N4008422B0095_Attachment-2_Roofing-IDIQ-ELIN-Schedules_REV1.xlsx

XLSX spreadsheet 178 KB Posted

Attached to
ROOFING INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) AT VARIOUS U. S. GOVERNMENT INSTALLATIONS, OKINAWA, JAPAN
Solicitation number
N4008422B0095
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Roofing Indefinite Delivery Indefinite Quantity Work
PROVIDE UNIT PRICES FOR LINE ITEMS BELOW IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS AND DRAWINGS.
Bidder / Company Name:
Printed Name and Signature: Date:

ITEM NO. SUPPLIES/ SERVICES Total Amount (in JPY)

A0001 ~ A0001CQOrdering Period 1: All supplies and services for line item A0001 through A0001CQ¥21,000,000
B0001 ~ B0001CQOrdering Period 2: All supplies and services for line item B0001 through B0001CQ¥21,000,000
C0001 ~ C0001CQOrdering Period 3: All supplies and services for line item C0001 through C0001CQ¥21,000,000
D0001 ~ D0001CQOrdering Period 4: All supplies and services for line item D0001 through D0001CQ¥21,000,000
E0001 ~ E0001CQOrdering Period 5: All supplies and services for line item E0001 through E0001CQ¥21,000,000
TOTAL ( Base Period): CLIN 0001¥105,000,000
F0001 ~ F0002CQOrdering Period 6: All supplies and services for line item F0001 through F0001CQ¥21,000,000
G0001 ~G0002CQOrdering Period 7: All supplies and services for line item G0001 through G0001CQ¥21,000,000
H0001 ~ H0002CQOrdering Period 8: All supplies and services for line item H0001 through H0001CQ¥21,000,000
TOTAL ( Option Period 1): CLIN 0002¥63,000,000

TOTAL CONTRACT AMOUNT ¥168,000,000

Abbreviations used:

CUI // FEDCON [When filled in] Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised Roofing IDIQ ELIN Schedule 18Jul2022

Source Selection Information--See FAR 2.101 and 3.104 [When filled in]

BASE YEAR 1 LINE ITEMS

GOVERNMENT ESTIMATE
Prepared by :FOR OFFICIAL USE ONLY
Signature :
Date :18-Jul-22
BASE PERIOD - ORDER PERIOD 1 PERIOD OF "1 YEAR FROM DATE OF AWARD"REFERNCE NO. OF DOCUMENTPAGES 1 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
A0001BASE PERIOD - ORDER PERIOD 1 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR ONE YEAR BASE PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from A0001AA to A0001CQ.
Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials
IREMOVAL WORK
The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property
A0001AARemove existing roofing system without insulation to bare substrate.8,000M2¥0
A0001ABRemove existing roofing system with insulation to bare substrate.18,000M2¥0
A0001ACPrepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa).63,000M2¥0
A0001ADRemove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate.5,000M2¥0
A0001AERemove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate12,000M2¥0
A0001AFRemove existing 2 ply built-up membrane200M2¥0
A0001AGRemove existing insulation200M2¥0
A0001AHRemove existing waterproof silicone roofing system to bare substrate400M2¥0
A0001AIRemove and store tarpaulin400M2¥0
Sub-total Removal¥0
IIROOFING INSTALLATION WORK
Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system
A0001AJCover for High power lines130LM¥0
A0001AK07 52 00 Para 1.3Provide new 2 ply roofing membrane200M2¥0
A0001ALProvide new ceiling insulation (Minimum thermal resistance (R) value shall be 38).400M2¥0
A0001AM07 14 00 Para 1.2Provide and Install New Reflective Roof Coating System8,500M2¥0
A0001AN07 14 00 Para 1.2Provide and Install new Waterproof and Reflective Roofing System (Insulation included).65,000M2¥0
A0001AOPlace tarpaulin sheet cover and provide new Sand Bags and accessories400M2¥0
Sub-total Roofing¥0
IIIFLASHING AND MISCELLANEOUS WORK
Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other related items
A0001AP05 50 13 Para 1.2Expansion joint cover, flat top maximum of 24-inch (609 mm) width.125M¥0
A0001AQ05 50 13 Para 1.2Expansion joint cover, flat top maximum of 36-inch (915 mm) width100M¥0
A0001AR05 50 13 Para 1.2Expansion joint cover, angular joint, maximum of 24 inch100M¥0
A0001ASN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 2 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
A0001AT05 50 13 Para 1.2Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing10EA¥0
A0001AU03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing.100EA¥0
A0001AV03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring50EA¥0
A001AW03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes50EA¥0
A0001AX26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors.50M¥0
A0001AY26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors.50M¥0
A0001AZ26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors.50M¥0
A0001BA26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors.50M¥0
A0001BB26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors50M¥0
A0001BC26 05 00 Para 1.3Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors.50M¥0
A0001BD26 05 00 Para 1.3Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors50M¥0
A0001BE26 05 00 Para 1.3Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors50M¥0
A0001BF07 60 00 Para 1.2Roof Ventilator flashing50EA¥0
A0001BGN/AN/AN/AN/A
A0001BH07 60 00 Para 1.2Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2)10EA¥0
A0001BI05 50 13 Para 1.2Smoke stack flashing50EA¥0
A0001BJN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 3 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
A0001BK05 50 13 Para 2.1.2Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing50EA¥0
A0001BLN/AN/AN/AN/A
A0001BM05 30 53 Para 1.5Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum10EA¥0
A0001BN05 50 13 Para 1.2Remove and reinstall existing roof edge mounted TV antenna support10EA¥0
A0001BO03 30 53 Para 1.5Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work25M2¥0
A0001BPN/AN/AN/AN/A
A0001BQ07 60 00 Para 1.2Roof mounted equipment flashing on existing concrete mounting pad10M¥0
A0001BRN/AN/AN/AN/A
A0001BS05 50 13 Para 1.2Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle.10EA¥0
A0001BT07 60 00 Para 1.2Provide new cage ladders, Type-1, maximum of 2,440m1EA¥0
A0001BU07 60 00 Para 1.2Provide new cage ladders, Type -2, maximum of 4,166 m1EA¥0
A0001BV07 60 00 Para 1.2Provide new cage ladders, Type -3 maximum of 5,385 m1EA¥0
A0001BW05 50 13 Para 1.2Provide steel rain guard/diverter10M¥0
Sub-total Flashing¥0
IVSEALING AND CONCRETE WORK
Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work
A0001BX07 92 00 Para 1.2Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area100M2R¥0
A0001BY07 92 00 Para 1.2Remove existing building joint caulking and reseal with new caulking.2,250M¥0
A0001BZ07 92 00 Para 1.2Remove existing building joint caulking and reseal with new caulking and rubberized felt50M¥0
A0001CA07 52 00 Para 1.3Repair and patch existing roof felts/system for preparation to apply reflective coating2,700M2¥0
A0001CB07 14 00 Para 3.1.3Repair concrete cracks by sealing with new pressure injected epoxy resin.1,000M¥0
A0001CC07 14 00 Para 3.1.3Repair concrete cracks by new caulking and reseal with new elastomeric slip100M¥0
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 4 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IVSEALING AND CONCRETE WORK (Cont)
A0001CD05 30 53 Para 1.5Repair damaged concrete parapets and repair concrete spalls with new epoxy concrete600M2¥0
A0001CE05 30 53 Para 1.5Filling of concrete gutter with new epoxy concrete, maximum of 4 inch thick (100mm)10M2¥0
A0001CF05 50 13 Para 2.1.8Replace metal roofing with new factory paint finish metal roofing sheet complete with trim and fasteners500M2¥0
A0001CG09 00 00 Para 1.2Fix hole in metal roof by applying metal sheets.100M2¥0
A0001CH09 00 00 Para 1.2Painting of Parapets and Concrete Surfaces500M2¥0
Sub-total Sealing¥0
VSCAFFOLDING FOR SPECIAL BUILDINGS
A0001CIScaffolding for Brigs and Special Buildings1,500M2¥0
A0001CJScaffolding for Hangars (Special Buildings)1,000M2¥0
Sub-total Scaffolding¥0
VITHE CONTRACTOR SHALL PROVIDE THE FOLLOWING URGENT REQUIRED BY THE CONTRACTING OFFICER
A0001CKUrgent response charge (OC=Occurrence)100OC¥0
A0001CLUrgent Material required, air freight100KG¥0
Sub-total Urgent Response¥0
VIICONTRACTOR TO PROVIDE NON-SPECIFIC WORK
A0001CMNon-specific work1NTE¥21,000,000¥21,000,000
Sub-total Non-Specific Work¥21,000,000
VIIIINDICATE THE COST PERCENTAGE REQUIRED WHEN WORK REQUESTED WILL BE IN IE SHIMA, U. S. MILITARY INSTALLATIONS
A0001CNThe work will be in Ie Shima and JWTC, how many percentage of cost shall be added to each Unit Price of all Line items above.15%NANA
VIVACM and LBP
A0001COACM sampling and test.10EA¥0
A0001CPLBP sampling and test.10EA¥0
A0001CQN/AN/AN/AN/A
Sub-Total ACM and LBP¥0
TOTAL PRICE FOR CONTRACT LINE ITEMS
FOR BASE YEAR 1 PERIOD, A0001AA THRU A0001CQ¥21,000,000

Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised Roofing IDIQ ELIN Schedules 18Jul2022

Source Selection Information--See FAR 2.101 and 3.104 [When filled in]

BASE YEAR 2 LINE ITEMS

BASE PERIOD - ORDER PERIOD 2REFERNCE NO. OF DOCUMENTPAGES 1 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
B0001BASE PERIOD - ORDER PERIOD 1- SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR FIRST OPTION PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER.

Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from B0001AA to B0001CQ.

Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials
IREMOVAL WORK
The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property
B0001AARemove existing roofing system without insulation to bare substrate.8,000M2¥0
B0001ABRemove existing roofing system with insulation to bare substrate.18,000M2¥0
B0001ACPrepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa).63,000M2¥0
B0001ADRemove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate.5,000M2¥0
B0001AERemove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate12,000M2¥0
B0001AFRemove existing 2 ply built-up membrane200M2¥0
B0001AGRemove existing insulation200M2¥0
B0001AHRemove existing waterproof silicone roofing system to bare substrate400M2¥0
B0001AIRemove and store tarpaulin400M2¥0
Sub-Total Removal¥0
IIROOFING INSTALLATION WORK
Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system
A0001AJCover for High power lines130LM¥0
B0001AK07 52 00 Para 1.3Provide new 2 ply roofing membrane200M2¥0
B0001ALProvide new ceiling insulation (Minimum thermal resistance (R) value shall be 38).400M2¥0
B0001AM07 14 00 Para 1.2Provide and Install New Reflective Roof Coating System8,500M2¥0
B0001AN07 14 00 Para 1.2Provide and Install new Waterproof and Reflective Roofing System (Insulation included).65,000M2¥0
B0001AOPlace tarpaulin sheet cover and provide new Sand Bags and accessories400M2¥0
Sub-Total Roofing¥0
IIIFLASHING AND MISCELLANEOUS WORK
Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other rela
B0001AP05 50 13 Para 1.2Expansion joint cover, flat top maximum of 24-inch (609 mm) width.125M¥0
B0001AQ05 50 13 Para 1.2Expansion joint cover, flat top maximum of 36-inch (915 mm) width100M¥0
B0001AR05 50 13 Para 1.2Expansion joint cover, angular joint, maximum of 24 inch100M¥0
B0001ASN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 2 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
B0001AT05 50 13 Para 1.2Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing10EA¥0
B0001AU03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing.100EA¥0
B0001AV03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring50EA¥0
B0001AW03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes50EA¥0
B0001AX26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors.50M¥0
B0001AY26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors.50M¥0
B0001AZ26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors.50M¥0
B0001BA26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors.50M¥0
B0001BB26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors50M¥0
B0001BC26 05 00 Para 1.3Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors.50M¥0
B0001BD26 05 00 Para 1.3Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors50M¥0
B0001BE26 05 00 Para 1.3Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors50M¥0
B001BF07 60 00 Para 1.2Roof Ventilator flashing50EA¥0
B0001BGN/AN/AN/AN/A
B0001BH07 60 00 Para 1.2Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2)10EA¥0
B0001BI05 50 13 Para 1.2Smoke stack flashing50EA¥0
B0001BJN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 3 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
B0001BK05 50 13 Para 2.1.2Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing50EA¥0
B0001BLN/AN/AN/AN/A
B0001BM05 30 53 Para 1.5Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum10EA¥0
B0001BN05 50 13 Para 1.2Remove and reinstall existing roof edge mounted TV antenna support10EA¥0
B0001BO03 30 53 Para 1.5Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work25M2¥0
B0001BPN/AN/AN/AN/A
B0001BQ07 60 00 Para 1.2Roof mounted equipment flashing on existing concrete mounting pad10M¥0
B0001BRN/AN/AN/AN/A
B0001BS05 50 13 Para 1.2Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle.10EA¥0
B0001BT07 60 00 Para 1.2Provide new cage ladders, Type-1, maximum of 2,440m1EA¥0
B0001BU07 60 00 Para 1.2Provide new cage ladders, Type -2, maximum of 4,166 m1EA¥0
B0001BV07 60 00 Para 1.2Provide new cage ladders, Type -3 maximum of 5,385 m1EA¥0
B0001BW05 50 13 Para 1.2Provide steel rain guard/diverter10M¥0
Sub-Total Flashing¥0
IVSEALING AND CONCRETE WORK
Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work
B0001BX07 92 00 Para 1.2Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area100M2R¥0
B0001BY07 92 00 Para 1.2Remove existing building joint caulking and reseal with new caulking.2,250M¥0
B0001BZ07 92 00 Para 1.2Remove existing building joint caulking and reseal with new caulking and rubberized felt50M¥0
B0001CA07 52 00 Para 1.3Repair and patch existing roof felts/system for preparation to apply reflective coating2,700M2¥0
B0001CB07 14 00 Para 3.1.3Repair concrete cracks by sealing with new pressure injected epoxy resin.1,000M¥0
B0001CC07 14 00 Para 3.1.3Repair concrete cracks by new caulking and reseal with new elastomeric slip100M¥0
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 4 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IVSEALING AND CONCRETE WORK (Cont)
B0001CD05 30 53 Para 1.5Repair damaged concrete parapets and repair concrete spalls with new epoxy concrete600M2¥0
B0001CE05 30 53 Para 1.5Filling of concrete gutter with new epoxy concrete, maximum of 4 inch thick (100mm)10M2¥0
B0001CF05 50 13 Para 2.1.8Replace metal roofing with new factory paint finish metal roofing sheet complete with trim and fasteners500M2¥0
B0001CG09 00 00 Para 1.2Fix hole in metal roof by applying metal sheets.100M2¥0
B0001CH09 00 00 Para 1.2Painting of Parapets and Concrete Surfaces500M2¥0
Sub-Total Sealing¥0
VSCAFFOLDING FOR SPECIAL BUILDINGS
B0001CIScaffolding for Brigs and Special Buildings1,500M2¥0
B0001CJScaffolding for Hangars (Special Buildings)1,000M2¥0
Sub-Total Scaffolding¥0
VITHE CONTRACTOR SHALL PROVIDE THE FOLLOWING URGENT REQUIRED BY THE CONTRACTING OFFICER
B0001CKUrgent response charge (OC=Occurrence)100OC¥0
B0001CLUrgent Material required, air freight100KG¥0
Sub-total Urgent Response¥0
VIICONTRACTOR TO PROVIDE NON-SPECIFIC WORK
B0001CMNon-specific work1NTE¥21,000,000¥21,000,000
Sub-total Non-Specific Work¥21,000,000
VIIIINDICATE THE COST PERCENTAGE REQUIRED WHEN WORK REQUESTED WILL BE IN IE SHIMA, U. S. MILITARY INSTALLATIONS
B0001CNThe work will be in Ie Shima and JWTC, how many percentage of cost shall be added to each Unit Price of all Line items above.15%NANA
VIVACM and LBP
B0001COACM sampling and test.10EA¥0
B0001CPLBP sampling and test.10EA
B0001CQN/AN/AN/AN/A
Sub-Total ACM and LBP¥0
TOTAL PRICE FOR CONTRACT LINE ITEMS
FORBASE PERIOD - ORDER PERIOD 2, B0001AA THRU B0001CQ¥21,000,000

Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised Roofing IDIQ ELIN Schedules 18Jul2022

Source Selection Information--See FAR 2.101 and 3.104 [When filled in]

BASE YEAR 3 LINE ITEMS

BASE PERIOD - ORDER PERIOD 3REFERNCE NO. OF DOCUMENTPAGES 1 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
C0001BASE PERIOD - ORDER PERIOD 3 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR SECOND OPTION PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER. Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from C0001AA to C0001CQ.
Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials
IREMOVAL WORK
The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property
C0001AARemove existing roofing system without insulation to bare substrate.8,000M2¥0
C0001ABRemove existing roofing system with insulation to bare substrate.18,000M2¥0
C0001ACPrepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa).63,000M2¥0
C0001ADRemove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate.5,000M2¥0
C0001AERemove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate12,000M2¥0
C0001AFRemove existing 2 ply built-up membrane200M2¥0
C0001AGRemove existing insulation200M2¥0
C0001AHRemove existing waterproof silicone roofing system to bare substrate400M2¥0
C0001AIRemove and store tarpaulin400M2¥0
Sub-Total Removal¥0
IIROOFING INSTALLATION WORK
Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system
C0001AJCover for High power lines130LM¥0
C0001AK07 52 00 Para 1.3Provide new 2 ply roofing membrane200M2¥0
C0001AL07 22 00 Para 1.2Provide new ceiling insulation (Minimum thermal resistance (R) value shall be 38).400M2¥0
C0001AM07 14 00 Para 1.2Provide and Install New Reflective Roof Coating System8,500M2¥0
C0001AN07 14 00 Para 1.2Provide and Install new Waterproof and Reflective Roofing System (Insulation included).65,000M2¥0
C0001AOPlace tarpaulin sheet cover and provide new Sand Bags and accessories400M2¥0
Sub-Total Roofing¥0
IIIFLASHING AND MISCELLANEOUS WORK
Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other rela
C0001AP05 50 13 Para 1.2Expansion joint cover, flat top maximum of 24-inch (609 mm) width.125M¥0
C0001AQ05 50 13 Para 1.2Expansion joint cover, flat top maximum of 36-inch (915 mm) width100M¥0
C0001AR05 50 13 Para 1.2Expansion joint cover, angular joint, maximum of 24 inch100M¥0
C0001ASN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110

CONTINUATION SHEET REFERNCE NO. OF DOCUMENT BEING CONTINUED PAGES 2 OF 4

BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
C0001AT05 50 13 Para 1.2Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing10EA¥0
C0001AU03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing.100EA¥0
C0001AV03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring50EA¥0
C0001AW03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes50EA¥0
C0001AX26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors.50M¥0
C0001AY26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors.50M¥0
C0010AZ26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors.50M¥0
C0001BA26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors.50M¥0
C0001BB26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors50M¥0
C0001BC26 05 00 Para 1.3Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors.50M¥0
C0001BD26 05 00 Para 1.3Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors50M¥0
C0010BE26 05 00 Para 1.3Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors50M¥0
C0001BF07 60 00 Para 1.2Roof Ventilator flashing50EA¥0
C0001BGN/AN/AN/AN/A
C0001BH07 60 00 Para 1.2Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2)10EA¥0
C0001BI05 50 13 Para 1.2Smoke stack flashing50EA¥0
C0001BJN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 3 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
C0001BK05 50 13 Para 2.1.2Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing50EA¥0
C0001BLN/AN/AN/AN/A
C0001BM05 30 53 Para 1.5Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum10EA¥0
C001BN05 50 13 Para 1.2Remove and reinstall existing roof edge mounted TV antenna support10EA¥0
C001BO03 30 53 Para 1.5Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work25M2¥0
C0001BPN/AN/AN/AN/A
C0001BQ07 60 00 Para 1.2Roof mounted equipment flashing on existing concrete mounting pad10M¥0
C0001BRN/AN/AN/AN/A
C0001BS05 50 13 Para 1.2Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle.10EA¥0
C0001BT07 60 00 Para 1.2Provide new cage ladders, Type-1, maximum of 2,440m1EA¥0
C0001BU07 60 00 Para 1.2Provide new cage ladders, Type -2, maximum of 4,166 m1EA¥0
C0001BV07 60 00 Para 1.2Provide new cage ladders, Type -3 maximum of 5,385 m1EA¥0
C0001BW05 50 13 Para 1.2Provide steel rain guard/diverter10M¥0
Sub-Total Flashing¥0
IVSEALING AND CONCRETE WORK
Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work
C0001BX07 92 00 Para 1.2Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area100M2R¥0
C0001BY07 92 00 Para 1.2Remove existing building joint caulking and reseal with new caulking.2,250M¥0
C0001BZ07 92 00 Para 1.2Remove existing building joint caulking and reseal with new caulking and rubberized felt50M¥0
C0001CA07 52 00 Para 1.3Repair and patch existing roof felts/system for preparation to apply reflective coating2,700M2¥0
C0001CB07 14 00 Para 3.1.3Repair concrete cracks by sealing with new pressure injected epoxy resin.1,000M¥0
C0001CC07 14 00 Para 3.1.3Repair concrete cracks by new caulking and reseal with new elastomeric slip100M¥0
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 4 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IVSEALING AND CONCRETE WORK (Cont)
C0001CD05 30 53 Para 1.5Repair damaged concrete parapets and repair concrete spalls with new epoxy concrete600M2¥0
C0001CE05 30 53 Para 1.5Filling of concrete gutter with new epoxy concrete, maximum of 4 inch thick (100mm)10M2¥0
C0001CF05 50 13 Para 2.1.8Replace metal roofing with new factory paint finish metal roofing sheet complete with trim and fasteners500M2¥0
C0001CG09 00 00 Para 1.2Fix hole in metal roof by applying metal sheets.100M2¥0
C0001CH09 00 00 Para 1.2Painting of Parapets and Concrete Surfaces500M2¥0
Sub-Total Sealing¥0
VSCAFFOLDING FOR SPECIAL BUILDINGS
C0001CIScaffolding for Brigs and Special Buildings1,500M2¥0
C0001CJScaffolding for Hangars (Special Buildings)1,000M2¥0
Sub-Total Scaffolding¥0
VITHE CONTRACTOR SHALL PROVIDE THE FOLLOWING URGENT REQUIRED BY THE CONTRACTING OFFICER
C0001CKUrgent response charge (OC=Occurrence)100OC¥0
C0001CLUrgent Material required, air freight100KG¥0
Sub-total Urgent Response¥0
VIICONTRACTOR TO PROVIDE NON-SPECIFIC WORK
C0001CMNon-specific work1NTE¥21,000,000¥21,000,000
Sub-total Non-Specific Work¥21,000,000
VIIIINDICATE THE COST PERCENTAGE REQUIRED WHEN WORK REQUESTED WILL BE IN IE SHIMA, U. S. MILITARY INSTALLATIONS
C0001CNThe work will be in Ie Shima and JWTC, how many percentage of cost shall be added to each Unit Price of all Line items above.15%NANA
VIVACM and LBP
C0001COACM sampling and test.10EA¥0
C0001CPLBP sampling and test.10EA¥0
C0001CQN/AN/AN/AN/A
Sub-Total ACM and LBP¥0
TOTAL PRICE FOR CONTRACT LINE ITEMS
FOR BASE PERIOD - ORDER PERIOD 3, C0001AA THRU C0001CQ¥21,000,000

Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised Roofing IDIQ ELIN Schedules 18Jul2022

Source Selection Information--See FAR 2.101 and 3.104 [When filled in]

BASE YEAR 4 LINE ITEMS

BASE PERIOD - ORDER PERIOD 4REFERNCE NO. OF DOCUMENTPAGES 1 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
D0001BASE YEAR 4 PERIOD- SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR THIRD OPTION PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER.

Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from D0001AA to D0001CQ.

Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials
IREMOVAL WORK
The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property
D0001AARemove existing roofing system without insulation to bare substrate.8,000M2¥0
D0001ABRemove existing roofing system with insulation to bare substrate.18,000M2¥0
D0001ACPrepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa).63,000M2¥0
D0001ADRemove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate.5,000M2¥0
D0001AERemove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate12,000M2¥0
D0001AFRemove existing 2 ply built-up membrane200M2¥0
D0001AGRemove existing insulation200M2¥0
D0001AHRemove existing waterproof silicone roofing system to bare substrate400M2¥0
D0001AIRemove and store tarpaulin400M2¥0
Sub-Total Removal¥0
IIROOFING INSTALLATION WORK
Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system
D0001AJCover for High power lines130LM¥0
D0001AK07 52 00 Para 1.3Provide new 2 ply roofing membrane200M2¥0
D0001AL07 22 00 Para 1.2Provide new ceiling insulation (Minimum thermal resistance (R) value shall be 38).400M2¥0
D0001AM07 14 00 Para 1.2Provide and Install New Reflective Roof Coating System8,500M2¥0
D0001AN07 14 00 Para 1.2Provide and Install new Waterproof and Reflective Roofing System (Insulation included).65,000M2¥0
D0001AOPlace tarpaulin sheet cover and provide new Sand Bags and accessories400M2¥0
Sub-Total Roofing¥0
IIIFLASHING AND MISCELLANEOUS WORK
Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other rela
D0001AP05 50 13 Para 1.2Expansion joint cover, flat top maximum of 24-inch (609 mm) width.125M¥0
D0001AQ05 50 13 Para 1.2Expansion joint cover, flat top maximum of 36-inch (915 mm) width100M¥0
D0001AR05 50 13 Para 1.2Expansion joint cover, angular joint, maximum of 24 inch100M¥0
D0001ASN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 2 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
D0001AT05 50 13 Para 1.2Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing10EA¥0
D0001AU03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing.100EA¥0
D0001AV03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring50EA¥0
D0001AW03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes50EA¥0
D0001AX26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors.50M¥0
D0001AY26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors.50M¥0
D0001AZ26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors.50M¥0
D0001BA26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors.50M¥0
D0001BB26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors50M¥0
D0001BC26 05 00 Para 1.3Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors.50M¥0
D0001BD26 05 00 Para 1.3Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors50M¥0
D0001BE26 05 00 Para 1.3Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors50M¥0
D0001BF07 60 00 Para 1.2Roof Ventilator flashing50EA¥0
D0001BGN/AN/AN/AN/A
D0001BH07 60 00 Para 1.2Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2)10EA¥0
D0001BI05 50 13 Para 1.2Smoke stack flashing50EA¥0
D0001BJN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 3 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
D0001BK05 50 13 Para 2.1.2Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing50EA¥0
D0001BLN/AN/AN/AN/A
D0001BM05 30 53 Para 1.5Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum10EA¥0
D0001BN05 50 13 Para 1.2Remove and reinstall existing roof edge mounted TV antenna support10EA¥0
D0001BO03 30 53 Para 1.5Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work25M2¥0
D0001BPN/AN/AN/AN/A
D0001BQ07 60 00 Para 1.2Roof mounted equipment flashing on existing concrete mounting pad10M¥0
D0001BRN/AN/AN/AN/A
D0001BS05 50 13 Para 1.2Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle.10EA¥0
D0001BT07 60 00 Para 1.2Provide new cage ladders, Type-1, maximum of 2,440m1EA¥0
D0001BU07 60 00 Para 1.2Provide new cage ladders, Type -2, maximum of 4,166 m1EA¥0
D0001BV07 60 00 Para 1.2Provide new cage ladders, Type -3 maximum of 5,385 m1EA¥0
D0001BW05 50 13 Para 1.2Provide steel rain guard/diverter10M¥0
Sub-Total Flashing¥0
IVSEALING AND CONCRETE WORK
Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work
D0001BX07 92 00 Para 1.2Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area100M2R¥0
D0001BY07 92 00 Para 1.2Remove existing building joint caulking and reseal with new caulking.2,250M¥0
D001BZ07 92 00 Para 1.2Remove existing building joint caulking and reseal with new caulking and rubberized felt50M¥0
D0001CA07 52 00 Para 1.3Repair and patch existing roof felts/system for preparation to apply reflective coating2,700M2¥0
D0001CB07 14 00 Para 3.1.3Repair concrete cracks by sealing with new pressure injected epoxy resin.1,000M¥0
D0001CC07 14 00 Para 3.1.3Repair concrete cracks by new caulking and reseal with new elastomeric slip100M¥0
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 4 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IVSEALING AND CONCRETE WORK (Cont)
D0001CD05 30 53 Para 1.5Repair damaged concrete parapets and repair concrete spalls with new epoxy concrete600M2¥0
D0001CE05 30 53 Para 1.5Filling of concrete gutter with new epoxy concrete, maximum of 4 inch thick (100mm)10M2¥0
D0001CF05 50 13 Para 2.1.8Replace metal roofing with new factory paint finish metal roofing sheet complete with trim and fasteners500M2¥0
D0001CG09 00 00 Para 1.2Fix hole in metal roof by applying metal sheets.100M2¥0
D0001CH09 00 00 Para 1.2Painting of Parapets and Concrete Surfaces500M2¥0
Sub-Total Sealing¥0
VSCAFFOLDING FOR SPECIAL BUILDINGS
D0001CIScaffolding for Brigs and Special Buildings1,500M2¥0
D0001CJScaffolding for Hangars (Special Buildings)1,000M2¥0
Sub-Total Scaffolding¥0
VITHE CONTRACTOR SHALL PROVIDE THE FOLLOWING URGENT REQUIRED BY THE CONTRACTING OFFICER
D0001CKUrgent response charge (OC=Occurrence)100OC¥0
D0001CLUrgent Material required, air freight100KG¥0
Sub-Total Urgent Response¥0
VIICONTRACTOR TO PROVIDE NON-SPECIFIC WORK
D0001CMNon-specific work1NTE¥21,000,000¥21,000,000
Sub-Total Non-Specific Work¥21,000,000
VIIIINDICATE THE COST PERCENTAGE REQUIRED WHEN WORK REQUESTED WILL BE IN IE SHIMA, U. S. MILITARY INSTALLATIONS
D0001CNThe work will be in Ie Shima and JWTC, how many percentage of cost shall be added to each Unit Price of all Line items above.15%NANA
VIVACM and LBP
D0001COACM sampling and test.10EA¥0
D0001CPLBP sampling and test.10EA¥0
D0001CQN/AN/AN/AN/A
Sub-Total ACM and LBP¥0
TOTAL PRICE FOR CONTRACT LINE ITEMS
FOR BASE PERIOD - ORDER PERIOD 4, D0001AA THRU D0001CQ¥21,000,000

Source Selection Information--See FAR 2.101 and 3.104 [When filled in] Revised Roofing IDIQ ELIN Schedules 18Jul2022

Source Selection Information--See FAR 2.101 and 3.104 [When filled in]

BASE YEAR 5 LINE ITEMS

BASE PERIOD - ORDER PERIOD 5REFERNCE NO. OF DOCUMENTPAGES 1 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
E0001BASE PERIOD - ORDER PERIOD 5 - SCHEDULE OF INDEFINITE QUANTITY WORK: THE LINE ITEMS LISTED BELOW ARE FOR FOURTH OPTION PERIOD AS ESTABLISHED BY THE CONTRACTING OFFICER.

Indefinite Quantity Work: Price to perform indefinite quantity work in accordance with all the terms of this contract. The contract price is the sum of contract lines from E0001AA to E0001CQ.

Units: M2 = Square Meters M= Linear Meter GFM=Government Furnish Materials
IREMOVAL WORK
The Government will order separate line items(s) for removal work. Removal work shall include proper disposal of debris off Government property
E0001AARemove existing roofing system without insulation to bare substrate.8,000M2¥0
E0001ABRemove existing roofing system with insulation to bare substrate.18,000M2¥0
E0001ACPrepare concrete or metal roof surfaces by waterblasting and deck brush (Water pressure is 10-15MPa).63,000M2¥0
E0001ADRemove roof insulation maximum of 6 inches (152 mm) thickness to bare substrate.5,000M2¥0
E0001AERemove existing rubberized, asphalt coated, fiber coated or elastomeric coated roofing system to bare substrate12,000M2¥0
E0001AFRemove existing 2 ply built-up membrane200M2¥0
E0001AGRemove existing insulation200M2¥0
E0001AHRemove existing waterproof silicone roofing system to bare substrate400M2¥0
E0001AIRemove and store tarpaulin400M2¥0
Sub-Total Removal¥0
IIROOFING INSTALLATION WORK
Except for materials supplied and those items indicated under “FLASHING AND MISCELLANEOUS WORK” and “SEALING AND CONCRETE WORK”,that the Government will order as a separate line items (s) the roofing system shall include the complete system
E0001AJCover for High power lines130LM¥0
E0001AK07 52 00 Para 1.3Provide new 2 ply roofing membrane200M2¥0
E0001AL07 22 00 Para 1.2Provide new ceiling insulation (Minimum thermal resistance (R) value shall be 38).400M2¥0
E0001AM07 14 00 Para 1.2Provide and Install New Reflective Roof Coating System8,500M2¥0
E0001AN07 14 00 Para 1.2Provide and Install new Waterproof and Reflective Roofing System (Insulation included).65,000M2¥0
E0001AOPlace tarpaulin sheet cover and provide new Sand Bags and accessories400M2¥0
Sub-Total Roofing¥0
IIIFLASHING AND MISCELLANEOUS WORK
Except for materials supplied and those items indicated under “SEALING AND CONCRETE WORK”, the work includes the removal of existing roof items and provision of new flashing works to include fastener, cleats, flashing felt, nailers sealant and other rela
E0001AP05 50 13 Para 1.2Expansion joint cover, flat top maximum of 24-inch (609 mm) width.125M¥0
E0001AQ05 50 13 Para 1.2Expansion joint cover, flat top maximum of 36-inch (915 mm) width100M¥0
E0001AR05 50 13 Para 1.2Expansion joint cover, angular joint, maximum of 24 inch100M¥0
E0001ASN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110

CONTINUATION SHEET REFERNCE NO. OF DOCUMENT BEING CONTINUED PAGES 2 OF 4

BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
E0001AT05 50 13 Para 1.2Cut existing vent stack, weld new vent stack to extend 1 foot (304mm) from the top of new roofing system, provide new flashing10EA¥0
E0001AU03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad for roof mounted water lines and other roof mounted piping, with flashing.100EA¥0
E0001AV03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for roof mounted conduits, reinstall existing conduits and wiring50EA¥0
E0001AW03 30 53 Para 1.5 and 05 50 13 Para 1.2Provide concrete mounting pad with flashing for junction boxes, reinstall wiring with new junction boxes50EA¥0
E0001AX26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 1-inch (25 mm) diameter with connectors.50M¥0
E0001AY26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 2-inch (50 mm) diameter with connectors.50M¥0
E0001AZ26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 3-inch (75 mm) diameter with connectors.50M¥0
E0001BA26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 4-inch (100 mm) diameter with connectors.50M¥0
E0001BB26 05 00 Para 1.3Provide and Install new electrical rigid steel conduit, up to 6-inch (150 mm) diameter with connectors50M¥0
E0001BC26 05 00 Para 1.3Provide and install new electrical wiring, up to #12 gage, 4 conductor, with connectors.50M¥0
E0001BD26 05 00 Para 1.3Provide and install new electrical wiring, up to #8 gage, 4 conductor, with connectors50M¥0
E0001BE26 05 00 Para 1.3Provide and install new electrical wiring, up to #2 gage, 4 conductor, with connectors50M¥0
E0001BF07 60 00 Para 1.2Roof Ventilator flashing50EA¥0
E0001BGN/AN/AN/AN/A
E0001BH07 60 00 Para 1.2Roof ventilator opening cover, flat type, maximum of 10 SF (0.92m2)10EA¥0
E0001BI05 50 13 Para 1.2Smoke stack flashing50EA¥0
E0001BJN/AN/AN/AN/A
NSN 7540-01-152-8067OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48) CFR 53.110
CONTINUATION SHEETREFERNCE NO. OF DOCUMENT BEING CONTINUEDPAGES 3 OF 4
NAME OF OFFFEROR OR CONTRACTOR
BID SCHEDULE
ITEM NOSECTION AND PARASUPPLIES/SERVICESQUANTITYUNITUNIT PRICETOTAL AMOUNT
IIIFLASHING AND MISCELLANEOUS WORK (CONT)
E0001BK05 50 13 Para 2.1.2Provide and install new roof mounted antenna pole of 6 LF (0.9m) maximum height with 3 each guy rods with turnbuckles, concrete mounting pad and flashing50EA¥0
E0001BLN/AN/AN/AN/A
E0001BM05 30 53 Para 1.5Encase existing roof mounted angle or pipe supports in new concrete pad with flashing, 1 cubic foot maximum10EA¥0
E0001BN05 50 13 Para 1.2Remove and reinstall existing roof edge mounted TV antenna support10EA¥0
E0001BO03 30 53 Para 1.5Removal of existing concrete roof pad for roof mounted equipment/items and repair damage roof substrate with epoxy concrete. No new work involved, only removal and repair work25M2¥0
E0001BPN/AN/AN/AN/A
E0001BQ07 60 00 Para 1.2Roof mounted equipment flashing on existing concrete mounting pad10M¥0
E0001BRN/AN/AN/AN/A
E0001BS05 50 13 Para 1.2Replace with new existing steel angle supports for roof mounted equipment and connectors, maximum of ¼ x3x3 inches x 10-feet per each galvanized steel angle.10EA¥0
E0001BT07 60 00 Para 1.2Provide new cage ladders, Type-1, maximum of 2,440m1EA¥0
E0001BU07 60 00 Para 1.2Provide new cage ladders, Type -2, maximum of 4,166 m1EA¥0
E0001BV07 60 00 Para 1.2Provide new cage ladders, Type -3 maximum of 5,385 m1EA¥0
E0001BW05 50 13 Para 1.2Provide steel rain guard/diverter10M¥0
Sub-Total Flashing¥0
IVSEALING AND CONCRETE WORK
Work shall include removal of existing caulking, surface preparation, provision of primers and/or soldering work
E0001BX07 92 00 Para 1.2Remove existing precise roof rib joint caulking and reseal with new caulking. (M2R= Square Meter of Roof Area100M2R¥0
E0001BY07 92 00 Para 1.2Remove existing building joint caulking and reseal with new caulking.2,250M¥0

This is the start of the file's text. The full file is on GovTribe.