Base Rec

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC
ITEM 3
ELINs A001 through A024.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (¥)Total (¥)
A001NAF ATSUGI STATION FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A001AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A001ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A001ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A001ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
A001AEPreventive Maintenance (PM) Program, Cathodic Protection Systems, Spec Item 3.2.212MO¥0
A001 NAF Atsugi Station Fund, Sub Total¥0
A002HOUSING FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A002AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A002ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A002ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A002ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
A002AEIntegrated Maintenance Program (IMP), Closed Circuit Television Systems (CCTV), Spec Item 3.3.112MO¥0
A002 Housing Fund, Sub Total¥0
A003DoDEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A003AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A003ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A003ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A003ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
A003 DoDEA Fund, Sub Total¥0
A004UT FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A004AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A004ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A004ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A004ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
A004 NAVFAC FE UEM Fund, Sub Total¥0
A005DLA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A005AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A005ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A005ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A005ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
A005 DLA Fund, Sub Total¥0
A006USNH FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A006AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A006ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A006ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A006ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
A006AEPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A006 USNH Fund, Sub Total¥0
A007DeCA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A007AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A007ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A007ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A007ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
A007AEPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A007 DeCA Fund, Sub Total¥0
A008NAVAL SECURITY FORCES FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A008AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A008ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A008ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A008ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A008 Naval Security Forces Fund, Sub Total¥0
A009NAVSUP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A009AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A009ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A009ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A009ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A009 NAVSUP Fund, Sub Total¥0
A010NCTS FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A010AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A010ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A010ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A010ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A010 NCTS Fund, Sub Total¥0
A011NEX FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A011AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A011ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A011ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A011ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A011 NEX Fund, Sub Total¥0
A012BANK FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A012AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A012ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A012ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A012ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A012 Bank Fund, Sub Total¥0
A013CREDIT UNION FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A013AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A013ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A013ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A013ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A013 Credit Union Fund, Sub Total¥0
A014CNATT FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A014AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A014ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A014ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A014ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A014 CNATT Fund, Sub Total¥0
A015CFWP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A015AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A015ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A015ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A015ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A015 CFWP Fund, Sub Total¥0
A016NAVSEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A016AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A016ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A016ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A016ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A016 NAVSEA Fund, Sub Total¥0
A017AIR OPERATIONS FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A017AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A017ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A017ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A017ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A017 Air Operations Fund, Sub Total¥0
A018EMERGENCY MANAGEMENT FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A018AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A018ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A018ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A018ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A018 Emergency Management Fund, Sub Total¥0
A019NCIS FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A019AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A019ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A019ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A019ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A019 NCIS Fund, Sub Total¥0
A020MWR FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A020AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A020ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A020ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A020ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A020 MWR Fund, Sub Total¥0
A021NAF ATSUGI ADMIN FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A021AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A021ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A021ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A021ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A021 NAF Atsugi Admin Fund, Sub Total¥0
A022UH FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A022AAIntegrated Maintenance Program (IMP), Closed Circuit Television Systems (CCTV), Spec Item 3.3.112MO¥0
A022 UH Fund, Sub Total¥0
A023NGIS FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A023AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A023ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A023ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A023ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A023 NGIS Fund, Sub Total¥0
A024NAVY LODGE FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
A024AAEmergency Service Orders, Spec Item 3.1.112MO¥0
A024ABUrgent Service Orders, Spec Item 3.1.212MO¥0
A024ACRoutine Service Orders, Spec Item 3.1.312MO¥0
A024ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
A024 Navy Lodge Fund, Sub Total¥0
TOTAL RECURRING WORK PRICE - BASE PERIODTOTAL ¥¥0
NOTES:
(1) Abbreviation : MO = Month LS = Lump Sum
(2) The Offeror/Contractor will be requested to submit approximate cost breakdown per system and per building and/or per
command (facility.)

&CUNCLASSIFIED/FOR OFFICIAL USE ONLY&RSRN16774686

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

Base Non

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT A - CLIN 9000
Line Item 0002 Non-Recurring Work - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT, CUSTODIAL - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A711
Name of Offeror/Contractor:
ELINProduct NameDescription ExtendedEstimated Quantity (Maximum)Unit of IssueUnit Price (¥)Extended (Total) Price (¥)
A700Material - Sprinkler Head (including disposal of existing one)New sprinkler head (except for open sprinkler), equal or better to existing. This item may be issued in conjunction with other ELINs titled "Sprinkler Head Replacement Site Work," ELIN 701, 702 and 703. This ELIN is for the furnish of the material, sprinkler head. The ELIN shall also include the disposal cost of existing one. (UPT work)120EA¥0
A701Sprinkler Head Replacement Site Work (location; at 4 meters high or less)(Sprinkler head material will be ordered by using above ELIN A700.) The existing installed height is at 4 meters high or less. This item may be issued in conjunction with above ELIN A700. All the labor, equipment, and other associated cost required to replace sprinkler head (except for those listed in above ELIN A700) are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)
"One (1)" unit (UN) of this item will be issued to the replacement of sprinkler head up to 20 ea.7UN¥0
A702Sprinkler Head Replacement Site Work (location; over 4 meters high and up to 8 meters high)(Sprinkler head material will be ordered by using above ELIN A700.) The existing installed height is over 4 meters high and up to 8 meters high. This item may be issued in conjunction with above ELIN A700. All the labor, equipment, and other associated cost required to replace sprinkler head (except for those listed in above ELIN A700) are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)
"One (1)" unit (UN) of this item will be issued to the replacement of sprinkler head up to 20 ea.2UN¥0
A703Sprinkler Head Replacement Site Work (location; over 8 meters high and up to 16 meters high)(Sprinkler head material will be ordered by using above ELIN A700.) The existing installed height is over 8 meters high and up to 16 meters high. This item may be issued in conjunction with above ELIN A700. All the labor, equipment, and other associated cost required to replace sprinkler head (except for those listed in above ELIN A700) are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)
"One (1)" unit (=1 time) of this item will be issued to the replacement of sprinkler head up to 20 ea.3UN¥0
A704Replacement of Spot Type Smoke Detector (at 3 meters high or less)Replace existing spot type smoke detector (hard wired) with new, equal or better to existing. New smoke detector shall be photo-electronic type. Use of ionization type will not be approved. The existing installed height is at or less than 3 meters. All the labor, equipment, materials, and other associated cost are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)10EA¥0
A705Replacement of Spot Type Heat Detector (at 3 meters high or less)Replace existing spot type heat detector with new, equal or better to existing. (New heat detector does not have to be explosion-proof.) The existing installed height is at or less than 3 meters. All the labor, equipment, materials, and other associated cost are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)10EA¥0
A706Material - Foam Concentrate (AFFF)Foam concentrate, aqueous film-forming foam (AFFF). This item may be used when foam (AFFF) system was used for actual fire or when quantity in foam tanks is reduced by accidental reason (such as accidental discharge) which the Contractor is not responsible for, and will be issued in conjunction with other ELIN titled "Foam Tank Filling Work," ELIN A707. This ELIN is for the furnish of the material, AFFF concentrate compatible with remaining. This ELIN may not be used for facility that does not use local made AFFF (currently Bldg. 183 does not use local Japanse product of AFFF.) Foam concentrate shall not contain any PFOS or other prohibited/regulated substance and shall be a product appropriate to foam system manufacturer. CN on Unit of Issue is a 20 liter can of foam concentrate, and order will be placed per 20 liter can, CN. For instance, if the required foam concentrate is 3,000 liter, the ordered quantity will be; 150 CN (can) (20 liter x 150 cans = 3,000 liter) (UPT work)60CN¥0
A707Foam Tank Filling WorkThis item may be used when foam (AFFF) system was used for actual fire or when quantity in foam tanks is reduced by any other reason (such as accidental discharge) which the Contractor is not responsible for. Fill the foam tank(s) with AFFF. The AFFF to be filled may be the Contractor furnished (per above ELIN A706) or may be the Government furnished. All the labor, equipment, and other associated cost required to fill the foam tank(s) with AFFF (except for those listed in above ELIN A706) are included, and if the AFFF is GFM the work indicated in J-0200000-06 is included.

In case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN.

Note that disposal of containers is included in this ELIN.

"One (1)" unit (UN) of this item will be issued to the foam tank filling work up to 3,000 Liter (i.e., 150 CN/cans). (UPT work)3UN¥0
A708Connect Alarm Signal to Base Wide Alarm MonitorProvide services to connect through existing telephone cable an existing alarm panel to the Base Wide Alarm Monitor Panel so alarm signal from the builidng is transmitted to a designated Base Wide Alarm Monitor. Connect building alarm panel and the bulding's MDF, and base wide alarm monitor panel and the buildings' MDF. "One (1)" EA of this item includes the line connection at both facilities. By one (1) EA order, the Contractor shall successfully complete singal transmission from one building to a base wide alarm monitor. All the labor, equipment, materials and other associated cost required for the signal transmission are included. Test and make sure alam signal is properly transmitted to a designated base wide alarm monitor. (UPT Work)3EA¥0
A709Unit Priced Labor Work - During Regular Working Hours (Negotiated)Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order.3,500HR¥0
A710Unit Priced Labor Work - Outside Regular Working Hours (Negotiated)Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order.700HR¥0
A711Material Costs- (Negotiated)Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.60,000,000Yen
TOTAL NON-RECURRING WORK PRICE BASE PERIOD (MAX AMOUNT)¥0
Notes:
Note 1: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 2: Abbreviation - LS = Lump Sum EA = Each UN = Unit HR = Hour CN = Can (for ELIN A706, 20L can)
Note 3: A700 through A708 may be uploaded at FedMall.

&CUNCLASSIFIED/FOR OFFICIAL USE ONLY&R&9SRN16774686

1st Rec

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0003 Recurring Work - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC
ITEM 3
ELINs B001 through B024.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (¥)Total (¥)
B001NAF ATSUGI STATION FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B001AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B001ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B001ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B001ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
B001AEPreventive Maintenance (PM) Program, Cathodic Protection Systems, Spec Item 3.2.212MO¥0
B001 NAF Atsugi Station Fund, Sub Total¥0
B002HOUSING FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B002AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B002ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B002ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B002ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
B002AEIntegrated Maintenance Program (IMP), Closed Circuit Television Systems (CCTV), Spec Item 3.3.112MO¥0
B002 Housing Fund, Sub Total¥0
B003DoDEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B003AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B003ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B003ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B003ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
B003 DoDEA Fund, Sub Total¥0
B004UT FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B004AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B004ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B004ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B004ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
B004 UT Fund, Sub Total¥0
B005DLA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B005AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B005ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B005ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B005ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
B005 DLA Fund, Sub Total¥0
B006USNH FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B006AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B006ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B006ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B006ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
B006AEPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B006 USNH Fund, Sub Total¥0
B007DeCA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B007AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B007ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B007ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B007ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
B007AEPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B007 DeCA Fund, Sub Total¥0
B008NAVAL SECURITY FORCES FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B008AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B008ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B008ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B008ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B008 Naval Security Forces Fund, Sub Total¥0
B009NAVSUP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B009AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B009ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B009ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B009ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B009 NAVSUP Fund, Sub Total¥0
B010NCTS FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B010AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B010ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B010ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B010ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B010 NCTS Fund, Sub Total¥0
B011NEX FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B011AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B011ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B011ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B011ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B011 NEX Fund, Sub Total¥0
B012BANK FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B012AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B012ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B012ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B012ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B012 Bank Fund, Sub Total¥0
B013CREDIT UNION FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B013AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B013ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B013ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B013ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B013 Credit Union Fund, Sub Total¥0
B014CNATT FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B014AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B014ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B014ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B014ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B014 CNATT Fund, Sub Total¥0
B015CFWP FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B015AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B015ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B015ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B015ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B015 CFWP Fund, Sub Total¥0
B016NAVSEA FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B016AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B016ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B016ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B016ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B016 NAVSEA Fund, Sub Total¥0
B017AIR OPERATIONS FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B017AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B017ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B017ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B017ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B017 Air Operations Fund, Sub Total¥0
B018EMERGENCY MANAGEMENT FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B018AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B018ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B018ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B018ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B018 Emergency Management Fund, Sub Total¥0
B019NCIS FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B019AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B019ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B019ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B019ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B019 NCIS Fund, Sub Total¥0
B020MWR FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B020AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B020ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B020ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B020ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B020 MWR Fund, Sub Total¥0
B021NAF ATSUGI ADMIN FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B021AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B021ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B021ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B021ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B021 NAF Atsugi Admin Fund, Sub Total¥0
B022UH FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B022AAIntegrated Maintenance Program (IMP), Closed Circuit Television Systems (CCTV), Spec Item 3.3.112MO¥0
B022 UH Fund, Sub Total¥0
B023NGIS FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B023AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B023ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B023ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B023ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B025 NGIS Fund, Sub Total¥0
B024NAVY LODGE FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
B024AAEmergency Service Orders, Spec Item 3.1.112MO¥0
B024ABUrgent Service Orders, Spec Item 3.1.212MO¥0
B024ACRoutine Service Orders, Spec Item 3.1.312MO¥0
B024ADPreventive Maintenance (PM) Program, Intrusion Detection Systems, Spec Item 3.2.312MO¥0
B024 Navy Lodge Fund, Sub Total¥0
TOTAL RECURRING WORK PRICE - FIRST OPTION PERIODTOTAL ¥¥0
NOTES:
(1) Abbreviation : MO = Month LS = Lump Sum
(2) The Offeror/Contractor will be requested to submit approximate cost breakdown per system and per building and/or per
command (facility.)

&CUNCLASSIFIED/FOR OFFICIAL USE ONLY&RSRN16774686

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

12' Panel, With Barbwire, 7' Height, Free-Standing

1st Non

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT B - CLIN 9001
Line Item 0004 Non-Recurring Work - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT, CUSTODIAL - NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B717
Name of Offeror/Contractor:
ELINProduct NameDescription ExtendedEstimated Quantity (Maximum)Unit of IssueUnit Price (¥)Extended (Total) Price (¥)
B700Material - Sprinkler Head (including disposal of existing one)New sprinkler head (except for open sprinkler), equal or better to existing. This item may be issued in conjunction with other ELINs titled "Sprinkler Head Replacement Site Work," ELIN 701, 702 and 703. This ELIN is for the furnish of the material, sprinkler head. The ELIN shall also include the disposal cost of existing one. (UPT work)120EA¥0
B701Sprinkler Head Replacement Site Work (location; at 4 meters high or less)(Sprinkler head material will be ordered by using above ELIN B700.) The existing installed height is at 4 meters high or less. This item may be issued in conjunction with above ELIN B700. All the labor, equipment, and other associated cost required to replace sprinkler head (except for those listed in above ELIN B700) are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)
"One (1)" unit (UN) of this item will be issued to the replacement of sprinkler head up to 20 ea.7UN¥0
B702Sprinkler Head Replacement Site Work (location; over 4 meters high and up to 8 meters high)(Sprinkler head material will be ordered by using above ELIN B700.) The existing installed height is over 4 meters high and up to 8 meters high. This item may be issued in conjunction with above ELIN B700. All the labor, equipment, and other associated cost required to replace sprinkler head (except for those listed in above ELIN B700) are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)
"One (1)" unit (UN) of this item will be issued to the replacement of sprinkler head up to 20 ea.2UN¥0
B703Sprinkler Head Replacement Site Work (location; over 8 meters high and up to 16 meters high)(Sprinkler head material will be ordered by using above ELIN B700.) The existing installed height is over 8 meters high and up to 16 meters high. This item may be issued in conjunction with above ELIN B700. All the labor, equipment, and other associated cost required to replace sprinkler head (except for those listed in above ELIN B700) are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)
"One (1)" unit (=1 time) of this item will be issued to the replacement of sprinkler head up to 20 ea.3UN¥0
B704Replacement of Spot Type Smoke Detector (at 3 meters high or less)Replace existing spot type smoke detector (hard wired) with new, equal or better to existing. New smoke detector shall be photo-electronic type. Use of ionization type will not be approved. The existing installed height is at or less than 3 meters. All the labor, equipment, materials, and other associated cost are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)10EA¥0
B705Replacement of Spot Type Heat Detector (at 3 meters high or less)Replace existing spot type heat detector with new, equal or better to existing. (New heat detector does not have to be explosion-proof.) The existing installed height is at or less than 3 meters. All the labor, equipment, materials, and other associated cost are included. Exception may be; in case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN. (UPT work)10EA¥0
B706Material - Foam Concentrate (AFFF)Foam concentrate, aqueous film-forming foam (AFFF). This item may be used when foam (AFFF) system was used for actual fire or when quantity in foam tanks is reduced by accidental reason (such as accidental discharge) which the Contractor is not responsible for, and will be issued in conjunction with other ELIN titled "Foam Tank Filling Work," ELIN B707. This ELIN is for the furnish of the material, AFFF concentrate compatible with remaining. This ELIN may not be used for facility that does not use local made AFFF (currently Bldg. 183 does not use local Japanse product of AFFF.) Foam concentrate shall not contain any PFOS or other prohibited/regulated substance and shall be a product appropriate to foam system manufacturer. CN on Unit of Issue is a 20 liter can of foam concentrate, and order will be placed per 20 liter can, CN. For instance, if the required foam concentrate is 3,000 liter, the ordered quantity will be; 150 CN (can) (20 liter x 150 cans = 3,000 liter) (UPT work)60CN¥0
B707Foam Tank Filling WorkThis item may be used when foam (AFFF) system was used for actual fire or when quantity in foam tanks is reduced by any other reason (such as accidental discharge) which the Contractor is not responsible for. Fill the foam tank(s) with AFFF. The AFFF to be filled may be the Contractor furnished (per above ELIN B706) or may be the Government furnished. All the labor, equipment, and other associated cost required to fill the foam tank(s) with AFFF (except for those listed in above ELIN B706) are included, and if the AFFF is GFM the work indicated in J-0200000-06 is included.

In case the Contractor cannot access to the area or cannot set up necessary tools/vehicles without removing some existing facility, other ELIN may be issued with this ELIN.

Note that disposal of containers is included in this ELIN.

"One (1)" unit (UN) of this item will be issued to the foam tank filling work up to 3,000 Liter (i.e., 150 CN/cans). (UPT work)3UN¥0
B708Connect Alarm Signal to Base Wide Alarm MonitorProvide services to connect through existing telephone cable an existing alarm panel to the Base Wide Alarm Monitor Panel so alarm signal from the builidng is transmitted to a designated Base Wide Alarm Monitor. Connect building alarm panel and the bulding's MDF, and base wide alarm monitor panel and the buildings' MDF. "One (1)" EA of this item includes the line connection at both facilities. By one (1) EA order, the Contractor shall successfully complete singal transmission from one building to a base wide alarm monitor. All the labor, equipment, materials and other associated cost required for the signal transmission are included. Test and make sure alam signal is properly transmitted to a designated base wide alarm monitor. (UPT Work)3EA¥0
B709Unit Priced Labor Work - During Regular Working Hours (Negotiated)Provide labor to perform all Unit Priced Labor work (during regular working hours) per the scope and delivery schedule specified in the order.3,500HR¥0
B710Unit Priced Labor Work - Outside Regular Working Hours (Negotiated)Provide labor to perform all Unit Priced Labor work (outside regular working hours) per the scope and delivery schedule specified in the order.700HR¥0
B711Material Costs- (Negotiated)Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.60,000,000Yen
TOTAL NON-RECURRING WORK PRICE FIRST OPTION PERIOD (MAX AMOUNT)¥0
Notes:
Note 1: Unit Price Column - Unit Prices must be expressed in whole yen. Extended Price must equal Estimated Quantity times Unit Price.
Note 2: Abbreviation - LS = Lump Sum EA = Each UN = Unit HR = Hour CN = Can (for ELIN B706, 20L can)
Note 3: B700 through B708 may be uploaded at FedMall.

&CUNCLASSIFIED/FOR OFFICIAL USE ONLY&R&9SRN16774686

2nd Rec

ATTACHMENT J-0200000-08
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #
EXHIBIT C - CLIN 9002
Line Item 0005 Recurring Work - Second Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC
ITEM 3
ELINs C001 through C024.
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit Price (¥)Total (¥)
C001NAF ATSUGI STATION FUND, Spec Item 3, Sub Annex 1502000 Facility Investment
C001AAEmergency Service Orders, Spec Item 3.1.112MO¥0
C001ABUrgent Service Orders, Spec Item 3.1.212MO¥0
C001ACRoutine Service Orders, Spec Item 3.1.312MO¥0
C001ADPreventive Maintenance (PM) Program, Fire Protection Systems, Spec Item 3.2.112MO¥0
C001AEPreventive Maintenance (PM) Program, Cathodic Protection Systems, Spec Item 3.2.212MO¥0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .