14T8702_Inquiries_ _Answers.pdf
PDF 47 KB Posted
- Solicitation number
- N40084-14-T-8702
About this file
RFI (1-3)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 14T8702_B1r1.pdf | ||
| 14T8702_C3.pdf | ||
| 14T8702_Amend1_Text_of_Amendment.pdf | ||
| 14T8702_C4.pdf | ||
| 14T8702_E.pdf | ||
| 14T8702_0001.pdf | ||
| 14T8702_C5.pdf | ||
| 14T8702_SV_LIST.xls | XLS spreadsheet | |
| 14T8702_A.pdf | ||
| 14T8702_C1.pdf | ||
| 14T8702_B.pdf | ||
| 14T8702_D.pdf | ||
| 14T8702_C2.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE PROPOSAL INQUIRY FORM
Question
No.
Reference
(Sect/Para/Page)
QUESTION GOVERNMENT RESPONSE
1 J-1502000-07 Would you provide us Manufacturer's Instruction and stuctural specification of Hangar Door at B1502, B223, B1401, B1430, B1508 to develop PM program?
Manufacturer's insturction for listed equipment shall be obtained by each offeror.
Hangar doors's structural specification for B223, B1401, B1430, and B1508 are already provided.
For B1502 hangar door information, additional reference drawings are provided. Please refer to PDF flies, "Additional 1502HDRD1" and "Additional 1502HDRD2."
J-1502000-07 Would you provide use electric control console drawing and machine drawing of Hangar Door at B1502, B223, B1401, B1430, B1508 to develop PM program?
For B1401, B1430 and B1508, there is no additional drawings.
For B223, additional reference drawings are provided. Please refer to PDF files, "Additional 223HDRD".
For B1502, please refer to files mentioned above.
1502000
3.2 PM Program
スペックに、プリベンティブ・メンテナンス中に発見した修理のFFPリミッ
トは、120労働時間と材料費10万円とあります。 労働時間と材料費の両方の要件を満たした作業がリミット超えの作業 という意味ですか?
例えば、材料費100万円、作業時間が30時間の作業はFFPリミット内で
すか?どのように解釈すればよろしいでしょうか?
According to the SPEC, FFP limit is up to a total of 120 labor hours (on-site labor hours) and up to a total of ¥100,000 during PM work.
Should over-FFP-limit work meet both labor hours and material requirement?
For instance, is the work which requires 1 Million yen material and 30 labor hours under FFP limit? How should I interpret this?
The FFP ceiling/(liability) limit is applied separately per labor and material in this solicitation.
In the case of the instance, the ceiling/limit of material is reached, but the ceiling/limit of labor has not been reached. .