Attach 2 0200000-09 ELINs.xlsx
XLSX spreadsheet 88 KB Posted
- Solicitation number
- N4008426Q1004
About this file
This is an Exhibit Line Item Numbers (ELIN) pricing template for a Request for Quote (RFQ) N4008426Q1004 for preventive maintenance and repair services for Japanese fire apparatus and trucks at Navy installations in Yokosuka, Sasebo, and Atsugi, Japan. The contract consists of two CLINs for the base period and two CLINs for each of four option periods, structured as recurring and non-recurring work categories.
The base period includes CLIN 0001 for recurring work with three line items: preventive maintenance inspections of Japanese fire apparatus (9 EA), repair services (18 EA), and transportation services (9 EA), all priced in Japanese Yen. CLIN 0002 covers non-recurring work with three ELINs: unit-priced labor for mechanics (1,000 hours), inspection technicians (100 hours), and materials, travel, and transportation costs (not-to-exceed ¥10,000,000). The option periods (first through fourth) mirror this structure with CLINs 0003-0004, 0005-0006, 0007-0008, and 0009-0010 respectively. Additionally, the template includes extensive pricing line items for fence-related services such as installation, maintenance, removal, and temporary rental of various fence types (red wood, cedar, chain link, ornamental steel, and barbed wire), though these appear to be template carryover items from a broader facilities maintenance contract rather than primary requirements for this specific solicitation focused on fire apparatus maintenance and repair services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synosis Soliciation N4008426Q1004.pdf | ||
| Attach 1 PWS Japanese Fire Truck 18SEPT2025.pdf | ||
| Attach 3 RFI Form.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINs-Base Period-Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT A - CLIN 0001 |
| Line Item 0001 Recurring Work - Base Period | ||||||
| PROVIDE PRICES FOR TRANSPORTATION - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 | ||||||
| ELIN / | ||||||
| Sub ELIN | Annex/Sub-annex | |||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total |
| Maintenance | |||||||
| A001 | AA | 1700000 | 3.1.1 | Preventive Maintenance Inspections of Japanese Fire Apparatus, Fire Engines and Equipment | 9 | EA | ¥ - |
| A001 | AB | 1700000 | 3.1.2 | Japanese Fire Apparatus, Fire Engines and Equipment Repair | 18 | EA | ¥ - |
| A001 | AC | 1700000 | 3.1.3 | Transportation | 9 | EA | ¥ - 0 |
| TOTAL RECURRING WORK - BASE PERIOD | ¥ - 0 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base Perid-Non-Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT A - CLIN 0002 |
| Line Item 0002 Non-Recurring Work - Base Period |
| PROVIDE PRICES FOR TRANSPORTATION - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A702 |
| Informational subELINs use numeric characters (01, 02, 03, etc.) if pricing at the ELIN level, and using the subELINs for information only, use numeric characters as the last two digits for the subELINs (A00101). >> | ||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Unit Priced Labor Work - Mechanic MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 1,000 | HR | ¥0 | ||||
| A701 | Unit Priced Labor Work - Inspection Technician MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly inspection technician wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 100 | HR | ¥0 | ||||
| A702 | Material, Travel, and Transporation Costs - MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. This line is to adjust for travel and transporation cost. | ||||
| NTE | ¥ 10,000,000 | |||||
| TOTAL NON-RECURRING WORK - BASE PERIOD | ¥ 10,000,000 |
ELINs-1st Opt Period-Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT B - CLIN 0003 |
| Line Item 0003 Recurring Work - First Option Period | ||||||
| PROVIDE PRICES FOR TRANSPORTATION - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs B001 | ||||||
| ELIN / | ||||||
| Sub ELIN | Annex/Sub-annex | |||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total |
| Maintenance | |||||||
| B001 | AA | 1700000 | 3.1.1 | Preventive Maintenance Inspections of Japanese Fire Apparatus, Fire Engines and Equipment | 9 | EA | ¥ - |
| B001 | AB | 1700000 | 3.1.2 | Japanese Fire Apparatus, Fire Engines and Equipment Repair | 18 | EA | ¥ - |
| B001 | AC | 1700000 | 3.1.3 | Transportation | 9 | EA | ¥ - 0 |
| TOTAL RECURRING WORK - FIRST OPTION PERIOD | ¥ - 0 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-1st Opt Period-Non-Recurr
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT B - CLIN 0004 |
| Line Item 0004 Non-Recurring Work - First Option Period |
| PROVIDE PRICES FOR TRANSPORTATION - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B702 |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Unit Priced Labor Work - Mechanic MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 1,000 | HR | ¥0 | ||||
| B701 | Unit Priced Labor Work - Inspection Technician MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly inspection technician wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 100 | HR | ¥0 | ||||
| B702 | Material, Travel, and Transporation Costs - MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. This line is to adjust for travel and transporation cost. | ||||
| NTE | ¥ 10,000,000 | |||||
| TOTAL NON-RECURRING WORK - FIRST OPTION PERIOD | ¥ 10,000,000 |
ELINs-2- Opt Period-Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT C - CLIN 0005 |
| Line Item 0005 Recurring Work - Second Option Period | |||||
| PROVIDE PRICES FOR TRANSPORTATION - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs C001 | |||||
| ELIN / Sub ELIN | Annex/Sub-annex | ||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total |
| Maintenance | |||||||
| C001 | AA | 1700000 | 3.1.1 | Preventive Maintenance Inspections of Japanese Fire Apparatus, Fire Engines and Equipment | 9 | EA | ¥ - |
| C001 | AB | 1700000 | 3.1.2 | Japanese Fire Apparatus, Fire Engines and Equipment Repair | 18 | EA | ¥ - |
| C001 | AC | 1700000 | 3.1.3 | Transportation | 9 | EA | ¥ - 0 |
| TOTAL RECURRING WORK - SECOND OPTION PERIOD | ¥ - 0 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-2-Period-Non-Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT C - CLIN 0006 |
| Line Item 0006 Non-Recurring Work - Second Option Period |
| PROVIDE PRICES FOR TRANSPORTATION - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs C700 through C702 |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| C700 | Unit Priced Labor Work - Mechanic MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 1,000 | HR | ¥0 | ||||
| C701 | Unit Priced Labor Work - Inspection Technician MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly inspection technician wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 100 | HR | ¥0 | ||||
| C702 | Material, Travel, and Transporation Costs - MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. This line is to adjust for travel and transporation cost. | ||||
| NTE | ¥ 10,000,000 | |||||
| TOTAL NON-RECURRING WORK - SECOND OPTION PERIOD | ¥ 10,000,000 |
ELINs-3-Period-Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT D - CLIN 0007 |
| Line Item 0007 Recurring Work - Third Option Period | |||||
| PROVIDE PRICES FOR TRANSPORTATION - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs D007 | |||||
| ELIN / Sub ELIN | Annex/Sub-annex | ||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total |
| Maintenance | |||||||
| D001 | AA | 1700000 | 3.1.1 | Preventive Maintenance Inspections of Japanese Fire Apparatus, Fire Engines and Equipment | 9 | EA | ¥ - |
| D001 | AB | 1700000 | 3.1.2 | Japanese Fire Apparatus, Fire Engines and Equipment Repair | 18 | EA | ¥ - |
| D001 | AC | 1700000 | 3.1.3 | Transportation | 9 | EA | ¥ - 0 |
| TOTAL RECURRING WORK - THIRD OPTION PERIOD | ¥ - 0 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-3-Period-Non-Recurrin
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT D - CLIN 0008 |
| Line Item 0008 Non-Recurring Work - Third Option Period |
| PROVIDE PRICES FOR TRANSPORTATION - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs D700 through D702 |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| D700 | Unit Priced Labor Work - Mechanic MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 1,000 | HR | ¥0 | ||||
| D701 | Unit Priced Labor Work - Inspection Technician MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly inspection technician wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 100 | HR | ¥0 | ||||
| D702 | Material, Travel, and Transporation Costs - MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. This line is to adjust for travel and transporation cost. | ||||
| NTE | $10,000,000.00 | |||||
| TOTAL NON-RECURRING WORK - THIRD OPTION PERIOD | ¥ 10,000,000 |
ELINs-4-Period-Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT E - CLIN 0009 |
| Line Item 0009 Recurring Work - Fourth Option Period | |||||
| PROVIDE PRICES FOR TRANSPORTATION - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs E001 | |||||
| ELIN / Sub ELIN | Annex/Sub-annex | ||||
| Spec Item | Description | Quantity | Unit of Issue | Unit Price | Total |
| Maintenance | |||||||
| E001 | AA | 1700000 | 3.1.1 | Preventive Maintenance Inspections of Japanese Fire Apparatus, Fire Engines and Equipment | 9 | EA | ¥ - |
| E001 | AB | 1700000 | 3.1.2 | Japanese Fire Apparatus, Fire Engines and Equipment Repair | 18 | EA | ¥ - |
| E001 | AC | 1700000 | 3.1.3 | Transportation | 9 | EA | ¥ - 0 |
| TOTAL RECURRING WORK - FOURTH OPTION PERIOD | ¥ - 0 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINs-4 Period-Non-Recurring
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # |
| EXHIBIT E - CLIN 0010 |
| Line Item 0010 Non-Recurring Work - Fourth Option Period |
| PROVIDE PRICES FOR TRANSPORTATION - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs E700 through E702 |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| E700 | Unit Priced Labor Work - Mechanic MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly mechanic wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 1,000 | HR | ¥0 | ||||
| E701 | Unit Priced Labor Work - Inspection Technician MUST BE NEGOTIATED BY KO | Cost to provide one flat rate hour of work-in-place. This unit price includes the Contractor's hourly inspection technician wage adjusted to allow for the offeror's workforce productivity, and all costs for profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance. In short, all costs associated with providing a specific flat rate hour of effort. | ||||
| 100 | HR | ¥0 | ||||
| E702 | Material, Travel, and Transporation Costs - MUST BE NEGOTIATED BY KO | The Contractor shall prepare an independent estimate for material costs associated with the requested work. The estimate shall be detailed enough to include the name of materials, size, quality, number of units and the unit prices. Material prices shall be the lowest price available considering the availability, quantity specified and the time constraints on the job. The Contractors costs are to include all shipping, handling and taxes that apply. This line is to adjust for travel and transporation cost. | ||||
| NTE | ¥ 10,000,000 | |||||
| TOTAL NON-RECURRING WORK - FOURTH OPTION PERIOD | ¥ 10,000,000 |
NAVFAC UOMs
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |
File details come from the government source that posted it. Updated .