apsco; Janitorial;
Wrecking and demolition laborers
GROUP 2 - Sewer and drain pipe layers and multiple concrete duct or any other type of pipe used, on public utility work (ground level to 8 feet); Pumpcrete pipe handlers
GROUP 3 - Asphalt rakers; Hod carriers; Plasterer laborers;
Gunnite laborers, Slab for setters on roads, highways, streets, airport runaways, and radii (any type of form) stringline men for all aforementioned work; Wagon and tower drillers on land and floating plant used on dredging;
Asphalt gunners and plug men (undercoating on road work);
Mortar pump laborers; Plaster pump laborers
GROUP 4 - Tunnel miners, and all laborers inside tunnel; Air blow pipemen; Torchmen (burners); Mortaring men on sewer and drain pipe (the applying of mortar and composition mixes); All bottom men on sewer work-all sewer and drain pipelayers-multiple concrete duct or any other type of pipe used on public utility work-8 feet or more below ground level, and all other sewer and trench laborers 8 feet or more below ground level regardless of excavation area; All labor work inside cofferdam; Use of a 10 foot or more drill steel for hand held drills; Caisson laborers ground level down 15 feet; All air tools 8 feet or more below ground level; All laborers working on swinging-suspended or any type or make of scaffolds, 48 feet to 100 feet; All chimney and silo laborers working at a height of 48 to 100 feet;
All tamping hammers over 150 lbs.; All laborers working inside of a sphere or any type or make of tank at a height of 48 feet to 100 feet; all hydraulic, electric and air tools or any other type 8 feet or more below ground level;
Vibrators-any type-8 feet or more below ground level
GROUP 5 - Gunnite nozzle men; Caisson laborers and all tamping hammers from 150 lbs and over; from 15 feet below ground level down to 50 feet; and all laborers working inside of a sphere or any type of tank for every additional 50 feet or part thereof above 100 feet in height
GROUP 6 - All underground cavern laborers; Caisson laborers 50 feet or more below ground level; Laborers working under radio active conditions (suiting up); Blasting men (Powdermen) GROUP 7 - Dosimeter (any device) used for monitoring nuclear exposure; Asbestos abatement worker; Toxic and hazardous waste removal laborer; and chimney and silo laborers for every additional 50 feet or any part thereof above 100 feet high
LABO0149-001 06/01/2018
KANE, KENDALL, AND McHENRY COUNTIES
Rates Fringes
LABORER
GROUP 1.....................$ 42.72 28.19
GROUP 2.....................$ 41.65 28.19
GROUP 3.....................$ 42.72 28.19
GROUP 4.....................$ 41.65 28.19
GROUP 5.....................$ 41.65 28.19
GROUP 6.....................$ 41.90 28.19
GROUP 7.....................$ 41.90 28.19
GROUP 8.....................$ 41.60 28.19
LABORER CLASSIFICATIONS
GROUP 1 Common Laborer
GROUP 2 Power Vibrator
GROUP 3 Torchman (demolition only), Mortarmen
GROUP 4 Power Tamper
GROUP 5 Jackhammer & Airspade; Chainsaw, Swinging Stage and Boatswain Chair; Cement Gun Nozzleman; Hod Carrier;
Plasterer Tender, and Tunnel Man
GROUP 6 Tile Layers; Bottom Men
GROUP 7 Caisson Laborers; Dynamiters
GROUP 8 Asbestos abatement laborers, Toxic and hazardous waste removal laborers, Dosimeter (any device) monitoring nuclear exposure
LABO0152-001 06/01/2017
LAKE COUNTY
LABORER
GROUP 1....................$ 41.20 27.47
GROUP 2....................$ 41.28 27.47
GROUP 3....................$ 41.30 27.47
GROUP 4....................$ 41.40 27.47
GROUP 5....................$ 41.40 27.47
GROUP 6....................$ 41.43 27.47
GROUP 7....................$ 41.53 27.47
GROUP 8....................$ 41.55 27.47
GROUP 9....................$ 41.40 27.47
GROUP 10....................$ 41.75 27.47
GROUP 11....................$ 41.40 27.47
LABORER CLASSIFICATIONS
GROUP 1: Building laborers; Plasterer tenders, General laborers (wrecking and demolition); Fireproofing and fire shop laborers
GROUP 2: Cement gun laborers and hose
GROUP 3: Chimney over 40 feet; Scaffold laborers; Wall men or wreckers
GROUP 4: Cement Gun nozzle (gunite) laborers
GROUP 5: Stone derrickmen and handlers
GROUP 6: Jackhammermen (tampers & vibrators); Power driven concrete saws
GROUP 7: Firebrick & boiler laborer setters
GROUP 8: Chimney laborers (on fire brick); Caisson Diggers;
Well Point system men
GROUP 9: Windlass and capstan persons
GROUP 10: Boiler setter plastic laborers
GROUP 11: Dosimeter (any device) monitoring nuclear exposure; Asbestos abatement laborers; Toxic and hazardous waste removal laborers
PAIN0014-002 06/01/2018
GRUNDY, LAKE, and WILL COUNTIES
Rates Fringes
PAINTER
Brush, Decorator, and
Paperhanger.................$ 46.55 27.24
PAIN0027-003 06/01/2019
Rates Fringes
GLAZIER..........................$ 44.85 37.72
PAIN0030-001 06/01/2019
DE KALB, DU PAGE, KANE, KENDALL AND MCHENRY COUNTIES
Rates Fringes
PAINTER
Brush, Drywall Taper/Finisher, Sandblaster, and Spray......$ 47.30 22.53
PLAS0005-003 07/01/2015
GRUNDY and WILL COUNTIES
Rates Fringes
PLASTERER........................$ 42.25 26.65
PLAS0005-006 07/01/2015
DU PAGE COUNTY
Rates Fringes
PLASTERER........................$ 42.25 26.65
PLAS0011-008 06/01/2019
DE KALB, KANE, KENDALL, AND McHENRY COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 47.01 34.10
PLAS0011-012 06/01/2019
GRUNDY AND WILL COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 43.00 38.16
PLAS0011-014 06/01/2019
LAKE COUNTY
CEMENT MASON/CONCRETE FINISHER...$ 45.53 35.60
PLASTERER........................$ 45.40 35.90
PLAS0803-002 08/01/2010
DUPAGE COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 38.00 24.03
PLUM0093-001 06/01/2015
LAKE and McHENRY COUNTIES
Rates Fringes
PLUMBER..........................$ 45.76 26.92
PLUM0130-002 06/01/2019
DUPAGE (Argonne National Laboratories and Fermi National Laboratory), GRUNDY & WILL COUNTIES
PLUMBER..........................$ 51.00 31.47
PLUM0501-001 12/01/2013
DUPAGE (excluding Argonne National Laboratory and Fermi National Laboratory), KANE, and KENDALL (except the Mich-Wis Pumping Station in Milbrook, Silicas and Plant and Village of Newark, excludes Yorkville) COUNTIES
PLUMBER/PIPEFITTER...............$ 41.20 29.15
* PLUM0597-001 06/01/2019
DUPAGE (Argonne National Laboratories, and Fermi National Laboratory), GRUNDY, LAKE, MCHENRY & WILL COUNTIES
PIPEFITTER.......................$ 49.60 33.09
ROOF0011-004 12/01/2019
DUPAGE, KANE, KENDALL, LAKE, MCHENRY, and WILL COUNTIES
ROOFER...........................$ 44.60 24.65
ROOF0011-009 12/01/2019
Rates Fringes
ROOFER...........................$ 35.28 23.26
SFIL0281-002 01/01/2018
DuPAGE, KANE, KENDALL, LAKE, McHENRY, and WILL COUNTIES
Rates Fringes
SPRINKLER FITTER.................$ 48.10 27.05
SHEE0073-003 06/08/2018
LAKE COUNTY
Rates Fringes
Sheet metal worker...............$ 44.25 37.02
SHEE0073-004 06/08/2018
LAKE COUNTY
Rates Fringes
Sheet Metal Worker
ALUMINUM GUTTER WORK........$ 31.32 37.02
SHEE0265-001 12/01/2018
DU PAGE, GRUNDY, KANE, KENDALL, McHENRY, and WILL COUNTIES
Rates Fringes
SHEET METAL WORKER...............$ 48.02 30.53
* TEAM0179-001 06/01/2017
GRUNDY, KENDALL, and WILL COUNTIES
Rates Fringes
TRUCK DRIVER
2 or 3 Axle Trucks..........$ 37.68 0.15+a 4 Axle Trucks...............$ 37.83 0.15+a 5 Axle Trucks...............$ 38.03 0.15+a 6 Axle Trucks...............$ 38.23 0.15+a
FOOTNOTES:
a. $733.20 per week.
b. Lowboy rate based on number of axles
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;
Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;
Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;
Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice
Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front
* TEAM0301-001 06/01/2019
LAKE AND MCHENRY COUNTIES
TRUCK DRIVER
2-3 AXLES...................$ 39.34 10.75+a 4 AXLES.....................$ 39.49 10.75+a 5 AXLES.....................$ 39.69 10.75+a 6 AXLES.....................$ 39.89 10.75+a
FOOTNOTES:
a. 380.00 per week pension.
b. Lowboy rate based on number of axles
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;
Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;
Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;
Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice
Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front
* TEAM0673-003 06/01/2019
DU PAGE and KANE COUNTIES
Rates Fringes
TRUCK DRIVER
2-3 AXLES...................$ 38.47 0.25+a 4 AXLES.....................$ 38.62 0.25+a 5 AXLES.....................$ 38.82 0.25+a 6 AXLES.....................$ 39.02 0.25+a
FOOTNOTE: a. $861.10 per week.
An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.
Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.
900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years - 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.
CLASSIFICATIONS:
Group 1 - Frame Truck when used for transportation purposes;
Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances;
Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters;
Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site
Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles
Group 3 - Dump Crets and Adgetators, 7 yards and over;
Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long;
Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice
Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic;
Self-loading equipment like P.B. and trucks with scoops on the front
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
OCT 2018
52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation
NOV 2015
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.211-13 Time Extensions SEP 2000 52.211-15 Defense Priority And Allocation Requirements APR 2008 52.211-18 Variation in Estimated Quantity APR 1984 52.219-14 Limitations On Subcontracting JAN 2017 52.222-4 Contract Work Hours and Safety Standards - Overtime
Compensation
MAY 2018
52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-27 Affirmative Action Compliance Requirements for
Construction
APR 2015
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-9 Buy American--Construction Materials MAY 2014 52.228-11 Pledges Of Assets AUG 2018 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-16 Progress Payments APR 2012 52.232-16 Alt I Progress Payments (Apr 2012) - Alternate I MAR 2000 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-12 Cleaning Up APR 1984 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Items AUG 2019 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000
52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL
ITEMS) (JAN 2020)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(v) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(vi) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
(vii) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of…