Attach_03_J-0200000-08 ELINs.xlsx
XLSX spreadsheet 72 KB Posted
- Solicitation number
- N4008424R2005
About this file
This document is an exhibit line item number (ELIN) schedule for the solicitation N4008424R2005 for high pressure vessel inspector services at Marine Corps Base Camp Smedley D. Butler. The schedule includes recurring and non-recurring line items for inspection services over one base year and four option years. Recurring line items are priced at $0 while non-recurring line items are estimated at YEN7,500,000 each year, totaling YEN37,500,000 over the five year period. Additional details provide unit pricing for installation, maintenance, repair and removal of fencing and temporary fencing rental. The schedule also includes terms for negotiated labor and materials for non-recurring work exceeding defined recurring limitations.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Attachment J-0200000-08 ELIN Schedule
SUMMARY
| DATE PREPARED/BY: | COMPANY NAME: |
| SOLICITATION/CONTRACT NUMBER: N40084-24-R-2005 | |
| PROJECT TITLE: | |
| HIGH PRESSURE VESSEL INSPECTOR SERVICES |
CLIN ITEM DESCRIPTION TOTAL
| Base Year | ||||
| 12months after Award | 0001 | BASE PERIOD - RECURRING WORK | ¥ - | |
| 0002 | BASE YEAR - NON-RECURRING WORK | ¥ 7,500,000 |
| Option 1 | ||||
| 12months after Base Year | 0003 | OPTION PERIOD 1 - RECURRING WORK | ¥ - | |
| 0004 | OPTION PERIOD 1 - NON-RECURRING WORK | ¥ 7,500,000 |
| Option 2 | ||||
| 12months after Option 1 | 0005 | OPTION PERIOD 2 - RECURRING WORK | ¥ - | |
| 0006 | OPTION PERIOD 2 - NON-RECURRING WORK | ¥ 7,500,000 |
| Option 3 | ||||
| 12months after Option 2 | 0007 | OPTION PERIOD 3 - RECURRING WORK | ¥ - | |
| 0008 | OPTION PERIOD 3 - NON-RECURRING WORK | ¥ 7,500,000 |
| Option 4 | ||||
| 12months after Option 3 | 0009 | OPTION PERIOD 4 - RECURRING WORK | ¥ - | |
| 0010 | OPTION PERIOD 4 - NON-RECURRING WORK | ¥ 7,500,000 |
| SUBTOTAL RECURRING (FFP) COST ALL OPTIONS: | ¥ - |
| FY24 EXCHANGE RATE: $1.00/¥139.1635 | $ - 0 |
| SUBTOTAL NON-RECURRING (IDIQ) COST ALL OPTIONS: | ¥ 37,500,000 |
| FY24 EXCHANGE RATE: $1.00/¥139.1635 | $ 269,467.21 |
| TOTAL CONTRACT AMOUNT (¥): | ¥ 37,500,000 |
| FY24 EXCHANGE RATE: $1.00/¥139.1635 | $ 269,467.21 |
&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
ELINs-Base Period-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT A |
| Line Item 0001 Recurring Work - Base Period |
| PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| A0001 MCB BUTLER | ||||
| A001AA | Inspection, Testing, and Certification Program Spec Item 3.1 | 12 | MO | ¥0 |
MCB BUTLER Subtotal ¥0
TOTAL RECURRING WORK PRICE - BASE PERIOD ¥0
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELIN-Base Period-IDIQ
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT A |
| Line Item 0002 Non-Recurring - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | |
| A700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order. | ||||||
| * Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate | 1 | LS | (Estimated |
Maximum Labor Cost)
| NTE ¥5,000,000 | ¥ 5,000,000 | ||
| A701 | Material Costs- MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Each task order | |
| material cost will be negotiated | 1 | LS | (Estimated |
Maximum Material Cost)
| NTE: ¥2,500,000 | ¥ 2,500,000 | ||
| TOTAL NON-RECURRING PRICE BASE YEAR | ¥7,500,000 |
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
ELINs-1st option-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT B |
| Line Item 0003 Recurring Work - 1st Option Period |
| PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| B0001 MCB BUTLER | ||||
| B001AA | Inspection, Testing, and Certification Program Spec Item 3.1 | 12 | MO | ¥0 |
MCB BUTLER Subtotal ¥0
TOTAL RECURRING WORK PRICE - 1ST OPTION PERIOD ¥0
Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELIN-1st Option Non-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT B |
| Line Item 0004 Non-Recurring - 1st Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | |
| B700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order. | ||||||
| * Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate | 1 | LS | (Estimated |
Maximum Labor Cost)
| NTE ¥5,000,000 | ¥ 5,000,000 | ||
| B701 | Material Costs- MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Each task order | |
| material cost will be negotiated | 1 | LS | (Estimated |
Maximum Material Cost)
| NTE: ¥2,500,000 | ¥ 2,500,000 | ||
| TOTAL NON-RECURRING PRICE 1ST OPTION PERIOD | ¥7,500,000 |
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
ELINs-2nd Option-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT C |
| Line Item 0005 Recurring Work - 2nd Option Period |
| PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| C001 MCB BUTLER | ||||
| C001AA | Inspection, Testing, and Certification Program Spec Item 3.1 | 12 | MO | ¥0 |
MCB BUTLER Subtotal ¥0
TOTAL RECURRING WORK PRICE - 2ND OPTION PERIOD ¥0
Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINS-2nd Option Non-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT C |
| Line Item 0006 Non-Recurring - 2nd Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | |
| C700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order. | ||||||
| * Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate | 1 | LS | (Estimated |
Maximum Labor Cost)
| NTE ¥5,000,000 | ¥ 5,000,000 | ||
| C701 | Material Costs- MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Each task order | |
| material cost will be negotiated | 1 | LS | (Estimated |
Maximum Material Cost)
| NTE: ¥2,500,000 | ¥ 2,500,000 | ||
| TOTAL NON-RECURRING PRICE 2ND OPTION PERIOD | ¥7,500,000 |
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
ELINS-3rd Option Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT D |
| Line Item 0007 Recurring Work - 3rd Option Period |
| PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| D001 MCB BUTLER | ||||
| D001AA | Inspection, Testing, and Certification Program Spec Item 3.1 | 12 | MO | ¥0 |
MCB BUTLER Subtotal ¥0
TOTAL RECURRING WORK PRICE - 3RD OPTION PERIOD ¥0
Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINS-3rd Option Non-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT D |
| Line Item 0008 Non-Recurring - 3rd Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | |
| D700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order. | ||||||
| * Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate | 1 | LS | (Estimated |
Maximum Labor Cost)
| NTE ¥5,000,000 | ¥ 5,000,000 | ||
| D701 | Material Costs- MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Each task order | |
| material cost will be negotiated | 1 | LS | (Estimated |
Maximum Material Cost)
| NTE: ¥2,500,000 | ¥ 2,500,000 | ||
| TOTAL NON-RECURRING 3RD OPTION PERIOD | ¥7,500,000 |
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
ELINS-4th Option Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT E |
| Line Item 0009 Recurring Work - 4th Option Period |
| PROVIDE PRICES FOR [1502000 Facility Investment] - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
ELIN / Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC
| E001 MCB BUTLER | ||||
| E001AA | Inspection, Testing, and Certification Program Spec Item 3.1 | 12 | MO | ¥0 |
MCB BUTLER Subtotal ¥0
TOTAL RECURRING WORK PRICE - 4TH OPTION PERIOD ¥0
Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELINS-4th Option Non-Recurring
| ATTACHMENT J-0200000-08 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N40084-24-R-2005 |
| EXHIBIT E |
| Line Item 0010 Non-Recurring - 4th Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | IMAP CAC | |
| E700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Task order completion date will be specified on each order. | ||||||
| * Refer Ministry of Land, Infrastructure, Transport and Tourism for Labor rate | 1 | LS | (Estimated |
Maximum Labor Cost)
| NTE ¥5,000,000 | ¥ 5,000,000 | ||
| E701 | Material Costs- MUST BE NEGOTIATED BY KO. | Performance of requirements that exceeds Recurring Work limitations. Each task order | |
| material cost will be negotiated | 1 | LS | (Estimated |
Maximum Material Cost)
| NTE: ¥2,500,000 | ¥ 2,500,000 | ||
| TOTAL NON-RECURRING PRICE 4TH OPTION PERIOD | ¥7,500,000 |
CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
Source Selection Information-See FAR 2.101 and 3.104 [when filled in]
File details come from the government source that posted it. Updated .