Atch(2)_J-0200000-18_ELINs.xlsx

XLSX spreadsheet 202 KB Posted

Attached to
HVAC Systems Maintenance, Testing, and Installation Services at U. S. Marine Corps Air Station Iwakuni, Japan
Solicitation number
N4008420B5400
Issued by

View the file

Other files

File Type Posted
20B5400_A0008.pdf PDF
Encl(1)_PWS_J-0200000-19_ELINs_A0007.pdf PDF
20B5400_A0007.pdf PDF
Encl(2)_Amend_List_A0007.pdf PDF
Atch(2)_J-0200000-19_ELINs_A0007.xlsx XLSX spreadsheet
Encl(1)_Government_Response_A0006.pdf PDF
20B5400_A0006.pdf PDF
Encl(2)_Amend_List_A0006.pdf PDF
Encl(2)_Amend_List_A0005.pdf PDF
Encl(1)_Government_Response_A0005.pdf PDF
20B5400_A0005.pdf PDF
20B5403_A0004.pdf PDF
20B5403_A0003.pdf PDF
Encl(1)_Government_Response_A0003.pdf PDF
Encl(1)_Government_Response_A0002.pdf PDF
20B5403_A0002.pdf PDF
Encl(2)_Amend_List_A0001.pdf PDF
Atch(2)_J-0200000-19_ELINs_A0001.xlsx XLSX spreadsheet
20B5400_A0001.pdf PDF
Encl(1)_Government_Response_A0001.pdf PDF
Atch(3)_Restricted_Area_Access.docx DOCX document
Atch(4)_1-Day_Official_Entry-Exit_Request.pdf PDF
20B5400_SF1449.pdf PDF
Atch(5)_PreBid_Inquiry_Form.xlsx XLSX spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINs-Base-Recurring

ATTACHMENT J-0200000-18
EXHIBIT LINE ITEM NUMBERS (ELINs)
HVAC SYSTEMS MAINTENANCE, TESTING, REPAIR, AND INSTALLATION SERVICES AT U. S. MCAS IWAKUNI, JAPAN
EXHIBIT A - CONTRACT LINE ITEM NUMBER (CLIN) 0001
Contract Period: 12 months (1 April 2020 through 31 March 2021)
Line Item 0001 Recurring Work - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT (FI) - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A008
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
1Station-Funded Areas - Spec Item 3
1AAEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for Bldg. #s 606, 607, 9500 (Performance of period (POP) FY20).6MO¥ - 0¥ - 0
1ABEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for services other than Sub ELIN A001AA.12MO¥ - 0¥ - 0
1ACUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for Bldg. #s 606, 607, 9500 (POP FY20).6MO¥ - 0¥ - 0
1ADUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for services other than Sub ELIN A001AC.12MO¥ - 0¥ - 0
1AERoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for Bldg. #s 606, 607, 9500 (POP FY20).6MO¥ - 0¥ - 0
1AFRoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for services other than Sub ELIN A001AE.12MO¥ - 0¥ - 0
1AGPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for Bldg. #s 606, 607, 9500 (POP FY20).6MO¥ - 0¥ - 0
1AHPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for services other than Sub ELIN A001AG.12MO¥ - 0¥ - 0
1AJInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.) (POP FY20).0MO¥ - 0¥ - 0
1AKInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.) (POP FY21).0MO¥ - 0¥ - 0
1ALHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contactor shall include the price for Bldg. #s 606, 607, 9500 (POP FY20).6MO¥ - 0¥ - 0
1AMHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
For rest of Bldgs listed under the Sub ELIN A001AK.12MO¥ - 0¥ - 0
1ANHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contactor shall include the price for Bldg. #s 606, 607, 9500 (POP FY20).6MO¥ - 0¥ - 0
1APHVAC Water Testing and Treatment Services, Spec Item 3.4.2
For rest of Bldgs listed under the Sub ELIN A001AM.12MO¥ - 0¥ - 0
1AQHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for Bldg. #s 606, 607, 9500 (POP FY20).6MO¥ - 0¥ - 0
1ARHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for services other than Sub ELIN A001AP.12MO¥ - 0¥ - 0

Station-Funded Areas Subtotal ¥ - 0

2 Housing Funded Areas - Spec Item 3 Remarks: POP for Housing-funded areas are 1 May 2020 through 31 March 2021, 11 months except for Bldg #200.

2AAEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contractor shall include the price for Bldg. #200.12MO¥ - 0¥ - 0
2ABEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contractor shall include the price except for Bldg. #200.11MO¥ - 0¥ - 0
2ACUrgent Service Orders, Spec item 3.1.2
The Offeror / Contractor shall include the price for Bldg. #200.12MO¥ - 0¥ - 0
2ADUrgent Service Orders, Spec item 3.1.2
The Offeror / Contractor shall include the price except for Bldg. #200.11MO¥ - 0¥ - 0
2AERoutine Service Orders, Spec Item 3.1.3
The Offeror / Contractor shall include the price for Bldg. #200.12MO¥ - 0¥ - 0
2AFRoutine Service Orders, Spec Item 3.1.3
The Offeror / Contractor shall include the price except for Bldg. #200.11MO¥ - 0¥ - 0
2AGPM Program, Spec Item 3.2
The Offeror / Contractor shall include the price for Bldg. #200.12MO¥ - 0¥ - 0
2AHPM Program, Spec Item 3.2
The Offeror / Contractor shall include the price except for Bldg. #200.11MO¥ - 0¥ - 0
2AJInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
2AKHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contractor shall include the price for Bldg. #200.12MO¥ - 0¥ - 0
2ALHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contractor shall include the price except for Bldg. #200.11MO¥ - 0¥ - 0
2AMHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contractor shall include the price except for Bldg. #200.12MO¥ - 0¥ - 0
2ANHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contractor shall include the price except for Bldg. #200.11MO¥ - 0¥ - 0
2APHVAC Resetting, Spec Item 3.4.3
The Offeror / Contractor shall include the price for Bldg. #200.12MO¥ - 0¥ - 0
2AQHVAC Resetting, Spec Item 3.4.3
The Offeror / Contractor shall include the price except for Bldg. #200.11MO¥ - 0¥ - 0

Housing Funded Areas Subtotal ¥ - 0

3Defense Commissary Agency (DeCA) Central Distribution Center (CDC) Funded Areas - Spec Item 3
3AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
3ABUrgent Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
3ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
3ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
3AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
3AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
3AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
3AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DeCA CDC Funded Areas Subtotal ¥ - 0

4Petroleum, Oils, and Lubrications (POL) Funded Areas - Spec Item 3
4AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
4ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
4ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
4ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
4AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
4AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
4AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
4AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

POL Funded Areas Subtotal ¥ - 0

5Department of Defense Education Activity (DoDEA) Funded Areas - Spec Item 3
5AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
5ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
5ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
5ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
5AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
5AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
5AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
5AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DoDEA Funded Areas Subtotal ¥ - 0

6Defense Logistics Agency (DLA) Disposition Funded Areas (Bldg. #299) - Spec Item 3
6AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
6ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
6ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
6ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
6AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
6AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
6AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
6AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DLA Funded Areas Subtotal ¥ - 0

7Defense Logistics Agency (DLA) Distribution Funded Areas (Bldg. #1645) - Spec Item 3
7AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
7ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
7ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
7ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
7AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
7AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
7AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
7AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DLA Funded Areas Subtotal ¥ - 0

8 Marine Corps Community Services (MCCS) Funded Areas - Spec Item 3 Remarks: The Offeror / Contactor shall include the service cost for Bldg. #s606, 607 and 9500 (100%) in this ELIN. The Government will allocate the % for Bldg. #9500.

8AAEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607 (POP FY21).6MO¥ - 0¥ - 0
8ABEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for Bldg. #9500 (POP FY21).6MO¥ - 0¥ - 0
8ACUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607 (POP FY21).6MO¥ - 0¥ - 0
8ADUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for Bldg. #9500 (POP FY21).6MO¥ - 0¥ - 0
8AERoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607 (POP FY21).6MO¥ - 0¥ - 0
8AFRoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for Bldg. #9500 (POP FY21).6MO¥ - 0¥ - 0
8AGPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607 (POP FY21).6MO¥ - 0¥ - 0
8AHPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for Bldg. #9500 (POP FY21).6MO¥ - 0¥ - 0
8AJInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for Bldg. #s 606 & 607 (POP FY21) for future use.)0MO¥ - 0¥ - 0
8AKInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for Bldg. #9500 (POP FY21) for future use.)0MO¥ - 0¥ - 0
8ALHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607 (POP FY21).6MO¥ - 0¥ - 0
8AMHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contactor shall include the price for Bldg. #9500 (POP FY21).6MO¥ - 0¥ - 0
8ANHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607 (POP FY21).6MO¥ - 0¥ - 0
8APHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contactor shall include the price for Bldg. #9500 (POP FY21).6MO¥ - 0¥ - 0
8AQHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607 (POP FY21).6MO¥ - 0¥ - 0
8ARHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for Bldg. #9500 (POP FY21).6MO¥ - 0¥ - 0

MCCS Funded Areas Subtotal ¥ - 0

TOTAL RECURRING WORK PRICE - BASE PERIOD¥ - 0
Remarks: MO = month, YR = year, FY = fiscal year, POP = periods of performance
- POP FY 20 (6 months) is 1 May 2019 through 30 September 2020
- POP FY 21 (6 months) is 1 October 2020 through 31 March 2021

&"TIMES NEW,Regular"UNCLASSIFIED / FOR OFFICIAL USE ONLY

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELINs-1st OP-Recurring

ATTACHMENT J-0200000-18
EXHIBIT LINE ITEM NUMBERS (ELINs)
HVAC SYSTEMS MAINTENANCE, TESTING, REPAIR, AND INSTALLATION SERVICES AT U. S. MCAS IWAKUNI, JAPAN
EXHIBIT B - CONTRACT LINE ITEM NUMBER (CLIN) 0003
Contract Period: 12 months (1 April 2021 through 31 March 2022)
Line Item 0003 Recurring Work - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT (FI) - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B008
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
1Station-Funded Areas - Spec Item 3
1AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
1ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
1ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
1ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
1AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
1AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
1AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
1AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

Station-Funded Areas Subtotal ¥ - 0

2Housing Funded Areas - Spec Item 3
2AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
2ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
2ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
2ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
2AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
2AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
2AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
2AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

Housing Funded Areas Subtotal ¥ - 0

3Defense Commissary Agency (DeCA) Central Distribution Center (CDC) Funded Areas - Spec Item 3
3AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
3ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
3ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
3ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
3AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
3AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
3AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
3AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DeCA CDC Funded Areas Subtotal ¥ - 0

4Petroleum, Oils, and Lubrications (POL) Funded Areas - Spec Item 3
4AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
4ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
4ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
4ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
4AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
4AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
4AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
4AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

POL Funded Areas Subtotal ¥ - 0

5Department of Defense Education Activity (DoDEA) Funded Areas - Spec Item 3
5AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
5ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
5ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
5ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
5AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
5AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
5AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
5AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DoDEA Funded Areas Subtotal ¥ - 0

6Defense Logistics Agency (DLA) Disposition Funded Areas (Bldg. #299) - Spec Item 3
6AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
6ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
6ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
6ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
6AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
6AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
6AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
6AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DLA Funded Areas Subtotal ¥ - 0

7Defense Logistics Agency (DLA) Distribution Funded Areas (Bldg. #1645) - Spec Item 3
7AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
7ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
7ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
7ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
7AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
7AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
7AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
7AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DLA Funded Areas Subtotal ¥ - 0

8 Marine Corps Community Services (MCCS) Funded Areas - Spec Item 3 Remarks: The Offeror / Contactor shall include the service cost for Bldg. #s606, 607 and 9500 (100%) in this ELIN. The Government will allocate the % for Bldg. #9500.

8AAEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8ABEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8ACUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8ADUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AERoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8AFRoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AGPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8AHPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AJInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for Bldg. #s 606 & 607 for future use.)0MO¥ - 0¥ - 0
8AKInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for Bldg. #9500 for future use.)0MO¥ - 0¥ - 0
8ALHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8AMHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8ANHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8APHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AQHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8ARHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0

MCCS Funded Areas Subtotal ¥ - 0

TOTAL RECURRING WORK PRICE - FIRST OPTION PERIOD¥ - 0
Remarks: MO = month, YR = year, FY = fiscal year

&"TIMES NEW,Regular"UNCLASSIFIED / FOR OFFICIAL USE ONLY

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-2nd OP-Recurring

ATTACHMENT J-0200000-18
EXHIBIT LINE ITEM NUMBERS (ELINs)
HVAC SYSTEMS MAINTENANCE, TESTING, REPAIR, AND INSTALLATION SERVICES AT U. S. MCAS IWAKUNI, JAPAN
EXHIBIT C - CONTRACT LINE ITEM NUMBER (CLIN) 0005
Contract Period: 12 months (1 April 2022 through 31 March 2023)
Line Item 0005 Recurring Work - Second Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT (FI) - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C008
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
1Station-Funded Areas - Spec Item 3
1AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
1ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
1ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
1ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
1AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
1AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
1AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
1AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

Station-Funded Areas Subtotal ¥ - 0

2Housing Funded Areas - Spec Item 3
2AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
2ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
2ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
2ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
2AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
2AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
2AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
2AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

Housing Funded Areas Subtotal ¥ - 0

3Defense Commissary Agency (DeCA) Central Distribution Center (CDC) Funded Areas - Spec Item 3
3AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
3ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
3ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
3ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
3AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
3AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
3AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
3AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DeCA CDC Funded Areas Subtotal ¥ - 0

4Petroleum, Oils, and Lubrications (POL) Funded Areas - Spec Item 3
4AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
4ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
4ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
4ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
4AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
4AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
4AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
4AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

POL Funded Areas Subtotal ¥ - 0

5Department of Defense Education Activity (DoDEA) Funded Areas - Spec Item 3
5AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
5ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
5ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
5ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
5AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
5AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
5AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
5AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DoDEA Funded Areas Subtotal ¥ - 0

6Defense Logistics Agency (DLA) Disposition Funded Areas (Bldg. #299) - Spec Item 3
6AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
6ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
6ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
6ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
6AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
6AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
6AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
6AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DLA Funded Areas Subtotal ¥ - 0

7Defense Logistics Agency (DLA) Distribution Funded Areas (Bldg. #1645) - Spec Item 3
7AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
7ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
7ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
7ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
7AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
7AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
7AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
7AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DLA Funded Areas Subtotal ¥ - 0

8 Marine Corps Community Services (MCCS) Funded Areas - Spec Item 3 Remarks: The Offeror / Contactor shall include the service cost for Bldg. #s606, 607 and 9500 (100%) in this ELIN. The Government will allocate the % for Bldg. #9500.

8AAEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8ABEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8ACUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8ADUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AERoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8AFRoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AGPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8AHPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AJInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for Bldg. #s 606 & 607 for future use.)0MO¥ - 0¥ - 0
8AKInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for Bldg. #9500 for future use.)12MO¥ - 0¥ - 0
8ALHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8AMHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8ANHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8APHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AQHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8ARHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0

MCCS Funded Areas Subtotal ¥ - 0

TOTAL RECURRING WORK PRICE - SECOND OPTION PERIOD¥ - 0
Remarks: MO = month, YR = year, FY = fiscal year

&"TIMES NEW,Regular"UNCLASSIFIED / FOR OFFICIAL USE ONLY

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

ELINs-3rd OP-Recurring

ATTACHMENT J-0200000-18
EXHIBIT LINE ITEM NUMBERS (ELINs)
HVAC SYSTEMS MAINTENANCE, TESTING, REPAIR, AND INSTALLATION SERVICES AT U. S. MCAS IWAKUNI, JAPAN
EXHIBIT D - CONTRACT LINE ITEM NUMBER (CLIN) 0007
Contract Period: 12 months (1 April 2023 through 31 March 2024)
Line Item 0007 Recurring Work - Third Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT (FI) - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs D001 through D008
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
1Station-Funded Areas - Spec Item 3
1AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
1ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
1ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
1ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
1AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
1AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
1AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
1AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

Station-Funded Areas Subtotal ¥ - 0

2Housing Funded Areas - Spec Item 3
2AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
2ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
2ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
2ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
2AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
2AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
2AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
2AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

Housing Funded Areas Subtotal ¥ - 0

3Defense Commissary Agency (DeCA) Central Distribution Center (CDC) Funded Areas - Spec Item 3
3AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
3ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
3ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
3ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
3AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
3AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
3AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
3AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DeCA CDC Funded Areas Subtotal ¥ - 0

4Petroleum, Oils, and Lubrications (POL) Funded Areas - Spec Item 3
4AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
4ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
4ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
4ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
4AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
4AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
4AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
4AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

POL Funded Areas Subtotal ¥ - 0

5Department of Defense Education Activity (DoDEA) Funded Areas - Spec Item 3
5AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
5ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
5ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
5ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
5AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
5AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
5AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
5AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DoDEA Funded Areas Subtotal ¥ - 0

6Defense Logistics Agency (DLA) Disposition Funded Areas (Bldg. #299) - Spec Item 3
6AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
6ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
6ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
6ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
6AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
6AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
6AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
6AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DLA Funded Areas Subtotal ¥ - 0

7Defense Logistics Agency (DLA) Distribution Funded Areas (Bldg. #1645) - Spec Item 3
7AAEmergency Service Orders, Spec Item 3.1.112MO¥ - 0¥ - 0
7ABUrgent Service Orders, Spec item 3.1.212MO¥ - 0¥ - 0
7ACRoutine Service Orders, Spec Item 3.1.312MO¥ - 0¥ - 0
7ADPM Program, Spec Item 3.212MO¥ - 0¥ - 0
7AEInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for future use.)0MO¥ - 0¥ - 0
7AFHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.112MO¥ - 0¥ - 0
7AGHVAC Water Testing and Treatment Services, Spec Item 3.4.212MO¥ - 0¥ - 0
7AHHVAC Resetting, Spec Item 3.4.312MO¥ - 0¥ - 0

DLA Funded Areas Subtotal ¥ - 0

8 Marine Corps Community Services (MCCS) Funded Areas - Spec Item 3 Remarks: The Offeror / Contactor shall include the service cost for Bldg. #s606, 607 and 9500 (100%) in this ELIN. The Government will allocate the % for Bldg. #9500.

8AAEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8ABEmergency Service Orders, Spec Item 3.1.1
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8ACUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8ADUrgent Service Orders, Spec item 3.1.2
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AERoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8AFRoutine Service Orders, Spec Item 3.1.3
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AGPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8AHPM Program, Spec Item 3.2
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AJInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for Bldg. #s 606 & 607 for future use.)0MO¥ - 0¥ - 0
8AKInspection, Testing, and Certification Program, Spec Item 3.3
(Note: Reserved for Bldg. #9500 for future use.)0MO¥ - 0¥ - 0
8ALHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8AMHVAC Seasonal Start-Up and Shutdown, Spec Item 3.4.1
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8ANHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8APHVAC Water Testing and Treatment Services, Spec Item 3.4.2
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0
8AQHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for Bldg. #s 606 & 607.12MO¥ - 0¥ - 0
8ARHVAC Resetting, Spec Item 3.4.3
The Offeror / Contactor shall include the price for Bldg. #9500.12MO¥ - 0¥ - 0

MCCS Funded Areas Subtotal ¥ - 0

TOTAL RECURRING WORK PRICE - THIRD OPTION PERIOD¥ - 0
Remarks: MO = month, YR = year, FY = fiscal year

&"TIMES NEW,Regular"UNCLASSIFIED / FOR OFFICIAL USE ONLY

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .