22R5401_Amend 0001_220606.pdf
PDF 136 KB Posted
- Solicitation number
- N4008422R5401
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 22R5401_Amend 0005_220701.pdf | ||
| Amend 0004_Encl(1)_Summary of Changes_PWS.pdf | ||
| 22R5401_Amend 0004_220629.pdf | ||
| 22R5401_Amend 0003_220628.pdf | ||
| 22R5401_Amend 0002_220613.pdf | ||
| RFP_Atch(3)_Preproposal_Inquiry_Form.xlsx | XLSX spreadsheet | |
| RFP_Atch(6)_Safety-Narrative_220513.docx | DOCX document | |
| 22R5401_RFP_220525.pdf | ||
| RFP_Atch(7)_Past_Performance_Questionnaire_220513.docx | DOCX document | |
| RFP_Atch(4)_1-Day_Official_Entry-Exit_Request.pdf | ||
| RFP_Atch(5)_Offeror Experience Project Data Sheet_220525.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5926362
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008422R5401, Inspection, Maintenance, Repair, and Testing Services for Vertical Transportation Equipment (VTE) System & Equipment at U.S. Marine Corps Air Station (MCAS) Iw akuni, Japan
Description of the amendment begins on Page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008422R5401
X 9B. DATED (SEE ITEM 11)
25-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jun-2022
CODE
NAVFAC FAR EAST
FEAD IWAKUNI
PSC 561 BOX 1871
FPO AP 96310-0019
N40084 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008422R5401
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
a. The purpose of this amendment 0001 is do the following;
(1) Provide Government response to offerors’ Pre-Proposal Inquiry (PPI) as shown below;
No. Reference (Page / Sect / Para)
Question Government Response
1 RFP page 50 / 2. Basis of Evaluation and Submittal Requirements for Each Factor / b. Technical Factors: (1) Factor 1, Corporate Experience
Is work accomplished as a subcontractor applicable as corporate experience for this project?
Related to this, when filling out Attachment 7 "Past Performance Questionnaire", in the case of work completed as a subcontractor, should the "Client Information" section be filled out by the end user or by the master contractor?
Yes, it is acceptable. Please refer to RFP page 51 of 78, section titled "Affiliates, Subsidiaries, Parent, LLC, LTD member companies, Predecessor companies, and subcontractors" for further guidance.
In the case of work completed by a subcontractor, Past Performance Questionnaire shall be completed by the Prime Contractor who subcontracted the work.
b. All other terms and conditions remain unchanged.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .