Atch (4) Government Responses to Pre Bid Inquiries.pdf

PDF 120 KB Posted

Attached to
WHE & Rigging Support Services and CESE Rental Services at CFAS, Japan Federal contract opportunity
Solicitation number
N4008421B6300
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document contains government responses to pre-bid inquiries for solicitation number N4008421B6300 for Weight Handling Equipment (WHE) and Rigging Support Services and Civil Engineering Support Equipment (CESE) rental Services at U.S. Fleet Activities Sasebo (CFAS), Japan. The Navy seeks rental of various heavy equipment including 1.2-ton and 1.5-ton forklifts for an 8-year period beginning March 16, 2021, with repairs to be completed within 5 working days if necessary. A rigging support team is to include 5-6 riggers for lifts, varying based on distance and enclosure size. The minimum order amount for rigging support has been changed to 8 hours per day. Participants at the pre-bid conference on December 15, 2020 included Nippon Express Co., Ltd. Sasebo Branch, Fukumaru Kensetsu, Sasebo Kaiun, and Yoshida Kaiun.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment (3) Pre Bid Inquiry Form Solicitation No. N4008421B6300 WHE & CESE RENTAL at CFAS

Question No.

Reference (Sect/Para/Page)

QUESTION

GOVERNMENT RESPONSE

1 1700000 4.5

Is it required to start the lease service for 1.2ton and 1.5ton forklifts on 16 Mar 2021? Also, is the lease service ordered continuously 8years including option years?

指定されている 1.2 トンと 1.5 トンのフォークリフトのリースサービス

は 2021 年 3 月 16 日に開始され、オプション期間を含めると 8 年間連

続で使用され続けるのでしょうか。

The awarded contractor must be prepared to accept and perform services / provide equipment for all ELINs beginning on the first day of the ordering period for the

IDIQ.

The period of performance would be specified in any task order issued for any ELIN(s) including forklifts.

The Government has historically required these forklifts to meet operational requirements for at least 10 years. However, operational requirements are subject to change including increasing or decreasing required quantities.

2 1700000 4.5.3

We cannot ensure to complete repairs of disabled forklifts within four hours of initial call because mechanic is not always available at the time and some parts may need to be ordered for the repair.

Also, any substitute or replacement is unavailable. Because explosion proof type is very rare and forklift lease company doesn’t have spare.

Could you please reconsider about the requirements for forklift?

4 時間以内に不具合のあるフォークリフトの修理を完了することは保

障できません。なぜなら、いつも整備士が空いているとも限りません

し、修理のために部品を取り寄せる必要がある可能性もあるからで

す。また、修理や検査の際に代替機を提供することも難しいです。防

爆型のフォークリフトは希少であるためフォークリフトリース会社は

予備を持っていないようです。契約業者がこの要求事項を満たすのは

困難なため、これらの要求事項を見直していただけないでしょうか。

Repair work can be completed within 5 working days instead of 4 hours.

It is preferable that the explosion-proof type of forklift is provided as substitute. However, if the same type is not available, it is acceptable that a forklift of similar type is provided as practical.

See updated PWS, Attachment (1).

3 17000 4.2

Attachment J-0200000-10

What is the factor to be determine the number of riggers when contractors crane is ordered? Which ELIN of rigging support team is expected to be ordered depending on the situation?

業者のクレーンが注文される際、リガーの数は何によって決定される

のでしょうか。どのシチュエーションでリガーサポートのどの ELIN

が注文される予定ですか?

A crane team is consisted of, at minimum, one crane operator and 5 to 6 riggers.

5 to 6 riggers are ordered when a contractor crane with operator is ordered.

- 6 riggers are required (1 signal man + 2 slingers on both ends) where “lift from” and “place to” locations are relatively distanced such as between a pier and deck of a ship.

Attachment (3) Pre Bid Inquiry Form Solicitation No. N4008421B6300 WHE & CESE RENTAL at CFAS

- Where lifts are conducted within small enough envelope, then required riggers may be down to 5.

Small number of riggers are ordered as supplemental workforce to PWD crane team.

Above policy will apply when we order contractor crane of any size.

4 1700000 2.3.1

Could you please reconsider the minimum order amount for each ELIN of rigging support from four hours to eight hours on the basis of regular working hours, 0800 – 1645? Because it’s highly difficult to maintain riggers without guarantee of their wages.

賃金の保障が無いと人員の確保が難しいため玉掛サポートの時間は

0800-1645 の 8 時間を保障していただけませんか。

Yes, we will change the minimum order amount for rigging support to “8 hours per day” from 4 hours per day.

Annex 1700000 Spec Item 2.3.1 has been revised.

See updated PWS, Attachment (1).

5 Pre-Bid Conference

Is it possible to tell us the Contractors who participated in the pre-bid Conference on 15 DEC 2020?

Yes. The following contractors participated:

• Nippon Express Co., Ltd. Sasebo Branch

• Fukumaru Kensetsu

• Sasebo Kaiun

• Yoshida Kaiun

File details come from the government source that posted it. Updated .