A-J-0200-15-ELIN-RENEW-20-D-0402-20260925-A0003.xlsx
XLSX spreadsheet 78 KB Posted
- Solicitation number
- N4008426R1011
About this file
This is an Exhibit Line Item Numbers (ELIN) pricing attachment for an Indefinite Delivery/Indefinite Quantity (IDIQ) service contract for maintenance, repair, and operation of facility infrastructure at Commander Fleet Activities (CFAY) Yokosuka, Japan. The contract covers a base period from June 1, 2027 to May 31, 2028, with four one-year option periods extending through May 31, 2032. Pricing is structured in Japanese Yen (YEN) with separate line items for recurring and non-recurring work across five contract periods.
The contract includes ten line items organized by period: Items 0001 and 0002 for the base period, Items 0003 and 0004 for the first option period, Items 0005 and 0006 for the second option period, Items 0007 and 0008 for the third option period, and Items 0009 and 0010 for the fourth option period. Recurring work (lump sum pricing) covers preventive maintenance and operation services for incinerator plants, weight scales, potable water tanks, wastewater treatment plants, and Granular Activated Carbon (GAC) filtering systems across nine customer organizations: CNIC, SRF, DLA, Housing, DODDS, USNH, DECA Yokosuka, NAVFAC UT, and Navy Lodge. Each recurring work line item specifies 12-month service periods with unit prices and cost ratios for allocation purposes. Non-recurring incidental work (Items 0002, 0004, 0006, 0008, and 0010) is priced at a not-to-exceed (NTE) amount of 850,000,000 YEN per period and covers direct labor, materials, transportation, disposal, reporting, and overhead costs for maintenance and repair tasks exceeding recurring work limitations. Services include Emergency (E), Urgent (U), and Routine (R) work classifications, with specific sharing rates noted for wastewater treatment plant operations (63%) and preventive maintenance (37%).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26R1011 Notice 4.pdf | ||
| N4008426R1011 Amendment 0002.pdf | ||
| 26R1011 Notice 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BR
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT A - CLIN 9000
| Line Item XXXX - | : 0001 | - Recurring Work - Base Period | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||||
| ELIN/Sub-ELINs | A001 to A009 | ||||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio | |
| A001 | CNIC | ||||||||
| 1502000 | Facility Investment |
| A001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| A001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| A001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| Preventive Maintenance (PM) | |||||||||
| A001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| A001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| A001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| A001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| CNIC Total | ¥ | ||||||||
| A002 | SRF | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| A002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| 1604000 | Wastewater | ||||||||
| A002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| Preventive Maintenance | |||||||||
| A002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| A002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| A002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| SRF Total | ¥ | ||||||||
| A003 | DLA | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| A003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| A003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| DLA Total | ¥ | ||||||||
| A004 | Housing | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| A004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Housing Total | ¥ | ||||||||
| A005 | DODDS | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| A005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| A005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| A005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| Preventive Maintenance (PM) | |||||||||
| A005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| DODDS Total | ¥ | ||||||||
| A006 | USNH | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| A006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| 1604000 | Wastewater | ||||||||
| A006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| Preventive Maintenance (PM) | |||||||||
| A006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| USNH Total | ¥ | ||||||||
| A007 | DECA Yokosuka | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| A007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| DECA Yokosuka Total | ¥ | ||||||||
| A008 | NAVFAC UT | ||||||||
| 1604000 | Wastewater | ||||||||
| A008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| NAVFAC UT Total | ¥ | ||||||||
| A009 | Navy Lodge | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| A009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Navy Lodge Total | ¥ |
| Total Recurring Work: | ¥ | |
| Note 1: Emergency = E, Urgent = U, Routine =R | ||
| Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total. |
&"Times New Roman,Regular"CUI
&"Times New Roman,Regular"
CUI
BN
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT A - CLIN 9000
| Line Item | : 0002 Non-Recurring Price - Base Period | ||||||
| Provide Prices For Facility Investment Services | |||||||
| ELIN A700 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| A700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 850,000,000 | ¥ 850,000,000 | |
| TOTAL NON-RECUURRING PRICE | ¥ 850,000,000 | ||||||
| Kg = | Kilogramme | ||||||
| LS = | Lump Sum | MO = Month | |||||
| EA = | Each |
CUI
1R
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT B - CLIN 9001
| Line Item XXXX - | : 0003 | - Recurring Work - First Option Period | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||||
| ELIN/Sub-ELINs | B001 to B009 | ||||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio | |
| B001 | CNIC | ||||||||
| 1502000 | Facility Investment |
| B001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| B001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| B001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| Preventive Maintenance (PM) | |||||||||
| B001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| B001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| B001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| B001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| CNIC Total | ¥ | ||||||||
| B002 | SRF | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| B002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| 1604000 | Wastewater | ||||||||
| B002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| Preventive Maintenance | |||||||||
| B002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| B002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| B002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| SRF Total | ¥ | ||||||||
| B003 | DLA | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| B003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| B003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| DLA Total | ¥ | ||||||||
| B004 | Housing | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| B004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Housing Total | ¥ | ||||||||
| B005 | DODDS | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| B005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| B005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| B005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| Preventive Maintenance (PM) | |||||||||
| B005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| DODDS Total | ¥ | ||||||||
| B006 | USNH | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| B006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| 1604000 | Wastewater | ||||||||
| B006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| Preventive Maintenance (PM) | |||||||||
| B006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| USNH Total | ¥ | ||||||||
| B007 | DECA Yokosuka | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| B007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| DECA Yokosuka Total | ¥ | ||||||||
| B008 | NAVFAC UT | ||||||||
| 1604000 | Wastewater | ||||||||
| B008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| NAVFAC UT Total | ¥ | ||||||||
| B009 | Navy Lodge | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| B009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Navy Lodge Total | ¥ |
| Total Recurring Work: | ¥ | |
| Note 1: Emergency = E, Urgent = U, Routine =R | ||
| Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total. |
CUI
1N
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT B - CLIN 9001
| Line Item | : 0004 Non-Recurring Price - First Option Period | ||||||
| Provide Prices For Facility Investment Services | |||||||
| ELIN B700 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| B700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 850,000,000 | ¥ 850,000,000 | |
| TOTAL NON-RECUURRING PRICE | ¥ 850,000,000 | ||||||
| Kg = | Kilogramme | ||||||
| LS = | Lump Sum | MO = Month | |||||
| EA = | Each |
CUI
2R
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT C - CLIN 9002
| Line Item XXXX - | : 0005 | - Recurring Work - Second Option Period | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||||
| ELIN/Sub-ELINs | C001 to C009 | ||||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio | |
| C001 | CNIC | ||||||||
| 1502000 | Facility Investment |
| C001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| C001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| C001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| Preventive Maintenance (PM) | |||||||||
| C001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| C001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| C001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| C001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| CNIC Total | ¥ | ||||||||
| C002 | SRF | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| C002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| 1604000 | Wastewater | ||||||||
| C002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| Preventive Maintenance | |||||||||
| C002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| C002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| C002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| SRF Total | ¥ | ||||||||
| C003 | DLA | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| C003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| C003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| DLA Total | ¥ | ||||||||
| C004 | Housing | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| C004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Housing Total | ¥ | ||||||||
| C005 | DODDS | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| C005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| C005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| C005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| Preventive Maintenance (PM) | |||||||||
| C005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| DODDS Total | ¥ | ||||||||
| C006 | USNH | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| C006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| 1604000 | Wastewater | ||||||||
| C006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| Preventive Maintenance (PM) | |||||||||
| C006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| USNH Total | ¥ | ||||||||
| C007 | DECA Yokosuka | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| C007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| DECA Yokosuka Total | ¥ | ||||||||
| C008 | NAVFAC UT | ||||||||
| 1604000 | Wastewater | ||||||||
| C008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| NAVFAC UT Total | ¥ | ||||||||
| C009 | Navy Lodge | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| C009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Navy Lodge Total | ¥ |
| Total Recurring Work: | ¥ | |
| Note 1: Emergency = E, Urgent = U, Routine =R | ||
| Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total. |
CUI
2N
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT C - CLIN 9002
| Line Item | : 0006 Non-Recurring Price - Second Option Period | ||||||
| Provide Prices For Facility Investment Services | |||||||
| ELIN C700 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| C700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 850,000,000 | ¥ 850,000,000 | |
| TOTAL NON-RECUURRING PRICE | ¥ 850,000,000 | ||||||
| Kg = | Kilogramme | ||||||
| LS = | Lump Sum | MO = Month | |||||
| EA = | Each |
CUI
3R
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT D - CLIN 9003
| Line Item XXXX - | : 0007 | - Recurring Work - Third Option Period | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||||
| ELIN/Sub-ELINs | D001 to D009 | ||||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio | |
| D001 | CNIC | ||||||||
| 1502000 | Facility Investment |
| D001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| D001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| D001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| Preventive Maintenance (PM) | |||||||||
| D001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| D001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| D001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| D001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| CNIC Total | ¥ | ||||||||
| D002 | SRF | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| D002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| 1604000 | Wastewater | ||||||||
| D002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| Preventive Maintenance | |||||||||
| D002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| D002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| D002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| SRF Total | ¥ | ||||||||
| D003 | DLA | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| D003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| D003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| DLA Total | ¥ | ||||||||
| D004 | Housing | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| D004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Housing Total | ¥ | ||||||||
| D005 | DODDS | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| D005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| D005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| D005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| Preventive Maintenance (PM) | |||||||||
| D005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| DODDS Total | ¥ | ||||||||
| D006 | USNH | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| D006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| 1604000 | Wastewater | ||||||||
| D006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| Preventive Maintenance (PM) | |||||||||
| D006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| USNH Total | ¥ | ||||||||
| D007 | DECA Yokosuka | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| D007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| DECA Yokosuka Total | ¥ | ||||||||
| D008 | NAVFAC UT | ||||||||
| 1604000 | Wastewater | ||||||||
| D008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| NAVFAC UT Total | ¥ | ||||||||
| D009 | Navy Lodge | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| D009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Navy Lodge Total | ¥ |
| Total Recurring Work: | ¥ | |
| Note 1: Emergency = E, Urgent = U, Routine =R | ||
| Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total. |
CUI
3N
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT D - CLIN 9002
| Line Item | : 0008 Non-Recurring Price - Third Option Period | ||||||
| Provide Prices For Facility Investment Services | |||||||
| ELIN D700 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| D700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 850,000,000 | ¥ 850,000,000 | |
| TOTAL NON-RECUURRING PRICE | ¥ 850,000,000 | ||||||
| Kg = | Kilogramme | ||||||
| LS = | Lump Sum | MO = Month | |||||
| EA = | Each |
CUI
4R
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT E - CLIN 9004
| Line Item XXXX - | : 0009 | - Recurring Work - Fourth Option Period | |||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||||||||
| ELIN/Sub-ELINs | E001 to E009 | ||||||||
| ELIN /Sub ELIN | Annex/ Sub-annex | Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | Ratio | |
| E001 | CNIC | ||||||||
| 1502000 | Facility Investment |
| E001 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 77% |
| E001 | AB | 1502000 | 3.2.2 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| E001 | AC | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| Preventive Maintenance (PM) | |||||||||
| E001 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 84% |
| E001 | AE | 1604000 | 3.2.2 | GAC Filtering System including E/U/R Work | 12 | MO | ¥ | ¥ | |
| E001 | AF | 1604000 | 3.2.3 | Septic Tanks & Cesspit Tank including E/U/R Work | 12 | MO | ¥ | ¥ | |
| E001 | AG | 1604000 | 3.2.4 | Paint Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| CNIC Total | ¥ | ||||||||
| E002 | SRF | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| E002 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 11% |
| 1604000 | Wastewater | ||||||||
| E002 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 10% |
| Preventive Maintenance | |||||||||
| E002 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 10% |
| E002 | AD | 1604000 | 3.2.8 | Bilge Water Treatment Plant including E/U/R Work | 12 | MO | ¥ | ¥ | |
| E002 | AE | 1604000 | 3.2.9 | Bilge Water Drainage Pipeline including E/U/R Work | 12 | MO | ¥ | ¥ | |
| SRF Total | ¥ | ||||||||
| E003 | DLA | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| E003 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| E003 | AB | 1502000 | 3.2.4 | Weight Scales including E/U/R Work | 12 | MO | ¥ | ¥ | |
| DLA Total | ¥ | ||||||||
| E004 | Housing | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| E004 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Housing Total | ¥ | ||||||||
| E005 | DODDS | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| E005 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| E005 | AB | 1502000 | 3.2.3 | Potable Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| 1604000 | Wastewater | ||||||||
| E005 | AC | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 2% |
| Preventive Maintenance (PM) | |||||||||
| E005 | AD | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 2% |
| DODDS Total | ¥ | ||||||||
| E006 | USNH | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| E006 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| 1604000 | Wastewater | ||||||||
| E006 | AB | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 4% |
| Preventive Maintenance (PM) | |||||||||
| E006 | AC | 1604000 | 3.2.1 | PM for Wastewater Treatment Plants and Relating Systems including and E/U/R Work | 12 | MO | ¥ | ¥ | 4% |
| USNH Total | ¥ | ||||||||
| E007 | DECA Yokosuka | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| E007 | AA | 1502000 | 3.2.1 | Incinerator Plant and Segregation Yard including E/U/R Work | 12 | MO | ¥ | ¥ | 3% |
| DECA Yokosuka Total | ¥ | ||||||||
| E008 | NAVFAC UT | ||||||||
| 1604000 | Wastewater | ||||||||
| E008 | AA | 1604000 | 3.1 | Operation for Wastewater Treatment Plants and Relating Systems | 12 | MO | ¥ | ¥ | 84% |
| NAVFAC UT Total | ¥ | ||||||||
| E009 | Navy Lodge | ||||||||
| 1502000 | Facility Investment | ||||||||
| Preventive Maintenance (PM) | |||||||||
| E009 | AA | 1502000 | 3.2.3 | Drinking Water Tanks and Related Equipment including E/U/R Work | 12 | MO | ¥ | ¥ | |
| Navy Lodge Total | ¥ |
| Total Recurring Work: | ¥ | |
| Note 1: Emergency = E, Urgent = U, Routine =R | ||
| Note 2: Sharing Rate for Sewage Treatment Plant: Operation is 63% in total, PMI is 37% in total. |
CUI
Section-B
SCHEDULE OF PRICE
| NAME OF OFFEROR OR CONTRACTOR: | ||||
| LINE ITEM | ITEM | Q'TY | UNIT | AMOUNT |
| NO. |
| Item 0001 | Recurring, Base Period | 1 | LS | ¥ |
| Provide Preventive Maintenance (PM) Program and Work Order Services | ||||
| for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater | ||||
| Treatment Plants and Related Equipment including Granular Activated | ||||
| Carbon (GAC) Filtering Systems, and Operation Service for the | ||||
| Wastewater Treatment Plants and Related Equipment in the CFAY | ||||
| From 1 June 2027 to 31 May 2028. |
| Item 0002 | Non-recurring Incidental Work, Base Period | 1 | NTE |
| Provide Unit Priced Task Work | |||
| Upon Receipt of a Task Order | |||
| From 1 June 2027 to 31 May 2028. |
| Item 0003 | Recurring, First Option Period | 1 | LS | ¥ |
| Provide Preventive Maintenance (PM) Program and Work Order Services | ||||
| for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater | ||||
| Treatment Plants and Related Equipment including Granular Activated | ||||
| Carbon (GAC) Filtering Systems, and Operation Service for the | ||||
| Wastewater Treatment Plants and Related Equipment in the CFAY | ||||
| From 1 June 2028 to 31 May 2029. |
| Item 0004 | Non-recurring Incidental Work, First Option Period | 1 | NTE | ¥ |
| Provide Unit Priced Task Work | ||||
| Upon Receipt of a Task Order | ||||
| From 1 June 2028 to 31 May 2029. |
| Item 0005 | Recurring, Second Option Period | 1 | LS | ¥ |
| Provide Preventive Maintenance (PM) Program and Work Order Services | ||||
| for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater | ||||
| Treatment Plants and Related Equipment including Granular Activated | ||||
| Carbon (GAC) Filtering Systems, and Operation Service for the | ||||
| Wastewater Treatment Plants and Related Equipment in the CFAY | ||||
| From 1 June 2029 to 31 May 2030. |
| Item 0006 | Non-recurring Incidental Work, Second Option Period | 1 | NTE | ¥ |
| Provide Unit Priced Task Work | ||||
| Upon Receipt of a Task Order | ||||
| From 1 June 2029 to 31 May 2030. |
| Item 0007 | Recurring, Third Option Period | 1 | LS | ¥ |
| Provide Preventive Maintenance (PM) Program and Work Order Services | ||||
| for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater | ||||
| Treatment Plants and Related Equipment including Granular Activated | ||||
| Carbon (GAC) Filtering Systems, and Operation Service for the | ||||
| Wastewater Treatment Plants and Related Equipment in the CFAY | ||||
| From 1 June 2030 to 31 May 2031. |
| Item 0008 | Non-recurring Incidental Work, Third Option Period | 1 | NTE | ¥ |
| Provide Unit Priced Task Work | ||||
| Upon Receipt of a Task Order | ||||
| From 1 June 2030 to 31 May 2031. |
| Item 0009 | Recurring, Fourth Option Period | 1 | LS | ¥ |
| Provide Preventive Maintenance (PM) Program and Work Order Services | ||||
| for the Incinerator Plant, Weight Scales, Potable Water Tanks, Wastewater | ||||
| Treatment Plants and Related Equipment including Granular Activated | ||||
| Carbon (GAC) Filtering Systems, and Operation Service for the | ||||
| Wastewater Treatment Plants and Related Equipment in the CFAY | ||||
| From 1 June 2031 to 31 May 2032. |
| Item 0010 | Non-recurring Incidental Work, Fourth Option Period | 1 | NTE | ¥ |
| Provide Unit Priced Task Work | ||||
| Upon Receipt of a Task Order | ||||
| From 1 June 2031 to 31 May 2032. |
TOTAL: (LINE ITEM 0001 through 0010) ¥
CLIN 9000 Exhibit A (Base Period)
CLIN 9001 Exhibit B (First Option Period)
CLIN 9002 Exhibit C (Second Option Period)
CLIN 9003 Exhibit D (Third Option Period)
CLIN 9004 Exhibit E (Fourth Option Period)
| NOTE: | The number of Placeholders established depends on the maximum number of lines |
| of accounting anticipated on an individual task order. | |
| Detail line items for task order is located in Attachment J-0200000-16 |
| CLIN = CONTRACT LINE ITEM |
| LS = LUMP SUM |
| NTE = NOT-TO-EXCEED |
| Q'TY = QUANTITY |
| If you will use below comments for GE, Print area should be chainge. | |
| Note: | GE was formulated based on market research conducted for same or similar items, previous purchases of similar or same items, and experience of technical engineers for this requirement. |
Provide Custodial Services, Grounds Maintenance and Landscaping Services and Pest Control Services for CFAY AOR area,
| Provide Integrated Solid Waste Management Services for XXX Waste Collection & Disposal, |
| Provide Base Operations Support (BOS) Service |
| for New SANNO Hotel at Bldg. #### |
| Provide Preventive Maintenance Program and |
| Service Orders for XXX Systems at Bldg. #### |
&"Times New Roman,Regular"CUI // FEDCON [when filled in] SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in]
&"Times New Roman,Regular"SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 [when filled in] B-&P
CUI // FEDCON [when filled in]
4N
| Attachment J-0200000-15 |
| Exhibit Line Item Numbers (ELINS) |
EXHIBIT E - CLIN 9002
| Line Item | : 0010 Non-Recurring Price - Fourth Option Period | ||||||
| Provide Prices For Facility Investment Services | |||||||
| ELIN E700 | |||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC |
| E700 | Non-recurring Incidental Work (Negotiated) | Non-recurring Incidental Work is consist of direct labor cost, direct material cost, and indirect cost such as transportation, disposal, report and overhead profit used in Non-recurring Incidental Work. Performance of specific maintenance, repair, and alteration work that exceeds the Recurring Work limitations of a service order or PM repair. Non-recurring Incidental Task order completion times will be specified in task order. | 1 | NTE | ¥ 850,000,000 | ¥ 850,000,000 | |
| TOTAL NON-RECUURRING PRICE | ¥ 850,000,000 | ||||||
| Kg = | Kilogramme | ||||||
| LS = | Lump Sum | MO = Month | |||||
| EA = | Each |
CUI
NAVFAC UOMs
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |
&"Times New Roman,Regular"&UATTACHMENT J-0200000-07
EXHIBIT LINE ITEM NUMBERS
&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .