This amendment modifies the specifications for a solicitation seeking offers to repair a damaged seawall at Commander Fleet Activities Sasebo in Japan. Key changes include deleting inconsistencies regarding government emergency use and timelines for abatement work. Requirements for negative air pressure systems, local exhaust equipment, and lead, cadmium, and chromium surveys are also removed. Supervision language is eased and diving operations clarified. Paint sampling locations and pulling test procedures are further specified. Offerors are advised to modify their proposals according to the revisions provided prior to the closing date of the solicitation.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI//FEDCON

Amendment #0003, Page 1 of 6

CUI // FEDCON

eProject No. 1608338 Amendment No. 0003

Date: 2 Aug 2022

REPAIR DAMAGED SEAWALL, MAIN BASE

At the

COMMANDER FLEET ACTIVITIES SASEBO

The purpose of this amendment is to delete inconsistencies concerning Government emergency use; to delete 14-calendar day limitation to finish MCL/PWL abatement work; to delete the English communication requirements for the superintendent or competent alternate; to delete inapplicable portions for projects in Japan; to ease the QC Manager requirements; to provide information concerning SCUBA operations; to add a description and map of paint sampling locations; to delete Contractor’s lead, cadmium, and chromium surveys; to clarify temporary fencing requirements; to delete negative air pressure system and local exhaust system requirements for lead remediation; and to clarify the pulling test requirements.

CHANGES IN SPECIFICATIONS

The following revisions must be made to the specifications listed herein. No revised specifications are being issued with this amendment. Prospective bidders are requested to make changes or revisions to the specifications as described hereinafter.

SECTION 01 14 00.00 33 – WORK RESTRICTIONS

Delete the following portion from item (3) of paragraph 1.2.1 Shipyard Area Scheduling Requirements:

“The Government may suspend all Contractor’s works at unknown intervals for a maximum of 90 days during the construction period for berthing operations without additional cost to the Government nor revision of the contract completion date. If required, the Contractor must remove construction materials and equipment, and must clear the areas needed by the Government during ship loading and unloading operations.”

Delete item g in its entirety from paragraph 1.2.3 Occupied Area Scheduling Requirements:

“g. The Contractor must finish Material Containing Lead(MCL)/Paint with Lead (PWL) abatement work within 14 calendar days at each berth, this period includes submission of clearance sampling report to the Government.”

Amendment #0003, Page 2 of 6

SECTION 01 30 00.00 33 – ADMINISTRATIVE REQUIREMENTS

Delete the following paragraph in its entirety and adjust the numbers of the remaining paragraphs:

“1.6.1 Minimum Communication Requirements Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.”

SECTION 01 33 00.00 33 – SUBMITTAL PROCEDURES

Delete the following paragraph in its entirety:

“1.4.1 Overseas Shop Drawing Submittals Send submittals via overnight express mail service. All costs associated with the overnight express mail service are borne by the Contractor. Costs associated with the overnight express mail of submittals related to proposed submittal variances of resubmittals necessary as a result of noncompliant or incomplete Contractor submittals are the responsibility of the Contractor.”

Delete the following items from the Submittal Register, under Section 02 83 00.00 33:

“Negative Air Pressure System; G (CME)”

“Local Exhaust Equipment; G (CME)” “Pressure Differential Log; G (CME)”

SECTION 01 45 00.00 33 – QUALITY CONTROL

Delete the following portion from paragraph 1.5.1.2 Qualifications:

“A graduate of a four year accredited college or university program in one of the following disciplines:

Engineering, Architecture, Construction Management, Engineering Technology, Building Construction, or Building Science, with a minimum of 10 years experience as a Project Superintendant, QC Manager, Project Manager, Project Engineer or Construction Manager on similar size and type construction contracts which included the major trades that are part of this Contract. The individual must have at least two years experience as a QC Manager. The individual must be familiar with the requirements of EM 385-1-1, and have experience in the areas of hazard identification, safety compliance, and sustainability.”

Add the following paragraph:

“1.5.5 Diving Method SCUBA operations are prohibited and must not be proposed. The Contracting Officer may authorize SCUBA operations should an occasion arise that diving operations would become unviable without the use of SCUBA.”

SECTION 01 50 00.00 33 – TEMPORARY FACILITIES AND CONTROLS

Revise the following paragraph from:

“3.5 TEMPORARY PROJECT SAFETY FENCING

As soon as practicable, but not later than 15 days after the date established for commencement of work, furnish and erect temporary project safety fencing at the work site. Maintain the safety fencing during the life of the contract and, upon completion and acceptance of the work, will become the property of the Contractor and be removed from the work site.”

Masayo.Sonoda.JA Highlight

Amendment #0003, Page 3 of 6

To:

“3.5 TEMPORARY PROJECT SAFETY AND SECURITY FENCING

As soon as practicable, but not later than 15 days after the date established for commencement of work, furnish and erect temporary project safety and security fencing at the work site. Maintain the safety and security fencing during the life of the contract and, upon completion and acceptance of the work, will become the property of the Contractor and be removed from the work site.”

SECTION 02 41 00.00 33 – DEMOLITION

“3.2.2.1.1 Government test result Government lead test result is attached end of this section.”

To the following and add the file, “Attachment 1_Bollard paint sampling locations.pdf” to the attachments.

“3.2.2.1.1 Government test result

Government paint sampling locations and lead sampling results are attached at the end of this section.”

Delete the following paragraph and subparagraph in their entirety and adjust the numbers of the succeeding paragraphs:

“3.2.2.1.2 Contractor’s Survey Perform lead, cadmium and chromium (VI) survey in accordance with EPA Title X and EPA RRP Rule before start of removal work.

Submit all laboratory reports to the Government. List the areas, types, locations, definition of non-detected and determination (Not use 0.5%, 5000 mg/Kg, and 0.06%.), and quantities (mg/kg) of lead, cadmium and chromium (VI) and any contamination that will affect the project, including soil and dust.

Provide sample descriptions, results, locations, location maps, and photographic documentation. Lead, cadmium and chromium (VI) sampling work must be done by an inspector or risk assessor who is trained and certified by the US EPA authorized certification and accreditation program. Testing laboratory must comply with following paragraph “Testing Laboratory”.

If the contractor suspects the presence of lead, cadmium and chromium (VI) in a location not identified within the table under paragraph "Government assumption without test data", the contractor may conduct survey/sampling at its own expense. If sampled and analyzed items on the laboratory report are confirmed to contain lead, cadmium and chromium (VI), a modification may be issued for the cost of the sampling, testing, abatement, and disposal.

3.2.2.1.2.1 Testing Laboratory

Submit the name, address, and telephone number of the testing laboratory selected to perform the analysis, testing, and reporting of concentrations (mg/kg) of lead, cadmium and chromium (VI). Use a laboratory participating in the EPA National Lead Laboratory Accreditation Program (NLLAP) by being accredited by either the American Association for Laboratory Accreditation (A2LA) or the American Industrial Hygiene Association (AIHA) and that is successfully participating in the Environmental Lead Proficiency Analytical Testing (ELPAT) program to perform sample analysis. The testing laboratory firm must be independent of the lead, cadmium and chromium (VI) contractor and must have no employee or employer relationship which could constitute a conflict of interest.”

SECTION 02 83 00.00 33 – LEAD REMEDIATION

Delete the following item from paragraph 1.1 REFERENCES:

“AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

Masayo.Sonoda.JA Highlight

Masayo.Sonoda.JA Highlight

Amendment #0003, Page 4 of 6

CUI // FEDCON

ASSP Z9.2 Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems”

Delete the following items from paragraph 1.4 SUBMITTALS:

“Negative Air Pressure System; G (CME)”

“Local Exhaust Equipment; G (CME)” “Pressure Differential Log; G (CME)”

Delete the following paragraphs and subparagraphs in their entirety and adjust the numbers of the succeeding paragraphs:

“1.5.3 Pressure Differential Recordings for Local Exhaust System Provide a local exhaust system that creates a negative pressure of at least 0.51 mm of water relative to the pressure external to the enclosure and operate it continuously, 24-hours a day, until the temporary enclosure of the lead, cadmium, chromium (VI) control area is removed. Submit pressure differential recordings for each work day to the PQP and GC for review and to the Contracting Officer within 24-hours from the end of each work day.”

“1.6.7 Negative Air Pressure System

1.6.7.1 Minimum Requirements

Do not proceed with work in the area until containment is set up and HEPA filtration systems are in place. The negative air pressure system must meet the requirements of ASSP Z9.2 including approved HEPA filters in accordance with UL 586. Negative air pressure equipment must be equipped with new HEPA filters, and be sufficient to maintain a minimum pressure differential of minus 0.005 kPa relative to adjacent, unsealed areas. Negative air pressure system minimum requirements are listed as follows:

a. The unit must be capable of delivering its rated volume of air with a clean first stage filter, an intermediate filter and a primary HEPA filter in place.

b. The HEPA filter must be certified as being capable of trapping and retaining mono-disperse particles as small as 0.3 micrometers at a minimum efficiency of 99.97 percent.

c. The unit must be capable of continuing to deliver no less than 70 percent of rated capacity when the HEPA filter is 70 percent full or measures 0.625 kPa static pressure differential on a magnehelic gauge.

d. Equip the unit with a manometer-type negative pressure differential monitor with minor scale division of 0.005 kPa and accuracy within plus or minus 1.0 percent.

e. Equip the unit with a means for the operator to easily interpret the readings in terms of the volumetric flow rate of air per minute moving through the machine at any given moment.

f. Equip the unit with an electronic mechanism that automatically shuts the machine off in the event of a filter breach or absence of a filter.

g. Equip the unit with an audible horn that sounds an alarm when the machine has shut itself off.

h. Equip the unit with an automatic safety mechanism that prevents a worker from improperly inserting the main HEPA filter.

1.6.7.2 Auxiliary Generator

Provide an auxiliary generator with capacity to power a minimum of 50 percent of the negative air machines at any time during the work. When power fails, the generator controls must automatically start the generator and switch the negative air pressure system machines to generator power. The generator must not present a carbon monoxide hazard to workers.”

“3.1.1.3 Negative Air Pressure System Containment

Amendment #0003, Page 5 of 6

CUI // FEDCON

a. Operate the negative air pressure systems to provide at least 4 air changes per hour inside the containment. Operate the local exhaust unit equipment continuously until the containment is removed.

Smoke test the negative air pressure system for leaks at the beginning of each shift. The certified supervisor is responsible to continuously monitor and keep a pressure differential log with an automatic manometric recording instrument. Notify the Contracting Officer immediately if the pressure differential falls below the prescribed minimum. Submit the continuously monitored pressure differential log, as specified. Do not use the building ventilation system as the local exhaust system. Terminate the local exhaust system out of doors unless the Contracting Officer allows an alternate arrangement. All filters must be new at the beginning of the project and be periodically changed as necessary to maintain specified pressure differential and disposed of as lead, cadmium and chromium (VI) contaminated waste.

b. Discontinuing Negative Air Pressure System. Operate the negative air pressure system continuously during abatement activities unless otherwise authorized by the Contracting Officer. At the completion of the project, units must be run until full cleanup has been completed and final clearance testing requirements have been met. Dismantling of the negative air pressure systems must conform to written decontamination procedures be as presented in the Lead, Cadmium, Chromium (VI) Compliance Plan.

Seal the HEPA filter machine intakes with polyethylene to prevent environmental contamination.

3.1.1.4 Decontamination Shower Facility

Provide clean and contaminated change rooms and shower facilities in accordance with this specification and 29 CFR 1926.62, 29 CFR 1926.1126, 29 CFR 1926.1127.

3.1.1.5 Mechanical Ventilation System

a. Use adequate ventilation to control personnel exposure to lead, cadmium and chromium (VI) in accordance with 29 CFR 1926.62, 29 CFR 1926.1126, 29 CFR 1926.1127. To the extent feasible, use local exhaust ventilation or other collection systems, approved by the CP. Evaluate and maintain local exhaust ventilation systems in accordance with 29 CFR 1926.62, 29 CFR 1926.1126, 29 CFR 1926.1127.

b. Vent local exhaust outside the building and away from building ventilation intakes or ensure system is connected to HEPA filters.

c. Use locally exhausted, power actuated tools or manual hand tools.”

“3.5.2.2 Disposal Documentation Coordinate all disposal or off-site shipments of lead, cadmium, and chromium (VI) waste with the host installation environmental function. Submit written evidence of TSD approval to demonstrate the hazardous waste treatment, storage, or disposal facility (TSD) is approved for lead, cadmium, chromium (VI) disposal by the local, prefectural, or GOJ environmental regulatory agencies. Submit one copy of the completed manifest signed and dated by the initial transporter, and one copy of completed manifest signed and dated by the treatment or disposal.

3.5.2.3 Payment for lead, cadmium, chromium (VI) waste

Payment for disposal of lead, cadmium, chromium (VI) waste will not be made until a signed copy of the manifest from the treatment or disposal facility is received and approved by the Contracting Officer. The manifest must detail and certify the amount of lead, cadmium, chromium (VI) containing waste delivered to the treatment or disposal facility.”

Delete the following portion from paragraph 3.2.1 Lead, Cadmium, Chromium (VI) Control Area Requirements:

“Full containment - Contain removal operations by the use of a negative pressure enclosure system with decontamination facilities and with HEPA filtered exhaust if required by the CP. “

Amendment #0003, Page 6 of 6

CUI // FEDCON

Revise item d in paragraph 3.5.2 Disposal, from:

d. Dispose of lead, cadmium, chromium (VI) contaminated material classified as hazardous waste at the GOJ approved Off-Base hazardous waste treatment, storage, or disposal facility off Government property. Turn-in lead, cadmium, chromium (VI) contaminated material classified as hazardous waste to Government’s storage facility as Government property.

d. Turn-in lead, cadmium, chromium (VI) contaminated material classified as hazardous waste to Government Recycling Center as Government property.

Revise item e in paragraph 3.5.2 Disposal, from:

e. Turn-in metals with firmly adhered PWL classified as scrap metal to Government’s storage facility as Government property.

e. Turn-in bollards and other metals with firmly adhered lead (MCL/PWL), cadmium, chromium (VI) classified as scrap metal to Government Recycling Center as Government property.

SECTION 03 01 30.71 33 – CONCRETE REHABILITATION

“3.4 BOLLARD PULLING TEST

Conduct bollard pulling test after the 28-day compressive strength of the filling concrete has been verified. Conduct test in accordance with precautions and procedures provided in UFC 4-150-08 MOORING HARDWARE INSPECTION. Loading must be increased incrementally from 10% up to 110% of the pulling load and must be held for 10 minutes when the final 110% is reached. The pulling loads to be applied at each bollard must be discussed with and approved by the Contracting Officer.”

To:

“3.4 BOLLARD PULLING TEST

Conduct bollard pulling test after the 28-day compressive strength of the filling concrete has been verified. Conduct test in accordance with precautions and procedures provided in UFC 4-150-08 MOORING HARDWARE INSPECTION. Loading must be increased incrementally from 10% up to 110% of the pulling load and must be held for 10 minutes when the final 110% is reached. The pulling loads to be applied at each bollard must be discussed with and approved by the Contracting Officer with reference to the withstand load indicated on the drawings.”

- End of Amendment -