Amendment_0001_-_PPIs _WDs _and_extension.pdf

PDF 81 KB Posted

Attached to
DB MACC NAVFAC MIDWEST Federal contract opportunity
Solicitation number
N40083-14-R-3212
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

Amendment 0001 - SF30

View the file

Other files for this federal contract opportunity

Other files attached to DB MACC NAVFAC MIDWEST, newest first.
File Type Posted
Document_(1)_Govt_Responses_to_PPIs.pdf PDF
Attachment_E_-_Pre_Proposal_Inquiry_Form.xlsx XLSX spreadsheet
N40083-14-R-3212_SF1442.pdf PDF
Attachment_A_-_Const_Des_Experience_Proj_Form.doc DOC document
Attachment_B_-_PPQ.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR3828214

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0001 is to provide: 1.) Government responses to PPIs (Document (1)); 2.) New Wage Determination; and 3.)

Extend the proposal due date to 16 June 2014 at 12pm CST. See Summary of Changes and attached Document (1).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Jun-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N40083-14-R-3212

X 9B. DATED (SEE ITEM 11)

12-May-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Jun-2014

CODE

NAVFAC MIDWEST PUBLIC WORKS DEPARTMENT

PWDGREATLAKESFEAD/201DECATURAVEBLDG2016

GREAT LAKES IL 60088

N40083 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N40083-14-R-3212

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

WAGE DETERMINATION

General Decision Number: IL140008 06/06/2014 IL8

Superseded General Decision Number: IL20130008

State: Illinois

Construction Types: Building and Residential

Counties: Du Page, Grundy, Kane, Kendall, Lake, McHenry and Will Counties in Illinois.

BUILDING AND RESIDENTIAL PROJECTS (does not include landscape projects).

Modification Number Publication Date 0 01/03/2014 1 01/24/2014 2 02/07/2014 3 02/14/2014 4 06/06/2014

ASBE0017-005 06/01/2013

Rates Fringes

ASBESTOS WORKER/INSULATOR

includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems.......... $ 46.95 23.85 Fire Stop Technician............. $ 37.56 22.65

HAZARDOUS MATERIAL HANDLER

includes preparation, wetting, stripping, removal, scrapping vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not............. $ 35.21 22.65

BOIL0001-003 01/01/2014

DU PAGE, GRUNDY, KANE, KENDALL, LAKE, MCHENRY, AND WILL COUNTIES

Rates Fringes

BOILERMAKER...................... $ 42.13 25.45

BRIL0014-001 06/01/2011

DU PAGE, GRUNDY, LAKE, and WILL COUNTIES Rates Fringes

BRICKLAYER....................... $ 39.78 20.80

BRIL0021-002 06/01/2010

Rates Fringes

MARBLE SETTER.................... $ 39.03 19.90

BRIL0021-008 06/01/2012

Rates Fringes

TERRAZZO WORKER/SETTER........... $ 39.37 20.51

TILE FINISHER.................... $ 33.60 15.22

TILE SETTER...................... $ 40.49 16.93

BRIL0021-010 06/01/2009

Rates Fringes

MARBLE FINISHER.................. $ 29.10 19.90

BRIL0027-002 06/01/2011

KANE, KENDALL, and MCHENRY COUNTIES Rates Fringes

BRICKLAYER....................... $ 39.78 20.80

CARP0555-004 10/01/2012

Residential

DU PAGE and LAKE COUNTIES Rates Fringes

CARPENTER........................ $ 32.12 25.47

CARP0555-005 06/01/2013

BUILDING

DUPAGE and LAKE COUNTIES Rates Fringes

CARPENTER........................ $ 42.52 26.77

CARP0555-006 06/01/2013

WILL COUNTY

BUILDING

Carpenter; Millwright; Piledrivermen.................... $ 42.52 29.05

CARP0555-007 10/01/2012

WILL COUNTY

RESIDENTIAL

Rates Fringes

CARPENTER........................ $ 32.12 25.47

CARP0555-009 06/01/2013

KANE, KENDALL, AND McHENRY COUNTIES

BUILDING

Rates Fringes

CARPENTER

Carpenter, Floor Layer, Lather, Millwright, and Piledriver.................. $ 42.52 29.05

CARP0555-010 10/01/2012

KANE, KENDALL, and McHENRY COUNTIES

RESIDENTIAL

Rates Fringes

CARPENTER........................ $ 32.12 25.47

CARP0555-012 10/01/2012

GRUNDY COUNTY

Rates Fringes

CARPENTER

Carpenter, Millwright, Piledriver, and Soft Floor Layer....................... $ 42.52 26.78 Residential................. $ 32.12 25.47

ELEC0009-002 06/03/2013

WILL COUNTY

Rates Fringes Line Construction Groundman................... $ 34.98 20.80 Lineman and Equipment Operator.................... $ 44.85 26.67

ELEC0117-002 09/02/2013

KANE (Northern Half) and McHENRY COUNTIES

ELECTRICIAN

Building.................... $ 43.33 25.75 Residential................. $ 39.48 23.22

ELEC0117-003 05/30/2011

KANE (Northern Half), and McHENRY COUNTIES Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN....... $ 35.77 21.89

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V-SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC0150-002 06/03/2013

LAKE COUNTY

Rates Fringes

ELECTRICIAN

Building & Residential...... $ 39.40 29.44

ELEC0150-003 06/03/2013

LAKE COUNTY

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN....... $ 35.13 24.42

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V- SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC0176-003 06/01/2012

Grundy and Will Counties Rates Fringes

ELECTRICIAN

Residential................. $ 36.65 28.20

ELEC0176-008 06/01/2013

GRUNDY and WILL COUNTIES

Building.................... $ 39.50 33.75

ELEC0176-015 06/01/2013

GRUNDY and WILL COUNTIES Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN....... $ 31.60 25.95

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V- SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC0461-002 09/02/2013

KANE (Southern Half) AND KENDALL COUNTIES

Rates Fringes

ELECTRICIAN

Building.................... $ 45.04 24.55 Residential................. $ 41.34 22.04

ELEC0461-005 06/04/2012

KANE (Southern Half), AND KENDALL COUNTIES

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN....... $ 36.39 21.20

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V- SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEC0701-002 09/03/2012

DUPAGE COUNTY

Rates Fringes

Building.................... $ 41.34 27.73

Residential................. $ 35.25 27.42

ELEC0701-003 06/03/2013

DU PAGE COUNTY

Rates Fringes

ELECTRICIAN

ELECTRICAL TECHNICIAN....... $ 33.90 25.00

Work includes the installation, maintenance and removal of telecommunication facilities (voice, sound, data and video), telephone, security, fire alarm systems that are a component of a multiplex system and share a common cable, and data inside wire, interconnect, terminal equipment, central office, PABX and equipment, micro waves, V- SAT, bypass, CATV, WAN, (wide area networks), LAN (Local area networks), and ISDN (integrated system digital network).The work shall cover the pulling of wire in raceways, but not the installation of raceways.

ELEV0002-001 01/01/2014

DU PAGE, GRUNDY, KANE, KENDALL, LAKE, and WILL COUNTIES

Rates Fringes ELEVATOR MECHANIC................ $ 49.90 26.785 +a+b

FOOTNOTES:

A. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving Day; Veterans' Day and Christmas Day.

B. Employer contributes 8% of regular hourly rate as vacation pay credit for employee who has worked in business more than 5 years, and 6% for employee who has worked in business less than 5 years.

ELEV0132-004 01/01/2012

McHENRY COUNTY Rates Fringes ELEVATOR MECHANIC................ $ 44.94 23.535+a+b

FOOTNOTES:

A . Eight paid holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; Day after Thanksgiving; Veterans' Day and Christmas Day.

B. Employer contributes 8% of regular hourly rate as vacation pay credit for employee who has worked in business more than 5 yrs, and 6% for employee who has worked in business less than 5 yrs.

* ENGI0150-026 06/01/2013

BUILDING and RESIDENTIAL

OPERATOR: Power Equipment

GROUP 1.................... $ 46.10 30.80

GROUP 2.................... $ 44.80 30.80

GROUP 3.................... $ 42.25 30.80

GROUP 4.................... $ 40.50 30.80

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Mechanic; Asphalt Plant*; Asphalt Spreader; Autograde*; Backhoes with Caisson attachment*:Batch Plant*; Benoto(Requires two Engineers); Boiler and Throttle Valve; Caisson Rigs*; Central Redi-Mix Plant*;

Combination Backhoe Front Endloader Machine; Compressor and Throttle Valve; Concrete Breaker (Truck Mounted)*; Concrete Conveyor; Concrete Conveyor, Truck Mounted; Concrete Paver over 27E cu. ft.*; Concrete Paver 27E cu ft and Under*; Concrete Placer*; Concrete Placing Boom; Concrete Pump (Truck Mounted); Concrete Tower; Cranes*; Cranes, Hammerhead*; Cranes, (GCI and similar type Requires two operators only); Creter Crane;

Crusher, Stone, etc; Derricks; Derricks, Traveling*; Formless Curb and Gutter Machine*; Grader, Elevating;

Grouting Machines; Highlift Shovels or Front Endloader 2 1/4 yd. and over; Hoists, Elevators, Outside Type Rack and pinion and similar Machines; Hoists, One, Two, and Three Drum; Hoists, Two Tugger One Floor; Hydraulic Backhoes*; Hydraulic Boom Trucks; Hydraulic Vac (and similar equipment);Locomotives; Motor Patrol*; Pile Drivers amd Skid Rig*; Post Hole Digger; Pre- Stress Machine; Pump Cretes Dual Ram(Requiring frequent Lubrication and Water); Pump Cretes; Squeeze Cretes-Screw Type Pumps Gypsum Bulker and Pump; Raised and Blind Hole Drill*; Roto Mill Grinder (36" and Over)*; Roto Mill Grinder (Less Than 36")*; Scoops-Tractor Drawn;

Slip-Form Paver*; Straddle Buggies; Tournapull; Tractor with Boom, and Side Boom; and Trenching Machines*.

GROUP 2: Bobcat (over 3/4 cu yd); Boilers; Brick Forklift; Broom, Power Propelled; Bulldozers; Concrete Mixer (Two Bag and over); Conveyor, Portable; Forklift Trucks; Greaser Engineer; Highlift Shovels or Front End loaders under 2 1/4 cu yd; Aotomatic Hoists, Hoists, Inside Elevators; Hoists, Sewer Dragging Machine; Hoists, Tugger Single Drum; Laser Screed; Rock Drill (Self-Propelled); Rock Drill (Truck Mounted)*; Rollers; Steam Generators;

Tractors; Tractor Drawn Vibratory Roller (Receives an additional $.50 per hour); Winch Trucks with "A" Frame.

GROUP 3: Air Compressor-Small 250 and Under (1 to 5 not to exceed a total of 300 ft); Air Compressor-Large over 250; Combination-Small Equipment Operator; Generator- Small 50 kw and under; Generator-Large over 50 kw; Heaters, Mechanical; Hoists, Inside Elevators (Remodeling or Renovatin work); Hydrualic Power Units (Pile Driving, Extracting, and Drilling); Low Boys; Pumps Over 3" (1 To 3 not to exceed a total of 300 ft); Pumps, Well Points; Welding Machines (2 through 5); Winches, 4 Small Electric Drill Winches; Bobcat (up to and including 3/4 cu yd)

GROUP 4 - Bobcats and/or other Skid Steer Loaders; Brick Forklifts; Oilers *-Requires Oiler

IRON0001-014 06/01/2013

DU PAGE (Eastern 1/4), LAKE, AND MCHENRY (Hebron, Woodstock,and East thereof) COUNTIES

IRONWORKER

Sheeter..................... $ 42.32 33.74 Structural and Reinforcing.. $ 42.07 33.74

IRON0063-003 06/01/2013

LAKE, DUPAGE (Eastern 1/4) and McHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES

Rates Fringes

IRONWORKER, ORNAMENTAL........... $ 42.90 30.11

IRON0063-004 06/01/2013

LAKE, DUPAGE (Eastern 1/4), and McHENRY (HEBRON, WOODSTOCK & EAST THEREOF) COUNTIES

Rates Fringes

IRONWORKER

Fence Erector............... $ 34.84 23.83

IRON0136-002 07/01/2012

LAKE, DUPAGE (Eastern 1/4) and McHENRY (HEBRON, WOODSTOCK & East thereof) COUNTIES

Rates Fringes

IRONWORKER

Machinery Movers; Riggers; Machinery Erectors.......... $ 35.87 28.67 Master Riggers.............. $ 38.37 28.67

IRON0393-002 06/01/2012

DUPAGE (REMAINDER), KANE, KENDALL (NORTHERN PART), and MCHENRY (SOUTHEAST 1/4)

COUNTIES

Rates Fringes

IRONWORKER....................... $ 44.95 27.48

IRON0444-002 06/01/2013

DUPAGE (ARGONNE & VIC), GRUNDY, KENDALL (Southern Part), and WILL COUNTIES

Rates Fringes

IRONWORKER....................... $ 41.00 31.45

IRON0498-006 06/01/2013

McHENRY COUNTY (Northwest Part) Rates Fringes

IRONWORKER....................... $ 35.09 31.03

* LABO0002-003 06/01/2014

DU PAGE COUNTY

LABORER

GROUP 1.................... $ 38.00 24.40

GROUP 2.................... $ 38.00 24.40

GROUP 3.................... $ 38.07 24.40

GROUP 4.................... $ 38.10 24.40

GROUP 5.................... $ 38.15 24.40

GROUP 6.................... $ 38.20 24.40

GROUP 7.................... $ 38.22 24.40

GROUP 8.................... $ 38.32 24.40

GROUP 9.................... $ 38.35 24.40

GROUP 10.................... $ 38.45 24.40

GROUP 11.................... $ 38.27 24.40

GROUP 12.................... $ 39.00 24.40

LABORER CLASSIFICATIONS

GROUP 1: Building laborers, Plasterer tenders, Pumps for Dewatering & other Unclassified Laborers

GROUP 2: Fireproofing and fire shop laborers

GROUP 3: Cement gun laborers and hose

GROUP 4: Chimney over 40 feet; Scaffold laborers; Weldman-wreckers Burners

GROUP 5: Cement gun nozzle (gunite) laborers; Windlass and capstan person

GROUP 6: Stone derrickmen and handlers

GROUP 7: Jackhammermen, Power driven concrete saws and other power equipment

GROUP 8: Firebrick & boiler laborers

GROUP 9: Chimney on fire brick; Caisson Diggers; Well Point system men

GROUP 10: Boiler setter plastic laborers

GROUP 11: Jackhammermen on fire brick work only

GROUP 12: Dosimeter (any device) monitoring nuclear exposure); Asbestos abatement laborers; Toxic and Hazardous waste removal laborers

LABO0075-001 06/01/2011

GRUNDY AND WILL COUNTIES

LABORER

GROUP 1..................... $ 35.20 21.45

GROUP 2..................... $ 35.30 21.45

GROUP 3..................... $ 35.40 21.45

GROUP 4..................... $ 35.45 21.45

GROUP 5..................... $ 35.70 21.45

GROUP 6..................... $ 36.05 21.45

GROUP 7..................... $ 36.20 21.45

LABORER CLASSIFICATIONS

GROUP 1 - Mortar mixers, handling asphalt shingles; Scaffolds; Sewer and trench work (ground level down to 8 feet); Catch basin and manhole diggers, mesh handling on road work; Cement and mineral filler handler; Concrete puddlers; Batch dumpers (cement & asphalt); Vibrator operators; Sand and stone wheelers to mixer Handlers);

Concrete wheelers; Airtamping hammermen; Concrete & paving breakers; Rock drillers/Jackhammermen; Chipping hammermen 1-Bag mixer; Asphalt laborer; Chain and power saws; Pit men; Fencing laborers; Mason tenders (mortar and brick wheeler); Kettlemen & tarmen, tank cleaners; Scaffold and staging laborers; Pot Firemen tarmen);

Heaters tender for any purpose; Water pumps (portable water pumps shall be tended by laborers if the employer determines tending is required); Rip rap; Handling of slab steel road forms in any manner, except road form setting, setting center strips, Contraction and expansion joints (road work); Unloading and handling of lumber, brick, transite materials, cast iron water pipe, reinforced concrete rods, sewer and drain tile, railroad tiles and all other creosoted materials; paving blocks and concrete forms; Handling of insulation of any type; all work involving the unloading of materials, fixtures, or furnishing, whether crated or uncrated; all mortar and composition mixers of sewer work; track laborers; Chimney and silo laborers working at a height of 1 to 48 feet; All laborers working on swinging suspended, or any type or make of scaffolding 1 to 48 feet; All laborers working inside a sphere or any type or make of tank; Working inside a sphere or any type or make of tank from bottom to a height of 48 feet; Form strippers (any type); Mechanical or motorized buggies, for concrete or masons employers; Use of skid steer loads or any other machinery which replaces the wheelbarrow or buggy; Handling multiple concrete duct or any other type of pipe used in public utility work unless otherwise specified herein; Snapping of wall ties and removal of rods; drilling of anchor bolt holes; Concrete or asphalt clipper type saws and self-propelled saws; Shoulder and grade laborers; All hydraulic electric and air or any other type of tools; Grouting and caulking; Cleaning lumber, Nail pulling, Deck hand; Dredgehand; Shore laborer; Bankmen on Floating Plant; Tool and material checkers; Signalmen and Flagmen on all construction work; Cleaning of debris; Removal of trees; Concrete curing, temporary concrete protection regardless of manner or materials used; Laborers on Apsco; Janitorial; Wrecking and demolition laborers

GROUP 2 - Sewer and drain pipe layers and multiple concrete duct or any other type of pipe used, on public utility work (ground level to 8 feet); Pumpcrete pipe handlers

GROUP 3 - Asphalt rakers; Hod carriers; Plasterer laborers; Gunnite laborers, Slab for setters on roads, highways, streets, airport runaways, and radii (any type of form) stringline men for all aforementioned work; Wagon and tower drillers on land and floating plant used on dredging; Asphalt gunners and plug men (undercoating on road work);

Mortar pump laborers; Plaster pump laborers

GROUP 4 - Tunnel miners, and all laborers inside tunnel; Air blow pipemen; Torchmen (burners); Mortaring men on sewer and drain pipe (the applying of mortar and composition mixes); All bottom men on sewer work-all sewer and drain pipelayers-multiple concrete duct or any other type of pipe used on public utility work-8 feet or more below ground level, and all other sewer and trench laborers 8 feet or more below ground level regardless of excavation area; All labor work inside cofferdam; Use of a 10 foot or more drill steel for hand held drills; Caisson laborers ground level down 15 feet; All air tools 8 feet or more below ground level; All laborers working on swinging-suspended or any type or make of scaffolds, 48 feet to 100 feet; All chimney and silo laborers working at a height of 48 to 100 feet; All tamping hammers over 150 lbs.; All laborers working inside of a sphere or any type or make of tank at a height of 48 feet to 100 feet; all hydraulic, electric and air tools or any other type 8 feet or more below ground level; Vibrators-any type-8 feet or more below ground level

GROUP 5 - Gunnite nozzle men; Caisson laborers and all tamping hammers from 150 lbs and over; from 15 feet below ground level down to 50 feet; and all laborers working inside of a sphere or any type of tank for every additional 50 feet or part thereof above 100 feet in height

GROUP 6 - All underground cavern laborers; Caisson laborers 50 feet or more below ground level; Laborers working under radio active conditions (suiting up); Blasting men (Powdermen)

GROUP 7 - Dosimeter (any device) used for monitoring nuclear exposure; Asbestos abatement worker; Toxic and hazardous waste removal laborer; and chimney and silo laborers for every additional 50 feet or any part thereof above 100 feet high

* LABO0149-001 06/01/2014

KANE, KENDALL, AND McHENRY COUNTIES Rates Fringes

LABORER

GROUP 1..................... $ 38.00 24.40

GROUP 2..................... $ 38.22 24.40

GROUP 3..................... $ 38.15 24.40

GROUP 4..................... $ 38.00 24.40

GROUP 5..................... $ 38.35 24.40

GROUP 6..................... $ 38.35 24.40

GROUP 7..................... $ 38.80 24.40

GROUP 8..................... $ 39.00 24.40

LABORER CLASSIFICATIONS

GROUP 1 Common Laborer

GROUP 2 Power Vibrator

GROUP 3 Torchman (demolition only), Mortarmen

GROUP 4 Power Tamper

GROUP 5 Jackhammer & Airspade; Chainsaw, Swinging Stage and Boatswain Chair; Cement Gun Nozzleman;

Hod Carrier; Plasterer Tender, and Tunnel Man

GROUP 6 Tile Layers; Bottom Men

GROUP 7 Caisson Laborers; Dynamiters

GROUP 8 Asbestos abatement laborers, Toxic and hazardous waste removal laborers, Dosimeter (any device) monitoring nuclear exposure

* LABO0152-001 06/01/2014

LAKE COUNTY

Rates Fringes

LABORER

GROUP 1.................... $ 38.00 24.40

GROUP 2.................... $ 38.07 24.40

GROUP 3.................... $ 38.22 24.40

GROUP 4.................... $ 38.15 24.40

GROUP 5.................... $ 38.27 24.40

GROUP 6.................... $ 38.22 24.40

GROUP 7.................... $ 38.32 24.40

GROUP 8.................... $ 38.35 24.40

GROUP 9.................... $ 38.15 24.40

GROUP 10.................... $ 38.45 24.40

GROUP 11.................... $ 39.00 24.40

LABORER CLASSIFICATIONS

GROUP 1: Building laborers; Plasterer tenders, General laborers (wrecking and demolition); Fireproofing and fire shop laborers

GROUP 2: Cement gun laborers and hose

GROUP 3: Chimney over 40 feet; Scaffold laborers; Wall men or wreckers

GROUP 4: Cement Gun nozzle (gunite) laborers

GROUP 5: Stone derrickmen and handlers

GROUP 6: Jackhammermen (tampers & vibrators); Power driven concrete saws

GROUP 7: Firebrick & boiler laborer setters

GROUP 8: Chimney laborers (on fire brick); Caisson Diggers; Well Point system men

GROUP 9: Windlass and capstan persons

GROUP 10: Boiler setter plastic laborers

GROUP 11: Dosimeter (any device) monitoring nuclear exposure; Asbestos abatement laborers; Toxic and hazardous waste removal laborers

PAIN0014-002 06/01/2013

GRUNDY, LAKE, and WILL COUNTIES Rates Fringes

PAINTER

Brush, Decorator, and Paperhanger................. $ 40.75 22.67

PAIN0027-003 06/01/2013

Rates Fringes

GLAZIER.......................... $ 40.00 29.42

PAIN0030-001 07/01/2013

DUPAGE, KANE, KENDALL, AND MCHENRY COUNTIES

Rates Fringes

PAINTER

Brush, Drywall Taper/Finisher, Sandblaster, and Spray...... $ 40.98 19.55

PLAS0005-003 07/01/2012

GRUNDY and WILL COUNTIES

Rates Fringes

PLASTERER........................ $ 40.25 22.34

PLAS0005-006 07/01/2012

DU PAGE COUNTY

Rates Fringes

PLASTERER........................ $ 40.25 22.34

PLAS0011-008 06/01/2012

DE KALB, KANE, KENDALL, AND McHENRY COUNTIES Rates Fringes

CEMENT MASON/CONCRETE FINISHER... $ 41.55 23.76

PLAS0011-012 06/01/2012

GRUNDY AND WILL COUNTIES

Rates Fringes

CEMENT MASON/CONCRETE FINISHER... $ 41.00 24.43

PLAS0011-014 06/01/2011

LAKE COUNTY

CEMENT MASON/CONCRETE FINISHER... $ 40.30 23.28

PLASTERER........................ $ 38.69 23.43

PLAS0803-002 08/01/2010

DUPAGE COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER... $ 38.00 24.03

PLUM0093-001 06/01/2011

LAKE and McHENRY COUNTIES Rates Fringes

PLUMBER.......................... $ 44.50 25.25

PLUM0130-002 06/01/2013

DUPAGE (Argonne National Laboratories and Fermi National Laboratory), GRUNDY & WILL COUNTIES

Rates Fringes

PLUMBER.......................... $ 46.05 23.47

PLUM0501-001 12/01/2013

DUPAGE (excluding Argonne National Laboratory and Fermi National Laboratory), KANE, and KENDALL (except the Mich-Wis Pumping Station in Milbrook, Silicas and Plant and Village of Newark, excludes Yorkville)

COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER............... $ 41.20 29.15

PLUM0597-001 06/01/2012

DUPAGE (Argonne National Laboratories, and Fermi National Laboratory), GRUNDY, LAKE, MCHENRY &

WILL COUNTIES

Rates Fringes

PIPEFITTER....................... $ 45.05 25.09

ROOF0011-004 12/01/2013

DUPAGE, KANE, KENDALL, LAKE, MCHENRY, and WILL COUNTIES Rates Fringes

ROOFER........................... $ 39.20 18.40

ROOF0011-009 12/01/2012

Rates Fringes

ROOFER.......................... .$ 30.21 17.55

SFIL0281-002 06/01/2013

DuPAGE, KANE, KENDALL, LAKE, McHENRY, and WILL COUNTIES Rates Fringes

SPRINKLER FITTER................. $ 47.15 20.15

SHEE0073-003 06/01/2011

LAKE COUNTY

Rates Fringes Sheet metal worker............... $ 40.56 27.23

SHEE0073-004 06/01/2011

LAKE COUNTY

Rates Fringes Sheet Metal Worker

ALUMINUM GUTTER WORK........ $ 27.63 27.23

SHEE0265-001 06/01/2011

DU PAGE, GRUNDY, KANE, KENDALL, McHENRY, and WILL COUNTIES

Rates Fringes

SHEET METAL WORKER............... $ 41.66 23.95

* TEAM0179-001 06/01/2011

GRUNDY, KENDALL, and WILL COUNTIES Rates Fringes

TRUCK DRIVER

2 or 3 Axle Trucks.......... $ 35.65 7.25+a 4 Axle Trucks............... $ 35.80 7.25+a 5 Axle Trucks............... $ 36.00 7.25+a 6 Axle Trucks............... $ 36.20 7.25+a All Lowboy Trucks........... $ 37.20 7.25+a

FOOTNOTE: a. $229.80 per week.

FOOTNOTE: An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes; Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances; Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers;

Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and

Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation;

Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long; Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice; Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic; Self-loading equipment like P.B. and trucks with scoops on the front

* TEAM0301-001 06/01/2011

LAKE AND MCHENRY COUNTIES

Rates Fringes

TRUCK DRIVER

2-3 AXLES................... $ 35.85 .15+a 4 AXLES..................... $ 36.00 .15+a 5 AXLES..................... $ 36.20 .15+a 6 AXLES..................... $ 36.40 .15+a

FOOTNOTE: a. $288.00 per week health and welfare $240.00 per week pension

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years

- 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes; Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances; Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers;

Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation;

Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit; Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long; Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice;

Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic; Self-loading equipment like P.B. and trucks with scoops on the front

* TEAM0673-003 06/01/2008

DU PAGE and KANE COUNTIES Rates Fringes

TRUCK DRIVER

2-3 AXLES................... $ 32.55 .15+a 4 AXLES..................... $ 32.70 .15+a 5 AXLES..................... $ 32.90 .15+a 6 AXLES..................... $ 33.10 .15+a

FOOTNOTE: a. $434.00 per week.

An additional $.20 per axle shall be paid for all vehicles with more than six (6) axles.

Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

900 straight time hours or more in 1 calendar year for the same employer shall receive 1 week paid vacation; 3 years

- 2 weeks paid vacation; 10 years - 3 weeks paid vacation; 20 years - 4 weeks paid vacation.

CLASSIFICATIONS:

Group 1 - Frame Truck when used for transportation purposes; Air Compressor and Welding Machines, including those pulled by cars, pick-up trucks and tractors; Ambulances; Articulated Dumps; Batch Gate Lockers; Batch Hopperman; Car and Truck Washers; Carry Alls; Forl Lifts and Hoisters; Helpers; Mechanics Helpers and Greasers; Oil Distributors, two-man operation; Pavement Breakers; Pole Trailer, up to 40 feet; Pothole Repair Trucks; Power Mower Tractors; Quick Change Barrier; Self-Propelled Chip Spreader; Shipping and Receiving Clerks and Checkers; Skipman; Slurry Trucks, two-man operation; Slurry Trucks, Conveyor Operated - 2 or 3 man operation; Teamsters; Unskilled Dumpmen; Warehousemen and Dockmen; Truck Drivers hauling warning lights, barricades, and portable toilets on the job site

Group 2 - Dispatcher; Dump Crets and Adgetators under 7 yards; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment under 16 cubic yards; Mixer Trucks under 7 yards; Ready-Mix Plant Hopper Operator; Winch Trucks, 2 Axles

Group 3 - Dump Crets and Adgetators, 7 yards and over; Dumpsters, Track Trucks, Euclids, Hug Bottom Dump Turnapulls or Turnatrailers when pulling other than self-loading equipment or similar equipment over 16 cubic yards; Explosives and/or Fission Material Trucks; Mixer Trucks 7 yards or over; Mobile Cranes while in transit;

Oil Distributors, one-man operation; Pole Trailer, over 40 feet; Pole and Expandable Trailers hauling material over 50 feet long; Slurry Trucks, one-man operation; Winch Trucks, 3 axles or more; Mechanic - *Truck Welder and *Truck Painter*These classifications shall only apply in areas where and when it has been a past area practice;

Asphalt Plant Operators in areas where it has been past practice

Group 4 - Dual-purpose vehicels, such as mounted crane tucks with hoist and accessories; Foreman; Master Mechanic; Self-loading equipment like P.B. and trucks with scoops on the front

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example:

SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana;

2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .