Atch (3) Government Response to Pre Bid Inquiries Amend 0005.pdf
PDF 142 KB Posted
- Solicitation number
- N4008421B6300
About this file
This document contains responses to pre-bid inquiries for solicitation number N4008421B6300 for Weight Handling Equipment (WHE) and Rigging Support Services and Civil Engineering Support Equipment (CESE) rental Services at U.S. Fleet Activities Sasebo (CFAS), Japan. The Navy is seeking to procure WHE and rigging support, including cranes ranging from 20-25 tons, forklifts, and rigging teams. Responses provide clarification on lease terms for forklifts, minimum order amounts for rigging teams, participation by contractors at a pre-bid conference, and delivery timelines for various equipment. Requirements for forklift leases have been removed, and changes have been made to crane size ranges and establishment of line items by crane size in the updated performance work statement and solicitation.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0005 Attachment (3) Pre Bid Inquiry Form Solicitation No. N4008421B6300 WHE & CESE RENTAL at CFAS
Question No.
Reference (Sect/Para/Page)
QUESTION
GOVERNMENT RESPONSE
1 1700000 4.5
Is it required to start the lease service for 1.2ton and 1.5ton forklifts on 16 Mar 2021? Also, is the lease service ordered continuously 8years including option years?
指定されている 1.2 トンと 1.5 トンのフォークリフトのリースサービス
は 2021 年 3 月 16 日に開始され、オプション期間を含めると 8 年間連
続で使用され続けるのでしょうか。
The awarded contractor must be prepared to accept and perform services / provide equipment for all ELINs beginning on the first day of the ordering period for the
IDIQ.
The period of performance would be specified in any task order issued for any ELIN(s) including forklifts.
The Government has historically required these forklifts to meet operational requirements for at least 10 years. However, operational requirements are subject to change including increasing or decreasing required quantities.
2 1700000 4.5.3
We cannot ensure to complete repairs of disabled forklifts within four hours of initial call because mechanic is not always available at the time and some parts may need to be ordered for the repair.
Also, any substitute or replacement is unavailable. Because explosion proof type is very rare and forklift lease company doesn’t have spare.
Could you please reconsider about the requirements for forklift?
4 時間以内に不具合のあるフォークリフトの修理を完了することは保
障できません。なぜなら、いつも整備士が空いているとも限りません
し、修理のために部品を取り寄せる必要がある可能性もあるからで
す。また、修理や検査の際に代替機を提供することも難しいです。防
爆型のフォークリフトは希少であるためフォークリフトリース会社は
予備を持っていないようです。契約業者がこの要求事項を満たすのは
困難なため、これらの要求事項を見直していただけないでしょうか。
Repair work can be completed within 5 working days instead of 4 hours.
It is preferable that the explosion-proof type of forklift is provided as substitute. However, if the same type is not available, it is acceptable that a forklift of similar type is provided as practical.
See updated PWS, Attachment (1).
3 1700000 4.2
Attachment J-0200000-10
What is the factor to be determine the number of riggers when contractors crane is ordered? Which ELIN of rigging support team is expected to be ordered depending on the situation?
業者のクレーンが注文される際、リガーの数は何によって決定される
のでしょうか。どのシチュエーションでリガーサポートのどの ELIN
が注文される予定ですか?
A crane team is consisted of, at minimum, one crane operator and 5 to 6 riggers.
5 to 6 riggers are ordered when a contractor crane with operator is ordered.
- 6 riggers are required (1 signal man + 2 slingers on both ends) where “lift from” and “place to” locations are relatively distanced such as between a pier and deck of a ship.
- Where lifts are conducted within small enough envelope, then required riggers may be down to 5.
Small number of riggers are ordered as supplemental workforce to PWD crane team.
Above policy will apply when we order contractor crane of any size.
4 1700000 2.3.1
Could you please reconsider the minimum order amount for each ELIN of rigging support from four hours to eight hours on the basis of regular working hours, 0800 – 1645? Because it’s highly difficult to maintain riggers without guarantee of their wages.
賃金の保障が無いと人員の確保が難しいため玉掛サポートの時間は
0800-1645 の 8 時間を保障していただけませんか。
Yes, we will change the minimum order amount for rigging support to “8 hours per day” from 4 hours per day.
Annex 1700000 Spec Item 2.3.1 has been revised.
See updated PWS, Attachment (1).
5 Pre-Bid Conference
Is it possible to tell us the Contractors who participated in the pre-bid Conference on 15 DEC 2020?
Yes. The following contractors participated:
• Nippon Express Co., Ltd. Sasebo Branch
• Fukumaru Kensetsu
• Sasebo Kaiun
• Yoshida Kaiun
Attachment J-1700000-03
Which type, high mast type or standard type is required regarding the 1.5ton electric forklift specified in the attachment J-170000-03?
Standard type:
mast height:1.995 meters, head-guard (roof) height: 2.250 meters maximum load height: 3.885 meters weight: 2,340kg
High mast type:
mast height: 2.495 meters, head-guard (roof) height: 2.250 meters maximum load height: 4.885 meters weight: 2,340kg
Requirement of forklift lease will be removed from this requirement
It will take at least 140days to deliver for either types because of explosion proof.
アタッチメント J-1700000-03 に記載してある 1.5 トンの電気フォークリ
フトについては、ハイマストタイプとスタンダードタイプのどちらが
必要とされているのでしょうか? どちらにしても防爆型のため納品には最低 140 日かかります。
J-1700000-03
1700000 4.5.3
Folk lift company says that it is unavailable to provide a substitute in the event of repairs because of no stock.
いずれのフォークリフトも在庫を持たないため修理の際に代替品を持
ってくるのは不可能との事です。
Requirement of forklift lease will be removed from this
J-1700000-03
Regarding the minimum turn radius of “0.5 ton or 0.7ton electric forklift” specified in the attachment J-1700000-03, 1.42 meters is the minimum turn radius in maker’s standard.
アタッチメント J-1700000-03 に記載してある”0.5 トンもしくは 0.7 トン
の電気フォークリフト”については、メーカー標準規格で 1.42 メートル
が最小旋回半径です。
Requirement of forklift lease will be removed from this
Amendment00 Attachment J-170000- 03 Required type of forklift 1.5 ton (2) & (6)
There is no forklifts to satisfy requirements (2) & (6). There is only one forklifts rental service company which can provide explosion proof type and rack stocker. According to the company, there are two types of explosion proof, which are the standard type and high mast type.
Please confirm (2) weight, and (6) “Forklift height” means( mast height or head guard) in accordance with attached specification with this request form
Requirement of forklift lease will be removed from this
Section F- 170000 /4.5.2 /4.5.3 (cannot meet your requests)
The forklifts service company says that it takes about 4.5 months to install an explosion type (1.5ton) and about 5 months to install 1.2 ton (Rack stocker) because they are a kind of built to order manufacture.
Besides mentioned above, they cannot provide any substitutes when the forklifts are out from the Base for repair or other reasons, because the company don’t have same type of inventory at hand.
The POC of the company said that they are not sure how they deal with the forklifts after their contracts end, which have been rented to the government right now for their own contracts. This means that it is a
Requirement of forklift lease will be removed from this considerable possibility that they cannot provide old types of forklifts either, when the new ones are out of service.
ELIN
A700D-A700F B700D-B700F C700D-C700F D700D-D700F E700D-E700F F700D-F700F G700D-G700F H700D-H700F
Could you please change the range from 20-35 ton to 20-25 ton?
It’s highly difficult to make arrangements for 35ton crane timely as requested because there is not company which owns 35 ton crane around here.
クレーンの範囲を 20-35 トンから 20-25 トンに変更していただけません
か?このあたりに 35 トンクレーンを所有している会社が無いため必要
に応じて手配することがかなり困難です。
Yes, The Government updated to change to 20-25 ton.
Please see updated ELIN.
ELIN
A700S B700S C700S D700S E700S F700S G700S H700S
Could you please separate the “hourly rate for overtime of crane operator” by crane size?
There is a big difference between 2.9-15ton and 300ton.
クレーンオペレーターの残業時間料金をクレーンの大きさ毎に分けて
頂けませんか?2.9 トン-15 トンの残業料金と 300 トンの残業料金差が
大きすぎます。
Yes, two line items will be established by crane size as follows:
X700S: Crane of 5.0 – 70 ton X700T: Crane of 120 ton and above
File details come from the government source that posted it. Updated .