ASBESTOS LEAD SAMPLING SERVICES CONTRACT AT VARIOUS U. S. NAVY, MARINE CORPS, ARMY AND AIR FORCE BASES AND FACILITIES THROUGHOUT JAPAN
Solicitation number
N4008424R0051
Issued by

About this file

This is a solicitation for an indefinite delivery/indefinite quantity contract to provide asbestos and lead sampling services at various U.S. Navy, Marine Corps, Army, and Air Force bases and facilities throughout Japan. The contractor will furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items necessary to provide sampling services outlined in the performance work statement at locations including U.S. Commander Fleet Activities Yokosuka, U.S. Commander Fleet Activities Sasebo, Naval Air Facility Atsugi, Naval Air Facility Misawa, Marine Corps Air Station Iwakuni, Marine Corps Community Services Camp Fuji, Commander Fleet Activities Okinawa, and other Navy, Marine Corps, and Air Force facilities. The contract will be a single-award, performance-based contract comprised of non-recurring work items issued on an as-needed basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Service Request NO. 22744731 E-Project NO. 1776633

ASBESTOS LEAD SAMPLING SERVICES

CONTRACT

AT

VARIOUS U.S. NAVY, MARINE CORPS, ARMY AND AIR FORCE

BASES AND FACILITIES THROUGHOUT JAPAN

UNDER

NON-RECURRING WORK CONTRACT

SUBMITTED BY:

NAVFAC FE CORE

PREPARED BY:

Elfren Dyoco Jr

Specification Writer August , 2023

Specification Approved By: Asbestos Program Coordinator PW5

NAME DATE

Specification Approved By: NAVFAC FE PW2 Facility Support Contract and Facility Management Product Line Director

NAVFAC FE FMFS PL DATE

CUI//DCRIT

CUI//FEDCON

Controlled by: PWD-Yokosuka CUI Category: DCRIT Limited Dissemination Control: FEDCON POC: Mr. Michael Ishibashi, 315-243-5072

ISHIBASHI.CARRIE.

G C.1514017340

Digitally signed by

ISHIBASHI.CARRIE.G C.1514017340

Date: 2023.08.23 10:59:21 +09'00'

LINARES.TIMOTHY.P

ATRICK.1178414239

Digitally signed by

LINARES.TIMOTHY.PATRICK.1178414

Date: 2023.08.25 11:02:17 +09'00'

0100000 – General Information

Table of Contents

Spec Item Title

1 General Information

1.1 Outline of Services

1.2 Acquisition of Additional Work

1.3 Background Information

1.4 Navy PBSA Approach

1.5 Standard Template

1.6 Related Information

1.7 Verification of Workload and Conditions

1.8 Contractor's Knowledge

1.9 Technical Proposal Certification

Spec Item Title Description

1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance

Work Statement (PWS) at various locations throughout Japan, including

U. S. Commander Fleet Activities Yokosuka (CFAY) and U.S.

Commander Fleet Activities Sasebo (CFAS), Naval Air Facility Atsugi

(NAFA) and Naval Air Facility Misawa (NAFM) and the surrounding

Navy, Marine Corps Air Station (MCAS) Iwakuni, Marine Corps

Community Services (MCCS) Camp Fuji, Commander Fleet Activities

Okinawa (CFAO), White Beach Naval Facility, Kadena Air Base, Camp

Shields, Tengan Pier, Awase Communication Site, Marine Corps Base

(MCB) Camp Butler, Camp Kinser, Camp Foster, Camp Courtney, Camp

Hansen, Camp Schwab, Camp Gonsalves/Jungle Warfare Center, and the surrounding Navy, Marine Corps and Air Force facilities under an

Indefinite Delivery Indefinite Quantity type, performance-based contract that is comprised of Non-Recurring Work Items.

The PWS is organized into annexes. Annex 1 is "General Information".

Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.

The annex numbers are identified as 1 through 18 in the description column, but the fully expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).

Annex 1 General Information

Annex 2 Management and Administration

Annex 3 N/A (Not Applicable)

Annex 4 N/A

Annex 5 N/A

Annex 6 N/A

Annex 7 N/A

Annex 8 N/A

Annex 9 N/A

Annex 10 N/A

Annex 11 N/A

Annex 12 N/A

Annex 13 N/A

Annex 14 N/A

Annex 15 N/A

Annex 16 N/A

Annex 17 N/A

Annex 18 Environmental

1.2 Acquisition of

Additional Work

The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in

Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.3 Background Information For each installation information go to the following each website.

Commander Fleet Activities Yokosuka is available at:

https://www.cnic.navy.mil/Yokosuka/index.htm

Commander Fleet Activities Sasebo is available at:

http://www.cnic.navy.mil/Sasebo/index.htm

Naval Air Facility Atsugi is available at:

http://www.cnic.navy.mil/Atsugi/index.htm

Misawa Air Force Base is available at:

http://www.misawa.af.mil/

Marine Corps Air Station Iwakuni is available at:

http://www.mcasiwakuni.marines.mil

Marine Corps Community Services Camp Fuji is available at:

http://www.mccsfuji.com/

Commander Fleet Activities Okinawa https://cnrj.cnic.navy.mil/Installations/CFA-Okinawa/

Marine Corps Base Camp Butler https://www.mcbbutler.marines.mil/

1.4 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts, which are:

1) performance outcomes,

2) measurable standards,

3) consideration of incentives, and

4) performance assessment plan.

1.5 Standard Template Key to implementing the PBSA approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs.

The standard template contains 18 standard annexes. Annex 1 will always contain General Information that is relevant to the entire scope of the contract. Annex 2 contains Management and Administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 and their associated sub-annexes contain the General Information, Management and Administration requirements, Performance Objectives, Related Information, and Performance Standards that are relevant to that technical annex. Except where otherwise stated, Annexes 3 through 18 and their associated sub-annex requirements are not relevant to one another. Within each technical annex and sub-annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the Management and Administrative requirements. Specification

Item 3 will always contain the Recurring Work requirements.

Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item

3 standards apply to all recurring work specification items. Specification

Item 3.1 is applicable to all 3.1 subordinate specification items.

Specification Items 3.2 and 3.3 are not considered subordinate to 3.1 nor are they considered subordinate to one another. All costs associated with

Annexes 1 and 2 and Specification Items 1 and 2 shall be priced, and their price shall be allocated to the Exhibit Line Items.

http://www.cnic.navy.mil/Yokosuka/index.htm http://www.cnic.navy.mil/Yokosuka/index.htm http://www.cnic.navy.mil/Sasebo/index.htm http://www.cnic.navy.mil/Atsugi/index.htm http://www.misawa.af.mil/ http://www.mcasiwakuni.marines.mil/ http://www.mccsfuji.com/

1.6 Related Information There are four types of Related Information that can be found in the

Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors’ to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked

“Informational Notes” throughout Annexes 1 through 18 and their associated sub-annexes are subject to this disclaimer. Offerors’ may not rely upon the "Informational Notes" as material representations of the

Government. Information provided in "Informational Notes" does not create a contractually binding requirement on either party. Clarifying

Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.7 Verification of

Workload and

Conditions

Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, maps, floor plans, and tables to represent the type and location of services to be provided.

All facilities, systems, and assets identified in this contract shall be accepted by the Contractor in "AS-IS" condition. The Contractor is fully responsible for all work up to and including the limits of liabilities specified.

As prescribed in FAR 52.237-1, offerors’ or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

1.8 Contractor's Knowledge The Navy expects to receive insightful management from its contractors.

This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.

1.9 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

0200000 – Management and Administration

Spec Item Title 2 Management and Administration

2.1 Definitions and Acronyms

2.2 General Information

2.2.1 Government Regular Working Hours

2.2.1.1 Observed Federal Holidays

2.2.1.2 Restriction to Contractor Working Hours

2.2.2 Wage Determinations

2.2.3 Requirements Hierarchy

2.3 General Administrative Requirements

2.3.1 Required Conferences and Meetings

2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment

2.3.3 Partnering

2.3.3.1 Informal Partnering

2.3.3.2 Contract Partnering Administration

2.3.3.3 Contract Partnering Session Attendees

2.3.4 Permits and Licenses

2.3.5 Insurance

2.3.5.1 Certificate of Insurance

2.3.5.2 Minimum Insurance Amounts

2.3.6 Protection of Government Property

2.3.7 Directives, Instructions, and References

2.3.8 Invoicing Procedures

2.3.9 Forms

2.3.10 Performance Evaluation

2.4 Government-Furnished Items

2.4.1 Government Furnished Services (GFS)

2.5 Contractor-Furnished Items

2.6 Management

2.6.1 Work Reception

2.6.2 Work Control

2.6.3 Work Schedule

2.6.4 Deliverables

2.6.5 Service Interruptions

2.6.6 Quality Management System (QMS)

2.6.6.1 Quality Management (QM) Plan

2.6.6.2 Quality Inspection and Surveillance

2.6.6.3 Quality Inspection and Surveillance Report

2.7 Personnel Requirements

2.7.1 Key Personnel

2.7.1.1 Project Manager (PM)

2.7.1.2 Quality Manager (QM)

2.7.1.3 Site Safety and Health Offices (SSHO)

2.7.1.4 Environmental/Energy Manager

2.7.2 Employee Requirements

2.7.2.1 Employee Certification and Training

2.7.2.2 Employee Appearance

2.7.2.3 Employee Conduct

2.7.2.4 Identification as Contractor Employee

2.7.2.5 Removal of Employees

2.7.2.6 Proof of Legal Residency

2.7.3 Service Contract Reporting (SCR)

Spec Item Title

2.8 Security Requirements

2.8.1 Employee Listing

2.8.2 Vehicles

2.8.3 Passes and Badges

2.8.4 Access to Installation

2.8.4.1 DBIDS Program

2.8.4.2 DBIDS Credentials

2.8.5 Access to Buildings

2.8.6 Access Arrangements

2.8.6.1 Escort Arrangement for Secured Areas

2.8.7 Security Clearances

2.8.8 Access to Controlled Unclassified Information

2.8.8.1 Information Security

2.8.8.2 Information Safeguarding Requirements

2.8.8.3 Disclosure of Information Requirements

2.8.8.4 Operations Security (OPSEC) Requirements

2.8.8.5 Violation of the Information Security Requirement

2.8.9 Access to Government Information Technology (IT), Operating Technology (OT), and Facility

Related Control Systems (FRCS)

2.8.10 Employee Status

2.9 Contractor Safety Program

2.9.1 Contractor Safety Requirements

2.9.2 Accident Prevention Plan (APP)

2.9.3 Activity Hazard Analysis (AHA)

2.9.4 Safety and Occupational Health (SOH) Risks and Compliance Plans

2.9.4.1 Alcohol and Drug Abuse Prevention Plan

2.9.4.2 Chemical Hazard Communication Program

2.9.4.3 Confined Space Program

2.9.4.4 Fall Prevention and Protection Plan

2.9.5 Accident and Damage Reporting

2.9.5.1 Accident Reporting and Notification Criteria

2.9.6 Fire Protection

2.9.7 Monthly On-Site Labor Report

2.9.8 OSHA and/or Japanese Labor Standards Inspection Office (LSIO) Citations and Violations

2.9.9 Safety Inspections and Monitoring

2.9.10 Safety Certification

2.9.11 Safety Apparel on Jobsites

2.9.12 Emergency Medical Treatment

2.10 Environmental Management and Sustainability

2.10.1 Environmental Protection

2.10.1.1 Sampling, Testing and Laboratory Services

2.10.1.2 Non-Regulated Waste Disposal

2.10.1.3 Regulated Waste Disposal

2.10.1.4 Spill Prevention, Containment, and Clean-up

2.10.1.5 Hazardous Material Management

2.10.1.6 Noise Control

2.10.1.7 Salvage

2.10.1.8 Asbestos Containing Material (ACM)

2.10.2 Sustainable Procurement and Practices

2.10.2.1 Environmentally Preferable Products

2.10.2.2 Use of Biobased Products

Spec Item Title

2.11 Disaster Preparedness

2.11.1 Tropical Cyclone Condition of Readiness (TCCOR)

2.12 Technical Library

2.13 Warranty Management

2.14 Recurring Work Procedures

2.15 Non-recurring Work

2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)

2.15.1.1 Acceptance and Performance

2.15.1.2 Invoicing and Receiving Payment

2.15.2 Unit Priced Labor (UPL) Work (Negotiated)

2.15.3 Non-Recurring ELINS

0200000 - Management and Administration

2 Management and

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-0200000-01.

2.2 General

Information

2.2.1 Government

Regular Working Hours

The Government's regular working hours are from 0730-1630, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this performance work statement (PWS). Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours must be authorized by the Contracting Officer (KO) prior to commencement of work.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays:

− New Year’s Day − Martin Luther King Jr.’s Birthday − President’s Day − Memorial Day − Juneteenth National Independence Day − Independence Day − Labor Day − Columbus Day − Veterans’ Day − Thanksgiving Day − Christmas Day

2.2.1.2 Restriction to

Contractor Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.

2.2.2 Wage

Determinations

Not Applicable

2.2.3 Requirements

Hierarchy

Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3 General

Administrative Requirements

2.3.1 Required

Conferences and Meetings

The Contractor shall attend administrative and coordination meetings. The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence.

Historically, there have been approximately four meetings per week.

Required meetings may be held remotely as directed by the KO.

2.3.2 Training for

Maintenance and Operation of New and Replacement Systems and Equipment

Not Applicable

2.3.3 Partnering To increase the likelihood of successful performance of this contract, the

Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who may receive services, principal individuals from Naval Facilities Engineering Systems Command (NAVFAC), the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.3.1 Informal Partnering The KO shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel.

The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by KO.

The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2 Contract Partnering

Administration

Upon award, the Administrative Contracting Officer (ACO) will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3 Contract Partnering

Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager (PM)

* Quality Manager (QM) Site Safety and Health Officer (SSHO)

2.3.4 Permits and

Licenses The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, host nation (Japanese), prefecture, and local laws and regulations.

The Contractor shall submit copies of Permits and Licenses per Section F.

2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause

52.228-5, INSURANCE – WORK ON A GOVERNMENT

INSTALLATION. This insurance must be maintained during the performance period.

2.3.5.1 Certificate of

Insurance

The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage per Section F. Other requirements and information are contained in the aforementioned insurance clause.

2.3.5.2 Minimum

Insurance Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: ¥50,000,000 per occurrence

Automobile Liability: ¥20,000,000 per person, ¥50,000,000 per occurrence for bodily injury, ¥2,000,000 per occurrence for property damage

Workmen's Compensation: As required by Japanese worker's compensation and occupational disease statutes

Employer's Liability coverage: ¥10,000,000

Other as required by Japanese law

2.3.6 Protection of

Government Property

During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of Contractor negligence under this contract to their original condition at no cost to the Government.

2.3.7 Directives, Instructions, and References

Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-02 and throughout the various Performance Work Statements and their respective J Attachments. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.8 Invoicing

Procedures

Refer to Section G for invoicing instructions. The Contractor shall submit payment requests and receiving reports using WAWF (Wide Area Work Flow).

Electronic invoicing: The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

WAWF training: The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://piee.eb.mil.

WAWF information can be found at the NAVFAC FE Portal Page.

http://navfac.navy.mil/navfac_worldwide/pacific/fecs/far_east/about_us/c ontractors_information.html.

Invoices shall be submitted in a format compatible with the most recent Government installed Microsoft Office Version (currently 2016). Invoice data shall be capable of being sorted by CLIN, annex/sub-annex, spec item, spec item title, and Exhibit Line Item Numbers (ELIN)/Sub-ELIN.

2.3.9 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-04.

2.3.10 Performance

Evaluation

The Contractor’s performance will be evaluated using the Contractor Performance Assessment Reporting System (CPARS) located on the website https://www.cpars.gov. On-line training for Contractor personnel is available on the website.

Prior to commencement of work the Contractor is required to provide the Government with the name, phone number and e-mail address of the “Contractor’s Representative” that will be responsible for receipt and review of draft performance evaluations prepared by the Government. It is the Contractor’s responsibility to keep this contact information current and provide changes to the KO.

2.4 Government-

Furnished Items

Except for items identified below as Government-Furnished, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services described in this PWS.

Government-Furnished Items will be provided in "AS-IS" condition and their use is at the option of the Contractor. The total or partial breakdown or failure of Government-Furnished Items shall not relieve the Contractor of the responsibility to perform the requirements of this contract.

The Contractor shall provide periodic servicing, maintenance, and repair of the Government-Furnished Items accepted for use at no additional cost to the Government. Servicing, maintenance, and repair shall be provided in accordance with the manufacturer’s recommendations. The Contractor shall generate work orders in NAVFAC Maximo for all servicing, maintenance, and repair activities performed on Government-Furnished Items.

At the completion of the contract, all Government-Furnished Items shall be returned to the Government in the same condition as received, except for reasonable wear and tear. Government-Furnished Items, which becomes worn out due to normal wear and tear, shall be returned to the Government and its replacement shall be the responsibility of the Contractor at no additional cost to the Government. The Contractor shall be responsible for the cost of any repairs or replacement caused by Contractor negligence or abuse.

The Government may inspect Government-Furnished Items at any time and without notice.

2.4.1 Government-

Furnished Services (GFS)

The Government will provide necessary daily transportation for personnel, for Azuma Island (See J-1800000-05-01) work, provided notification is given to the Government not less than seven calendar days in advance.

The Government will provide this daily waterborne transportation at no cost to the Contractor between Arai Dock and the U.S. Navy Azuma Petroleum http://navfac.navy.mil/navfac_worldwide/pacific/fecs/far_east/about_us/c https://www.cpars.gov/

Area. The Contractor's personnel shall possess a valid security pass to the Petroleum area prior to boarding at Arai Dock. Transportation will be by small boat with a capacity of about 20 people. 24 hours shuttle service is available. In addition, the U.S. Government will also provide waterborne transportation for the Contractor's truck and it's operator between the ramp adjacent to Berth Five at the U.S. Fleet Activities, Yokosuka, and the U.S.

Navy Azuma Petroleum Area, at no cost to the Contractor, provided that written notification specifying the size of the truck for this movement is submitted not less than seven calendar days in advance.

2.5 Contractor-

Furnished Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.

Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.

The Contractor shall provide work schedules for both Recurring and Non- Recurring Work per Section F. At a minimum, work schedules shall include:

• Description of service(s) to be accomplished

• Location

• Date service(s) are scheduled to be accomplished

2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business.

In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls, per Section F. At a minimum, the notification shall include the following:

• The date and time the work was initially coordinated.

• The name and phone number of the Government person with whom the work was initially coordinated.

• The name and phone number of the Government person who prevented the work from being performed as previously coordinated.

• The alternative date and time, the Government person requested the work be accomplished.

2.6.4 Deliverables Except where otherwise stated, deliverable requirements are specified in

Sections C, F, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify deliverables, as directed by the KO, at no additional cost to the Government. All Contractor submittals shall be in Japanese with English translations.

Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office 2016 or Current Version compatible format. Deliverables shall include the company name, contract number, contract title, date, and shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable. Refer to DoDI 5200.48 for marking requirements (as applicable).

Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

2.6.5 Service

Interruptions

If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, COR, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, COR, affected tenants, and customers as soon as practicable and provide the status of repairs, as directed by the KO, until normal operation is restored.

Scheduled utility outages and interruptions to equipment, system(s) operation, or other services shall be scheduled after hours of operation.

The Contractor shall shutdown, restart, and perform operational checks on all equipment affected by both scheduled and unscheduled utility outages and service interruptions, at no additional cost to the Government.

2.6.6 Quality

Management System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

• Accurate documentation of work processes, procedures, and output measures.

• A systematic procedure for assessing compliance with performance objectives and standards.

• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.6.1 Quality

Management (QM) Plan

The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, the Contractor shall submit the revised QM Plan for acceptance, per Section F.

The Contractor’s QM Plan shall include, at a minimum, the following:

• Policy and objectives of Quality Management System (QMS)

• Quality organization o List of personnel o Organization Chart o Responsibilities & lines of authority o Training and qualifications o Quality Manager resume

• Approach to assuring quality of services provided and conformance with performance objectives and standards

• Methods and procedures for effective planning, operation and control of processes and performance of work

• Procedures for inspection and surveillance of services to include all contractual requirements.

o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work

• Documentation and records management

• Communication with government (customers)

2.6.6.2 Quality Inspection

and Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the COR after completion/termination of the contract per Section F.

2.6.6.3 Quality Inspection

and Surveillance Report

The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a narrative of events, a tabulated summary and results of the quality inspection and surveillance events performed, inspection-driven corrective actions taken and the results attained, and management process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

2.7 Personnel

Requirements

The Contractor shall comply with the personnel requirements stated below:

Note: The Contractor will not be allowed to bring any employees aboard United States Forces, Japan (USFJ) installations and areas from countries listed in under USFJ Instruction 31-204 (Designated Third Country Nationals).

2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO or COR necessary to validate their qualifications.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract.

The key personnel shall be revised as applicable for the contract.

The Contractor shall provide complete resumes for proposed substitutes and any additional information requested by the KO. Proposed substitutes shall have comparable qualifications to those of the persons being replaced. The KO will notify the Contractor within 15 calendar days after receipt of all required information of the consent on substitutions. No change in fixed unit prices may occur as a result of key personnel substitutions.

Key personnel shall be able to speak, read and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures or an interpreter shall be made available at no additional cost to the Government.

2.7.1.1 Project Manager

(PM)

The Contractor shall provide a PM and designated alternate, as applicable, who shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be available by telephone, radio or other means and be on-site three hours for Kanto Region, Camp Fuji and six hours for Misawa, Sasebo and Iwakuni Regions during the Government's regular working hours and shall be available on-site within six hours after the Government's regular working hours for Kanto Region, Camp Fuji and six hours for Misawa, Sasebo and Iwakuni Regions.

The PM (including alternate) shall be an employee of the prime contractor.

Sub-contractor employees cannot assume the PM or alternate PM position.

The PM shall have at least five years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate shall be available by telephone, radio or other means and on-site within three hours for the Kanto Region, Camp Fuji and six hours for Misawa, Sasebo and Iwakuni Regions during the Government's regular working hours and shall be available on-site within six hours after the Government’s regular working hours for the Kanto Region, Camp Fuji and 24 hours for Misawa, Sasebo and Iwakuni Regions. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.

The Quality Manager or designated alternate shall report directly to a senior corporate official and shall not report directly to the Project Manager. The Quality Manager shall not be the same person as the Project Manager.

The Quality Manager or designated alternate shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract

The Quality Manager or designated alternate shall have a current CMQ/OE certification and at least five years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager or designated alternate shall not be the same person as the

SSHO.

2.7.1.3 Site Safety and

Health Officer

(SSHO)

The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 Code of Federal Regulations (CFR) 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the KO for acceptance in consultation with the Safety Office.

The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract.

The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years’ experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO shall not be the same person as the Project Manager or Quality Manager.

Note: The Japan Construction Occupational Safety and Health Association (JCOSHA) provides the construction site safety and health management course “KOUJI SHUNIN COURSE”, or “SYOCHOU COURSE”, which is as acceptable equivalent to the 30-hours OSHA safety class. This training can be viewed at the JCOSHA website.

http://www.kensaibou.or.jp or http://www.kensaibou.or.jp/eng/index.html

This training certificate is valid for five years from the date issued. The SSHO shall maintain a current certificate. The refresher course is also an equivalent course after the initial training course has been completed.

2.7.1.4 Environmental/

Energy Manager

The Contractor shall provide an Environmental/Energy Manager whose primary duty and responsibility is to ensure Contractor operations adhere to the goals and policies of the Environmental Management System, the Installation Energy Plan, and other specified Sustainability requirements affecting this contract. The Environmental/Energy Manager shall develop, implement and monitor environmental strategies, policies and programs that promote sustainable development and examine the contract activities to establish where improvements can be made and ensure compliance with environmental legislation and energy policy.

http://www.kensaibou.or.jp/ http://www.kensaibou.or.jp/eng/index.html

The Environmental/Energy Manager shall have a minimum two years’ experience with environmental procedures similar to those of this contract;

familiarity with Environmental Management Systems (EMSs); and knowledge of environmental regulations and federal energy laws and policy (including energy and water reduction requirements and renewable energy requirements) that are applicable to operations similar to those of this contract.

2.7.2 Employee

Requirements

The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. The Contractor shall provide personnel who can speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures or an interpreter shall be furnished at no additional cost to the Government.

2.7.2.1 Employee

Certification and Training

The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 24 hours of request.

2.7.2.2 Employee

Appearance

The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

2.7.2.3 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

2.7.2.4 Identification as

Contractor Employee

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in both verbal communication and electronic or written correspondence.

2.7.2.5 Removal of

Employees

The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.

2.7.2.6 Proof of Legal

Residency

No employee or representative of the Contractor will be admitted to the site of work unless satisfactory Proof of Legal Residency is submitted per Section F.

2.7.3 Service Contract

Reporting (SCR)

The following manpower reporting is required by NMCARS 5237.102

The Contractor shall report total dollar amount invoiced and all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.sam.gov.

Per Section F, reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each https://www.sam.gov/ calendar year. Contractors may direct questions to the help desk, linked at https://www.sam.gov.

2.8 Security

Requirements

The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.

a) The Contractor shall comply with all activity security requirements.

Upon request, the Contractor shall submit the name and address of each employee performing work under this contract and shall have the employees fill out questionnaires and other forms required for security.

b) The Contractor’s employees shall not disclose or cause to be disseminated any information concerning the operations of the activity which could result in or increase the likelihood of the possibility of a breach of the activity's security or interrupt the continuity of its operations.

c) Disclosure of information to any person not entitled to receive it, or failure to safeguard any classified information that may come to the Contractor or any person under his control, may subject the Contractor, his agents or employees to criminal liability under Title 18, Sections 793 and 798 of the United States Code.

d) All inquiries, comments or complaints arising from any matter observed, experienced, or learned as a result of or in connection with the performance of this contract, the resolution of which may require the dissemination of official information shall be directed to the KO.

e) Deviations from or violations of any of the provisions of this paragraph will, in addition to all other criminal and civil remedies provided by law, subject the Contractor to immediate termination for default and/or the individuals involved to a withdrawal of the

Government's acceptance and approval of employment.

The Contractor shall ensure that Contractor personnel do not present a risk to security. By entering the installation, Contractor personnel are subject to installation, state, local and federal regulations and laws, including but not limited to debarment and criminal prosecution.

KO or COR will provide SPOT letter to Security for vetting purposes.

2.8.1 Employee Listing The Contractor shall maintain a current Employee List and submit per Section F. The list shall include employee’s name, supervisor, company, and level of security clearance.

2.8.2 Vehicles The Contractor’s vehicles used for this contract shall have a company name displayed on each side of the Contractor's vehicles or shall have contractor’s nameplate or similar item by which the Government can identify the vehicle’s purpose. The company name displayed and nameplate or similar item shall be in a manner and size that is clearly visible.

https://www.sam.gov/

Decals shall be placed inside each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid license plate.

Vehicles shall meet all other requirement of local regulations, such as safety standards and exhaust gas regulations, and shall carry proof of insurance, safety inspection record and registration.

2.8.3 Passes and Badges All Contractor employees shall obtain the required employee and vehicle passes. The Contractor employees must be able to obtain Common Access Cards (CAC), if applicable, in accordance with security requirements. Each employee shall wear the Government issued badge over the front of the outer clothing.