About this file

This is an Excel pricing attachment to a solicitation for a Supervisory Control and Data Acquisition (SCADA) system maintenance contract to support electrical receiving and distribution systems and facilities for the U.S. Naval Air Facility in Atsugi and U.S. Forces Japan controlled areas in the Kanto Plain of Japan. The attachment provides line item numbers and pricing details for recurring and non-recurring work under the contract. Recurring work includes prices for emergency, urgent and routine service orders as well as preventative maintenance programs for various facilities. Non-recurring work includes unit prices for labor during and outside regular working hours, materials, and coefficients for associated costs. The attachment also includes unit prices for fence installation, repair, removal and rental, grounds maintenance, and expedited and indefinite quantity work.

View the file

Other files

File Type Posted
Amendment0001_N4008423R8902_SCADA_.pdf PDF
SF1449_N4008423R8902_SCADA_.pdf PDF
Attach4_Pre-Proposal Inquiry-PPI_Form.xlsx XLSX spreadsheet
Attach5_ExhibitA_ExperienceProjectDataSheet.docx DOCX document
Attach3_Site Visit Request Form.xlsx XLSX spreadsheet
Attach6_ExhibitB_PastPerformance Questionnaitre-PPQ.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base_Recur

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
EXHIBIT A - RECURRING WORK
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A002
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
A001 NAF ST FUND
SUB-ANNEX 1502000 Spec Item 3
A001AAEmergency Service Orders, Spec Item 3.1.112M
A001ABUrgent Service Orders, Spec Item 3.1.212M
A001ACRoutine Service Orders, Spec Item 3.1.312M
A001ADPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #1 SEWAGE TREATMENT PLANT)1LS
A001AEPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #2 BOILER PLANT)1LS
A001AFPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #3 WATER TREATMENT PLANT)1LS
A001AGPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #4 SUBSTATION)1LS
SUB-ANNEX 1601000 Spec Item 3
A001BAEmergency Service Orders, Spec Item 3.1.112M
A001BBUrgent Service Orders, Spec Item 3.1.212M
A001BCRoutine Service Orders, Spec Item 3.1.312M
SUB-ANNEX 1602000 Spec Item 3
A001CAPreventive Maintenance (PM) Program, Main Electrical Substation Spec Item 3.1.1.1 (Inventory: J-1601000-01)1LS
A001CBPreventive Maintenance (PM) Program, 60Hz Power Plant, Spec Item 3.1.1.2 (Inventory: J-1601000-02 Part I)1LS
A001CCPreventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 1)1LS

A001 NAF ST FUND, Subtotal:

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
A002 NAF HOUSING FUND
SUB-ANNEX 1601000 Spec Item 3
A002AAEmergency Service Orders, Spec Item 3.1.112M
A002ABUrgent Service Orders, Spec Item 3.1.212M
A002ACRoutine Service Orders, Spec Item 3.1.312M
SUB-ANNEX 1602000 Spec Item 3
A002CCPreventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 2)1LS

A002 NAF HOUSING FUND, Subtotal:

TOTAL RECURRING WORK (BASE PERIOD)

Notes:
1. Abbreviation - M = Monthly LS = Lump Sum
2. The Offerors/Contractor will be requested to submit approximate cost breakdown for
"Preventive Maintenance Program" per building/facility.

&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT A

Base_NoRecur

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
EXHIBIT A - NON-RECURRING WORK
Line Item 0002 Non-recurring Work - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A704
ELIN /
Sub ELINProduct NameDescription ExtendedEstimated Quantity
(Max)Unit of
IssueUnit Price
Total

Price

A700Unit Price Labor Work -
During Regular Working HoursProvide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order.1,600HR
A701Unit Price Labor Work -
Outside Regular Working HoursProvide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order.1,300HR
A702Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - During Regular Working HoursProvide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer.150HR
A703Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - Outside Regular Working HoursProvide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer.250HR
A704Material Costs-Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.35,000,000JPY
Coefficient

(see Notes 1)

TOTAL NON-RECURRING WORK PRICE (BASE PERIOD)

Notes:
1. The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits.
Only "Coefficient" will be used for these associated costs.
Extend the coefficient to no more than two (2) decimal places.
For example, if the offeror's coefficient for material is 1.10 then; 15,000,000 JPY x 1.10 = 16,500,000 JPY

2. Unit Price Column - Unit Prices must be expressed in whole Japanese Yen (JPY). Extended Price must equal Estimated Quantity times Unit Price.

3. Abbreviation - EA = Each HR = Hour

&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

1ST OPT

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
EXHIBIT B - RECURRING WORK
Line Item 0003 Recurring Work - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B002
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
B001 NAF ST FUND
SUB-ANNEX 1502000 Spec Item 3
B001AAEmergency Service Orders, Spec Item 3.1.112M
B001ABUrgent Service Orders, Spec Item 3.1.212M
B001ACRoutine Service Orders, Spec Item 3.1.312M
B001ADPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #1 SEWAGE TREATMENT PLANT)1LS
B001AEPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #2 BOILER PLANT)1LS
B001AFPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #3 WATER TREATMENT PLANT)1LS
B001AGPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #4 SUBSTATION)1LS
SUB-ANNEX 1601000 Spec Item 3
B001BAEmergency Service Orders, Spec Item 3.1.112M
B001BBUrgent Service Orders, Spec Item 3.1.212M
B001BCRoutine Service Orders, Spec Item 3.1.312M
SUB-ANNEX 1602000 Spec Item 3
B001CAPreventive Maintenance (PM) Program, Main Electrical Substation Spec Item 3.1.1.1 (Inventory: J-1601000-01)1LS
B001CBPreventive Maintenance (PM) Program, 60Hz Power Plant, Spec Item 3.1.1.2 (Inventory: J-1601000-02 Part I)1LS
B001CCPreventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 1)1LS

B001 NAF ST FUND, Subtotal:

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
B002 NAF HOUSING FUND
SUB-ANNEX 1601000 Spec Item 3
B002AAEmergency Service Orders, Spec Item 3.1.112M
B002ABUrgent Service Orders, Spec Item 3.1.212M
B002ACRoutine Service Orders, Spec Item 3.1.312M
SUB-ANNEX 1602000 Spec Item 3
B002CCPreventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 2)1LS

B002 NAF HOUSING FUND, Subtotal:

TOTAL RECURRING WORK (FIRST OPTION PERIOD)

Notes:
1. Abbreviation - M = Monthly LS = Lump Sum
2. The Offerors/Contractor will be requested to submit approximate cost breakdown for
"Preventive Maintenance Program" per building/facility.

&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT B

1ST_NoRecur

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
EXHIBIT B - NON-RECURRING WORK
Line Item 0004 Non-recurring Work - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B704
ELIN /
Sub ELINProduct NameDescription ExtendedEstimated Quantity
(Max)Unit of
IssueUnit Price
Total

Price

B700Unit Price Labor Work -
During Regular Working HoursProvide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order.1,600HR
B701Unit Price Labor Work -
Outside Regular Working HoursProvide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order.1,300HR
B702Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - During Regular Working HoursProvide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer.150HR
B703Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - Outside Regular Working HoursProvide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer.250HR
B704Material Costs-Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.35,000,000JPY
Coefficient

(see Notes 1)

TOTAL NON-RECURRING WORK PRICE (FIRST OPTION PERIOD)

Notes:
1. The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits.
Only "Coefficient" will be used for these associated costs.
Extend the coefficient to no more than two (2) decimal places.
For example, if the offeror's coefficient for material is 1.10 then; 15,000,000 JPY x 1.10 = 16,500,000 JPY
2. Unit Price Column - Unit Prices must be expressed in whole Japanese Yen (JPY). Extended Price must equal Estimated
Quantity times Unit Price.
3. Abbreviation - EA = Each HR = Hour

&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT B

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

2ND OPT

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
EXHIBIT C - RECURRING WORK
Line Item 0005 Recurring Work - Second Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C002
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
C001 NAF ST FUND
SUB-ANNEX 1502000 Spec Item 3
C001AAEmergency Service Orders, Spec Item 3.1.112M
C001ABUrgent Service Orders, Spec Item 3.1.212M
C001ACRoutine Service Orders, Spec Item 3.1.312M
C001ADPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #1 SEWAGE TREATMENT PLANT)1LS
C001AEPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #2 BOILER PLANT)1LS
C001AFPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #3 WATER TREATMENT PLANT)1LS
C001AGPreventive Maintenance (PM) Program, SCADA, Spec Item 3.2.1 (Attachment J-1502000-01 Facilities Property Inventory #4 SUBSTATION)1LS
SUB-ANNEX 1601000 Spec Item 3
C001BAEmergency Service Orders, Spec Item 3.1.112M
C001BBUrgent Service Orders, Spec Item 3.1.212M
C001BCRoutine Service Orders, Spec Item 3.1.312M
SUB-ANNEX 1602000 Spec Item 3
C001CAPreventive Maintenance (PM) Program, Main Electrical Substation Spec Item 3.1.1.1 (Inventory: J-1601000-01)1LS
C001CBPreventive Maintenance (PM) Program, 60Hz Power Plant, Spec Item 3.1.1.2 (Inventory: J-1601000-02 Part I)1LS
C001CCPreventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 1)1LS

C001 NAF ST FUND, Subtotal:

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
C002 NAF HOUSING FUND
SUB-ANNEX 1601000 Spec Item 3
C002AAEmergency Service Orders, Spec Item 3.1.112M
C002ABUrgent Service Orders, Spec Item 3.1.212M
C002ACRoutine Service Orders, Spec Item 3.1.312M
SUB-ANNEX 1602000 Spec Item 3
C002CCPreventive Maintenance (PM) Program, Secondary Substations, Spec Item 3.1.1.3 (Inventory: J-1601000-02 Part 2)1LS

C002 NAF HOUSING FUND, Subtotal:

TOTAL RECURRING WORK (SECOND OPTION PERIOD)

Notes:
1. Abbreviation - M = Monthly LS = Lump Sum
2. The Offerors/Contractor will be requested to submit approximate cost breakdown for
"Preventive Maintenance Program" per building/facility.

&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT C

2ND_NoRecur

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
EXHIBIT C - NON-RECURRING WORK
Line Item 0006 Non-recurring Work - Second Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - NON-RECURRING - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 through C704
ELIN /
Sub ELINProduct NameDescription ExtendedEstimated Quantity
(Max)Unit of
IssueUnit Price
Total

Price

C700Unit Price Labor Work -
During Regular Working HoursProvide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order.1,600HR
C701Unit Price Labor Work -
Outside Regular Working HoursProvide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order.1,300HR
C702Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - During Regular Working HoursProvide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer.150HR
C703Unit Priced Labor Work, Special High Voltage Equipment Manufacturer - Outside Regular Working HoursProvide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order. This is applied to labor work of all the special high voltage (Tokubetsu Kouatsu per Japanese electrical standard) equipment manufacturer.250HR
C704Material Costs-Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.35,000,000JPY
Coefficient

(see Notes 1)

TOTAL NON-RECURRING WORK PRICE (SECOND OPTION PERIOD)

Notes:
1. The "Coefficient" is an adjustment to the material cost to allow for all associated costs including but not limited to ordering, handling, stockpiling, overhead, and profits.
Only "Coefficient" will be used for these associated costs.
Extend the coefficient to no more than two (2) decimal places.
For example, if the offeror's coefficient for material is 1.10 then; 15,000,000 JPY x 1.10 = 16,500,000 JPY
2. Unit Price Column - Unit Prices must be expressed in whole Japanese Yen (JPY). Extended Price must equal Estimated
Quantity times Unit Price.
3. Abbreviation - EA = Each HR = Hour

&"Times New Roman,Regular"Attachment J-0200000-09 EXHIBIT C

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN B011 through B211 (NOTE: Revise to match ELIN Structure) Line Item 0003 Option Year One - Firm Fixed Price Work ELIN B001 through B211 Line Item 0004 Option Year One- Indefinite Quantity Work ELIN B1001 through B1004

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN B1001 through B1004

File details come from the government source that posted it. Updated .