| Roofing Indefinite Delivery Indefinite Quantity Work |
| PROVIDE UNIT PRICES FOR LINE ITEMS BELOW IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS AND DRAWINGS. |
| Bidder / Company Name: |
| Printed Name and Signature: Date: |
ITEM NO. SUPPLIES/ SERVICES Total Amount (in JPY)
| A0001 ~ A0001CQ | Ordering Period 1: All supplies and services for line item A0001 through A0001CQ | ¥21,000,000 |
| B0001 ~ B0001CQ | Ordering Period 2: All supplies and services for line item B0001 through B0001CQ | ¥21,000,000 |
| C0001 ~ C0001CQ | Ordering Period 3: All supplies and services for line item C0001 through C0001CQ | ¥21,000,000 |
| D0001 ~ D0001CQ | Ordering Period 4: All supplies and services for line item D0001 through D0001CQ | ¥21,000,000 |
| E0001 ~ E0001CQ | Ordering Period 5: All supplies and services for line item E0001 through E0001CQ | ¥21,000,000 |
| TOTAL ( Base Period): CLIN 0001 | | ¥105,000,000 |
| F0001 ~ F0002CQ | Ordering Period 6: All supplies and services for line item F0001 through F0001CQ | ¥21,000,000 |
| G0001 ~G0002CQ | Ordering Period 7: All supplies and services for line item G0001 through G0001CQ | ¥21,000,000 |
| H0001 ~ H0002CQ | Ordering Period 8: All supplies and services for line item H0001 through H0001CQ | ¥21,000,000 |
| TOTAL ( Option Period 1): CLIN 0002 | | ¥63,000,000 |
TOTAL CONTRACT AMOUNT ¥168,000,000
Abbreviations used:
CUI // FEDCON [When filled in] Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised#3 Roofing IDIQ ELIN Schedule 25Jul2022
Source Selection Information--See FAR 2.101 and 3.104 [When filled in]
BASE YEAR 1 LINE ITEMS
| BASE PERIOD - ORDER PERIOD 1 PERIOD OF "1 YEAR FROM DATE OF AWARD" | | | REFERNCE NO. OF DOCUMENT | | | PAGES 1 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| A0001 | | BASE PERIOD - ORDER PERIOD 1 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from A0001AA to A0001CQ. | | | | |
| | Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials | | | | |
| I | | REMOVAL WORK | | | | |
| | The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property | | | | |
| A0001AA | | Remove existing roofing system without insulation to bare substrate. | 8,000 | M2 | | ¥0 |
| A0001AB | | Remove existing roofing system with insulation to bare substrate. | 18,000 | M2 | | ¥0 |
| A0001AC | | Prepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa). | 63,000 | M2 | | ¥0 |
| A0001AD | | Remove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate. | 5,000 | M2 | | ¥0 |
| A0001AE | | Remove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate | 12,000 | M2 | | ¥0 |
| A0001AF | | Remove existing 2 ply built-up membrane | 200 | M2 | | ¥0 |
| A0001AG | | Remove existing insulation | 200 | M2 | | ¥0 |
| A0001AH | | Remove existing waterproof silicone roofing system to bare substrate | 400 | M2 | | ¥0 |
| A0001AI | | Remove and store tarpaulin | 400 | M2 | | ¥0 |
| | Sub-total Removal | | | | ¥0 |
| II | | ROOFING INSTALLATION WORK | | | | |
| | Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system | | | | |
| A0001AJ | | Cover for High power lines | 130 | LM | | ¥0 |
| A0001AK | 07 52 00 Para 1.3 | Provide new 2 ply roofing membrane | 200 | M2 | | ¥0 |
| A0001AL | | Provide new ceiling insulation (Minimum thermal resistance (R) value shall be 38). | 400 | M2 | | ¥0 |
| A0001AM | 07 14 00 Para 1.2 | Provide and Install New Reflective Roof Coating System | 8,500 | M2 | | ¥0 |
| A0001AN | 07 14 00 Para 1.2 | Provide and Install new Waterproof and Reflective Roofing System (Insulation included). | 65,000 | M2 | | ¥0 |
| A0001AO | | Place tarpaulin sheet cover and provide new Sand Bags and accessories | 400 | M2 | | ¥0 |
| | Sub-total Roofing | | | | ¥0 |
| III | | FLASHING AND MISCELLANEOUS WORK | | | | |
| | Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other related items | | | | |
| A0001AP | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 24-inch (609 mm) width. | 125 | M | | ¥0 |
| A0001AQ | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 36-inch (915 mm) width | 100 | M | | ¥0 |
| A0001AR | 05 50 13 Para 1.2 | Expansion joint cover, angular joint, maximum of 24 inch | 100 | M | | ¥0 |
| A0001AS | N/A | N/A | N/A | N/A | | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 2 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| A0001AT | 05 50 13 Para 1.2 | Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing | 10 | EA | | ¥0 |
| A0001AU | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing. | 100 | EA | | ¥0 |
| A0001AV | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring | 50 | EA | | ¥0 |
| A001AW | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes | 50 | EA | | ¥0 |
| A0001AX | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors. | 50 | M | | ¥0 |
| A0001AY | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors. | 50 | M | | ¥0 |
| A0001AZ | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors. | 50 | M | | ¥0 |
| A0001BA | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors. | 50 | M | | ¥0 |
| A0001BB | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors | 50 | M | | ¥0 |
| A0001BC | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors. | 50 | M | | ¥0 |
| A0001BD | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| A0001BE | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| A0001BF | 07 60 00 Para 1.2 | Roof Ventilator flashing | 50 | EA | | ¥0 |
| A0001BG | N/A | N/A | N/A | N/A | | |
| A0001BH | 07 60 00 Para 1.2 | Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2) | 10 | EA | | ¥0 |
| A0001BI | 05 50 13 Para 1.2 | Smoke stack flashing | 50 | EA | | ¥0 |
| A0001BJ | N/A | N/A | N/A | N/A | | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 3 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| A0001BK | 05 50 13 Para 2.1.2 | Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing | 50 | EA | | ¥0 |
| A0001BL | N/A | N/A | N/A | N/A | | |
| A0001BM | 05 30 53 Para 1.5 | Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum | 10 | EA | | ¥0 |
| A0001BN | 05 50 13 Para 1.2 | Remove and reinstall existing roof edge mounted TV antenna support | 10 | EA | | ¥0 |
| A0001BO | 03 30 53 Para 1.5 | Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work | 25 | M2 | | ¥0 |
| A0001BP | N/A | N/A | N/A | N/A | | |
| A0001BQ | 07 60 00 Para 1.2 | Roof mounted equipment flashing on existing concrete mounting pad | 10 | M | | ¥0 |
| A0001BR | N/A | N/A | N/A | N/A | | |
| A0001BS | 05 50 13 Para 1.2 | Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle. | 10 | EA | | ¥0 |
| A0001BT | 07 60 00 Para 1.2 | Provide new cage ladders, Type-1, maximum of 2,440m | 1 | EA | | ¥0 |
| A0001BU | 07 60 00 Para 1.2 | Provide new cage ladders, Type -2, maximum of 4,166 m | 1 | EA | | ¥0 |
| A0001BV | 07 60 00 Para 1.2 | Provide new cage ladders, Type -3 maximum of 5,385 m | 1 | EA | | ¥0 |
| A0001BW | 05 50 13 Para 1.2 | Provide steel rain guard/diverter | 10 | M | | ¥0 |
| | Sub-total Flashing | | | | ¥0 |
| IV | | SEALING AND CONCRETE WORK | | | | |
| | Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work | | | | |
| A0001BX | 07 92 00 Para 1.2 | Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area | 100 | M2R | | ¥0 |
| A0001BY | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking. | 2,250 | M | | ¥0 |
| A0001BZ | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking and rubberized felt | 50 | M | | ¥0 |
| A0001CA | 07 52 00 Para 1.3 | Repair and patch existing roof felts/system for preparation to apply reflective coating | 2,700 | M2 | | ¥0 |
| A0001CB | 07 14 00 Para 3.1.3 | Repair concrete cracks by sealing with new pressure injected epoxy resin. | 1,000 | M | | ¥0 |
| A0001CC | 07 14 00 Para 3.1.3 | Repair concrete cracks by new caulking and reseal with new elastomeric slip | 100 | M | | ¥0 |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 4 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| IV | | SEALING AND CONCRETE WORK (Cont) | | | | |
| A0001CD | 05 30 53 Para 1.5 | Repair damaged concrete parapets and repair concrete spalls with new epoxy concrete | 600 | M2 | | ¥0 |
| A0001CE | 05 30 53 Para 1.5 | Filling of concrete gutter with new epoxy concrete, maximum of 4 inch thick (100mm) | 10 | M2 | | ¥0 |
| A0001CF | 05 50 13 Para 2.1.8 | Replace metal roofing with new factory paint finish metal roofing sheet complete with trim and fasteners | 500 | M2 | | ¥0 |
| A0001CG | 05 50 13 Para 2.1.8 | Fix hole in metal roof by applying metal sheets. | 100 | M2 | | ¥0 |
| A0001CH | 09 90 00 Para 1.2 | Painting of Parapets and Concrete Surfaces | 500 | M2 | | ¥0 |
| | Sub-total Sealing | | | | ¥0 |
| V | | SCAFFOLDING FOR SPECIAL BUILDINGS | | | | |
| A0001CI | | Scaffolding for Brigs and Special Buildings | 1,500 | M2 | | ¥0 |
| A0001CJ | | Scaffolding for Hangars (Special Buildings) | 1,000 | M2 | | ¥0 |
| | Sub-total Scaffolding | | | | ¥0 |
| VI | | THE CONTRACTOR SHALL PROVIDE THE FOLLOWING URGENT REQUIRED BY THE CONTRACTING OFFICER | | | | |
| A0001CK | | Urgent response charge (OC=Occurrence) | 100 | OC | | ¥0 |
| A0001CL | | Urgent Material required, air freight | 100 | KG | | ¥0 |
| | Sub-total Urgent Response | | | | ¥0 |
| VII | | CONTRACTOR TO PROVIDE NON-SPECIFIC WORK | | | | |
| A0001CM | | Non-specific work | 1 | NTE | ¥21,000,000 | ¥21,000,000 |
| | Sub-total Non-Specific Work | | | | ¥21,000,000 |
| VIII | | INDICATE THE COST PERCENTAGE REQUIRED WHEN WORK REQUESTED WILL BE IN IE SHIMA, U. S. MILITARY INSTALLATIONS | | | | |
| A0001CN | | The work will be in Ie Shima and JWTC, how many percentage of cost shall be added to each Unit Price of all Line items above. | 15 | % | NA | NA |
| VIV | | ACM and LBP | | | | |
| A0001CO | | ACM sampling and test. | 10 | EA | | ¥0 |
| A0001CP | | LBP sampling and test. | 10 | EA | | ¥0 |
| A0001CQ | N/A | N/A | N/A | N/A | | |
| | Sub-Total ACM and LBP | | | | ¥0 |
| | TOTAL PRICE FOR CONTRACT LINE ITEMS | | | | |
| | FOR BASE YEAR 1 PERIOD, A0001AA THRU A0001CQ | | | | ¥21,000,000 |
Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised#2 Roofing IDIQ ELIN Schedules 22Jul2022
Source Selection Information--See FAR 2.101 and 3.104 [When filled in]
BASE YEAR 2 LINE ITEMS
| BASE PERIOD - ORDER PERIOD 2 | | | REFERNCE NO. OF DOCUMENT | | | PAGES 1 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| B0001 | | BASE PERIOD - ORDER PERIOD 1- SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR FIRST OPTION PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. | | | | |
Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from B0001AA to B0001CQ.
| | Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials | | | |
| I | | REMOVAL WORK | | | |
| | The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property | | | |
| B0001AA | | Remove existing roofing system without insulation to bare substrate. | 8,000 | M2 | ¥0 |
| B0001AB | | Remove existing roofing system with insulation to bare substrate. | 18,000 | M2 | ¥0 |
| B0001AC | | Prepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa). | 63,000 | M2 | ¥0 |
| B0001AD | | Remove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate. | 5,000 | M2 | ¥0 |
| B0001AE | | Remove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate | 12,000 | M2 | ¥0 |
| B0001AF | | Remove existing 2 ply built-up membrane | 200 | M2 | ¥0 |
| B0001AG | | Remove existing insulation | 200 | M2 | ¥0 |
| B0001AH | | Remove existing waterproof silicone roofing system to bare substrate | 400 | M2 | ¥0 |
| B0001AI | | Remove and store tarpaulin | 400 | M2 | ¥0 |
| | Sub-Total Removal | | | ¥0 |
| II | | ROOFING INSTALLATION WORK | | | |
| | Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system | | | |
| A0001AJ | | Cover for High power lines | 130 | LM | ¥0 |
| B0001AK | 07 52 00 Para 1.3 | Provide new 2 ply roofing membrane | 200 | M2 | ¥0 |
| B0001AL | | Provide new ceiling insulation (Minimum thermal resistance (R) value shall be 38). | 400 | M2 | ¥0 |
| B0001AM | 07 14 00 Para 1.2 | Provide and Install New Reflective Roof Coating System | 8,500 | M2 | ¥0 |
| B0001AN | 07 14 00 Para 1.2 | Provide and Install new Waterproof and Reflective Roofing System (Insulation included). | 65,000 | M2 | ¥0 |
| B0001AO | | Place tarpaulin sheet cover and provide new Sand Bags and accessories | 400 | M2 | ¥0 |
| | Sub-Total Roofing | | | ¥0 |
| III | | FLASHING AND MISCELLANEOUS WORK | | | |
| | Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other rela | | | |
| B0001AP | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 24-inch (609 mm) width. | 125 | M | ¥0 |
| B0001AQ | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 36-inch (915 mm) width | 100 | M | ¥0 |
| B0001AR | 05 50 13 Para 1.2 | Expansion joint cover, angular joint, maximum of 24 inch | 100 | M | ¥0 |
| B0001AS | N/A | N/A | N/A | N/A | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 2 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| B0001AT | 05 50 13 Para 1.2 | Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing | 10 | EA | | ¥0 |
| B0001AU | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing. | 100 | EA | | ¥0 |
| B0001AV | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring | 50 | EA | | ¥0 |
| B0001AW | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes | 50 | EA | | ¥0 |
| B0001AX | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors. | 50 | M | | ¥0 |
| B0001AY | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors. | 50 | M | | ¥0 |
| B0001AZ | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors. | 50 | M | | ¥0 |
| B0001BA | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors. | 50 | M | | ¥0 |
| B0001BB | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors | 50 | M | | ¥0 |
| B0001BC | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors. | 50 | M | | ¥0 |
| B0001BD | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| B0001BE | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| B001BF | 07 60 00 Para 1.2 | Roof Ventilator flashing | 50 | EA | | ¥0 |
| B0001BG | N/A | N/A | N/A | N/A | | |
| B0001BH | 07 60 00 Para 1.2 | Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2) | 10 | EA | | ¥0 |
| B0001BI | 05 50 13 Para 1.2 | Smoke stack flashing | 50 | EA | | ¥0 |
| B0001BJ | N/A | N/A | N/A | N/A | | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 3 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| B0001BK | 05 50 13 Para 2.1.2 | Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing | 50 | EA | | ¥0 |
| B0001BL | N/A | N/A | N/A | N/A | | |
| B0001BM | 05 30 53 Para 1.5 | Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum | 10 | EA | | ¥0 |
| B0001BN | 05 50 13 Para 1.2 | Remove and reinstall existing roof edge mounted TV antenna support | 10 | EA | | ¥0 |
| B0001BO | 03 30 53 Para 1.5 | Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work | 25 | M2 | | ¥0 |
| B0001BP | N/A | N/A | N/A | N/A | | |
| B0001BQ | 07 60 00 Para 1.2 | Roof mounted equipment flashing on existing concrete mounting pad | 10 | M | | ¥0 |
| B0001BR | N/A | N/A | N/A | N/A | | |
| B0001BS | 05 50 13 Para 1.2 | Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle. | 10 | EA | | ¥0 |
| B0001BT | 07 60 00 Para 1.2 | Provide new cage ladders, Type-1, maximum of 2,440m | 1 | EA | | ¥0 |
| B0001BU | 07 60 00 Para 1.2 | Provide new cage ladders, Type -2, maximum of 4,166 m | 1 | EA | | ¥0 |
| B0001BV | 07 60 00 Para 1.2 | Provide new cage ladders, Type -3 maximum of 5,385 m | 1 | EA | | ¥0 |
| B0001BW | 05 50 13 Para 1.2 | Provide steel rain guard/diverter | 10 | M | | ¥0 |
| | Sub-Total Flashing | | | | ¥0 |
| IV | | SEALING AND CONCRETE WORK | | | | |
| | Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work | | | | |
| B0001BX | 07 92 00 Para 1.2 | Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area | 100 | M2R | | ¥0 |
| B0001BY | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking. | 2,250 | M | | ¥0 |
| B0001BZ | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking and rubberized felt | 50 | M | | ¥0 |
| B0001CA | 07 52 00 Para 1.3 | Repair and patch existing roof felts/system for preparation to apply reflective coating | 2,700 | M2 | | ¥0 |
| B0001CB | 07 14 00 Para 3.1.3 | Repair concrete cracks by sealing with new pressure injected epoxy resin. | 1,000 | M | | ¥0 |
| B0001CC | 07 14 00 Para 3.1.3 | Repair concrete cracks by new caulking and reseal with new elastomeric slip | 100 | M | | ¥0 |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 4 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| IV | | SEALING AND CONCRETE WORK (Cont) | | | | |
| B0001CD | 05 30 53 Para 1.5 | Repair damaged concrete parapets and repair concrete spalls with new epoxy concrete | 600 | M2 | | ¥0 |
| B0001CE | 05 30 53 Para 1.5 | Filling of concrete gutter with new epoxy concrete, maximum of 4 inch thick (100mm) | 10 | M2 | | ¥0 |
| B0001CF | 05 50 13 Para 2.1.8 | Replace metal roofing with new factory paint finish metal roofing sheet complete with trim and fasteners | 500 | M2 | | ¥0 |
| B0001CG | 05 50 13 Para 2.1.8 | Fix hole in metal roof by applying metal sheets. | 100 | M2 | | ¥0 |
| B0001CH | 09 90 00 Para 1.2 | Painting of Parapets and Concrete Surfaces | 500 | M2 | | ¥0 |
| | Sub-Total Sealing | | | | ¥0 |
| V | | SCAFFOLDING FOR SPECIAL BUILDINGS | | | | |
| B0001CI | | Scaffolding for Brigs and Special Buildings | 1,500 | M2 | | ¥0 |
| B0001CJ | | Scaffolding for Hangars (Special Buildings) | 1,000 | M2 | | ¥0 |
| | Sub-Total Scaffolding | | | | ¥0 |
| VI | | THE CONTRACTOR SHALL PROVIDE THE FOLLOWING URGENT REQUIRED BY THE CONTRACTING OFFICER | | | | |
| B0001CK | | Urgent response charge (OC=Occurrence) | 100 | OC | | ¥0 |
| B0001CL | | Urgent Material required, air freight | 100 | KG | | ¥0 |
| | Sub-total Urgent Response | | | | ¥0 |
| VII | | CONTRACTOR TO PROVIDE NON-SPECIFIC WORK | | | | |
| B0001CM | | Non-specific work | 1 | NTE | ¥21,000,000 | ¥21,000,000 |
| | Sub-total Non-Specific Work | | | | ¥21,000,000 |
| VIII | | INDICATE THE COST PERCENTAGE REQUIRED WHEN WORK REQUESTED WILL BE IN IE SHIMA, U. S. MILITARY INSTALLATIONS | | | | |
| B0001CN | | The work will be in Ie Shima and JWTC, how many percentage of cost shall be added to each Unit Price of all Line items above. | 15 | % | NA | NA |
| VIV | | ACM and LBP | | | | |
| B0001CO | | ACM sampling and test. | 10 | EA | | ¥0 |
| B0001CP | | LBP sampling and test. | 10 | EA | | ¥0 |
| B0001CQ | N/A | N/A | N/A | N/A | | |
| | Sub-Total ACM and LBP | | | | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS | |
| FORBASE PERIOD - ORDER PERIOD 2, B0001AA THRU B0001CQ | ¥21,000,000 |
Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised#2 Roofing IDIQ ELIN Schedules 22Jul2022
Source Selection Information--See FAR 2.101 and 3.104 [When filled in]
BASE YEAR 3 LINE ITEMS
| BASE PERIOD - ORDER PERIOD 3 | | | REFERNCE NO. OF DOCUMENT | | | PAGES 1 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| C0001 | | BASE PERIOD - ORDER PERIOD 3 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR SECOND OPTION PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from C0001AA to C0001CQ. | | | | |
| | Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials | | | | |
| I | | REMOVAL WORK | | | | |
| | The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property | | | | |
| C0001AA | | Remove existing roofing system without insulation to bare substrate. | 8,000 | M2 | | ¥0 |
| C0001AB | | Remove existing roofing system with insulation to bare substrate. | 18,000 | M2 | | ¥0 |
| C0001AC | | Prepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa). | 63,000 | M2 | | ¥0 |
| C0001AD | | Remove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate. | 5,000 | M2 | | ¥0 |
| C0001AE | | Remove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate | 12,000 | M2 | | ¥0 |
| C0001AF | | Remove existing 2 ply built-up membrane | 200 | M2 | | ¥0 |
| C0001AG | | Remove existing insulation | 200 | M2 | | ¥0 |
| C0001AH | | Remove existing waterproof silicone roofing system to bare substrate | 400 | M2 | | ¥0 |
| C0001AI | | Remove and store tarpaulin | 400 | M2 | | ¥0 |
| | Sub-Total Removal | | | | ¥0 |
| II | | ROOFING INSTALLATION WORK | | | | |
| | Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system | | | | |
| C0001AJ | | Cover for High power lines | 130 | LM | | ¥0 |
| C0001AK | 07 52 00 Para 1.3 | Provide new 2 ply roofing membrane | 200 | M2 | | ¥0 |
| C0001AL | 07 22 00 Para 1.2 | Provide new ceiling insulation (Minimum thermal resistance (R) value shall be 38). | 400 | M2 | | ¥0 |
| C0001AM | 07 14 00 Para 1.2 | Provide and Install New Reflective Roof Coating System | 8,500 | M2 | | ¥0 |
| C0001AN | 07 14 00 Para 1.2 | Provide and Install new Waterproof and Reflective Roofing System (Insulation included). | 65,000 | M2 | | ¥0 |
| C0001AO | | Place tarpaulin sheet cover and provide new Sand Bags and accessories | 400 | M2 | | ¥0 |
| | Sub-Total Roofing | | | | ¥0 |
| III | | FLASHING AND MISCELLANEOUS WORK | | | | |
| | Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other rela | | | | |
| C0001AP | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 24-inch (609 mm) width. | 125 | M | | ¥0 |
| C0001AQ | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 36-inch (915 mm) width | 100 | M | | ¥0 |
| C0001AR | 05 50 13 Para 1.2 | Expansion joint cover, angular joint, maximum of 24 inch | 100 | M | | ¥0 |
| C0001AS | N/A | N/A | N/A | N/A | | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
CONTINUATION SHEET REFERNCE NO. OF DOCUMENT BEING CONTINUED PAGES 2 OF 4
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| C0001AT | 05 50 13 Para 1.2 | Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing | 10 | EA | | ¥0 |
| C0001AU | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing. | 100 | EA | | ¥0 |
| C0001AV | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring | 50 | EA | | ¥0 |
| C0001AW | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes | 50 | EA | | ¥0 |
| C0001AX | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors. | 50 | M | | ¥0 |
| C0001AY | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors. | 50 | M | | ¥0 |
| C0010AZ | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors. | 50 | M | | ¥0 |
| C0001BA | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors. | 50 | M | | ¥0 |
| C0001BB | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors | 50 | M | | ¥0 |
| C0001BC | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors. | 50 | M | | ¥0 |
| C0001BD | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| C0010BE | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| C0001BF | 07 60 00 Para 1.2 | Roof Ventilator flashing | 50 | EA | | ¥0 |
| C0001BG | N/A | N/A | N/A | N/A | | |
| C0001BH | 07 60 00 Para 1.2 | Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2) | 10 | EA | | ¥0 |
| C0001BI | 05 50 13 Para 1.2 | Smoke stack flashing | 50 | EA | | ¥0 |
| C0001BJ | N/A | N/A | N/A | N/A | | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 3 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| C0001BK | 05 50 13 Para 2.1.2 | Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing | 50 | EA | | ¥0 |
| C0001BL | N/A | N/A | N/A | N/A | | |
| C0001BM | 05 30 53 Para 1.5 | Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum | 10 | EA | | ¥0 |
| C001BN | 05 50 13 Para 1.2 | Remove and reinstall existing roof edge mounted TV antenna support | 10 | EA | | ¥0 |
| C001BO | 03 30 53 Para 1.5 | Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work | 25 | M2 | | ¥0 |
| C0001BP | N/A | N/A | N/A | N/A | | |
| C0001BQ | 07 60 00 Para 1.2 | Roof mounted equipment flashing on existing concrete mounting pad | 10 | M | | ¥0 |
| C0001BR | N/A | N/A | N/A | N/A | | |
| C0001BS | 05 50 13 Para 1.2 | Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle. | 10 | EA | | ¥0 |
| C0001BT | 07 60 00 Para 1.2 | Provide new cage ladders, Type-1, maximum of 2,440m | 1 | EA | | ¥0 |
| C0001BU | 07 60 00 Para 1.2 | Provide new cage ladders, Type -2, maximum of 4,166 m | 1 | EA | | ¥0 |
| C0001BV | 07 60 00 Para 1.2 | Provide new cage ladders, Type -3 maximum of 5,385 m | 1 | EA | | ¥0 |
| C0001BW | 05 50 13 Para 1.2 | Provide steel rain guard/diverter | 10 | M | | ¥0 |
| | Sub-Total Flashing | | | | ¥0 |
| IV | | SEALING AND CONCRETE WORK | | | | |
| | Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work | | | | |
| C0001BX | 07 92 00 Para 1.2 | Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area | 100 | M2R | | ¥0 |
| C0001BY | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking. | 2,250 | M | | ¥0 |
| C0001BZ | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking and rubberized felt | 50 | M | | ¥0 |
| C0001CA | 07 52 00 Para 1.3 | Repair and patch existing roof felts/system for preparation to apply reflective coating | 2,700 | M2 | | ¥0 |
| C0001CB | 07 14 00 Para 3.1.3 | Repair concrete cracks by sealing with new pressure injected epoxy resin. | 1,000 | M | | ¥0 |
| C0001CC | 07 14 00 Para 3.1.3 | Repair concrete cracks by new caulking and reseal with new elastomeric slip | 100 | M | | ¥0 |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 4 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| IV | | SEALING AND CONCRETE WORK (Cont) | | | | |
| C0001CD | 05 30 53 Para 1.5 | Repair damaged concrete parapets and repair concrete spalls with new epoxy concrete | 600 | M2 | | ¥0 |
| C0001CE | 05 30 53 Para 1.5 | Filling of concrete gutter with new epoxy concrete, maximum of 4 inch thick (100mm) | 10 | M2 | | ¥0 |
| C0001CF | 05 50 13 Para 2.1.8 | Replace metal roofing with new factory paint finish metal roofing sheet complete with trim and fasteners | 500 | M2 | | ¥0 |
| C0001CG | 05 50 13 Para 2.1.8 | Fix hole in metal roof by applying metal sheets. | 100 | M2 | | ¥0 |
| C0001CH | 09 90 00 Para 1.2 | Painting of Parapets and Concrete Surfaces | 500 | M2 | | ¥0 |
| | Sub-Total Sealing | | | | ¥0 |
| V | | SCAFFOLDING FOR SPECIAL BUILDINGS | | | | |
| C0001CI | | Scaffolding for Brigs and Special Buildings | 1,500 | M2 | | ¥0 |
| C0001CJ | | Scaffolding for Hangars (Special Buildings) | 1,000 | M2 | | ¥0 |
| | Sub-Total Scaffolding | | | | ¥0 |
| VI | | THE CONTRACTOR SHALL PROVIDE THE FOLLOWING URGENT REQUIRED BY THE CONTRACTING OFFICER | | | | |
| C0001CK | | Urgent response charge (OC=Occurrence) | 100 | OC | | ¥0 |
| C0001CL | | Urgent Material required, air freight | 100 | KG | | ¥0 |
| | Sub-total Urgent Response | | | | ¥0 |
| VII | | CONTRACTOR TO PROVIDE NON-SPECIFIC WORK | | | | |
| C0001CM | | Non-specific work | 1 | NTE | ¥21,000,000 | ¥21,000,000 |
| | Sub-total Non-Specific Work | | | | ¥21,000,000 |
| VIII | | INDICATE THE COST PERCENTAGE REQUIRED WHEN WORK REQUESTED WILL BE IN IE SHIMA, U. S. MILITARY INSTALLATIONS | | | | |
| C0001CN | | The work will be in Ie Shima and JWTC, how many percentage of cost shall be added to each Unit Price of all Line items above. | 15 | % | NA | NA |
| VIV | | ACM and LBP | | | | |
| C0001CO | | ACM sampling and test. | 10 | EA | | ¥0 |
| C0001CP | | LBP sampling and test. | 10 | EA | | ¥0 |
| C0001CQ | N/A | N/A | N/A | N/A | | |
| | Sub-Total ACM and LBP | | | | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS | |
| FOR BASE PERIOD - ORDER PERIOD 3, C0001AA THRU C0001CQ | ¥21,000,000 |
Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised#2 Roofing IDIQ ELIN Schedules 22Jul2022
Source Selection Information--See FAR 2.101 and 3.104 [When filled in]
BASE YEAR 4 LINE ITEMS
| BASE PERIOD - ORDER PERIOD 4 | | | REFERNCE NO. OF DOCUMENT | | | PAGES 1 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| D0001 | | BASE YEAR 4 PERIOD- SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR THIRD OPTION PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. | | | | |
Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from D0001AA to D0001CQ.
| | Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials | | | |
| I | | REMOVAL WORK | | | |
| | The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property | | | |
| D0001AA | | Remove existing roofing system without insulation to bare substrate. | 8,000 | M2 | ¥0 |
| D0001AB | | Remove existing roofing system with insulation to bare substrate. | 18,000 | M2 | ¥0 |
| D0001AC | | Prepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa). | 63,000 | M2 | ¥0 |
| D0001AD | | Remove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate. | 5,000 | M2 | ¥0 |
| D0001AE | | Remove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate | 12,000 | M2 | ¥0 |
| D0001AF | | Remove existing 2 ply built-up membrane | 200 | M2 | ¥0 |
| D0001AG | | Remove existing insulation | 200 | M2 | ¥0 |
| D0001AH | | Remove existing waterproof silicone roofing system to bare substrate | 400 | M2 | ¥0 |
| D0001AI | | Remove and store tarpaulin | 400 | M2 | ¥0 |
| | Sub-Total Removal | | | ¥0 |
| II | | ROOFING INSTALLATION WORK | | | |
| | Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system | | | |
| D0001AJ | | Cover for High power lines | 130 | LM | ¥0 |
| D0001AK | 07 52 00 Para 1.3 | Provide new 2 ply roofing membrane | 200 | M2 | ¥0 |
| D0001AL | 07 22 00 Para 1.2 | Provide new ceiling insulation (Minimum thermal resistance (R) value shall be 38). | 400 | M2 | ¥0 |
| D0001AM | 07 14 00 Para 1.2 | Provide and Install New Reflective Roof Coating System | 8,500 | M2 | ¥0 |
| D0001AN | 07 14 00 Para 1.2 | Provide and Install new Waterproof and Reflective Roofing System (Insulation included). | 65,000 | M2 | ¥0 |
| D0001AO | | Place tarpaulin sheet cover and provide new Sand Bags and accessories | 400 | M2 | ¥0 |
| | Sub-Total Roofing | | | ¥0 |
| III | | FLASHING AND MISCELLANEOUS WORK | | | |
| | Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other rela | | | |
| D0001AP | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 24-inch (609 mm) width. | 125 | M | ¥0 |
| D0001AQ | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 36-inch (915 mm) width | 100 | M | ¥0 |
| D0001AR | 05 50 13 Para 1.2 | Expansion joint cover, angular joint, maximum of 24 inch | 100 | M | ¥0 |
| D0001AS | N/A | N/A | N/A | N/A | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 2 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| D0001AT | 05 50 13 Para 1.2 | Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing | 10 | EA | | ¥0 |
| D0001AU | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing. | 100 | EA | | ¥0 |
| D0001AV | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring | 50 | EA | | ¥0 |
| D0001AW | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes | 50 | EA | | ¥0 |
| D0001AX | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors. | 50 | M | | ¥0 |
| D0001AY | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors. | 50 | M | | ¥0 |
| D0001AZ | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors. | 50 | M | | ¥0 |
| D0001BA | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors. | 50 | M | | ¥0 |
| D0001BB | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors | 50 | M | | ¥0 |
| D0001BC | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors. | 50 | M | | ¥0 |
| D0001BD | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| D0001BE | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| D0001BF | 07 60 00 Para 1.2 | Roof Ventilator flashing | 50 | EA | | ¥0 |
| D0001BG | N/A | N/A | N/A | N/A | | |
| D0001BH | 07 60 00 Para 1.2 | Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2) | 10 | EA | | ¥0 |
| D0001BI | 05 50 13 Para 1.2 | Smoke stack flashing | 50 | EA | | ¥0 |
| D0001BJ | N/A | N/A | N/A | N/A | | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 3 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| D0001BK | 05 50 13 Para 2.1.2 | Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing | 50 | EA | | ¥0 |
| D0001BL | N/A | N/A | N/A | N/A | | |
| D0001BM | 05 30 53 Para 1.5 | Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum | 10 | EA | | ¥0 |
| D0001BN | 05 50 13 Para 1.2 | Remove and reinstall existing roof edge mounted TV antenna support | 10 | EA | | ¥0 |
| D0001BO | 03 30 53 Para 1.5 | Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work | 25 | M2 | | ¥0 |
| D0001BP | N/A | N/A | N/A | N/A | | |
| D0001BQ | 07 60 00 Para 1.2 | Roof mounted equipment flashing on existing concrete mounting pad | 10 | M | | ¥0 |
| D0001BR | N/A | N/A | N/A | N/A | | |
| D0001BS | 05 50 13 Para 1.2 | Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle. | 10 | EA | | ¥0 |
| D0001BT | 07 60 00 Para 1.2 | Provide new cage ladders, Type-1, maximum of 2,440m | 1 | EA | | ¥0 |
| D0001BU | 07 60 00 Para 1.2 | Provide new cage ladders, Type -2, maximum of 4,166 m | 1 | EA | | ¥0 |
| D0001BV | 07 60 00 Para 1.2 | Provide new cage ladders, Type -3 maximum of 5,385 m | 1 | EA | | ¥0 |
| D0001BW | 05 50 13 Para 1.2 | Provide steel rain guard/diverter | 10 | M | | ¥0 |
| | Sub-Total Flashing | | | | ¥0 |
| IV | | SEALING AND CONCRETE WORK | | | | |
| | Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work | | | | |
| D0001BX | 07 92 00 Para 1.2 | Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area | 100 | M2R | | ¥0 |
| D0001BY | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking. | 2,250 | M | | ¥0 |
| D001BZ | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking and rubberized felt | 50 | M | | ¥0 |
| D0001CA | 07 52 00 Para 1.3 | Repair and patch existing roof felts/system for preparation to apply reflective coating | 2,700 | M2 | | ¥0 |
| D0001CB | 07 14 00 Para 3.1.3 | Repair concrete cracks by sealing with new pressure injected epoxy resin. | 1,000 | M | | ¥0 |
| D0001CC | 07 14 00 Para 3.1.3 | Repair concrete cracks by new caulking and reseal with new elastomeric slip | 100 | M | | ¥0 |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 4 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| IV | | SEALING AND CONCRETE WORK (Cont) | | | | |
| D0001CD | 05 30 53 Para 1.5 | Repair damaged concrete parapets and repair concrete spalls with new epoxy concrete | 600 | M2 | | ¥0 |
| D0001CE | 05 30 53 Para 1.5 | Filling of concrete gutter with new epoxy concrete, maximum of 4 inch thick (100mm) | 10 | M2 | | ¥0 |
| D0001CF | 05 50 13 Para 2.1.8 | Replace metal roofing with new factory paint finish metal roofing sheet complete with trim and fasteners | 500 | M2 | | ¥0 |
| D0001CG | 05 50 13 Para 2.1.8 | Fix hole in metal roof by applying metal sheets. | 100 | M2 | | ¥0 |
| D0001CH | 09 90 00 Para 1.2 | Painting of Parapets and Concrete Surfaces | 500 | M2 | | ¥0 |
| | Sub-Total Sealing | | | | ¥0 |
| V | | SCAFFOLDING FOR SPECIAL BUILDINGS | | | | |
| D0001CI | | Scaffolding for Brigs and Special Buildings | 1,500 | M2 | | ¥0 |
| D0001CJ | | Scaffolding for Hangars (Special Buildings) | 1,000 | M2 | | ¥0 |
| | Sub-Total Scaffolding | | | | ¥0 |
| VI | | THE CONTRACTOR SHALL PROVIDE THE FOLLOWING URGENT REQUIRED BY THE CONTRACTING OFFICER | | | | |
| D0001CK | | Urgent response charge (OC=Occurrence) | 100 | OC | | ¥0 |
| D0001CL | | Urgent Material required, air freight | 100 | KG | | ¥0 |
| | Sub-Total Urgent Response | | | | ¥0 |
| VII | | CONTRACTOR TO PROVIDE NON-SPECIFIC WORK | | | | |
| D0001CM | | Non-specific work | 1 | NTE | ¥21,000,000 | ¥21,000,000 |
| | Sub-Total Non-Specific Work | | | | ¥21,000,000 |
| VIII | | INDICATE THE COST PERCENTAGE REQUIRED WHEN WORK REQUESTED WILL BE IN IE SHIMA, U. S. MILITARY INSTALLATIONS | | | | |
| D0001CN | | The work will be in Ie Shima and JWTC, how many percentage of cost shall be added to each Unit Price of all Line items above. | 15 | % | NA | NA |
| VIV | | ACM and LBP | | | | |
| D0001CO | | ACM sampling and test. | 10 | EA | | ¥0 |
| D0001CP | | LBP sampling and test. | 10 | EA | | ¥0 |
| D0001CQ | N/A | N/A | N/A | N/A | | |
| | Sub-Total ACM and LBP | | | | ¥0 |
| TOTAL PRICE FOR CONTRACT LINE ITEMS | |
| FOR BASE PERIOD - ORDER PERIOD 4, D0001AA THRU D0001CQ | ¥21,000,000 |
Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised Roofing#2 IDIQ ELIN Schedules 22Jul2022
Source Selection Information--See FAR 2.101 and 3.104 [When filled in]
BASE YEAR 5 LINE ITEMS
| BASE PERIOD - ORDER PERIOD 5 | | | REFERNCE NO. OF DOCUMENT | | | PAGES 1 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| E0001 | | BASE PERIOD - ORDER PERIOD 5 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR FOURTH OPTION PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. | | | | |
Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from E0001AA to E0001CQ.
| | Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials | | | |
| I | | REMOVAL WORK | | | |
| | The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property | | | |
| E0001AA | | Remove existing roofing system without insulation to bare substrate. | 8,000 | M2 | ¥0 |
| E0001AB | | Remove existing roofing system with insulation to bare substrate. | 18,000 | M2 | ¥0 |
| E0001AC | | Prepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa). | 63,000 | M2 | ¥0 |
| E0001AD | | Remove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate. | 5,000 | M2 | ¥0 |
| E0001AE | | Remove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate | 12,000 | M2 | ¥0 |
| E0001AF | | Remove existing 2 ply built-up membrane | 200 | M2 | ¥0 |
| E0001AG | | Remove existing insulation | 200 | M2 | ¥0 |
| E0001AH | | Remove existing waterproof silicone roofing system to bare substrate | 400 | M2 | ¥0 |
| E0001AI | | Remove and store tarpaulin | 400 | M2 | ¥0 |
| | Sub-Total Removal | | | ¥0 |
| II | | ROOFING INSTALLATION WORK | | | |
| | Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system | | | |
| E0001AJ | | Cover for High power lines | 130 | LM | ¥0 |
| E0001AK | 07 52 00 Para 1.3 | Provide new 2 ply roofing membrane | 200 | M2 | ¥0 |
| E0001AL | 07 22 00 Para 1.2 | Provide new ceiling insulation (Minimum thermal resistance (R) value shall be 38). | 400 | M2 | ¥0 |
| E0001AM | 07 14 00 Para 1.2 | Provide and Install New Reflective Roof Coating System | 8,500 | M2 | ¥0 |
| E0001AN | 07 14 00 Para 1.2 | Provide and Install new Waterproof and Reflective Roofing System (Insulation included). | 65,000 | M2 | ¥0 |
| E0001AO | | Place tarpaulin sheet cover and provide new Sand Bags and accessories | 400 | M2 | ¥0 |
| | Sub-Total Roofing | | | ¥0 |
| III | | FLASHING AND MISCELLANEOUS WORK | | | |
| | Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other rela | | | |
| E0001AP | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 24-inch (609 mm) width. | 125 | M | ¥0 |
| E0001AQ | 05 50 13 Para 1.2 | Expansion joint cover, flat top maximum of 36-inch (915 mm) width | 100 | M | ¥0 |
| E0001AR | 05 50 13 Para 1.2 | Expansion joint cover, angular joint, maximum of 24 inch | 100 | M | ¥0 |
| E0001AS | N/A | N/A | N/A | N/A | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | |
CONTINUATION SHEET REFERNCE NO. OF DOCUMENT BEING CONTINUED PAGES 2 OF 4
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| E0001AT | 05 50 13 Para 1.2 | Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing | 10 | EA | | ¥0 |
| E0001AU | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing. | 100 | EA | | ¥0 |
| E0001AV | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring | 50 | EA | | ¥0 |
| E0001AW | 03 30 53 Para 1.5 and 05 50 13 Para 1.2 | Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes | 50 | EA | | ¥0 |
| E0001AX | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors. | 50 | M | | ¥0 |
| E0001AY | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors. | 50 | M | | ¥0 |
| E0001AZ | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors. | 50 | M | | ¥0 |
| E0001BA | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors. | 50 | M | | ¥0 |
| E0001BB | 26 05 00 Para 1.3 | Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors | 50 | M | | ¥0 |
| E0001BC | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors. | 50 | M | | ¥0 |
| E0001BD | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| E0001BE | 26 05 00 Para 1.3 | Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors | 50 | M | | ¥0 |
| E0001BF | 07 60 00 Para 1.2 | Roof Ventilator flashing | 50 | EA | | ¥0 |
| E0001BG | N/A | N/A | N/A | N/A | | |
| E0001BH | 07 60 00 Para 1.2 | Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2) | 10 | EA | | ¥0 |
| E0001BI | 05 50 13 Para 1.2 | Smoke stack flashing | 50 | EA | | ¥0 |
| E0001BJ | N/A | N/A | N/A | N/A | | |
| NSN 7540-01-152-8067 | | | | OPTIONAL FORM 336 (4-86) | | |
| | | | Sponsored by GSA FAR (48) CFR 53.110 | | |
| CONTINUATION SHEET | | | | | REFERNCE NO. OF DOCUMENT BEING CONTINUED | PAGES 3 OF 4 |
| NAME OF OFFFEROR OR CONTRACTOR | | | | | | |
| BID SCHEDULE | | | | | | |
| ITEM NO | SECTION AND PARA | SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | TOTAL AMOUNT |
| III | | FLASHING AND MISCELLANEOUS WORK (CONT) | | | | |
| E0001BK | 05 50 13 Para 2.1.2 | Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing | 50 | EA | | ¥0 |
| E0001BL | N/A | N/A | N/A | N/A | | |
| E0001BM | 05 30 53 Para 1.5 | Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum | 10 | EA | | ¥0 |
| E0001BN | 05 50 13 Para 1.2 | Remove and reinstall existing roof edge mounted TV antenna support | 10 | EA | | ¥0 |
| E0001BO | 03 30 53 Para 1.5 | Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work | 25 | M2 | | ¥0 |
| E0001BP | N/A | N/A | N/A | N/A | | |
| E0001BQ | 07 60 00 Para 1.2 | Roof mounted equipment flashing on existing concrete mounting pad | 10 | M | | ¥0 |
| E0001BR | N/A | N/A | N/A | N/A | | |
| E0001BS | 05 50 13 Para 1.2 | Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle. | 10 | EA | | ¥0 |
| E0001BT | 07 60 00 Para 1.2 | Provide new cage ladders, Type-1, maximum of 2,440m | 1 | EA | | ¥0 |
| E0001BU | 07 60 00 Para 1.2 | Provide new cage ladders, Type -2, maximum of 4,166 m | 1 | EA | | ¥0 |
| E0001BV | 07 60 00 Para 1.2 | Provide new cage ladders, Type -3 maximum of 5,385 m | 1 | EA | | ¥0 |
| E0001BW | 05 50 13 Para 1.2 | Provide steel rain guard/diverter | 10 | M | | ¥0 |
| | Sub-Total Flashing | | | | ¥0 |
| IV | | SEALING AND CONCRETE WORK | | | | |
| | Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work | | | | |
| E0001BX | 07 92 00 Para 1.2 | Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area | 100 | M2R | | ¥0 |
| E0001BY | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking. | 2,250 | M | | ¥0 |
| E0001BZ | 07 92 00 Para 1.2 | Remove existing building joint caulking and reseal with new caulking and rubberized felt | 50 | M | | ¥0 |
This is the start of the file's text. The full file is on GovTribe.