This document is an Amendment of Solicitation for a Base Storm Drainage System Upgrade at CFA Chinhae, Korea, issued by NAVFACSYSCOM FAR EAST. Amendment 0001 extends the Request for Quote (RFQ) response due date from 24 December 2025 to 30 December 2025 at 2:00 PM Korea Standard Time. The amendment provides clarifications to contractors through a series of questions and answers regarding site-specific construction details, including pavement composition, fence foundation requirements, and surface finishing specifications.
Key technical clarifications include confirmation that the work area consists primarily of red clay pavement with some concrete sections, the existing fence line has a strip-type footing, and surface course pavement color will be designated by the contracting officer. Contractors are instructed to remove existing surface finishes and align new pavement with the base perimeter fence foundation elevation. The solicitation requires offerors to acknowledge all amendments in their proposals, with a warning that failure to do so may result in quote rejection.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF18 FOR RFQ N4008426Q4002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date 24 Dec 2025 30 Dec 2025
N4008426Q40020001
Section K - Representations, Certification, & Other Statements
Miscellaneous text in this section has been modified to:
DESCRIPTION OF AMENDMENT 0001
1. The purpose of this amendment is to provide answers to requests for information (RFI) for solicitation no. N40084-26-Q-4002, Upgrade Base Storm Drainage System at CFA Chinhae, Korea.
N o
D a t e
Questions Answers
Based on the site visitation, the area indicated as "REMOVE EXISTING RED CLAY PAVEMENT" appears to be either a sidewalk or a concrete pavement, which differs from what is shown in the bid drawings. Please provide direction on how to proceed.
As shown on the existing plan drawings, the work area consists primarily of red clay pavement, with a portion adjacent to the guardrail finished in concrete.
The fence area does not have a strip footing, and the existing surface appears to be finished with asphalt concrete (A.C.).
Please provide guidance regarding the required A.C. finishing work.
The existing fence line is supported by a strip-type footing, and construction shall be performed in accordance with the pavement section details shown on the drawings.
Do you need to do the new fence foundation first? No.
Should a temporary fence be installed/removed for new fence work?
No.
Do we need to do a plate bearing test?: No.
Should the surface course pavemen be color ascon(red)?
Yes, color will be designated by the contracting officer.
There is a height mismatch between the newly installed upper foundation and the existing lower foundation.
All existing surface finishes shall be removed prior to installing the pavement, which shall be set to align with the elevation of the base perimeter fence foundation.
2. Offerors shall acknowledge all solicitation amendments in their proposals.
3. By reason of this amendment, the RFQ due date has been extended to 30 December 2025, at no later than 02:00 PM Korea Standard Time (KST).
4. All other terms and conditions remain the same.
Amendment 0001 Acknowledgment
Signature _______________________
Name/Title _______________________
Company _______________________
IMPORTANT
This amendment must be acknowledged when your quote is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the quote. The acknowledgement must be received prior to quote opening time. Acceptance of late acknowledgement is subject to the provisions set forth in the Defense Federal Acquisition Regulations Supplement.
(End of Summary of Changes)
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0001 |
| EffDate: 22 Dec 2025 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N40084 |
| AdmCode: |
| IssuedBy: NAVFACSYSCOM FAR EAST |
PSC 473 BOX 13, FPO AP 96349-0013
FPO, AP 96349-0013
UNITED STATES
Yun Kim, Email: yun.c.kim4.ln@us.navy.mil Telephone: 315-763-5871 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N4008426Q4002 |
| SolDate: 09 Dec 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: AMENDMENT 0001 TO SOLICITATION NO. N4008426Q4002, UPGRADE BASE STORM DRAINAGE SYSTEM AT CFAC. |
a. Description begins on page# 2.
| ContNameTitle: |
| CoNameTitle: Sung Ho Yu |
| ContDate: |
| CODate: 22 Dec 2025 |