Attach2_08-J-0200000-09_SCADA ELIN-1.xlsx
XLSX spreadsheet 68 KB Posted
- Solicitation number
- N4008423R8902
About this file
This is an Excel pricing attachment to a solicitation for a Supervisory Control and Data Acquisition (SCADA) system maintenance contract to support electrical receiving and distribution systems and facilities for the U.S. Naval Air Facility in Atsugi and U.S. Forces Japan controlled areas in the Kanto Plain of Japan. The attachment provides line item numbers and pricing details for recurring and non-recurring work under the contract. Recurring work includes prices for emergency, urgent and routine service orders as well as preventative maintenance programs for various facilities. Non-recurring work includes unit prices for labor during and outside regular working hours, materials, and coefficients for associated costs. The attachment also includes unit prices for fence installation, repair, removal and rental, grounds maintenance, and expedited and indefinite quantity work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0001_N4008423R8902_SCADA_.pdf | ||
| SF1449_N4008423R8902_SCADA_.pdf | ||
| Attach4_Pre-Proposal Inquiry-PPI_Form.xlsx | XLSX spreadsheet | |
| Attach5_ExhibitA_ExperienceProjectDataSheet.docx | DOCX document | |
| Attach3_Site Visit Request Form.xlsx | XLSX spreadsheet | |
| Attach6_ExhibitB_PastPerformance Questionnaitre-PPQ.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base_Recur
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT A - RECURRING WORK |
| Line Item 0001 Recurring Work - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs A001 through A002 |
| ELIN / | ||||||
| Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | |
| A | 001 NAF ST FUND | |||||
| SUB-ANNEX 1502000 Spec Item 3 | ||||||
| A | 001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M | ||
| A | 001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M | ||
| A | 001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M | ||
| A | 001AD | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #1 SEWAGE TREATMENT PLANT) | 1 | LS | ||
| A | 001AE | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #2 BOILER PLANT) | 1 | LS | ||
| A | 001AF | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #3 WATER TREATMENT PLANT) | 1 | LS | ||
| A | 001AG | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #4 SUBSTATION) | 1 | LS | ||
| SUB-ANNEX 1601000 Spec Item 3 | ||||||
| A | 001BA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M | ||
| A | 001BB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M | ||
| A | 001BC | Routine Service Orders, Spec Item 3.1.3 | 12 | M | ||
| SUB-ANNEX 1602000 Spec Item 3 | ||||||
| A | 001CA | Preventive Maintenance (PM) Program, Main Electrical Substation Spec Item 3.1.1.1 (Inventory: J-1601000-01) | 1 | LS | ||
| A | 001CB | Preventive Maintenance (PM) Program, 60Hz Power Plant, Spec Item 3.1.1.2 (Inventory: J-1601000-02 Part I) | 1 | LS | ||
| A | 001CC | Preventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 1) | 1 | LS |
A001 NAF ST FUND, Subtotal:
| ELIN / | ||||||
| Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | |
| A | 002 NAF HOUSING FUND | |||||
| SUB-ANNEX 1601000 Spec Item 3 | ||||||
| A | 002AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M | ||
| A | 002AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M | ||
| A | 002AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M | ||
| SUB-ANNEX 1602000 Spec Item 3 | ||||||
| A | 002CC | Preventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 2) | 1 | LS |
A002 NAF HOUSING FUND, Subtotal:
TOTAL RECURRING WORK (BASE PERIOD)
| Notes: |
| 1. Abbreviation - M = Monthly LS = Lump Sum |
| 2. The Offerors/Contractor will be requested to submit approximate cost breakdown for |
| "Preventive Maintenance Program" per building/facility. |
&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT A
Base_NoRecur
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT A - NON-RECURRING WORK |
| Line Item 0002 Non-recurring Work - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A704 |
| ELIN / | |||
| Sub ELIN | Product Name | Description Extended | Estimated Quantity |
| (Max) | Unit of | ||
| Issue | Unit Price | ||
| Total |
Price
| A700 | Unit Price Labor Work - | |||||
| During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | 1,600 | HR | |||
| A701 | Unit Price Labor Work - | |||||
| Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | 1,300 | HR | |||
| A702 | Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer. | 150 | HR | ||
| A703 | Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer. | 250 | HR | ||
| A704 | Material Costs- | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 35,000,000 | JPY | ||
| Coefficient |
(see Notes 1)
TOTAL NON-RECURRING WORK PRICE (BASE PERIOD)
| Notes: | |
| 1. The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits. | |
| Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.10 then; 15,000,000 JPY x 1.10 = 16,500,000 JPY |
2. Unit Price Column - Unit Prices must be expressed in whole Japanese Yen (JPY). Extended Price must equal Estimated Quantity times Unit Price.
3. Abbreviation - EA = Each HR = Hour
&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004
1ST OPT
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT B - RECURRING WORK |
| Line Item 0003 Recurring Work - First Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs B001 through B002 |
| ELIN / | ||||||
| Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | |
| B | 001 NAF ST FUND | |||||
| SUB-ANNEX 1502000 Spec Item 3 | ||||||
| B | 001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M | ||
| B | 001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M | ||
| B | 001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M | ||
| B | 001AD | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #1 SEWAGE TREATMENT PLANT) | 1 | LS | ||
| B | 001AE | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #2 BOILER PLANT) | 1 | LS | ||
| B | 001AF | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #3 WATER TREATMENT PLANT) | 1 | LS | ||
| B | 001AG | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #4 SUBSTATION) | 1 | LS | ||
| SUB-ANNEX 1601000 Spec Item 3 | ||||||
| B | 001BA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M | ||
| B | 001BB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M | ||
| B | 001BC | Routine Service Orders, Spec Item 3.1.3 | 12 | M | ||
| SUB-ANNEX 1602000 Spec Item 3 | ||||||
| B | 001CA | Preventive Maintenance (PM) Program, Main Electrical Substation Spec Item 3.1.1.1 (Inventory: J-1601000-01) | 1 | LS | ||
| B | 001CB | Preventive Maintenance (PM) Program, 60Hz Power Plant, Spec Item 3.1.1.2 (Inventory: J-1601000-02 Part I) | 1 | LS | ||
| B | 001CC | Preventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 1) | 1 | LS |
B001 NAF ST FUND, Subtotal:
| ELIN / | ||||||
| Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | |
| B | 002 NAF HOUSING FUND | |||||
| SUB-ANNEX 1601000 Spec Item 3 | ||||||
| B | 002AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M | ||
| B | 002AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M | ||
| B | 002AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M | ||
| SUB-ANNEX 1602000 Spec Item 3 | ||||||
| B | 002CC | Preventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 2) | 1 | LS |
B002 NAF HOUSING FUND, Subtotal:
TOTAL RECURRING WORK (FIRST OPTION PERIOD)
| Notes: |
| 1. Abbreviation - M = Monthly LS = Lump Sum |
| 2. The Offerors/Contractor will be requested to submit approximate cost breakdown for |
| "Preventive Maintenance Program" per building/facility. |
&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT B
1ST_NoRecur
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT B - NON-RECURRING WORK |
| Line Item 0004 Non-recurring Work - First Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B704 |
| ELIN / | |||
| Sub ELIN | Product Name | Description Extended | Estimated Quantity |
| (Max) | Unit of | ||
| Issue | Unit Price | ||
| Total |
Price
| B700 | Unit Price Labor Work - | |||||
| During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | 1,600 | HR | |||
| B701 | Unit Price Labor Work - | |||||
| Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | 1,300 | HR | |||
| B702 | Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer. | 150 | HR | ||
| B703 | Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer. | 250 | HR | ||
| B704 | Material Costs- | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 35,000,000 | JPY | ||
| Coefficient |
(see Notes 1)
TOTAL NON-RECURRING WORK PRICE (FIRST OPTION PERIOD)
| Notes: | |
| 1. The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits. | |
| Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.10 then; 15,000,000 JPY x 1.10 = 16,500,000 JPY | |
| 2. Unit Price Column - Unit Prices must be expressed in whole Japanese Yen (JPY). Extended Price must equal Estimated | |
| Quantity times Unit Price. | |
| 3. Abbreviation - EA = Each HR = Hour |
&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT B
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004
2ND OPT
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT C - RECURRING WORK |
| Line Item 0005 Recurring Work - Second Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs C001 through C002 |
| ELIN / | ||||||
| Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | |
| C | 001 NAF ST FUND | |||||
| SUB-ANNEX 1502000 Spec Item 3 | ||||||
| C | 001AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M | ||
| C | 001AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M | ||
| C | 001AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M | ||
| C | 001AD | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #1 SEWAGE TREATMENT PLANT) | 1 | LS | ||
| C | 001AE | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #2 BOILER PLANT) | 1 | LS | ||
| C | 001AF | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #3 WATER TREATMENT PLANT) | 1 | LS | ||
| C | 001AG | Preventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #4 SUBSTATION) | 1 | LS | ||
| SUB-ANNEX 1601000 Spec Item 3 | ||||||
| C | 001BA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M | ||
| C | 001BB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M | ||
| C | 001BC | Routine Service Orders, Spec Item 3.1.3 | 12 | M | ||
| SUB-ANNEX 1602000 Spec Item 3 | ||||||
| C | 001CA | Preventive Maintenance (PM) Program, Main Electrical Substation Spec Item 3.1.1.1 (Inventory: J-1601000-01) | 1 | LS | ||
| C | 001CB | Preventive Maintenance (PM) Program, 60Hz Power Plant, Spec Item 3.1.1.2 (Inventory: J-1601000-02 Part I) | 1 | LS | ||
| C | 001CC | Preventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 1) | 1 | LS |
C001 NAF ST FUND, Subtotal:
| ELIN / | ||||||
| Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | |
| C | 002 NAF HOUSING FUND | |||||
| SUB-ANNEX 1601000 Spec Item 3 | ||||||
| C | 002AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | M | ||
| C | 002AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | M | ||
| C | 002AC | Routine Service Orders, Spec Item 3.1.3 | 12 | M | ||
| SUB-ANNEX 1602000 Spec Item 3 | ||||||
| C | 002CC | Preventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 2) | 1 | LS |
C002 NAF HOUSING FUND, Subtotal:
TOTAL RECURRING WORK (SECOND OPTION PERIOD)
| Notes: |
| 1. Abbreviation - M = Monthly LS = Lump Sum |
| 2. The Offerors/Contractor will be requested to submit approximate cost breakdown for |
| "Preventive Maintenance Program" per building/facility. |
&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT C
2ND_NoRecur
| ATTACHMENT J-0200000-09 |
| EXHIBIT LINE ITEM NUMBERS |
| EXHIBIT C - NON-RECURRING WORK |
| Line Item 0006 Non-recurring Work - Second Option Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs C700 through C704 |
| ELIN / | |||
| Sub ELIN | Product Name | Description Extended | Estimated Quantity |
| (Max) | Unit of | ||
| Issue | Unit Price | ||
| Total |
Price
| C700 | Unit Price Labor Work - | |||||
| During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. | 1,600 | HR | |||
| C701 | Unit Price Labor Work - | |||||
| Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. | 1,300 | HR | |||
| C702 | Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - During Regular Working Hours | Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer. | 150 | HR | ||
| C703 | Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - Outside Regular Working Hours | Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer. | 250 | HR | ||
| C704 | Material Costs- | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 35,000,000 | JPY | ||
| Coefficient |
(see Notes 1)
TOTAL NON-RECURRING WORK PRICE (SECOND OPTION PERIOD)
| Notes: | |
| 1. The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits. | |
| Only "Coefficient" will be used for these associated costs. | |
| Extend the coefficient to no more than two (2) decimal places. | |
| For example, if the offeror's coefficient for material is 1.10 then; 15,000,000 JPY x 1.10 = 16,500,000 JPY | |
| 2. Unit Price Column - Unit Prices must be expressed in whole Japanese Yen (JPY). Extended Price must equal Estimated | |
| Quantity times Unit Price. | |
| 3. Abbreviation - EA = Each HR = Hour |
&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT C
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004