The file's text, extracted by GovTribe without its formatting.
Summary Attachment J-0200000-07 ELIN Schedule
SUMMARY
| DATE PREPARED: | |
| PREPARED BY: | |
| CONTRACT/SOLICITATION NUMBER: N40084-24-R-2000 | |
| PROJECT TITLE: IE-SHIMA MARINE CORPS BASE FACILITIES MULTI-FUNCTION | |
| MAINTENANCE AND SERVICES |
| MARINE CORPS BASE CAMP SMEDLEY D. BUTLER IE-SHIMA ISLAND OKINAWA, JAPAN | |
CLIN ITEM DESCRIPTION TOTAL
Base Year 1 Jun 2024 ~
| 31 May 2025 | 0001 | BASE PERIOD - RECURRING WORK | ¥ - | |
| | 0002 | BASE YEAR - NON-RECURRING WORK | ¥ - |
Option 1 1 Jun 2025 ~
| 31 May 2026 | 0003 | OPTION PERIOD 1 - RECURRING WORK | ¥ - | |
| | 0004 | OPTION PERIOD 1 - NON-RECURRING WORK | ¥ - |
Option 2 1 Jun 2026 ~
| 31 May 2027 | 0005 | OPTION PERIOD 2 - RECURRING WORK | ¥ - | |
| | 0006 | OPTION PERIOD 2 - NON-RECURRING WORK | ¥ - |
Option 3 1 Jun 2027 ~
| 31 May 2028 | 0007 | OPTION PERIOD 3 - RECURRING WORK | ¥ - | |
| | 0008 | OPTION PERIOD 3 - NON-RECURRING WORK | ¥ - |
Option 4 1 Jun 2028 ~
| 31 May 2029 | 0009 | OPTION PERIOD 4 - RECURRING WORK | ¥ - | |
| | 0010 | OPTION PERIOD 4 - NON-RECURRING WORK | ¥ - |
Option 5 1 Jun 2029 ~
| 31 May 2030 | 0011 | OPTION PERIOD 5 - RECURRING WORK | ¥ - | |
| | 0012 | OPTION PERIOD 5 - NON-RECURRING WORK | ¥ - |
Option 6 1 Jun 2030 ~
| 31 May 2031 | 0013 | OPTION PERIOD 6 - RECURRING WORK | ¥ - | |
| | 0014 | OPTION PERIOD 6 - NON-RECURRING WORK | ¥ - |
Option 7 1 Jun 2031 ~
| 31 May 2032 | 0015 | OPTION PERIOD 7 - RECURRING WORK | ¥ - | |
| | 0016 | OPTION PERIOD 7- NON-RECURRING WORK | ¥ - |
| SUBTOTAL RECURRING (FFP) COST ALL OPTIONS: | ¥ - |
| FY24 EXCHANGE RATE: $1.00/¥139.1635 | $ - 0 |
| SUBTOTAL NON-RECURRING (IDIQ) COST ALL OPTIONS: | ¥ - |
| FY24 EXCHANGE RATE: $1.00/¥139.1635 | $ - 0 |
| TOTAL CONTRACT AMOUNT (¥): | | ¥ - |
| TOTAL CONTRACT AMOUNT ($): | | |
| FY24 EXCHANGE RATE: $1.00/¥139.1635 | | $ - 0 | |
&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Base_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | |
| EXHIBIT A - CLIN 0001 | | | | | | | |
| Line Item 0001 Recurring work - Base Period | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS | | | | | | | |
| MAINTENANCE & LANDSCAPING - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs A001 through A011 | | | | | | | |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | | Total | |
| 1502000 Facility Investment | | | | | | | |
| A001 | Service Call, Spec Item 3.1 | | | | | | |
| Service Call | | | | | | |
| A001AA | Urgent Service Orders, Spec Item 3.1.1 | 3 | EA | ¥ | - | ¥ | - 0 |
| A001AB | Routine Service Orders, Spec Item 3.1.2 | 3 | EA | ¥ | - | ¥ | - 0 |
| A001 Subtotal | | | | | ¥ | - 0 |
| A002 | PM Program, Spec Item 3.2.1 | | | | | | |
| Fire Suppression Systems | | | | | | |
| A002AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| A002AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| A002AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| A002 Subtotal | | | | | ¥ | - 0 |
| A003 | PM Program, Spec Item 3.2.2 | | | | | | |
| Gate Barrier Systems | | | | | | |
| A003AA | MCB Compound, Gate 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| A003 Subtotal | | | | | ¥ | - 0 |
| A004 | Other Recurring Services Program, Spec Item 3.3.1 | | | | | | |
| Exhaust Hood and Duct Systems | | | | | | |
| A004AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| A004AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| A004AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| A004 Subtotal | | | | | ¥ | - 0 |
| A005 | Other Recurring Services Program, Spec Item 3.3.2 | | | | | | |
| Grease Traps | | | | | | |
| A005AA | MCB Compound, Building 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| A005 Subtotal | | | | | ¥ | - 0 |
| A006 | Other Recurring Services Program, Spec Item 3.3.3 | | | | | | |
| Septic Tanks | | | | | | |
| A006AA | MCB Compound, Building 81 | 12 | MO | ¥ | - | ¥ | - 0 |
| A006AB | MCB Training Area, Building 42-G | 12 | MO | ¥ | - | ¥ | - 0 |
| A006 Subtotal | | | | | ¥ | - 0 |
| A007 | Other Recurring Services Program, Spec Item 3.3.4 | | | | | | |
| Oil Water Separators | | | | | | |
| A007AA | MCB Compound, Building 87-A | 12 | MO | ¥ | - | ¥ | - 0 |
| A007AB | MCB Compound, Building 82-B | 12 | MO | ¥ | - | ¥ | - 0 |
| A007AC | MCB Compound, Building 80-N | 12 | MO | ¥ | - | ¥ | - 0 |
| A007AD | MCB Training Area, Building 42-M | 12 | MO | ¥ | - | ¥ | - 0 |
| A007AE | MCB Training Area, Building 42-J | 12 | MO | ¥ | - | ¥ | - 0 |
| A007 Subtotal | | | | | ¥ | - 0 |
| 1503030 Integrated Solid Waste Management | | | | | | | |
| A008 | Solid Waste Collection and Disposal, Spec Item 3.1 & 3.2 | | | | | | |
| Solid Waste Collection and Disposal | | | | | | |
| A008AA | MCB Compound, Enclosure 82-A | 12 | MO | ¥ | - | ¥ | - 0 |
| A008AB | MCB Compound, Enclosure 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| A008AC | MCB Training Area, Building 42 | 12 | MO | ¥ | - | ¥ | - 0 |
| A008 Subtotal | | | | | ¥ | - 0 |
| 1503050 Grounds Maintenance and Landscaping | | | | | | | |
| A009 | Improved Grounds, Spec Item 3.1 | | | | | | |
| Improved Grounds | | | | | | |
| A009AA | MCB Compound Area | 12 | MO | ¥ | - | ¥ | - 0 |
| A009AB | MCB Training Area | 12 | MO | ¥ | - | ¥ | - 0 |
| A009AC | MCB Antenna Area | 12 | MO | ¥ | - | ¥ | - 0 |
| A009 Subtotal | | | | | ¥ | - 0 |
| A010 | Operational Areas, Spec Item 3.2 & 3.3 | | | | | | |
| Operational Areas | | | | | | |
| A010AA | Anti-Terrorism Force Protection , MCB Compound Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| A010AB | Anti-Terrorism Force Protection, MCB Training Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| A010AC | Anti-Terrorism Force Protection, MCB Antenna Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| A010 Subtotal | | | | | ¥ | - 0 |
| A011 | Typhoon Cleanup, Spec Item 3.4 | | | | | | |
| Typhoon Cleanup | | | | | | |
| A011AA | MCB Compound Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| A011AB | MCB Training Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| A011 Subtotal | | | | | ¥ | - 0 |
TOTAL RECURRING WORK FOR BASE YEAR ¥ - 0
&11CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
&11CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Base_Non-Recurring
| ATTACHMENT J-0200000-07 | | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | | |
| EXHIBIT A - CLIN 0002 | | | | | | | | |
| Line Item 0002 Non-Recurring Work - Base Period | | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS MAINTENANCE | | | | | | | | |
| & LANDSCPAING - NON-RECURRING WORK PRICE (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | | | | | | | | |
| ELINs A700 through A709 | | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | | Extended Price | |
| A700 | Unit Priced Labor Work "MUST BE NEGOTIATED BY KO". | Provide labor to perform all Unit Priced Labor Work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| A701 | Material Costs "MUST BE NEGOTIATED BY KO". | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| A702 | Solid Waste Collection and Disposal | The Contractor shall provide collection of residential, commercial, and industrial solid wastes to ensure refuse and recyclables are properly collected and disposed at an off-base facility in accordance with environmentally approved procedures. | 300 | CY | ¥ | - 0 | ¥ | - 0 |
| A703 | Typhoon Cleanup and Debris Removal, Collection and Disposal | The Contractor shall mobilize its entire workforce within eight (8) hours or the "All Clear" Typhoon Condition announcement and be on the working job site. All collected debris shall be removed and disposed of off Government properties. The Contractor shall collect, remove, and dispose all vegetation debris, cracked or broken tree limb within installation and along fenced line at an off-base faciltiy in accrodance with envornmentally approved procedures. | 4 | EA | ¥ | - 0 | ¥ | - 0 |
| A704 | Tree and Stump Removal from 6" to 12" DBH (Diameter at Breast Height) | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 30 | EA | ¥ | - 0 | ¥ | - 0 |
| A705 | Tree and Stump Removal from 12" to 20" DBH (Diameter at Breast Height) and above. | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 20 | EA | ¥ | - 0 | ¥ | - 0 |
| A706 | Septic Tank Pumping, Cleanding, Collection and Disposal | The Contractor shall provide equipment and personnel to provide septic tanks pumping, cleaning, collection, and disposal of septic waste per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 10,000 | GL | ¥ | - 0 | ¥ | - 0 |
| A707 | Oil Water Separator Collection, Cleaning, and Disposal | The Contractor shall provide equipment and personnel to provide oil water separator cleaning, collection, and disposal of oil waste and sludge per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| A708 | Grease Trap Cleaning, Collection, and Disposal | The Contractor shall provide equipment and personnel to provide grease traps pumping, cleaning, collection, and disposal of grease per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| A709 | Grounds Maintenance and Landscaping | The Contractor shall maintain improved grounds area to include removal and disposal of all debris at an off-base facility in accordance with environmentally approved procedures. | 50 | AC | ¥ | - 0 | ¥ | - 0 |
TOTAL NON-RECURRING WORK FOR BASE YEAR ¥ 2,000,000
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT1_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | |
| EXHIBIT B - CLIN 0003 | | | | | | | |
| Line Item 0003 Recurring work - Option Period 1 | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS | | | | | | | |
| MAINTENANCE & LANDSCAPING - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs B001 through B011 | | | | | | | |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | | Total | |
| 1502000 Facility Investment | | | | | | | |
| B001 | Service Call, Spec Item 3.1 | | | | | | |
| Service Call | | | | | | |
| B001AA | Urgent Service Orders, Spec Item 3.1.1 | 3 | EA | ¥ | - | ¥ | - 0 |
| B001AB | Routine Service Orders, Spec Item 3.1.2 | 3 | EA | ¥ | - | ¥ | - 0 |
| B001 Subtotal | | | | | ¥ | - 0 |
| B002 | PM Program, Spec Item 3.2.1 | | | | | | |
| Fire Suppression Systems | | | | | | |
| B002AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| B002AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| B002AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| B002 Subtotal | | | | | ¥ | - 0 |
| B003 | PM Program, Spec Item 3.2.2 | | | | | | |
| Gate Barrier Systems | | | | | | |
| B003AA | MCB Compound, Gate 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| B003 Subtotal | | | | | ¥ | - 0 |
| B004 | Other Recurring Services Program, Spec Item 3.3.1 | | | | | | |
| Exhaust Hood and Duct Systems | | | | | | |
| B004AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| B004AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| B004AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| B004 Subtotal | | | | | ¥ | - 0 |
| B005 | Other Recurring Services Program, Spec Item 3.3.2 | | | | | | |
| Grease Traps | | | | | | |
| B005AA | MCB Compound, Building 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| B005 Subtotal | | | | | ¥ | - 0 |
| B006 | Other Recurring Services Program, Spec Item 3.3.3 | | | | | | |
| Septic Tanks | | | | | | |
| B006AA | MCB Compound, Building 81 | 12 | MO | ¥ | - | ¥ | - 0 |
| B006AB | MCB Training Area, Building 42-G | 12 | MO | ¥ | - | ¥ | - 0 |
| B006 Subtotal | | | | | ¥ | - 0 |
| B007 | Other Recurring Services Program, Spec Item 3.3.4 | | | | | | |
| Oil Water Separators | | | | | | |
| B007AA | MCB Compound, Building 87-A | 12 | MO | ¥ | - | ¥ | - 0 |
| B007AB | MCB Compound, Building 82-B | 12 | MO | ¥ | - | ¥ | - 0 |
| B007AC | MCB Compound, Building 80-N | 12 | MO | ¥ | - | ¥ | - 0 |
| B007AD | MCB Training Area, Building 42-M | 12 | MO | ¥ | - | ¥ | - 0 |
| B007AE | MCB Training Area, Building 42-J | 12 | MO | ¥ | - | ¥ | - 0 |
| B007 Subtotal | | | | | ¥ | - 0 |
| 1503030 Integrated Solid Waste Management | | | | | | | |
| B008 | Solid Waste Collection and Disposal, Spec Item 3.1 & 3.2 | | | | | | |
| Solid Waste Collection and Disposal | | | | | | |
| B008AA | MCB Compound, Enclosure 82-A | 12 | MO | ¥ | - | ¥ | - 0 |
| B008AB | MCB Compound, Enclosure 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| B008AC | MCB Training Area, Building 42 | 12 | MO | ¥ | - | ¥ | - 0 |
| B008 Subtotal | | | | | ¥ | - 0 |
| 1503050 Grounds Maintenance and Landscaping | | | | | | | |
| B009 | Improved Grounds, Spec Item 3.1 | | | | | | |
| Improved Grounds | | | | | | |
| B009AA | MCB Compound Area | 12 | MO | ¥ | - | ¥ | - 0 |
| B009AB | MCB Training Area | 12 | MO | ¥ | - | ¥ | - 0 |
| B009AC | MCB Antenna Area | 12 | MO | ¥ | - | ¥ | - 0 |
| B009 Subtotal | | | | | ¥ | - 0 |
| B010 | Operational Areas, Spec Item 3.2 & 3.3 | | | | | | |
| Operational Areas | | | | | | |
| B010AA | Anti-Terrorism Force Protection , MCB Compound Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| B010AB | Anti-Terrorism Force Protection, MCB Training Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| B010AC | Anti-Terrorism Force Protection, MCB Antenna Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| B010 Subtotal | | | | | ¥ | - 0 |
| B011 | Typhoon Cleanup, Spec Item 3.4 | | | | | | |
| Typhoon Cleanup | | | | | | |
| B011AA | MCB Compound Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| B011AB | MCB Training Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| B011 Subtotal | | | | | ¥ | - 0 |
TOTAL RECURRING WORK FOR OPTION YEAR 1 ¥ - 0
&11CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT1_Non-Recurring
| ATTACHMENT J-0200000-07 | | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | | |
| EXHIBIT B - CLIN 0004 | | | | | | | | |
| Line Item 0004 Non-Recurring Work - Option Period 1 | | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS MAINTENANCE | | | | | | | | |
| & LANDSCPAING - NON-RECURRING WORK PRICE (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | | | | | | | | |
| ELINs B700 through B709 | | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | | Extended Price | |
| B700 | Unit Priced Labor Work "MUST BE NEGOTIATED BY KO". | Provide labor to perform all Unit Priced Labor Work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| B701 | Material Costs "MUST BE NEGOTIATED BY KO". | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| B702 | Solid Waste Collection and Disposal | The Contractor shall provide collection of residential, commercial, and industrial solid wastes to ensure refuse and recyclables are properly collected and disposed at an off-base facility in accordance with environmentally approved procedures. | 300 | CY | ¥ | - 0 | ¥ | - 0 |
| B703 | Typhoon Cleanup and Debris Removal, Collection and Disposal | The Contractor shall mobilize its entire workforce within eight (8) hours or the "All Clear" Typhoon Condition announcement and be on the working job site. All collected debris shall be removed and disposed of off Government properties. The Contractor shall collect, remove, and dispose all vegetation debris, cracked or broken tree limb within installation and along fenced line at an off-base faciltiy in accrodance with envornmentally approved procedures. | 4 | EA | ¥ | - 0 | ¥ | - 0 |
| B704 | Tree and Stump Removal from 6" to 12" DBH (Diameter at Breast Height) | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 30 | EA | ¥ | - 0 | ¥ | - 0 |
| B705 | Tree and Stump Removal from 12" to 20" DBH (Diameter at Breast Height) and above. | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 20 | EA | ¥ | - 0 | ¥ | - 0 |
| B706 | Septic Tank Pumping, Cleanding, Collection and Disposal | The Contractor shall provide equipment and personnel to provide septic tanks pumping, cleaning, collection, and disposal of septic waste per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 10,000 | GL | ¥ | - 0 | ¥ | - 0 |
| B707 | Oil Water Separator Collection, Cleaning, and Disposal | The Contractor shall provide equipment and personnel to provide oil water separator cleaning, collection, and disposal of oil waste and sludge per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| B708 | Grease Trap Cleaning, Collection, and Disposal | The Contractor shall provide equipment and personnel to provide grease traps pumping, cleaning, collection, and disposal of grease per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| B709 | Grounds Maintenance and Landscaping | The Contractor shall maintain improved grounds area to include removal and disposal of all debris at an off-base facility in accordance with environmentally approved procedures. | 50 | AC | ¥ | - 0 | ¥ | - 0 |
TOTAL NON-RECURRING WORK FOR OPTION YEAR 1 ¥ 2,000,000
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT2_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | |
| EXHIBIT C - CLIN 0005 | | | | | | | |
| Line Item 0005 Recurring work - Option Period 2 | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS | | | | | | | |
| MAINTENANCE & LANDSCAPING - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs C001 through C011 | | | | | | | |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | | Total | |
| 1502000 Facility Investment | | | | | | | |
| C001 | Service Call, Spec Item 3.1 | | | | | | |
| Service Call | | | | | | |
| C001AA | Urgent Service Orders, Spec Item 3.1.1 | 3 | EA | ¥ | - | ¥ | - 0 |
| C001AB | Routine Service Orders, Spec Item 3.1.2 | 3 | EA | ¥ | - | ¥ | - 0 |
| C001 Subtotal | | | | | ¥ | - 0 |
| C002 | PM Program, Spec Item 3.2.1 | | | | | | |
| Fire Suppression Systems | | | | | | |
| C002AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| C002AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| C002AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| C002 Subtotal | | | | | ¥ | - 0 |
| C003 | PM Program, Spec Item 3.2.2 | | | | | | |
| Gate Barrier Systems | | | | | | |
| C003AA | MCB Compound, Gate 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| C003 Subtotal | | | | | ¥ | - 0 |
| C004 | Other Recurring Services Program, Spec Item 3.3.1 | | | | | | |
| Exhaust Hood and Duct Systems | | | | | | |
| C004AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| C004AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| C004AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| C004 Subtotal | | | | | ¥ | - 0 |
| C005 | Other Recurring Services Program, Spec Item 3.3.2 | | | | | | |
| Grease Traps | | | | | | |
| C005AA | MCB Compound, Building 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| C005 Subtotal | | | | | ¥ | - 0 |
| C006 | Other Recurring Services Program, Spec Item 3.3.3 | | | | | | |
| Septic Tanks | | | | | | |
| C006AA | MCB Compound, Building 81 | 12 | MO | ¥ | - | ¥ | - 0 |
| C006AB | MCB Training Area, Building 42-G | 12 | MO | ¥ | - | ¥ | - 0 |
| C006 Subtotal | | | | | ¥ | - 0 |
| C007 | Other Recurring Services Program, Spec Item 3.3.4 | | | | | | |
| Oil Water Separators | | | | | | |
| C007AA | MCB Compound, Building 87-A | 12 | MO | ¥ | - | ¥ | - 0 |
| C007AB | MCB Compound, Building 82-B | 12 | MO | ¥ | - | ¥ | - 0 |
| C007AC | MCB Compound, Building 80-N | 12 | MO | ¥ | - | ¥ | - 0 |
| C007AD | MCB Training Area, Building 42-M | 12 | MO | ¥ | - | ¥ | - 0 |
| C007AE | MCB Training Area, Building 42-J | 12 | MO | ¥ | - | ¥ | - 0 |
| C007 Subtotal | | | | | ¥ | - 0 |
| 1503030 Integrated Solid Waste Management | | | | | | | |
| C008 | Solid Waste Collection and Disposal, Spec Item 3.1 & 3.2 | | | | | | |
| Solid Waste Collection and Disposal | | | | | | |
| C008AA | MCB Compound, Enclosure 82-A | 12 | MO | ¥ | - | ¥ | - 0 |
| C008AB | MCB Compound, Enclosure 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| C008AC | MCB Training Area, Building 42 | 12 | MO | ¥ | - | ¥ | - 0 |
| C008 Subtotal | | | | | ¥ | - 0 |
| 1503050 Grounds Maintenance and Landscaping | | | | | | | |
| C009 | Improved Grounds, Spec Item 3.1 | | | | | | |
| Improved Grounds | | | | | | |
| C009AA | MCB Compound Area | 12 | MO | ¥ | - | ¥ | - 0 |
| C009AB | MCB Training Area | 12 | MO | ¥ | - | ¥ | - 0 |
| C009AC | MCB Antenna Area | 12 | MO | ¥ | - | ¥ | - 0 |
| C009 Subtotal | | | | | ¥ | - 0 |
| C010 | Operational Areas, Spec Item 3.2 & 3.3 | | | | | | |
| Operational Areas | | | | | | |
| C010AA | Anti-Terrorism Force Protection , MCB Compound Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| C010AB | Anti-Terrorism Force Protection, MCB Training Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| C010AC | Anti-Terrorism Force Protection, MCB Antenna Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| C010 Subtotal | | | | | ¥ | - 0 |
| C011 | Typhoon Cleanup, Spec Item 3.4 | | | | | | |
| Typhoon Cleanup | | | | | | |
| C011AA | MCB Compound Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| C011AB | MCB Training Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| C011 Subtotal | | | | | ¥ | - 0 |
TOTAL RECURRING WORK FOR OPTION YEAR 2 ¥ - 0
&11CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT2_Non-Recurring
| ATTACHMENT J-0200000-07 | | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | | |
| EXHIBIT C - CLIN 0006 | | | | | | | | |
| Line Item 0006 Non-Recurring Work - Option Period 2 | | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS MAINTENANCE | | | | | | | | |
| & LANDSCPAING - NON-RECURRING WORK PRICE (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | | | | | | | | |
| ELINs C700 through C709 | | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | | Extended Price | |
| C700 | Unit Priced Labor Work "MUST BE NEGOTIATED BY KO". | Provide labor to perform all Unit Priced Labor Work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| C701 | Material Costs "MUST BE NEGOTIATED BY KO". | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| C702 | Solid Waste Collection and Disposal | The Contractor shall provide collection of residential, commercial, and industrial solid wastes to ensure refuse and recyclables are properly collected and disposed at an off-base facility in accordance with environmentally approved procedures. | 300 | CY | ¥ | - 0 | ¥ | - 0 |
| C703 | Typhoon Cleanup and Debris Removal, Collection and Disposal | The Contractor shall mobilize its entire workforce within eight (8) hours or the "All Clear" Typhoon Condition announcement and be on the working job site. All collected debris shall be removed and disposed of off Government properties. The Contractor shall collect, remove, and dispose all vegetation debris, cracked or broken tree limb within installation and along fenced line at an off-base faciltiy in accrodance with envornmentally approved procedures. | 4 | EA | ¥ | - 0 | ¥ | - 0 |
| C704 | Tree and Stump Removal from 6" to 12" DBH (Diameter at Breast Height) | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 30 | EA | ¥ | - 0 | ¥ | - 0 |
| C705 | Tree and Stump Removal from 12" to 20" DBH (Diameter at Breast Height) and above. | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 20 | EA | ¥ | - 0 | ¥ | - 0 |
| C706 | Septic Tank Pumping, Cleanding, Collection and Disposal | The Contractor shall provide equipment and personnel to provide septic tanks pumping, cleaning, collection, and disposal of septic waste per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 10,000 | GL | ¥ | - 0 | ¥ | - 0 |
| C707 | Oil Water Separator Collection, Cleaning, and Disposal | The Contractor shall provide equipment and personnel to provide oil water separator cleaning, collection, and disposal of oil waste and sludge per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| C708 | Grease Trap Cleaning, Collection, and Disposal | The Contractor shall provide equipment and personnel to provide grease traps pumping, cleaning, collection, and disposal of grease per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| C709 | Grounds Maintenance and Landscaping | The Contractor shall maintain improved grounds area to include removal and disposal of all debris at an off-base facility in accordance with environmentally approved procedures. | 50 | AC | ¥ | - 0 | ¥ | - 0 |
TOTAL NON-RECURRING WORK FOR OPTION YEAR 2 ¥ 2,000,000
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT3_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | |
| EXHIBIT D - CLIN 0007 | | | | | | | |
| Line Item 0007 Recurring work - Option Period 3 | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS | | | | | | | |
| MAINTENANCE & LANDSCAPING - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs D001 through D011 | | | | | | | |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | | Total | |
| 1502000 Facility Investment | | | | | | | |
| D001 | Service Call, Spec Item 3.1 | | | | | | |
| Service Call | | | | | | |
| D001AA | Urgent Service Orders, Spec Item 3.1.1 | 3 | EA | ¥ | - | ¥ | - 0 |
| D001AB | Routine Service Orders, Spec Item 3.1.2 | 3 | EA | ¥ | - | ¥ | - 0 |
| D001 Subtotal | | | | | ¥ | - 0 |
| D002 | PM Program, Spec Item 3.2.1 | | | | | | |
| Fire Suppression Systems | | | | | | |
| D002AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| D002AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| D002AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| D002 Subtotal | | | | | ¥ | - 0 |
| D003 | PM Program, Spec Item 3.2.2 | | | | | | |
| Gate Barrier Systems | | | | | | |
| D003AA | MCB Compound, Gate 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| D003 Subtotal | | | | | ¥ | - 0 |
| D004 | Other Recurring Services Program, Spec Item 3.3.1 | | | | | | |
| Exhaust Hood and Duct Systems | | | | | | |
| D004AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| D004AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| D004AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| D004 Subtotal | | | | | ¥ | - 0 |
| D005 | Other Recurring Services Program, Spec Item 3.3.2 | | | | | | |
| Grease Traps | | | | | | |
| D005AA | MCB Compound, Building 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| D005 Subtotal | | | | | ¥ | - 0 |
| D006 | Other Recurring Services Program, Spec Item 3.3.3 | | | | | | |
| Septic Tanks | | | | | | |
| D006AA | MCB Compound, Building 81 | 12 | MO | ¥ | - | ¥ | - 0 |
| D006AB | MCB Training Area, Building 42-G | 12 | MO | ¥ | - | ¥ | - 0 |
| D006 Subtotal | | | | | ¥ | - 0 |
| D007 | Other Recurring Services Program, Spec Item 3.3.4 | | | | | | |
| Oil Water Separators | | | | | | |
| D007AA | MCB Compound, Building 87-A | 12 | MO | ¥ | - | ¥ | - 0 |
| D007AB | MCB Compound, Building 82-B | 12 | MO | ¥ | - | ¥ | - 0 |
| D007AC | MCB Compound, Building 80-N | 12 | MO | ¥ | - | ¥ | - 0 |
| D007AD | MCB Training Area, Building 42-M | 12 | MO | ¥ | - | ¥ | - 0 |
| D007AE | MCB Training Area, Building 42-J | 12 | MO | ¥ | - | ¥ | - 0 |
| D007 Subtotal | | | | | ¥ | - 0 |
| 1503030 Integrated Solid Waste Management | | | | | | | |
| D008 | Solid Waste Collection and Disposal, Spec Item 3.1 & 3.2 | | | | | | |
| Solid Waste Collection and Disposal | | | | | | |
| D008AA | MCB Compound, Enclosure 82-A | 12 | MO | ¥ | - | ¥ | - 0 |
| D008AB | MCB Compound, Enclosure 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| D008AC | MCB Training Area, Building 42 | 12 | MO | ¥ | - | ¥ | - 0 |
| D008 Subtotal | | | | | ¥ | - 0 |
| 1503050 Grounds Maintenance and Landscaping | | | | | | | |
| D009 | Improved Grounds, Spec Item 3.1 | | | | | | |
| Improved Grounds | | | | | | |
| D009AA | MCB Compound Area | 12 | MO | ¥ | - | ¥ | - 0 |
| D009AB | MCB Training Area | 12 | MO | ¥ | - | ¥ | - 0 |
| D009AC | MCB Antenna Area | 12 | MO | ¥ | - | ¥ | - 0 |
| D009 Subtotal | | | | | ¥ | - 0 |
| D010 | Operational Areas, Spec Item 3.2 & 3.3 | | | | | | |
| Operational Areas | | | | | | |
| D010AA | Anti-Terrorism Force Protection , MCB Compound Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| D010AB | Anti-Terrorism Force Protection, MCB Training Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| D010AC | Anti-Terrorism Force Protection, MCB Antenna Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| D010 Subtotal | | | | | ¥ | - 0 |
| D011 | Typhoon Cleanup, Spec Item 3.4 | | | | | | |
| Typhoon Cleanup | | | | | | |
| D011AA | MCB Compound Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| D011AB | MCB Training Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| D011 Subtotal | | | | | ¥ | - 0 |
TOTAL RECURRING WORK FOR OPTION YEAR 3 ¥ - 0
&11CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT3_Non-Recurring
| ATTACHMENT J-0200000-07 | | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | | |
| EXHIBIT D - CLIN 0008 | | | | | | | | |
| Line Item 0008 Non-Recurring Work - Option Period 3 | | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS MAINTENANCE | | | | | | | | |
| & LANDSCPAING - NON-RECURRING WORK PRICE (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | | | | | | | | |
| ELINs D700 through D709 | | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | | Extended Price | |
| D700 | Unit Priced Labor Work "MUST BE NEGOTIATED BY KO". | Provide labor to perform all Unit Priced Labor Work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| D701 | Material Costs "MUST BE NEGOTIATED BY KO". | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| D702 | Solid Waste Collection and Disposal | The Contractor shall provide collection of residential, commercial, and industrial solid wastes to ensure refuse and recyclables are properly collected and disposed at an off-base facility in accordance with environmentally approved procedures. | 300 | CY | ¥ | - 0 | ¥ | - 0 |
| D703 | Typhoon Cleanup and Debris Removal, Collection and Disposal | The Contractor shall mobilize its entire workforce within eight (8) hours or the "All Clear" Typhoon Condition announcement and be on the working job site. All collected debris shall be removed and disposed of off Government properties. The Contractor shall collect, remove, and dispose all vegetation debris, cracked or broken tree limb within installation and along fenced line at an off-base faciltiy in accrodance with envornmentally approved procedures. | 4 | EA | ¥ | - 0 | ¥ | - 0 |
| D704 | Tree and Stump Removal from 6" to 12" DBH (Diameter at Breast Height) | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 30 | EA | ¥ | - 0 | ¥ | - 0 |
| D705 | Tree and Stump Removal from 12" to 20" DBH (Diameter at Breast Height) and above. | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 20 | EA | ¥ | - 0 | ¥ | - 0 |
| D706 | Septic Tank Pumping, Cleanding, Collection and Disposal | The Contractor shall provide equipment and personnel to provide septic tanks pumping, cleaning, collection, and disposal of septic waste per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 10,000 | GL | ¥ | - 0 | ¥ | - 0 |
| D707 | Oil Water Separator Collection, Cleaning, and Disposal | The Contractor shall provide equipment and personnel to provide oil water separator cleaning, collection, and disposal of oil waste and sludge per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| D708 | Grease Trap Cleaning, Collection, and Disposal | The Contractor shall provide equipment and personnel to provide grease traps pumping, cleaning, collection, and disposal of grease per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| D709 | Grounds Maintenance and Landscaping | The Contractor shall maintain improved grounds area to include removal and disposal of all debris at an off-base facility in accordance with environmentally approved procedures. | 50 | AC | ¥ | - 0 | ¥ | - 0 |
TOTAL NON-RECURRING WORK FOR OPTION YEAR 3 ¥ 2,000,000
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT4_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | |
| EXHIBIT E - CLIN 0009 | | | | | | | |
| Line Item 0009 Recurring work - Option Period 4 | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS | | | | | | | |
| MAINTENANCE & LANDSCAPING - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs E001 through E011 | | | | | | | |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | | Total | |
| 1502000 Facility Investment | | | | | | | |
| E001 | Service Call, Spec Item 3.1 | | | | | | |
| Service Call | | | | | | |
| E001AA | Urgent Service Orders, Spec Item 3.1.1 | 3 | EA | ¥ | - | ¥ | - 0 |
| E001AB | Routine Service Orders, Spec Item 3.1.2 | 3 | EA | ¥ | - | ¥ | - 0 |
| E001 Subtotal | | | | | ¥ | - 0 |
| E002 | PM Program, Spec Item 3.2.1 | | | | | | |
| Fire Suppression Systems | | | | | | |
| E002AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| E002AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| E002AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| E002 Subtotal | | | | | ¥ | - 0 |
| E003 | PM Program, Spec Item 3.2.2 | | | | | | |
| Gate Barrier Systems | | | | | | |
| E003AA | MCB Compound, Gate 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| E003 Subtotal | | | | | ¥ | - 0 |
| E004 | Other Recurring Services Program, Spec Item 3.3.1 | | | | | | |
| Exhaust Hood and Duct Systems | | | | | | |
| E004AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| E004AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| E004AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| E004 Subtotal | | | | | ¥ | - 0 |
| E005 | Other Recurring Services Program, Spec Item 3.3.2 | | | | | | |
| Grease Traps | | | | | | |
| E005AA | MCB Compound, Building 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| E005 Subtotal | | | | | ¥ | - 0 |
| E006 | Other Recurring Services Program, Spec Item 3.3.3 | | | | | | |
| Septic Tanks | | | | | | |
| E006AA | MCB Compound, Building 81 | 12 | MO | ¥ | - | ¥ | - 0 |
| E006AB | MCB Training Area, Building 42-G | 12 | MO | ¥ | - | ¥ | - 0 |
| E006 Subtotal | | | | | ¥ | - 0 |
| E007 | Other Recurring Services Program, Spec Item 3.3.4 | | | | | | |
| Oil Water Separators | | | | | | |
| E007AA | MCB Compound, Building 87-A | 12 | MO | ¥ | - | ¥ | - 0 |
| E007AB | MCB Compound, Building 82-B | 12 | MO | ¥ | - | ¥ | - 0 |
| E007AC | MCB Compound, Building 80-N | 12 | MO | ¥ | - | ¥ | - 0 |
| E007AD | MCB Training Area, Building 42-M | 12 | MO | ¥ | - | ¥ | - 0 |
| E007AE | MCB Training Area, Building 42-J | 12 | MO | ¥ | - | ¥ | - 0 |
| E007 Subtotal | | | | | ¥ | - 0 |
| 1503030 Integrated Solid Waste Management | | | | | | | |
| E008 | Solid Waste Collection and Disposal, Spec Item 3.1 & 3.2 | | | | | | |
| Solid Waste Collection and Disposal | | | | | | |
| E008AA | MCB Compound, Enclosure 82-A | 12 | MO | ¥ | - | ¥ | - 0 |
| E008AB | MCB Compound, Enclosure 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| E008AC | MCB Training Area, Building 42 | 12 | MO | ¥ | - | ¥ | - 0 |
| E008 Subtotal | | | | | ¥ | - 0 |
| 1503050 Grounds Maintenance and Landscaping | | | | | | | |
| E009 | Improved Grounds, Spec Item 3.1 | | | | | | |
| Improved Grounds | | | | | | |
| E009AA | MCB Compound Area | 12 | MO | ¥ | - | ¥ | - 0 |
| E009AB | MCB Training Area | 12 | MO | ¥ | - | ¥ | - 0 |
| E009AC | MCB Antenna Area | 12 | MO | ¥ | - | ¥ | - 0 |
| E009 Subtotal | | | | | ¥ | - 0 |
| E010 | Operational Areas, Spec Item 3.2 & 3.3 | | | | | | |
| Operational Areas | | | | | | |
| E010AA | Anti-Terrorism Force Protection , MCB Compound Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| E010AB | Anti-Terrorism Force Protection, MCB Training Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| E010AC | Anti-Terrorism Force Protection, MCB Antenna Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| E010 Subtotal | | | | | ¥ | - 0 |
| E011 | Typhoon Cleanup, Spec Item 3.4 | | | | | | |
| Typhoon Cleanup | | | | | | |
| E011AA | MCB Compound Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| E011AB | MCB Training Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| E011 Subtotal | | | | | ¥ | - 0 |
TOTAL RECURRING WORK FOR OPTION YEAR 4 ¥ - 0
&11CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT4_Non-Recurring
| ATTACHMENT J-0200000-07 | | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | | |
| EXHIBIT E - CLIN 0010 | | | | | | | | |
| Line Item 0010 Non-Recurring Work - Option Period 4 | | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS MAINTENANCE | | | | | | | | |
| & LANDSCPAING - NON-RECURRING WORK PRICE (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | | | | | | | | |
| ELINs E700 through E709 | | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | | Extended Price | |
| E700 | Unit Priced Labor Work "MUST BE NEGOTIATED BY KO". | Provide labor to perform all Unit Priced Labor Work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| E701 | Material Costs "MUST BE NEGOTIATED BY KO". | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| E702 | Solid Waste Collection and Disposal | The Contractor shall provide collection of residential, commercial, and industrial solid wastes to ensure refuse and recyclables are properly collected and disposed at an off-base facility in accordance with environmentally approved procedures. | 300 | CY | ¥ | - 0 | ¥ | - 0 |
| E703 | Typhoon Cleanup and Debris Removal, Collection and Disposal | The Contractor shall mobilize its entire workforce within eight (8) hours or the "All Clear" Typhoon Condition announcement and be on the working job site. All collected debris shall be removed and disposed of off Government properties. The Contractor shall collect, remove, and dispose all vegetation debris, cracked or broken tree limb within installation and along fenced line at an off-base faciltiy in accrodance with envornmentally approved procedures. | 4 | EA | ¥ | - 0 | ¥ | - 0 |
| E704 | Tree and Stump Removal from 6" to 12" DBH (Diameter at Breast Height) | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 30 | EA | ¥ | - 0 | ¥ | - 0 |
| E705 | Tree and Stump Removal from 12" to 20" DBH (Diameter at Breast Height) and above. | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 20 | EA | ¥ | - 0 | ¥ | - 0 |
| E706 | Septic Tank Pumping, Cleanding, Collection and Disposal | The Contractor shall provide equipment and personnel to provide septic tanks pumping, cleaning, collection, and disposal of septic waste per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 10,000 | GL | ¥ | - 0 | ¥ | - 0 |
| E707 | Oil Water Separator Collection, Cleaning, and Disposal | The Contractor shall provide equipment and personnel to provide oil water separator cleaning, collection, and disposal of oil waste and sludge per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| E708 | Grease Trap Cleaning, Collection, and Disposal | The Contractor shall provide equipment and personnel to provide grease traps pumping, cleaning, collection, and disposal of grease per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 500 | GL | ¥ | - 0 | ¥ | - 0 |
| E709 | Grounds Maintenance and Landscaping | The Contractor shall maintain improved grounds area to include removal and disposal of all debris at an off-base facility in accordance with environmentally approved procedures. | 50 | AC | ¥ | - 0 | ¥ | - 0 |
TOTAL NON-RECURRING WORK FOR OPTION YEAR 4 ¥ 2,000,000
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT5_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | |
| EXHIBIT F - CLIN 0011 | | | | | | | |
| Line Item 0011 Recurring work - Option Period 5 | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS | | | | | | | |
| MAINTENANCE & LANDSCAPING - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs F001 through F011 | | | | | | | |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | | Total | |
| 1502000 Facility Investment | | | | | | | |
| F001 | Service Call, Spec Item 3.1 | | | | | | |
| Service Call | | | | | | |
| F001AA | Urgent Service Orders, Spec Item 3.1.1 | 3 | EA | ¥ | - | ¥ | - 0 |
| F001AB | Routine Service Orders, Spec Item 3.1.2 | 3 | EA | ¥ | - | ¥ | - 0 |
| F001 Subtotal | | | | | ¥ | - 0 |
| F002 | PM Program, Spec Item 3.2.1 | | | | | | |
| Fire Suppression Systems | | | | | | |
| F002AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| F002AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| F002AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| F002 Subtotal | | | | | ¥ | - 0 |
| F003 | PM Program, Spec Item 3.2.2 | | | | | | |
| Gate Barrier Systems | | | | | | |
| F003AA | MCB Compound, Gate 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| F003 Subtotal | | | | | ¥ | - 0 |
| F004 | Other Recurring Services Program, Spec Item 3.3.1 | | | | | | |
| Exhaust Hood and Duct Systems | | | | | | |
| F004AA | MCB Compound, Building 80, Room A115 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| F004AB | MCB Compound, Building 80, Room A115 - Hood 2 | 12 | MO | ¥ | - | ¥ | - 0 |
| F004AC | MCB Compound, Building 80, Room B113 - Hood 1 | 12 | MO | ¥ | - | ¥ | - 0 |
| F004 Subtotal | | | | | ¥ | - 0 |
| F005 | Other Recurring Services Program, Spec Item 3.3.2 | | | | | | |
| Grease Traps | | | | | | |
| F005AA | MCB Compound, Building 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| F005 Subtotal | | | | | ¥ | - 0 |
| F006 | Other Recurring Services Program, Spec Item 3.3.3 | | | | | | |
| Septic Tanks | | | | | | |
| F006AA | MCB Compound, Building 81 | 12 | MO | ¥ | - | ¥ | - 0 |
| F006AB | MCB Training Area, Building 42-G | 12 | MO | ¥ | - | ¥ | - 0 |
| F006 Subtotal | | | | | ¥ | - 0 |
| F007 | Other Recurring Services Program, Spec Item 3.3.4 | | | | | | |
| Oil Water Separators | | | | | | |
| F007AA | MCB Compound, Building 87-A | 12 | MO | ¥ | - | ¥ | - 0 |
| F007AB | MCB Compound, Building 82-B | 12 | MO | ¥ | - | ¥ | - 0 |
| F007AC | MCB Compound, Building 80-N | 12 | MO | ¥ | - | ¥ | - 0 |
| F007AD | MCB Training Area, Building 42-M | 12 | MO | ¥ | - | ¥ | - 0 |
| F007AE | MCB Training Area, Building 42-J | 12 | MO | ¥ | - | ¥ | - 0 |
| F007 Subtotal | | | | | ¥ | - 0 |
| 1503030 Integrated Solid Waste Management | | | | | | | |
| F008 | Solid Waste Collection and Disposal, Spec Item 3.1 & 3.2 | | | | | | |
| Solid Waste Collection and Disposal | | | | | | |
| F008AA | MCB Compound, Enclosure 82-A | 12 | MO | ¥ | - | ¥ | - 0 |
| F008AB | MCB Compound, Enclosure 80-H | 12 | MO | ¥ | - | ¥ | - 0 |
| F008AC | MCB Training Area, Building 42 | 12 | MO | ¥ | - | ¥ | - 0 |
| F008 Subtotal | | | | | ¥ | - 0 |
| 1503050 Grounds Maintenance and Landscaping | | | | | | | |
| F009 | Improved Grounds, Spec Item 3.1 | | | | | | |
| Improved Grounds | | | | | | |
| F009AA | MCB Compound Area | 12 | MO | ¥ | - | ¥ | - 0 |
| F009AB | MCB Training Area | 12 | MO | ¥ | - | ¥ | - 0 |
| F009AC | MCB Antenna Area | 12 | MO | ¥ | - | ¥ | - 0 |
| F009 Subtotal | | | | | ¥ | - 0 |
| F010 | Operational Areas, Spec Item 3.2 & 3.3 | | | | | | |
| Operational Areas | | | | | | |
| F010AA | Anti-Terrorism Force Protection , MCB Compound Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| F010AB | Anti-Terrorism Force Protection, MCB Training Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| F010AC | Anti-Terrorism Force Protection, MCB Antenna Area Perimiter Fence | 12 | MO | ¥ | - | ¥ | - 0 |
| F010 Subtotal | | | | | ¥ | - 0 |
| F011 | Typhoon Cleanup, Spec Item 3.4 | | | | | | |
| Typhoon Cleanup | | | | | | |
| F011AA | MCB Compound Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| F011AB | MCB Training Area and Perimiter Fence Typhoon Cleanup | 12 | MO | ¥ | - | ¥ | - 0 |
| F011 Subtotal | | | | | ¥ | - 0 |
TOTAL RECURRING WORK FOR OPTION YEAR 5 ¥ - 0
&11CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT5_Non-Recurring
| ATTACHMENT J-0200000-07 | | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-R-2000 | | | | | | | | |
| EXHIBIT F - CLIN 0012 | | | | | | | | |
| Line Item 0012 Non-Recurring Work - Option Period 5 | | | | | | | | |
| PROVIDE PRICES FOR FACILITY INVESTMENT, INTEGRATED SOLID WASTE MANAGEMENT, AND GROUNDS MAINTENANCE | | | | | | | | |
| & LANDSCPAING - NON-RECURRING WORK PRICE (IDIQ) - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | | | | | | | | |
| ELINs F700 through F709 | | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | | Extended Price | |
| F700 | Unit Priced Labor Work "MUST BE NEGOTIATED BY KO". | Provide labor to perform all Unit Priced Labor Work subject to the Service Contract Act per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| F701 | Material Costs "MUST BE NEGOTIATED BY KO". | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A001, A002, and A003. (**NOTE: A Not-to-Exceed (NTE) extended amount of ¥1,000,000 shall apply upon contract award**). | NTE | | | | ¥ | 1,000,000 |
| F702 | Solid Waste Collection and Disposal | The Contractor shall provide collection of residential, commercial, and industrial solid wastes to ensure refuse and recyclables are properly collected and disposed at an off-base facility in accordance with environmentally approved procedures. | 300 | CY | ¥ | - 0 | ¥ | - 0 |
| F703 | Typhoon Cleanup and Debris Removal, Collection and Disposal | The Contractor shall mobilize its entire workforce within eight (8) hours or the "All Clear" Typhoon Condition announcement and be on the working job site. All collected debris shall be removed and disposed of off Government properties. The Contractor shall collect, remove, and dispose all vegetation debris, cracked or broken tree limb within installation and along fenced line at an off-base faciltiy in accrodance with envornmentally approved procedures. | 4 | EA | ¥ | - 0 | ¥ | - 0 |
| F704 | Tree and Stump Removal from 6" to 12" DBH (Diameter at Breast Height) | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 30 | EA | ¥ | - 0 | ¥ | - 0 |
| F705 | Tree and Stump Removal from 12" to 20" DBH (Diameter at Breast Height) and above. | The Contractor shall remove trees including stumps and roots. Trees and/or Plants shall be cutdown and the stumps shall be removed to a depth of at least 6" (inches) below grade. Treat to prevent re-growth. Backfill excavated areas and remove, collect and dispose all debris off Government Property at an off-base facility in accordance with environmentally approved procedures. | 20 | EA | ¥ | - 0 | ¥ | - 0 |
| F706 | Septic Tank Pumping, Cleanding, Collection and Disposal | The Contractor shall provide equipment and personnel to provide septic tanks pumping, cleaning, collection, and disposal of septic waste per the scope and delivery schedule specified in the task order at an off-base disposal facility in accordance with environmentally approved procedures. | 10,000 | GL | ¥ | - 0 | ¥ | - 0 |
This is the start of the file's text. The full file is on GovTribe.