Attachment (3) PPI Response_20R6301_Amend 0002.pdf
PDF 135 KB Posted
- Attached to
- SWIMMING POOLS AT CFAS
- Solicitation number
- N4008420R6301
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008420R6301_Amend 0002.pdf | ||
| Attachment (2) ELIN List_Amend 0002_r.xlsx | XLSX spreadsheet | |
| N4008420R6301_Amend 0001.pdf | ||
| Attachment (3) PPI Response_20R6301.pdf | ||
| Attachment (d) Provision 52.204-24.pdf | ||
| Attachment (c) SECNAV5512-1.pdf | ||
| Attachment (e) PPQ Form.doc | DOC document | |
| Attachment (a) Pre-Proposal Inquiry Fom.doc | DOC document | |
| Attachment (b) DBIDS Card - Paper Pass Request.xlsx | XLSX spreadsheet | |
| Attachment (2) ELIN List.xlsx | XLSX spreadsheet | |
| N4008420R6301.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment (3): Pre‐Proposal Inquiry Response –N4008420R6301 Amendment 0002
Solicitation No. N4008420R6301 SWIMMING POOLS AT CFAS
Question No.
Reference (Sect/Para/Page)
QUESTION GOVERNMENT RESPONSE
1 Award May we request the previous bid tabulations and/or contract award to ensure we provide the most competitive submission possible for review?
The current contract, N4008415D6000, was awarded on 26 May 2015.
All information can be found at Federal Procurement Data System (https://www.fpds.gov).
2 Pg. 258/263 We notice on the PWS that there are items listed as being performed daily, as well as twice per day. We perceive this as meaning we are servicing all Three (3) pools daily, and even twice per day, Year Round. Can you confirm all three pools are serviced Year-Round, or do we go off of Page 262’s schedule below of the pools being closed part of the year?
Main Base and Hario Outdoor Pools: 1 May - Sept 30th
Indoor Training Pool: Service is Sept 1st through the 31st of May
The pools are NOT serviced year-round, they are serviced only during the period of pool operation that is listed on the “Pool Operation Period”, Attachment J-1503040-04. The Contractor’s work is only required for the pool operation period.
3 Pg. 12 We want to confirm that the Government will be paying for the electricity and water to fill/operate the pumps, chemical feed pumps, etc. in section 2.4.2 it states that we are responsible for paying utilities.
“The Contractor is responsible for the cost of all utilities at all Government- provided facilities and any additional Contractor-owned facilities, at prevailing Naval Station rates. The Contractor will be billed directly for all utilities provided to all Contractor occupied facilities.
Historically, electrical and water utility consumption at the Government- Furnished Facilities has averaged approximately 103,211 MWH of electricity and 161,851 KGAL annually. “
Our question is do we need to budget to finance the operation of the pool when it comes to monthly utilities, and if so, at what point is the Government responsible for utilities in the case of the system being down, pool leaking, etc.?
Yes, the Government will pay for the water and electricity costs that will be utilized to perform required work at the workplace, which includes the mechanical rooms in this contract.
No, there is no need to include utility cost in the Offeror’s cost/price proposal as there are no Government- provided facilities (Spec Item 2.4.1) or Contractor-owned facilities for this requirement.
4 Pg. 47/264 Recurring Work
1503040-Other(Training Pools) Spec Item 3 『Pool operation period is provided in J-1503040-04』
Do the swimming pool operators have to stay at the work Site (e.g. 0530-1900 M/B) IAW the each pool operation times Shown in J-1503040-04?
And if so, Hario HSG’s closed day” Monday” requires no Operator working?
No, pool operators are not required to stay at the work site during pool operation times. It is up to the Contractor to establish an appropriate work schedule that allows the performance of the operation and maintenance of the water treatment system as listed in J-1502000-05 and J-1503040-05.
Yes, operation and maintenance is still required on the day the pool is Closed. The water treatment system is continuously running to maintain the water quality during the pool operation period.
5 Pg. 47/264 Water treatment and Filtration system
Pg. 48/264
1503040 Spec Item:3.1.1 In case of an urgent supplies of chemicals to the water Treatment chemical system, Can the contractor have the space to store minimum quantity of the chemicals at the proper place in the swimming pool Location?
『Types of chemicals and average annual usage amount are provided in J-1503040-06』 We would like to make sure if the annual usage amount for the each type Chemical name in J-1503040-06 correct.
Yes. Per Annex 2 Spec Item 2.5 Contractor-Furnished Items; “the Contractor is required to provide a locker for chemical containers”.
Corrected historical usage amount and unit of measurement is provided in J-1503040-06.
6 Pg. 40-41/264 Preventive Maintenance (PM) Program
1502000 Spec Item 3.2 『The Contractor is fully responsible for and shall perform Any repairs, including replacement, discovered during Scheduled Maintenance work up to a total of ¥300,000 per Occurrence.』(40PG) 『A non-recurring work task order may be issued for repairs Exceeding the liability limit.』(41PG) We understand that the issued non-recurring work task order will cover the whole amount of the cost including the liability limit (¥300,000).
Is our understanding acceptable?
A non-recurring work task order issued for repairs exceeding the liability limit of ¥300,000 will be paid for the full cost incurred minus the liability limit.
Example: Expense for repairs totaling ¥400,000 ¥400,000 (repairs) - ¥300,000 (Liability limit) = ¥100,000 Total Price for Task Order.
7 Pg. 39/264 Workmanship and Material Standards
1502000 Spec Item:2.3.1 『The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in timely manner to assure full life expectancy of the facilities, systems, and equipment.』
In order to respond to appropriate maintenance checking, We would like to share the life expectancy list and the latest repair record that will be written on Attachment J-1502000-02.
The condition of all equipment will be confirmed at the initial inventory check, as required in 1502000 Spec Item 3.
Historical data of equipment repair/replacement is added to PWS as J- 1502000-06.
File details come from the government source that posted it. Updated .