Attach_03_J-0200000-08 ELINs.xlsx

XLSX spreadsheet 72 KB Posted

Attached to
High Pressure Vessel Inspector Services for Marine Corps Base Camp Smedley D. Butler
Solicitation number
N4008424R2005
Issued by

About this file

This document is an exhibit line item number (ELIN) schedule for the solicitation N4008424R2005 for high pressure vessel inspector services at Marine Corps Base Camp Smedley D. Butler. The schedule includes recurring and non-recurring line items for inspection services over one base year and four option years. Recurring line items are priced at $0 while non-recurring line items are estimated at YEN7,500,000 each year, totaling YEN37,500,000 over the five year period. Additional details provide unit pricing for installation, maintenance, repair and removal of fencing and temporary fencing rental. The schedule also includes terms for negotiated labor and materials for non-recurring work exceeding defined recurring limitations.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Attachment J-0200000-08 ELIN Schedule

SUMMARY

DATE PREPARED/BY:COMPANY NAME:
SOLICITATION/CONTRACT NUMBER: N40084-24-R-2005
PROJECT TITLE:
HIGH PRESSURE VESSEL INSPECTOR SERVICES

CLIN ITEM DESCRIPTION TOTAL

Base Year
12months after Award0001BASE PERIOD - RECURRING WORK¥ -
0002BASE YEAR - NON-RECURRING WORK¥ 7,500,000
Option 1
12months after Base Year0003OPTION PERIOD 1 - RECURRING WORK¥ -
0004OPTION PERIOD 1 - NON-RECURRING WORK¥ 7,500,000
Option 2
12months after Option 10005OPTION PERIOD 2 - RECURRING WORK¥ -
0006OPTION PERIOD 2 - NON-RECURRING WORK¥ 7,500,000
Option 3
12months after Option 20007OPTION PERIOD 3 - RECURRING WORK¥ -
0008OPTION PERIOD 3 - NON-RECURRING WORK¥ 7,500,000
Option 4
12months after Option 30009OPTION PERIOD 4 - RECURRING WORK¥ -
0010OPTION PERIOD 4 - NON-RECURRING WORK¥ 7,500,000
SUBTOTAL RECURRING (FFP) COST ALL OPTIONS:¥ -
FY24 EXCHANGE RATE: $1.00/¥139.1635$ - 0
SUBTOTAL NON-RECURRING (IDIQ) COST ALL OPTIONS:¥ 37,500,000
FY24 EXCHANGE RATE: $1.00/¥139.1635$ 269,467.21
TOTAL CONTRACT AMOUNT (¥):¥ 37,500,000
FY24 EXCHANGE RATE: $1.00/¥139.1635$ 269,467.21

&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]

ELINs-Base Period-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT A
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

A0001 MCB BUTLER
A001AAInspection, Testing, and Certification Program Spec Item 3.112MO¥0

MCB BUTLER Subtotal ¥0

TOTAL RECURRING WORK PRICE - BASE PERIOD ¥0

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELIN-Base Period-IDIQ

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT A
Line Item 0002 Non-Recurring - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
A700Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order.
* Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate1LS(Estimated

Maximum Labor Cost)

NTE ¥5,000,000¥ 5,000,000
A701Material Costs- MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Each task order
material cost will be negotiated1LS(Estimated

Maximum Material Cost)

NTE: ¥2,500,000¥ 2,500,000
TOTAL NON-RECURRING PRICE BASE YEAR¥7,500,000

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

ELINs-1st option-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT B
Line Item 0003 Recurring Work - 1st Option Period
PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

B0001 MCB BUTLER
B001AAInspection, Testing, and Certification Program Spec Item 3.112MO¥0

MCB BUTLER Subtotal ¥0

TOTAL RECURRING WORK PRICE - 1ST OPTION PERIOD ¥0

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELIN-1st Option Non-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT B
Line Item 0004 Non-Recurring - 1st Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
B700Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order.
* Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate1LS(Estimated

Maximum Labor Cost)

NTE ¥5,000,000¥ 5,000,000
B701Material Costs- MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Each task order
material cost will be negotiated1LS(Estimated

Maximum Material Cost)

NTE: ¥2,500,000¥ 2,500,000
TOTAL NON-RECURRING PRICE 1ST OPTION PERIOD¥7,500,000

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

ELINs-2nd Option-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT C
Line Item 0005 Recurring Work - 2nd Option Period
PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

C001 MCB BUTLER
C001AAInspection, Testing, and Certification Program Spec Item 3.112MO¥0

MCB BUTLER Subtotal ¥0

TOTAL RECURRING WORK PRICE - 2ND OPTION PERIOD ¥0

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINS-2nd Option Non-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT C
Line Item 0006 Non-Recurring - 2nd Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
C700Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order.
* Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate1LS(Estimated

Maximum Labor Cost)

NTE ¥5,000,000¥ 5,000,000
C701Material Costs- MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Each task order
material cost will be negotiated1LS(Estimated

Maximum Material Cost)

NTE: ¥2,500,000¥ 2,500,000
TOTAL NON-RECURRING PRICE 2ND OPTION PERIOD¥7,500,000

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

ELINS-3rd Option Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT D
Line Item 0007 Recurring Work - 3rd Option Period
PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

D001 MCB BUTLER
D001AAInspection, Testing, and Certification Program Spec Item 3.112MO¥0

MCB BUTLER Subtotal ¥0

TOTAL RECURRING WORK PRICE - 3RD OPTION PERIOD ¥0

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINS-3rd Option Non-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT D
Line Item 0008 Non-Recurring - 3rd Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
D700Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order.
* Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate1LS(Estimated

Maximum Labor Cost)

NTE ¥5,000,000¥ 5,000,000
D701Material Costs- MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Each task order
material cost will be negotiated1LS(Estimated

Maximum Material Cost)

NTE: ¥2,500,000¥ 2,500,000
TOTAL NON-RECURRING 3RD OPTION PERIOD¥7,500,000

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

ELINS-4th Option Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT E
Line Item 0009 Recurring Work - 4th Option Period
PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3

ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

E001 MCB BUTLER
E001AAInspection, Testing, and Certification Program Spec Item 3.112MO¥0

MCB BUTLER Subtotal ¥0

TOTAL RECURRING WORK PRICE - 4TH OPTION PERIOD ¥0

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINS-4th Option Non-Recurring

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N40084-24-R-2005
EXHIBIT E
Line Item 0010 Non-Recurring - 4th Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit PriceExtended PriceIMAP CAC
E700Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order.
* Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate1LS(Estimated

Maximum Labor Cost)

NTE ¥5,000,000¥ 5,000,000
E701Material Costs- MUST BE NEGOTIATED BY KO.Performance of requirements that exceeds Recurring Work limitations. Each task order
material cost will be negotiated1LS(Estimated

Maximum Material Cost)

NTE: ¥2,500,000¥ 2,500,000
TOTAL NON-RECURRING PRICE 4TH OPTION PERIOD¥7,500,000

CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

Source Selection Information-See FAR 2.101 and 3.104 [when filled in]

File details come from the government source that posted it. Updated .