This is an Exhibit Line Item Numbers (ELIN) pricing attachment for an Indefinite Delivery/Indefinite Quantity (IDIQ) service contract for maintenance, repair, and operation of facility infrastructure at Commander Fleet Activities (CFAY) Yokosuka, Japan. The contract covers a base period from June 1, 2027 to May 31, 2028, with four one-year option periods extending through May 31, 2032. Pricing is structured in Japanese Yen (YEN) with separate line items for recurring and non-recurring work across five contract periods.

The contract includes ten line items organized by period: Items 0001 and 0002 for the base period, Items 0003 and 0004 for the first option period, Items 0005 and 0006 for the second option period, Items 0007 and 0008 for the third option period, and Items 0009 and 0010 for the fourth option period. Recurring work (lump sum pricing) covers preventive maintenance and operation services for incinerator plants, weight scales, potable water tanks, wastewater treatment plants, and Granular Activated Carbon (GAC) filtering systems across nine customer organizations: CNIC, SRF, DLA, Housing, DODDS, USNH, DECA Yokosuka, NAVFAC UT, and Navy Lodge. Each recurring work line item specifies 12-month service periods with unit prices and cost ratios for allocation purposes. Non-recurring incidental work (Items 0002, 0004, 0006, 0008, and 0010) is priced at a not-to-exceed (NTE) amount of 850,000,000 YEN per period and covers direct labor, materials, transportation, disposal, reporting, and overhead costs for maintenance and repair tasks exceeding recurring work limitations. Services include Emergency (E), Urgent (U), and Routine (R) work classifications, with specific sharing rates noted for wastewater treatment plant operations (63%) and preventive maintenance (37%).

View the file

Other files

File Type Posted
26R1011 Notice 4.pdf PDF
N4008426R1011 Amendment 0002.pdf PDF
26R1011 Notice 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BR

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT A - CLIN 9000

Line Item XXXX -: 0001- Recurring Work - Base Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsA001 to A009
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal PriceRatio
A001CNIC
1502000Facility Investment
A001AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥77%
A001AB15020003.2.2Weight Scales including E/U/R Work12MO¥¥
A001AC15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
Preventive Maintenance (PM)
A001AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥84%
A001AE16040003.2.2GAC Filtering System including E/U/R Work12MO¥¥
A001AF16040003.2.3Septic Tanks & Cesspit Tank including E/U/R Work12MO¥¥
A001AG16040003.2.4Paint Water Treatment Plant including E/U/R Work12MO¥¥
CNIC Total¥
A002SRF
1502000Facility Investment
Preventive Maintenance (PM)
A002AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥11%
1604000Wastewater
A002AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥10%
Preventive Maintenance
A002AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥10%
A002AD16040003.2.8Bilge Water Treatment Plant including E/U/R Work12MO¥¥
A002AE16040003.2.9Bilge Water Drainage Pipeline including E/U/R Work12MO¥¥
SRF Total¥
A003DLA
1502000Facility Investment
Preventive Maintenance (PM)
A003AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥4%
A003AB15020003.2.4Weight Scales including E/U/R Work12MO¥¥
DLA Total¥
A004Housing
1502000Facility Investment
Preventive Maintenance (PM)
A004AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Housing Total¥
A005DODDS
1502000Facility Investment
Preventive Maintenance (PM)
A005AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥2%
A005AB15020003.2.3Potable Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
A005AC16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥2%
Preventive Maintenance (PM)
A005AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥2%
DODDS Total¥
A006USNH
1502000Facility Investment
Preventive Maintenance (PM)
A006AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
1604000Wastewater
A006AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥4%
Preventive Maintenance (PM)
A006AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥4%
USNH Total¥
A007DECA Yokosuka
1502000Facility Investment
Preventive Maintenance (PM)
A007AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
DECA Yokosuka Total¥
A008NAVFAC UT
1604000Wastewater
A008AA16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥84%
NAVFAC UT Total¥
A009Navy Lodge
1502000Facility Investment
Preventive Maintenance (PM)
A009AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Navy Lodge Total¥
Total Recurring Work:¥
Note 1: Emergency = E, Urgent = U, Routine =R
Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total.

&"Times New Roman,Regular"CUI

&"Times New Roman,Regular"

CUI

BN

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT A - CLIN 9000

Line Item: 0002 Non-Recurring Price - Base Period
Provide Prices For Facility Investment Services
ELIN A700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Non-recurring Incidental Work (Negotiated)Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order.1NTE¥ 850,000,000¥ 850,000,000
TOTAL NON-RECUURRING PRICE¥ 850,000,000
Kg =Kilogramme
LS =Lump SumMO = Month
EA =Each

CUI

1R

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT B - CLIN 9001

Line Item XXXX -: 0003- Recurring Work - First Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsB001 to B009
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal PriceRatio
B001CNIC
1502000Facility Investment
B001AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥77%
B001AB15020003.2.2Weight Scales including E/U/R Work12MO¥¥
B001AC15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
Preventive Maintenance (PM)
B001AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥84%
B001AE16040003.2.2GAC Filtering System including E/U/R Work12MO¥¥
B001AF16040003.2.3Septic Tanks & Cesspit Tank including E/U/R Work12MO¥¥
B001AG16040003.2.4Paint Water Treatment Plant including E/U/R Work12MO¥¥
CNIC Total¥
B002SRF
1502000Facility Investment
Preventive Maintenance (PM)
B002AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥11%
1604000Wastewater
B002AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥10%
Preventive Maintenance
B002AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥10%
B002AD16040003.2.8Bilge Water Treatment Plant including E/U/R Work12MO¥¥
B002AE16040003.2.9Bilge Water Drainage Pipeline including E/U/R Work12MO¥¥
SRF Total¥
B003DLA
1502000Facility Investment
Preventive Maintenance (PM)
B003AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥4%
B003AB15020003.2.4Weight Scales including E/U/R Work12MO¥¥
DLA Total¥
B004Housing
1502000Facility Investment
Preventive Maintenance (PM)
B004AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Housing Total¥
B005DODDS
1502000Facility Investment
Preventive Maintenance (PM)
B005AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥2%
B005AB15020003.2.3Potable Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
B005AC16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥2%
Preventive Maintenance (PM)
B005AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥2%
DODDS Total¥
B006USNH
1502000Facility Investment
Preventive Maintenance (PM)
B006AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
1604000Wastewater
B006AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥4%
Preventive Maintenance (PM)
B006AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥4%
USNH Total¥
B007DECA Yokosuka
1502000Facility Investment
Preventive Maintenance (PM)
B007AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
DECA Yokosuka Total¥
B008NAVFAC UT
1604000Wastewater
B008AA16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥84%
NAVFAC UT Total¥
B009Navy Lodge
1502000Facility Investment
Preventive Maintenance (PM)
B009AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Navy Lodge Total¥
Total Recurring Work:¥
Note 1: Emergency = E, Urgent = U, Routine =R
Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total.

CUI

1N

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT B - CLIN 9001

Line Item: 0004 Non-Recurring Price - First Option Period
Provide Prices For Facility Investment Services
ELIN B700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
B700Non-recurring Incidental Work (Negotiated)Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order.1NTE¥ 850,000,000¥ 850,000,000
TOTAL NON-RECUURRING PRICE¥ 850,000,000
Kg =Kilogramme
LS =Lump SumMO = Month
EA =Each

CUI

2R

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT C - CLIN 9002

Line Item XXXX -: 0005- Recurring Work - Second Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsC001 to C009
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal PriceRatio
C001CNIC
1502000Facility Investment
C001AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥77%
C001AB15020003.2.2Weight Scales including E/U/R Work12MO¥¥
C001AC15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
Preventive Maintenance (PM)
C001AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥84%
C001AE16040003.2.2GAC Filtering System including E/U/R Work12MO¥¥
C001AF16040003.2.3Septic Tanks & Cesspit Tank including E/U/R Work12MO¥¥
C001AG16040003.2.4Paint Water Treatment Plant including E/U/R Work12MO¥¥
CNIC Total¥
C002SRF
1502000Facility Investment
Preventive Maintenance (PM)
C002AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥11%
1604000Wastewater
C002AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥10%
Preventive Maintenance
C002AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥10%
C002AD16040003.2.8Bilge Water Treatment Plant including E/U/R Work12MO¥¥
C002AE16040003.2.9Bilge Water Drainage Pipeline including E/U/R Work12MO¥¥
SRF Total¥
C003DLA
1502000Facility Investment
Preventive Maintenance (PM)
C003AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥4%
C003AB15020003.2.4Weight Scales including E/U/R Work12MO¥¥
DLA Total¥
C004Housing
1502000Facility Investment
Preventive Maintenance (PM)
C004AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Housing Total¥
C005DODDS
1502000Facility Investment
Preventive Maintenance (PM)
C005AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥2%
C005AB15020003.2.3Potable Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
C005AC16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥2%
Preventive Maintenance (PM)
C005AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥2%
DODDS Total¥
C006USNH
1502000Facility Investment
Preventive Maintenance (PM)
C006AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
1604000Wastewater
C006AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥4%
Preventive Maintenance (PM)
C006AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥4%
USNH Total¥
C007DECA Yokosuka
1502000Facility Investment
Preventive Maintenance (PM)
C007AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
DECA Yokosuka Total¥
C008NAVFAC UT
1604000Wastewater
C008AA16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥84%
NAVFAC UT Total¥
C009Navy Lodge
1502000Facility Investment
Preventive Maintenance (PM)
C009AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Navy Lodge Total¥
Total Recurring Work:¥
Note 1: Emergency = E, Urgent = U, Routine =R
Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total.

CUI

2N

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT C - CLIN 9002

Line Item: 0006 Non-Recurring Price - Second Option Period
Provide Prices For Facility Investment Services
ELIN C700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
C700Non-recurring Incidental Work (Negotiated)Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order.1NTE¥ 850,000,000¥ 850,000,000
TOTAL NON-RECUURRING PRICE¥ 850,000,000
Kg =Kilogramme
LS =Lump SumMO = Month
EA =Each

CUI

3R

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT D - CLIN 9003

Line Item XXXX -: 0007- Recurring Work - Third Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsD001 to D009
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal PriceRatio
D001CNIC
1502000Facility Investment
D001AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥77%
D001AB15020003.2.2Weight Scales including E/U/R Work12MO¥¥
D001AC15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
Preventive Maintenance (PM)
D001AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥84%
D001AE16040003.2.2GAC Filtering System including E/U/R Work12MO¥¥
D001AF16040003.2.3Septic Tanks & Cesspit Tank including E/U/R Work12MO¥¥
D001AG16040003.2.4Paint Water Treatment Plant including E/U/R Work12MO¥¥
CNIC Total¥
D002SRF
1502000Facility Investment
Preventive Maintenance (PM)
D002AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥11%
1604000Wastewater
D002AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥10%
Preventive Maintenance
D002AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥10%
D002AD16040003.2.8Bilge Water Treatment Plant including E/U/R Work12MO¥¥
D002AE16040003.2.9Bilge Water Drainage Pipeline including E/U/R Work12MO¥¥
SRF Total¥
D003DLA
1502000Facility Investment
Preventive Maintenance (PM)
D003AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥4%
D003AB15020003.2.4Weight Scales including E/U/R Work12MO¥¥
DLA Total¥
D004Housing
1502000Facility Investment
Preventive Maintenance (PM)
D004AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Housing Total¥
D005DODDS
1502000Facility Investment
Preventive Maintenance (PM)
D005AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥2%
D005AB15020003.2.3Potable Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
D005AC16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥2%
Preventive Maintenance (PM)
D005AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥2%
DODDS Total¥
D006USNH
1502000Facility Investment
Preventive Maintenance (PM)
D006AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
1604000Wastewater
D006AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥4%
Preventive Maintenance (PM)
D006AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥4%
USNH Total¥
D007DECA Yokosuka
1502000Facility Investment
Preventive Maintenance (PM)
D007AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
DECA Yokosuka Total¥
D008NAVFAC UT
1604000Wastewater
D008AA16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥84%
NAVFAC UT Total¥
D009Navy Lodge
1502000Facility Investment
Preventive Maintenance (PM)
D009AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Navy Lodge Total¥
Total Recurring Work:¥
Note 1: Emergency = E, Urgent = U, Routine =R
Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total.

CUI

3N

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT D - CLIN 9002

Line Item: 0008 Non-Recurring Price - Third Option Period
Provide Prices For Facility Investment Services
ELIN D700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
D700Non-recurring Incidental Work (Negotiated)Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order.1NTE¥ 850,000,000¥ 850,000,000
TOTAL NON-RECUURRING PRICE¥ 850,000,000
Kg =Kilogramme
LS =Lump SumMO = Month
EA =Each

CUI

4R

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT E - CLIN 9004

Line Item XXXX -: 0009- Recurring Work - Fourth Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINsE001 to E009
ELIN /Sub ELINAnnex/ Sub-annexSpec ItemDescriptionQuantityUnit of MeasureUnit PriceTotal PriceRatio
E001CNIC
1502000Facility Investment
E001AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥77%
E001AB15020003.2.2Weight Scales including E/U/R Work12MO¥¥
E001AC15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
Preventive Maintenance (PM)
E001AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥84%
E001AE16040003.2.2GAC Filtering System including E/U/R Work12MO¥¥
E001AF16040003.2.3Septic Tanks & Cesspit Tank including E/U/R Work12MO¥¥
E001AG16040003.2.4Paint Water Treatment Plant including E/U/R Work12MO¥¥
CNIC Total¥
E002SRF
1502000Facility Investment
Preventive Maintenance (PM)
E002AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥11%
1604000Wastewater
E002AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥10%
Preventive Maintenance
E002AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥10%
E002AD16040003.2.8Bilge Water Treatment Plant including E/U/R Work12MO¥¥
E002AE16040003.2.9Bilge Water Drainage Pipeline including E/U/R Work12MO¥¥
SRF Total¥
E003DLA
1502000Facility Investment
Preventive Maintenance (PM)
E003AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥4%
E003AB15020003.2.4Weight Scales including E/U/R Work12MO¥¥
DLA Total¥
E004Housing
1502000Facility Investment
Preventive Maintenance (PM)
E004AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Housing Total¥
E005DODDS
1502000Facility Investment
Preventive Maintenance (PM)
E005AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥2%
E005AB15020003.2.3Potable Water Tanks and Related Equipment including E/U/R Work12MO¥¥
1604000Wastewater
E005AC16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥2%
Preventive Maintenance (PM)
E005AD16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥2%
DODDS Total¥
E006USNH
1502000Facility Investment
Preventive Maintenance (PM)
E006AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
1604000Wastewater
E006AB16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥4%
Preventive Maintenance (PM)
E006AC16040003.2.1PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work12MO¥¥4%
USNH Total¥
E007DECA Yokosuka
1502000Facility Investment
Preventive Maintenance (PM)
E007AA15020003.2.1Incinerator Plant and Segregation Yard including E/U/R Work12MO¥¥3%
DECA Yokosuka Total¥
E008NAVFAC UT
1604000Wastewater
E008AA16040003.1Operation for Wastewater Treatment Plants and Relating Systems12MO¥¥84%
NAVFAC UT Total¥
E009Navy Lodge
1502000Facility Investment
Preventive Maintenance (PM)
E009AA15020003.2.3Drinking Water Tanks and Related Equipment including E/U/R Work12MO¥¥
Navy Lodge Total¥
Total Recurring Work:¥
Note 1: Emergency = E, Urgent = U, Routine =R
Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total.

CUI

Section-B

SCHEDULE OF PRICE

NAME OF OFFEROR OR CONTRACTOR:
LINE ITEMITEMQ'TYUNITAMOUNT
NO.
Item 0001Recurring, Base Period1LS¥
Provide Preventive Maintenance (PM) Program and Work Order Services
for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater
Treatment Plants and Related Equipment including Granular Activated
Carbon (GAC) Filtering Systems, and Operation Service for the
Wastewater Treatment Plants and Related Equipment in the CFAY
From 1 June 2027 to 31 May 2028.
Item 0002Non-recurring Incidental Work, Base Period1NTE
Provide Unit Priced Task Work
Upon Receipt of a Task Order
From 1 June 2027 to 31 May 2028.
Item 0003Recurring, First Option Period1LS¥
Provide Preventive Maintenance (PM) Program and Work Order Services
for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater
Treatment Plants and Related Equipment including Granular Activated
Carbon (GAC) Filtering Systems, and Operation Service for the
Wastewater Treatment Plants and Related Equipment in the CFAY
From 1 June 2028 to 31 May 2029.
Item 0004Non-recurring Incidental Work, First Option Period1NTE¥
Provide Unit Priced Task Work
Upon Receipt of a Task Order
From 1 June 2028 to 31 May 2029.
Item 0005Recurring, Second Option Period1LS¥
Provide Preventive Maintenance (PM) Program and Work Order Services
for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater
Treatment Plants and Related Equipment including Granular Activated
Carbon (GAC) Filtering Systems, and Operation Service for the
Wastewater Treatment Plants and Related Equipment in the CFAY
From 1 June 2029 to 31 May 2030.
Item 0006Non-recurring Incidental Work, Second Option Period1NTE¥
Provide Unit Priced Task Work
Upon Receipt of a Task Order
From 1 June 2029 to 31 May 2030.
Item 0007Recurring, Third Option Period1LS¥
Provide Preventive Maintenance (PM) Program and Work Order Services
for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater
Treatment Plants and Related Equipment including Granular Activated
Carbon (GAC) Filtering Systems, and Operation Service for the
Wastewater Treatment Plants and Related Equipment in the CFAY
From 1 June 2030 to 31 May 2031.
Item 0008Non-recurring Incidental Work, Third Option Period1NTE¥
Provide Unit Priced Task Work
Upon Receipt of a Task Order
From 1 June 2030 to 31 May 2031.
Item 0009Recurring, Fourth Option Period1LS¥
Provide Preventive Maintenance (PM) Program and Work Order Services
for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater
Treatment Plants and Related Equipment including Granular Activated
Carbon (GAC) Filtering Systems, and Operation Service for the
Wastewater Treatment Plants and Related Equipment in the CFAY
From 1 June 2031 to 31 May 2032.
Item 0010Non-recurring Incidental Work, Fourth Option Period1NTE¥
Provide Unit Priced Task Work
Upon Receipt of a Task Order
From 1 June 2031 to 31 May 2032.

TOTAL: (LINE ITEM 0001 through 0010) ¥

CLIN 9000 Exhibit A (Base Period)

CLIN 9001 Exhibit B (First Option Period)

CLIN 9002 Exhibit C (Second Option Period)

CLIN 9003 Exhibit D (Third Option Period)

CLIN 9004 Exhibit E (Fourth Option Period)

NOTE:The number of Placeholders established depends on the maximum number of lines
of accounting anticipated on an individual task order.
Detail line items for task order is located in Attachment J-0200000-16
CLIN = CONTRACT LINE ITEM
LS = LUMP SUM
NTE = NOT-TO-EXCEED
Q'TY = QUANTITY
If you will use below comments for GE, Print area should be chainge.
Note:GE was formulated based on market research conducted for same or similar items, previous purchases of similar or same items, and experience of technical engineers for this requirement.

Provide Custodial Services, Grounds Maintenance and Landscaping Services and Pest Control Services for CFAY AOR area,

Provide Integrated Solid Waste Management Services for XXX Waste Collection & Disposal,
Provide Base Operations Support (BOS) Service
for New SANNO Hotel at Bldg. ####
Provide Preventive Maintenance Program and
Service Orders for XXX Systems at Bldg. ####

&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]

&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] B-&P

CUI // FEDCON [when filled in]

4N

Attachment J-0200000-15
Exhibit Line Item Numbers (ELINS)

EXHIBIT E - CLIN 9002

Line Item: 0010 Non-Recurring Price - Fourth Option Period
Provide Prices For Facility Investment Services
ELIN E700
ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
E700Non-recurring Incidental Work (Negotiated)Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order.1NTE¥ 850,000,000¥ 850,000,000
TOTAL NON-RECUURRING PRICE¥ 850,000,000
Kg =Kilogramme
LS =Lump SumMO = Month
EA =Each

CUI

NAVFAC UOMs

ACAcreFRFramePDPad
AMAmpouleFTFootPGPackage
ATAssortmentFVFivePIPillow
AYAssemblyFYFiftyPMPlate
BABallGGGreat GrossPRPair
BDBundleGIGillPTPint
BEBaleGLGallonPXPellet
BFBoard FootGMGramPZPacket
BGBagGNGrainQTQuart
BKBookGPGroupRARation
BLBarrelGRGrossRDRound
BOBoltHDHundredRLReel
BQBriquetHFHundred FeetRMReam
BRBarHKHankRORoll
BTBottleHPHundred PoundsRXThousand Rounds
BXBoxHRHoursSBSquare Mile
CACartridgeHSHundred Square FeetSCSquare Centimeters
CBCarboyHWHundred WeightSDSkid
CCCubic CentimeterHYHundred YardsSESet
CDCubic YardINInchSFSquare Foot
CEConeJRJarSHSheet
CFCubic FootKGKilogramSISquare Inch
CGCentigramKMKilometerSKSkein
CICubic InchKRCaratSLSpool
CKCakeKTKitSMSquare Meter
CLCoilLBPoundSOShot
CMCentimeterLFLinear FootSPStrip
CNCanLGLengthSQSquare
COContainerLHLabor HoursSXStick
CUCurieLILiterSYSquare Yard
CYCylinderLMLinear MeterTCTruckload
CZCubic MeterLOLotTDTwenty-Four
DADaysLSLump SumTETen
DCDecagramLYLinear YardTFTwenty-Five
DEDecimeterMCThousand Cubic FeetTGGross Ton
DGDecigramMEMealTNTon
DLDeciliterMFThousand FeetTOTroy Ounce
DMDramMGMilligramTSThirty-Six
DODollarsMIMileTTTablet
DRDrumMLMilliliterTUTube
DWPennyweightMMMillimeterUNUnit
DZDozenMOMonthsUSUS U.S.P Unit
EAEachMRMeterVIVial
ENEach CollectionMXThousandWKWeek
EXExposureOTOutfitYDYard
FDFoldOZOunceYRYears

&"Times New Roman,Regular"&UATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

&"Times New Roman,Regular"Page &P of &N

File details come from the government source that posted it. Updated .