The file's text, extracted by GovTribe without its formatting.
Summary Attachment J-0200000-07 ELIN Schedule
SUMMARY
| DATE PREPARED: | |
| PREPARED BY: | |
| CONTRACT NUMBER: N40084-24-B-2003 | |
| PROJECT TITLE: Grounds Maintenance and Landscaping Services | |
| Southern Camps |
| MARINE CORPS BASE FACILITIES, CAMP SMEDLEY D. BUTLER OKINAWA, JAPAN | |
CLIN ITEM DESCRIPTION TOTAL
Base Year 1 Jan 2025 ~
| 31 Dec 2025 | 0001 | BASE PERIOD - RECURRING WORK | ¥ - | |
| | 0002 | BASE YEAR - NON-RECURRING WORK | ¥ 50,000,000 |
Option 1 1 Jan 2026 ~
| 31 Dec 2026 | 0003 | OPTION PERIOD 1 - RECURRING WORK | ¥ - | |
| | 0004 | OPTION PERIOD 1 - NON-RECURRING WORK | ¥ 50,000,000 |
Option 2 1 Jan 2027 ~
| 31 Dec 2027 | 0005 | OPTION PERIOD 2 - RECURRING WORK | ¥ - | |
| | 0006 | OPTION PERIOD 2 - NON-RECURRING WORK | ¥ 50,000,000 |
Option 3 1 Jan 2028 ~
| 31 Dec 2028 | 0007 | OPTION PERIOD 3 - RECURRING WORK | ¥ - | |
| | 0008 | OPTION PERIOD 3 - NON-RECURRING WORK | ¥ 50,000,000 |
Option 4 1 Jan 2029 ~
| 31 Dec 2029 | 0009 | OPTION PERIOD 4 - RECURRING WORK | ¥ - | |
| | 0010 | OPTION PERIOD 4 - NON-RECURRING WORK | ¥ 50,000,000 |
Option 5 1 Jan 2030 ~
| 31 Dec 2030 | 0011 | OPTION PERIOD 5 - RECURRING WORK | ¥ - | |
| | 0012 | OPTION PERIOD 5 - NON-RECURRING WORK | ¥ 50,000,000 |
Option 6 1 Jan 2031 ~
| 31 Dec 2031 | 0013 | OPTION PERIOD 6 - RECURRING WORK | ¥ - | |
| | 0014 | OPTION PERIOD 6 - NON-RECURRING WORK | ¥ 50,000,000 |
Option 7 1 Jan 2032 ~
| 31 Dec 2032 | 0015 | OPTION PERIOD 7 - RECURRING WORK | ¥ - | |
| | 0016 | OPTION PERIOD 7- NON-RECURRING WORK | ¥ 50,000,000 |
| SUBTOTAL RECURRING (FFP) COST ALL OPTIONS: | ¥ - |
| FY25 EXCHANGE RATE: $1.00/¥145.7323 | $ - 0 |
| SUBTOTAL NON-RECURRING (IDIQ) COST ALL OPTIONS: | ¥ 400,000,000 |
| FY25 EXCHANGE RATE: $1.00/¥145.7323 | $ 2,744,758.71 |
| TOTAL CONTRACT AMOUNT (¥): | | ¥ 400,000,000 |
| TOTAL CONTRACT AMOUNT ($): | | |
| FY25 EXCHANGE RATE: $1.00/¥145.7323 | | $ 2,744,758.71 | |
&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
&12CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Base_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-B-2003 | | | | | | | |
| EXHIBIT A - CLIN 0001 | | | | | | | |
| Line Item 0001 Recurring work - Base Period | | | | | | | |
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - RECURRING WORK IN | | | | | | | |
| ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs A001 through A017 | | | | | | | |
| ELIN /Sub ELIN | Description | Months | Total Acreage | Unit of Issue | Unit Price | Total | |
| A001 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 1) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards (SLS) listed in J-1503050-03. | | | | | | |
| A001AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 9.05 | AC | ¥ | ¥ | - 0 |
| A001AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 8.85 | AC | ¥ | ¥ | - 0 |
| A001AC | Plaza Housing Areas, Spec Item 3.1.1 to 3.1.5 | 12 | 1.76 | AC | ¥ | ¥ | - 0 |
| A001 Subtotal | | | | | ¥ | - 0 |
| A002 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A002AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 218.49 | AC | ¥ | ¥ | - 0 |
| A002AB | Camp Lester, Spec Item 3.1.1 to 3.1.5 | 12 | 30.85 | AC | ¥ | ¥ | - 0 |
| A002AC | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 146.10 | AC | ¥ | ¥ | - 0 |
| A002AD | MCAS Futenma, Spec Item 3.1.1 to 3.1.5 | 12 | 249.62 | AC | ¥ | ¥ | - 0 |
| A002AE | Plaza Housing Areas, Spec Item 3.1.1 to 3.1.5 | 12 | 22.16 | AC | ¥ | ¥ | - 0 |
| A002 Subtotal | | | | | ¥ | - 0 |
| A003 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.2, Operational Areas (SLS 2) | | | | | | |
| Services for Operational Areas Southern Camps areas/acreage indicated in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards (SLS) listed in J-1503050-03. | | | | | | |
| A003AA | Camp Foster, Spec Item 3.2.1 to 3.2.4 | 12 | 11.69 | AC | ¥ | ¥ | - 0 |
| A003AB | Camp Lester, Spec Item 3.2.1 to 3.2.4 | 12 | 1.48 | AC | ¥ | ¥ | - 0 |
| A003AC | Camp Kinser, Spec Item 3.2.1 to 3.2.4 | 12 | 5.02 | AC | ¥ | ¥ | - 0 |
| A003AD | MCAS Futenma, Spec Item 3.2.1 to 3.2.4 | 12 | 9.54 | AC | ¥ | ¥ | - 0 |
| A003AE | Plaza Housing Areas, Spec Item 3.2.1 to 3.2.4 | 12 | 1.62 | AC | ¥ | ¥ | - 0 |
| A003 Subtotal | | | | | ¥ | - 0 |
| A004 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.3, Storm & Drainage Systems (SLS 3) | | | | | | |
| Services for Storm and Drainage Systems Southern Camps areas/acreage indicated in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A004AA | Camp Foster, Spec Item 3.3 | 12 | 6,820 | LF | ¥ | ¥ | - 0 |
| A004AB | Camp Kinser, Spec Item 3.3 | 12 | 310 | LF | ¥ | ¥ | - 0 |
| A004AC | MCAS Futenma, Spec Item 3.3 | 12 | 1,960 | LF | ¥ | ¥ | - 0 |
| A004AD | Plaza Housing Areas, Spec Item 3.3 | 12 | 1,190 | LF | ¥ | ¥ | - 0 |
| A004 Subtotal | | | | | ¥ | - 0 |
| A005 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.2, Operational Areas | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified in Spec Item 3.2, Sub Spec Item 3.2.3 | | | | | | |
| A005AA | MCAS Futenma (Airfield), Spec Item 3.2.3 | 12 | 277.38 | AC | ¥ | ¥ | - 0 |
| A005 Subtotal | | | | | ¥ | - 0 |
| GRAND TOTAL MCB A001-A005 | | | | | ¥ | - 0 |
| A006 | DoDEA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A006AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 34.43 | AC | ¥ | ¥ | - 0 |
| A006AB | Camp Lester, Spec Item 3.1.1 to 3.1.5 | 12 | 10.10 | AC | ¥ | ¥ | - 0 |
| A006AC | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 9.48 | AC | ¥ | ¥ | - 0 |
| A006 Subtotal | | | | | ¥ | - 0 |
| A007 | USNH - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Sotherrn Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A007AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 19.04 | AC | ¥ | ¥ | - 0 |
| A007AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 2.21 | AC | ¥ | ¥ | - 0 |
| A007AC | MCAS Futenma, Spec Item 3.1.1 to 3.1.5 | 12 | 1.72 | AC | ¥ | ¥ | - 0 |
| A007 Subtotal | | | | | ¥ | - 0 |
| A008 | NCIS - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A008AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 0.26 | AC | ¥ | ¥ | - 0 |
| A008 Subtotal | | | | | ¥ | - 0 |
| A009 | USAG - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A009AA | Camp Kinser (403rd LRC), Spec Item 3.1.1 to 3.1.5 | 12 | 1.91 | AC | ¥ | ¥ | - 0 |
| A009AB | Forth Buckner (78th SIG), Spec Item 3.1.1 to 3.1.5 | 12 | 7.08 | AC | ¥ | ¥ | - 0 |
| A009 Subtotal | | | | | ¥ | - 0 |
| A010 | DECA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A010AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 2.00 | AC | ¥ | ¥ | - 0 |
| A010AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 3.99 | AC | ¥ | ¥ | - 0 |
| A010 Subtotal | | | | | ¥ | - 0 |
| A011 | DMA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A011AA | Camp Kinser (AFN), Spec Item 3.1.1 to 3.1.5 | 12 | 8.80 | AC | ¥ | ¥ | - 0 |
| A011AB | Plaza Housing Area (AFN), Spec Item 3.1.1 to 3.1.5 | 12 | 3.64 | AC | ¥ | ¥ | - 0 |
| A011 Subtotal | | | | | ¥ | - 0 |
| A012 | USSF - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A012AA | Forth Buckner (53rd SIG), Spec Item 3.1.1 to 3.1.5 | 12 | 3.98 | AC | ¥ | ¥ | - 0 |
| A012AB | Camp Kinser (16th EEWF-A), Spec Item 3.1.1 to 3.1.5 | 12 | 2.18 | AC | ¥ | ¥ | - 0 |
| A012 Subtotal | | | | | ¥ | - 0 |
| A013 | DLA Disposition - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A013AA | Camp Kinser (DRMO), Spec Item 3.1.1 to 3.1.5 | 12 | 0.30 | AC | ¥ | ¥ | - 0 |
| A013 Subtotal | | | | | ¥ | - 0 |
| A014 | DLA Distribution - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A014AA | Camp Kinser (DLA), Spec Item 3.1.1 to 3.1.5 | 12 | 2.06 | AC | ¥ | ¥ | - 0 |
| A014 Subtotal | | | | | ¥ | - 0 |
| A015 | DLA Document - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A015AA | Camp Foster (DLA), Spec Item 3.1.1 to 3.1.5 | 12 | 0.59 | AC | ¥ | ¥ | - 0 |
| A015 Subtotal | | | | | ¥ | - 0 |
| A016 | USACE - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| A016AA | Camp Lester (ACOE), Spec Item 3.1.1 to 3.1.5 | 12 | 0.23 | AC | ¥ | ¥ | - 0 |
| A016AB | Camp Foster (ACOE), Spec Item 3.1.1 to 3.1.5 | 12 | 0.59 | AC | ¥ | ¥ | - 0 |
| A016 Subtotal | | | | | ¥ | - 0 |
| A017 | 1503050 Grounds Maintenance and Landscaping, Spec Item 3.4, Grounds Maintenance Service Orders (SLS 1, 2 & 3) | | | | | | |
| The Contractor shall perform grounds maintenance service order work in a timely manner to accomplish any grounds maintenance and landscaping works identified within the entire boundery of the installation to ensure requirements are responded to and completed in accordance with specified standards. | | | | | | |
| A017AA | Service Orders, Spec Item 3.4 | 20 | N/A | EA | ¥ | ¥ | - 0 |
| A017 Subtotal | | | | | ¥ | - 0 |
TOTAL RECURRING WORK FOR BASE YEAR ¥ - 0
&11CUI//FEDCON [when filled in] Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Base_Non-Recurring
| ATTACHMENT J-0200000-07 | | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-B-2003 | | | | | | | | |
| EXHIBIT A - CLIN 0002 | | | | | | | | |
| Line Item 0002 Non-Recurring Work - Base Period | | | | | | | | |
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - NON-RECURRING WORK IN | | | | | | | | |
| ACCORDANCE WITH SECTION C, SPEC ITEM 4 | | | | | | | | |
| ELINs A700 through A708 | | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| A700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | | | | | | |
| NTE | | ¥ | 25,000,000 | | | | |
| A701 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO. | | NTE | | | ¥ | 25,000,000 |
| A702 | Special Event Grass Cutting | The Contractor shall provide equipment and personnel to provide special event grass cutting per the scope of work and delivery schedule specified in the task order. Grass shall be mowed and trimmes to a uniform height of 2". All debris shall be removed and disposed at an off-base facilty upon completion of mowing. Work shall be completed within the specified time provided in the task order. | | 50 | AC | ¥ | ¥ | - 0 |
| A703 | Special Event Edging | The Contractor shall provide equipment and presonnel to provide special event edging per the scope of work and delivery schedule specified in the task order. Edging to provide a uniform edged cut. All clippings shall be removed and disposed at an off-base facility upon completion of edging. Work shall be completed within the specified time provided in the task order. | | 20,000 | LF | ¥ | ¥ | - 0 |
| A704 | Underbrushing | The Contractor shall provide equipment and personnel to provide underburshing per the scope of work and delivery schedule specified in the task order. All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. All debris shall be removed and disposed at an off-base facility upon completion of unbrushing. Work shall be completed within the specified time provided in the task order. | | 50 | AC | ¥ | ¥ | - 0 |
| A705 | Tree Removal Small (6 inches to 12 inches DBH), Medium (12 inches to 20 inches DBH, Large (20 inches and above). | The Contractor shall provide equipment and personnel to provide tree removal per the scope of work and delivery schedule specified in the task order. All debris, braches, stem, leaves, etc. shall be removed and disposed at an off-base facilty upon completion of tree removal. Work shall be completed within the specified time provided in the task order. | | 50 | EA | ¥ | ¥ | - 0 |
| A706 | Tree Pruning | The Contractor shall provide equipment and personnel to provide tree pruning per the scope of work and delivery schedule specified in the task order. All debris, braches, leaves, etc. shall be removed and disposed at an off-base facilty upon completion of tree removal. Work shall be completed within the specified time provided in the task order. | | 50 | EA | ¥ | | - 0 |
| A707 | Stump Removal | The Contractor shall provide equipment and personnel to provide stump removal per the scope of work and delivery schedule specified in the task order. Plants shall be cut down and treated to prevent re-growth. Backfill all excavated holes. All debris shall be removed and disposed at an off-base facilty upon completion of tree removal. Work shall be completed within the specified time provided in the task order. | | 100 | EA | ¥ | ¥ | - 0 |
| A708 | Typhoon Clean-up (Southern Camps, Marine Corps Base Camp S.D. Butler) | The Contractor shall provide equipment and personnel to provide typhoon clean-up per the scope of work. The Contractor shall response within eight (8) hours or the "All Clear" Typhoon Condition announcement and be on the job site working. The Contractor shall collect and remove all debris, vegetation, broken branches, fallen trees, etc. as result of the typhoon fence lines and all locations within the Nothern Camps, MCB installations. The Contractor shall collect and properly disposed all collected debris, vegetation, fallen trees, broken branches, etc. at an off-base facility. The Contractor shall also commence righting, re-planting, and re-staking trees, plants and schrubs which has been uprooted and/or blown over by the typhoon. | | 5 | LT | ¥ | ¥ | - 0 |
TOTAL NON-RECURRING WORK FOR BASE YEAR ¥ 50,000,000
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT1_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-B-2003 | | | | | | | |
| EXHIBIT B - CLIN 0003 | | | | | | | |
| Line Item 0003 Recurring work - Option Period 1 | | | | | | | |
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - RECURRING WORK IN | | | | | | | |
| ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs B001 through B017 | | | | | | | |
| ELIN /Sub ELIN | Description | Months | Total Acreage | Unit of Issue | Unit Price | Total | |
| B001 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 1) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards (SLS) listed in J-1503050-03. | | | | | | |
| B001AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 9.05 | AC | ¥ | ¥ | - 0 |
| B001AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 8.85 | AC | ¥ | ¥ | - 0 |
| B001AC | Plaza Housing Areas, Spec Item 3.1.1 to 3.1.5 | 12 | 1.76 | AC | ¥ | ¥ | - 0 |
| B001 Subtotal | | | | | ¥ | - 0 |
| B002 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B002AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 218.49 | AC | ¥ | ¥ | - 0 |
| B002AB | Camp Lester, Spec Item 3.1.1 to 3.1.5 | 12 | 30.85 | AC | ¥ | ¥ | - 0 |
| B002AC | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 146.10 | AC | ¥ | ¥ | - 0 |
| B002AD | MCAS Futenma, Spec Item 3.1.1 to 3.1.5 | 12 | 249.62 | AC | ¥ | ¥ | - 0 |
| B002AE | Plaza Housing Areas, Spec Item 3.1.1 to 3.1.5 | 12 | 22.16 | AC | ¥ | ¥ | - 0 |
| B002 Subtotal | | | | | ¥ | - 0 |
| B003 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.2, Operational Areas (SLS 2) | | | | | | |
| Services for Operational Areas Southern Camps areas/acreage indicated in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards (SLS) listed in J-1503050-03. | | | | | | |
| B003AA | Camp Foster, Spec Item 3.2.1 to 3.2.4 | 12 | 11.69 | AC | ¥ | ¥ | - 0 |
| B003AB | Camp Lester, Spec Item 3.2.1 to 3.2.4 | 12 | 1.48 | AC | ¥ | ¥ | - 0 |
| B003AC | Camp Kinser, Spec Item 3.2.1 to 3.2.4 | 12 | 5.02 | AC | ¥ | ¥ | - 0 |
| B003AD | MCAS Futenma, Spec Item 3.2.1 to 3.2.4 | 12 | 9.54 | AC | ¥ | ¥ | - 0 |
| B003AE | Plaza Housing Areas, Spec Item 3.2.1 to 3.2.4 | 12 | 1.62 | AC | ¥ | ¥ | - 0 |
| B003 Subtotal | | | | | ¥ | - 0 |
| B004 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.3, Storm & Drainage Systems (SLS 3) | | | | | | |
| Services for Storm and Drainage Systems Southern Camps areas/acreage indicated in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B004AA | Camp Foster, Spec Item 3.3 | 12 | 6,820 | LF | ¥ | ¥ | - 0 |
| B004AB | Camp Kinser, Spec Item 3.3 | 12 | 310 | LF | ¥ | ¥ | - 0 |
| B004AC | MCAS Futenma, Spec Item 3.3 | 12 | 1,960 | LF | ¥ | ¥ | - 0 |
| B004AD | Plaza Housing Areas, Spec Item 3.3 | 12 | 1,190 | LF | ¥ | ¥ | - 0 |
| B004 Subtotal | | | | | ¥ | - 0 |
| B005 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.2, Operational Areas | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified in Spec Item 3.2, Sub Spec Item 3.2.3 | | | | | | |
| B005AA | MCAS Futenma (Airfield), Spec Item 3.2.3 | 12 | 277.38 | AC | ¥ | ¥ | - 0 |
| B005 Subtotal | | | | | ¥ | - 0 |
| GRAND TOTAL MCB B001-B005 | | | | | ¥ | - 0 |
| B006 | DoDEA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B006AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 34.43 | AC | ¥ | ¥ | - 0 |
| B006AB | Camp Lester, Spec Item 3.1.1 to 3.1.5 | 12 | 10.10 | AC | ¥ | ¥ | - 0 |
| B006AC | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 9.48 | AC | ¥ | ¥ | - 0 |
| B006 Subtotal | | | | | ¥ | - 0 |
| B007 | USNH - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Sotherrn Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B007AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 19.04 | AC | ¥ | ¥ | - 0 |
| B007AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 2.21 | AC | ¥ | ¥ | - 0 |
| B007AC | MCAS Futenma, Spec Item 3.1.1 to 3.1.5 | 12 | 1.72 | AC | ¥ | ¥ | - 0 |
| B007 Subtotal | | | | | ¥ | - 0 |
| B008 | NCIS - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B008AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 0.26 | AC | ¥ | ¥ | - 0 |
| B008 Subtotal | | | | | ¥ | - 0 |
| B009 | USAG - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B009AA | Camp Kinser (403rd LRC), Spec Item 3.1.1 to 3.1.5 | 12 | 1.91 | AC | ¥ | ¥ | - 0 |
| B009AB | Forth Buckner (78th SIG), Spec Item 3.1.1 to 3.1.5 | 12 | 7.08 | AC | ¥ | ¥ | - 0 |
| B009 Subtotal | | | | | ¥ | - 0 |
| B010 | DECA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B010AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 2.00 | AC | ¥ | ¥ | - 0 |
| B010AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 3.99 | AC | ¥ | ¥ | - 0 |
| B010 Subtotal | | | | | ¥ | - 0 |
| B011 | DMA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B011AA | Camp Kinser (AFN), Spec Item 3.1.1 to 3.1.5 | 12 | 8.80 | AC | ¥ | ¥ | - 0 |
| B011AB | Plaza Housing Area (AFN), Spec Item 3.1.1 to 3.1.5 | 12 | 3.64 | AC | ¥ | ¥ | - 0 |
| B011 Subtotal | | | | | ¥ | - 0 |
| B012 | USSF - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B012AA | Forth Buckner (53rd SIG), Spec Item 3.1.1 to 3.1.5 | 12 | 3.98 | AC | ¥ | ¥ | - 0 |
| B012AB | Camp Kinser (16th EEWF-A), Spec Item 3.1.1 to 3.1.5 | 12 | 2.18 | AC | ¥ | ¥ | - 0 |
| B012 Subtotal | | | | | ¥ | - 0 |
| B013 | DLA Disposition - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B013AA | Camp Kinser (DRMO), Spec Item 3.1.1 to 3.1.5 | 12 | 0.30 | AC | ¥ | ¥ | - 0 |
| B013 Subtotal | | | | | ¥ | - 0 |
| B014 | DLA Distribution - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B014AA | Camp Kinser (DLA), Spec Item 3.1.1 to 3.1.5 | 12 | 2.06 | AC | ¥ | ¥ | - 0 |
| B014 Subtotal | | | | | ¥ | - 0 |
| B015 | DLA Document - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B015AA | Camp Foster (DLA), Spec Item 3.1.1 to 3.1.5 | 12 | 0.59 | AC | ¥ | ¥ | - 0 |
| B015 Subtotal | | | | | ¥ | - 0 |
| B016 | USACE - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| B016AA | Camp Lester (ACOE), Spec Item 3.1.1 to 3.1.5 | 12 | 0.23 | AC | ¥ | ¥ | - 0 |
| B016AB | Camp Foster (ACOE), Spec Item 3.1.1 to 3.1.5 | 12 | 0.59 | AC | ¥ | ¥ | - 0 |
| B016 Subtotal | | | | | ¥ | - 0 |
| B017 | 1503050 Grounds Maintenance and Landscaping, Spec Item 3.4, Grounds Maintenance Service Orders (SLS 1, 2 & 3) | | | | | | |
| The Contractor shall perform grounds maintenance service order work in a timely manner to accomplish any grounds maintenance and landscaping works identified within the entire boundery of the installation to ensure requirements are responded to and completed in accordance with specified standards. | | | | | | |
| B017AA | Service Orders, Spec Item 3.4 | 20 | N/A | EA | ¥ | ¥ | - 0 |
| B017 Subtotal | | | | | ¥ | - 0 |
TOTAL RECURRING WORK FOR OPTION YEAR 1 ¥ - 0
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT1_Non-Recurring
| ATTACHMENT J-0200000-07 | | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-B-2003 | | | | | | | | |
| EXHIBIT B - CLIN 0004 | | | | | | | | |
| Line Item 0004 Non-Recurring Work - Option Period 1 | | | | | | | | |
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - NON-RECURRING WORK IN | | | | | | | | |
| ACCORDANCE WITH SECTION C, SPEC ITEM 4 | | | | | | | | |
| ELINs B700 through B708 | | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| B700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | | | | | | |
| NTE | | ¥ | 25,000,000 | | | | |
| B701 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO. | | NTE | | | ¥ | 25,000,000 |
| B702 | Special Event Grass Cutting | The Contractor shall provide equipment and personnel to provide special event grass cutting per the scope of work and delivery schedule specified in the task order. Grass shall be mowed and trimmes to a uniform height of 2". All debris shall be removed and disposed at an off-base facilty upon completion of mowing. Work shall be completed within the specified time provided in the task order. | | 50 | AC | ¥ | ¥ | - 0 |
| B703 | Special Event Edging | The Contractor shall provide equipment and presonnel to provide special event edging per the scope of work and delivery schedule specified in the task order. Edging to provide a uniform edged cut. All clippings shall be removed and disposed at an off-base facility upon completion of edging. Work shall be completed within the specified time provided in the task order. | | 20,000 | LF | ¥ | ¥ | - 0 |
| B704 | Underbrushing | The Contractor shall provide equipment and personnel to provide underburshing per the scope of work and delivery schedule specified in the task order. All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. All debris shall be removed and disposed at an off-base facility upon completion of unbrushing. Work shall be completed within the specified time provided in the task order. | | 50 | AC | ¥ | ¥ | - 0 |
| B705 | Tree Removal Small (6 inches to 12 inches DBH), Medium (12 inches to 20 inches DBH, Large (20 inches and above). | The Contractor shall provide equipment and personnel to provide tree removal per the scope of work and delivery schedule specified in the task order. All debris, braches, stem, leaves, etc. shall be removed and disposed at an off-base facilty upon completion of tree removal. Work shall be completed within the specified time provided in the task order. | | 50 | EA | ¥ | ¥ | - 0 |
| B706 | Tree Pruning | The Contractor shall provide equipment and personnel to provide tree pruning per the scope of work and delivery schedule specified in the task order. All debris, braches, leaves, etc. shall be removed and disposed at an off-base facilty upon completion of tree removal. Work shall be completed within the specified time provided in the task order. | | 50 | EA | ¥ | | - 0 |
| B707 | Stump Removal | The Contractor shall provide equipment and personnel to provide stump removal per the scope of work and delivery schedule specified in the task order. Plants shall be cut down and treated to prevent re-growth. Backfill all excavated holes. All debris shall be removed and disposed at an off-base facilty upon completion of tree removal. Work shall be completed within the specified time provided in the task order. | | 100 | EA | ¥ | ¥ | - 0 |
| B708 | Typhoon Clean-up (Southern Camps, Marine Corps Base Camp S.D. Butler) | The Contractor shall provide equipment and personnel to provide typhoon clean-up per the scope of work. The Contractor shall response within eight (8) hours or the "All Clear" Typhoon Condition announcement and be on the job site working. The Contractor shall collect and remove all debris, vegetation, broken branches, fallen trees, etc. as result of the typhoon fence lines and all locations within the Nothern Camps, MCB installations. The Contractor shall collect and properly disposed all collected debris, vegetation, fallen trees, broken branches, etc. at an off-base facility. The Contractor shall also commence righting, re-planting, and re-staking trees, plants and schrubs which has been uprooted and/or blown over by the typhoon. | | 5 | LT | ¥ | ¥ | - 0 |
TOTAL NON-RECURRING WORK FOR OPTION YEAR 1 ¥ 50,000,000
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT2_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-B-2003 | | | | | | | |
| EXHIBIT C - CLIN 0005 | | | | | | | |
| Line Item 0005 Recurring work - Option Period 2 | | | | | | | |
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - RECURRING WORK IN | | | | | | | |
| ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs C001 through C017 | | | | | | | |
| ELIN /Sub ELIN | Description | Months | Total Acreage | Unit of Issue | Unit Price | Total | |
| C001 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 1) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards (SLS) listed in J-1503050-03. | | | | | | |
| C001AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 9.05 | AC | ¥ | ¥ | - 0 |
| C001AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 8.85 | AC | ¥ | ¥ | - 0 |
| C001AC | Plaza Housing Areas, Spec Item 3.1.1 to 3.1.5 | 12 | 1.76 | AC | ¥ | ¥ | - 0 |
| C001 Subtotal | | | | | ¥ | - 0 |
| C002 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C002AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 218.49 | AC | ¥ | ¥ | - 0 |
| C002AB | Camp Lester, Spec Item 3.1.1 to 3.1.5 | 12 | 30.85 | AC | ¥ | ¥ | - 0 |
| C002AC | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 146.10 | AC | ¥ | ¥ | - 0 |
| C002AD | MCAS Futenma, Spec Item 3.1.1 to 3.1.5 | 12 | 249.62 | AC | ¥ | ¥ | - 0 |
| C002AE | Plaza Housing Areas, Spec Item 3.1.1 to 3.1.5 | 12 | 22.16 | AC | ¥ | ¥ | - 0 |
| C002 Subtotal | | | | | ¥ | - 0 |
| C003 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.2, Operational Areas (SLS 2) | | | | | | |
| Services for Operational Areas Southern Camps areas/acreage indicated in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards (SLS) listed in J-1503050-03. | | | | | | |
| C003AA | Camp Foster, Spec Item 3.2.1 to 3.2.4 | 12 | 11.69 | AC | ¥ | ¥ | - 0 |
| C003AB | Camp Lester, Spec Item 3.2.1 to 3.2.4 | 12 | 1.48 | AC | ¥ | ¥ | - 0 |
| C003AC | Camp Kinser, Spec Item 3.2.1 to 3.2.4 | 12 | 5.02 | AC | ¥ | ¥ | - 0 |
| C003AD | MCAS Futenma, Spec Item 3.2.1 to 3.2.4 | 12 | 9.54 | AC | ¥ | ¥ | - 0 |
| C003AE | Plaza Housing Areas, Spec Item 3.2.1 to 3.2.4 | 12 | 1.62 | AC | ¥ | ¥ | - 0 |
| C003 Subtotal | | | | | ¥ | - 0 |
| C004 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.3, Storm & Drainage Systems (SLS 3) | | | | | | |
| Services for Storm and Drainage Systems Southern Camps areas/acreage indicated in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C004AA | Camp Foster, Spec Item 3.3 | 12 | 6,820 | LF | ¥ | ¥ | - 0 |
| C004AB | Camp Kinser, Spec Item 3.3 | 12 | 310 | LF | ¥ | ¥ | - 0 |
| C004AC | MCAS Futenma, Spec Item 3.3 | 12 | 1,960 | LF | ¥ | ¥ | - 0 |
| C004AD | Plaza Housing Areas, Spec Item 3.3 | 12 | 1,190 | LF | ¥ | ¥ | - 0 |
| C004 Subtotal | | | | | ¥ | - 0 |
| C005 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.2, Operational Areas | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified in Spec Item 3.2, Sub Spec Item 3.2.3 | | | | | | |
| C005AA | MCAS Futenma (Airfield), Spec Item 3.2.3 | 12 | 277.38 | AC | ¥ | ¥ | - 0 |
| C005 Subtotal | | | | | ¥ | - 0 |
| GRAND TOTAL MCB C001-C005 | | | | | ¥ | - 0 |
| C006 | DoDEA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C006AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 34.43 | AC | ¥ | ¥ | - 0 |
| C006AB | Camp Lester, Spec Item 3.1.1 to 3.1.5 | 12 | 10.10 | AC | ¥ | ¥ | - 0 |
| C006AC | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 9.48 | AC | ¥ | ¥ | - 0 |
| C006 Subtotal | | | | | ¥ | - 0 |
| C007 | USNH - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Sotherrn Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C007AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 19.04 | AC | ¥ | ¥ | - 0 |
| C007AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 2.21 | AC | ¥ | ¥ | - 0 |
| C007AC | MCAS Futenma, Spec Item 3.1.1 to 3.1.5 | 12 | 1.72 | AC | ¥ | ¥ | - 0 |
| C007 Subtotal | | | | | ¥ | - 0 |
| C008 | NCIS - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C008AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 0.26 | AC | ¥ | ¥ | - 0 |
| C008 Subtotal | | | | | ¥ | - 0 |
| C009 | USAG - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C009AA | Camp Kinser (403rd LRC), Spec Item 3.1.1 to 3.1.5 | 12 | 1.91 | AC | ¥ | ¥ | - 0 |
| C009AB | Forth Buckner (78th SIG), Spec Item 3.1.1 to 3.1.5 | 12 | 7.08 | AC | ¥ | ¥ | - 0 |
| C009 Subtotal | | | | | ¥ | - 0 |
| C010 | DECA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C010AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 2.00 | AC | ¥ | ¥ | - 0 |
| C010AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 3.99 | AC | ¥ | ¥ | - 0 |
| C010 Subtotal | | | | | ¥ | - 0 |
| C011 | DMA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C011AA | Camp Kinser (AFN), Spec Item 3.1.1 to 3.1.5 | 12 | 8.80 | AC | ¥ | ¥ | - 0 |
| C011AB | Plaza Housing Area (AFN), Spec Item 3.1.1 to 3.1.5 | 12 | 3.64 | AC | ¥ | ¥ | - 0 |
| C011 Subtotal | | | | | ¥ | - 0 |
| C012 | USSF - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C012AA | Forth Buckner (53rd SIG), Spec Item 3.1.1 to 3.1.5 | 12 | 1.91 | AC | ¥ | ¥ | - 0 |
| C012AB | Camp Kinser (16th EEWF-A), Spec Item 3.1.1 to 3.1.5 | 12 | 2.18 | AC | ¥ | ¥ | - 0 |
| C012 Subtotal | | | | | ¥ | - 0 |
| C013 | DLA Disposition - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C013AA | Camp Kinser (DRMO), Spec Item 3.1.1 to 3.1.5 | 12 | 0.30 | AC | ¥ | ¥ | - 0 |
| C013 Subtotal | | | | | ¥ | - 0 |
| C014 | DLA Distribution - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C014AA | Camp Kinser (DLA), Spec Item 3.1.1 to 3.1.5 | 12 | 2.06 | AC | ¥ | ¥ | - 0 |
| C014 Subtotal | | | | | ¥ | - 0 |
| C015 | DLA Document - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C015AA | Camp Foster (DLA), Spec Item 3.1.1 to 3.1.5 | 12 | 0.59 | AC | ¥ | ¥ | - 0 |
| C015 Subtotal | | | | | ¥ | - 0 |
| C016 | USACE - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| C016AA | Camp Lester (ACOE), Spec Item 3.1.1 to 3.1.5 | 12 | 0.23 | AC | ¥ | ¥ | - 0 |
| C016AB | Camp Foster (ACOE), Spec Item 3.1.1 to 3.1.5 | 12 | 0.59 | AC | ¥ | ¥ | - 0 |
| C016 Subtotal | | | | | ¥ | - 0 |
| C017 | 1503050 Grounds Maintenance and Landscaping, Spec Item 3.4, Grounds Maintenance Service Orders (SLS 1, 2 & 3) | | | | | | |
| The Contractor shall perform grounds maintenance service order work in a timely manner to accomplish any grounds maintenance and landscaping works identified within the entire boundery of the installation to ensure requirements are responded to and completed in accordance with specified standards. | | | | | | |
| C017AA | Service Orders, Spec Item 3.4 | 20 | N/A | EA | ¥ | ¥ | - 0 |
| C017 Subtotal | | | | | ¥ | - 0 |
TOTAL RECURRING WORK FOR OPTION YEAR 2 ¥ - 0
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT2_Non-Recurring
| ATTACHMENT J-0200000-07 | | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-B-2003 | | | | | | | | |
| EXHIBIT C - CLIN 0006 | | | | | | | | |
| Line Item 0006 Non-Recurring Work - Option Period 2 | | | | | | | | |
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - NON-RECURRING WORK IN | | | | | | | | |
| ACCORDANCE WITH SECTION C, SPEC ITEM 4 | | | | | | | | |
| ELINs C700 through C708 | | | | | | | | |
| ELIN | Product Name (120 Characters) | Description Extended | | Estimated Quantity | Unit of Issue | Unit Price | Extended Price | |
| C700 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | | | | | | |
| NTE | | ¥ | 25,000,000 | | | | |
| C701 | Material Costs- MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. These material costs MUST BE NEGOTIATED BY KO. | | NTE | | | ¥ | 25,000,000 |
| C702 | Special Event Grass Cutting | The Contractor shall provide equipment and personnel to provide special event grass cutting per the scope of work and delivery schedule specified in the task order. Grass shall be mowed and trimmes to a uniform height of 2". All debris shall be removed and disposed at an off-base facilty upon completion of mowing. Work shall be completed within the specified time provided in the task order. | | 50 | AC | ¥ | ¥ | - 0 |
| C703 | Special Event Edging | The Contractor shall provide equipment and presonnel to provide special event edging per the scope of work and delivery schedule specified in the task order. Edging to provide a uniform edged cut. All clippings shall be removed and disposed at an off-base facility upon completion of edging. Work shall be completed within the specified time provided in the task order. | | 20,000 | LF | ¥ | ¥ | - 0 |
| C704 | Underbrushing | The Contractor shall provide equipment and personnel to provide underburshing per the scope of work and delivery schedule specified in the task order. All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. All debris shall be removed and disposed at an off-base facility upon completion of unbrushing. Work shall be completed within the specified time provided in the task order. | | 50 | AC | ¥ | ¥ | - 0 |
| C705 | Tree Removal Small (6 inches to 12 inches DBH), Medium (12 inches to 20 inches DBH, Large (20 inches and above). | The Contractor shall provide equipment and personnel to provide tree removal per the scope of work and delivery schedule specified in the task order. All debris, braches, stem, leaves, etc. shall be removed and disposed at an off-base facilty upon completion of tree removal. Work shall be completed within the specified time provided in the task order. | | 50 | EA | ¥ | ¥ | - 0 |
| C706 | Tree Pruning | The Contractor shall provide equipment and personnel to provide tree pruning per the scope of work and delivery schedule specified in the task order. All debris, braches, leaves, etc. shall be removed and disposed at an off-base facilty upon completion of tree removal. Work shall be completed within the specified time provided in the task order. | | 50 | EA | ¥ | | - 0 |
| C707 | Stump Removal | The Contractor shall provide equipment and personnel to provide stump removal per the scope of work and delivery schedule specified in the task order. Plants shall be cut down and treated to prevent re-growth. Backfill all excavated holes. All debris shall be removed and disposed at an off-base facilty upon completion of tree removal. Work shall be completed within the specified time provided in the task order. | | 100 | EA | ¥ | ¥ | - 0 |
| C708 | Typhoon Clean-up (Southern Camps, Marine Corps Base Camp S.D. Butler) | The Contractor shall provide equipment and personnel to provide typhoon clean-up per the scope of work. The Contractor shall response within eight (8) hours or the "All Clear" Typhoon Condition announcement and be on the job site working. The Contractor shall collect and remove all debris, vegetation, broken branches, fallen trees, etc. as result of the typhoon fence lines and all locations within the Nothern Camps, MCB installations. The Contractor shall collect and properly disposed all collected debris, vegetation, fallen trees, broken branches, etc. at an off-base facility. The Contractor shall also commence righting, re-planting, and re-staking trees, plants and schrubs which has been uprooted and/or blown over by the typhoon. | | 5 | LT | ¥ | ¥ | - 0 |
TOTAL NON-RECURRING WORK FOR OPTION YEAR 2 ¥ 50,000,000
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
Source Selection Information-See FAR 2.101 and 3.104 [when filled]
OPT3_Recurring
| ATTACHMENT J-0200000-07 | | | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | | | |
| SOLICITATION/CONTRACT # N40084-24-B-2003 | | | | | | | |
| EXHIBIT D - CLIN 0007 | | | | | | | |
| Line Item 0007 Recurring work - Option Period 3 | | | | | | | |
| PROVIDE PRICES TO PERFORM GROUNDS MAINTENANCE AND LANDSCAPING SERVICES - RECURRING WORK IN | | | | | | | |
| ACCORDANCE WITH SECTION C, SPEC ITEM 3 | | | | | | | |
| ELINs D001 through D017 | | | | | | | |
| ELIN /Sub ELIN | Description | Months | Total Acreage | Unit of Issue | Unit Price | Total | |
| D001 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 1) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards (SLS) listed in J-1503050-03. | | | | | | |
| D001AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 9.05 | AC | ¥ | ¥ | - 0 |
| D001AB | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 8.85 | AC | ¥ | ¥ | - 0 |
| D001AC | Plaza Housing Areas, Spec Item 3.1.1 to 3.1.5 | 12 | 1.76 | AC | ¥ | ¥ | - 0 |
| D001 Subtotal | | | | | ¥ | - 0 |
| D002 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| D002AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 218.49 | AC | ¥ | ¥ | - 0 |
| D002AB | Camp Lester, Spec Item 3.1.1 to 3.1.5 | 12 | 30.85 | AC | ¥ | ¥ | - 0 |
| D002AC | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 146.10 | AC | ¥ | ¥ | - 0 |
| D002AD | MCAS Futenma, Spec Item 3.1.1 to 3.1.5 | 12 | 249.62 | AC | ¥ | ¥ | - 0 |
| D002AE | Plaza Housing Areas, Spec Item 3.1.1 to 3.1.5 | 12 | 22.16 | AC | ¥ | ¥ | - 0 |
| D002 Subtotal | | | | | ¥ | - 0 |
| D003 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.2, Operational Areas (SLS 2) | | | | | | |
| Services for Operational Areas Southern Camps areas/acreage indicated in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards (SLS) listed in J-1503050-03. | | | | | | |
| D003AA | Camp Foster, Spec Item 3.2.1 to 3.2.4 | 12 | 11.69 | AC | ¥ | ¥ | - 0 |
| D003AB | Camp Lester, Spec Item 3.2.1 to 3.2.4 | 12 | 1.48 | AC | ¥ | ¥ | - 0 |
| D003AC | Camp Kinser, Spec Item 3.2.1 to 3.2.4 | 12 | 5.02 | AC | ¥ | ¥ | - 0 |
| D003AD | MCAS Futenma, Spec Item 3.2.1 to 3.2.4 | 12 | 9.54 | AC | ¥ | ¥ | - 0 |
| D003AE | Plaza Housing Areas, Spec Item 3.2.1 to 3.2.4 | 12 | 1.62 | AC | ¥ | ¥ | - 0 |
| D003 Subtotal | | | | | ¥ | - 0 |
| D004 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.3, Storm & Drainage Systems (SLS 3) | | | | | | |
| Services for Storm and Drainage Systems Southern Camps areas/acreage indicated in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| D004AA | Camp Foster, Spec Item 3.3 | 12 | 6,820 | LF | ¥ | ¥ | - 0 |
| D004AB | Camp Kinser, Spec Item 3.3 | 12 | 310 | LF | ¥ | ¥ | - 0 |
| D004AC | MCAS Futenma, Spec Item 3.3 | 12 | 1,960 | LF | ¥ | ¥ | - 0 |
| D004AD | Plaza Housing Areas, Spec Item 3.3 | 12 | 1,190 | LF | ¥ | ¥ | - 0 |
| D004 Subtotal | | | | | ¥ | - 0 |
| D005 | MCB - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.2, Operational Areas | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified in Spec Item 3.2, Sub Spec Item 3.2.3 | | | | | | |
| D005AA | MCAS Futenma (Airfield), Spec Item 3.2.3 | 12 | 277.38 | AC | ¥ | ¥ | - 0 |
| D005 Subtotal | | | | | ¥ | - 0 |
| GRAND TOTAL MCB D001-D005 | | | | | ¥ | - 0 |
| D006 | DoDEA - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Southern Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| D006AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 34.43 | AC | ¥ | ¥ | - 0 |
| D006AB | Camp Lester, Spec Item 3.1.1 to 3.1.5 | 12 | 10.10 | AC | ¥ | ¥ | - 0 |
| D006AC | Camp Kinser, Spec Item 3.1.1 to 3.1.5 | 12 | 9.48 | AC | ¥ | ¥ | - 0 |
| D006 Subtotal | | | | | ¥ | - 0 |
| D007 | USNH - 1503050 Grounds Maintenance and Landscaping, Spec Item 3.1, Improved Grounds (SLS 2) | | | | | | |
| Services for Improved Grounds Sotherrn Camps areas/acreage indicated other than those specified as Prestige in the Site Maps provided in J-1503050-05 performed as specified for the Standard Service Level per the Service Level Standards listed in J-1503050-03. | | | | | | |
| D007AA | Camp Foster, Spec Item 3.1.1 to 3.1.5 | 12 | 19.04 | AC | ¥ | ¥ | - 0 |
This is the start of the file's text. The full file is on GovTribe.