N40083-14-R-2706_SOLICITATION.pdf
PDF 2 MB Posted
- Solicitation number
- N4008314R2706
About this file
Original Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N40083-14-R-2706_Sol_Amend_01.pdf | ||
| Contractor's_Operations_Manual_(10-06).pdf | ||
| 1800000_ELINS_Abatement_New_Solicitation_Asbestos_Lead_Mold_RFP.xlsx | XLSX spreadsheet | |
| N4008314R2706_Synopsis_Asbestos_Abatement_14R2706.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 30 May 2014
X
A X B
C D
EX
X G F 25 - 30
31 - 38 H 39 - 41 lorna.tribby@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C2 1 41
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N40083 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Building 2516 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
LORNA TRIBBY 812-854-6021
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 5
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 8 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
9 - 24
PART II - CONTRACT CLAUSES
NAVFAC MIDWEST PWD CRANE
NAVAL SUPPORT ACTIVITY B#2516
300 HIGHWAY 361
CRANE IN 47522-5001 812-854-6641
812-854-3800FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
30 Apr 2014
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N40083-14-R-2706
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 1 Each Asbestos/Lead/Mold Abatement/Remediation
FFP
Contractor shall provide all labor, materials and equipment necessary to perform work as detailed in Section C, specification item 4 included herein. Exhibit line items A001 - A049 are provided for detail pricing.
FOB: Destination
ESTIMATED
NET AMT
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 1 Each OPTION Asbestos/Lead/Mold Abatement/Remediation
FFP
OPTION PERIOD #1 - Contractor shall provide all labor, materials and equipment necessary to perform work as detailed in Section C, specification item 4 included herein. Exhibit line items B001 - B049 are provided for detail pricing.
FOB: Destination
ESTIMATED
NET AMT
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 1 Each OPTION Asbestos/Lead/Mold Abatement/Remediation
FFP
OPTION PERIOD #2 - Contractor shall provide all labor, materials and equipment necessary to perform work as detailed in Section C, specification item 4 included herein. Exhibit line items C001 - C049 are provided for detail pricing.
FOB: Destination
ESTIMATED
NET AMT
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 1 Each OPTION Asbestos/Lead/Mold Abatement/Remediation
FFP
OPTION PERIOD #3 - Contractor shall provide all labor, materials and equipment necessary to perform work as detailed in Section C, specification item 4 included herein. Exhibit line items D001 - D049 are provided for detail pricing.
FOB: Destination
ESTIMATED
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0005 1 Each OPTION Asbestos/Lead/Mold Abatement/Remediation
FFP
OPTION PERIOD #4 - Contractor shall provide all labor, materials and equipment necessary to perform work as detailed in Section C, specification item 4 included herein. Exhibit line items E001 - E049 are provided for detail pricing.
FOB: Destination
ESTIMATED
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
EXHIBIT A EXHIBIT
LINE ITEMS
SEE ATTACHED
EXCEL SPREADSHEET
FFP
FOB: Destination
GENERAL INFORMATION
Service Contract Act Wage Determination 1996-0223, Revision #31, dated 06/25/2013 is incorporated and attached.
NAICS Code: 562910 – Remediation Services (Size Standard: 500 employees)
FSC Code: F108
This procurement is a set-aside for Small Business.
All offerors are required to be registered in the Central Contractor Registration (CCR) database in accordance with FAR 4.1102. LACK OF REGISTRATION IN THE CCR DATABASE WILL MAKE THE OFFEROR INELIGIBLE FOR AWARD. The website address for the CCR database is https://www.sam.gov/portal/public/SAM .
Quotes are due no later than 2:00 p.m. on May 30, 2014. Quotes may be faxed to 812-854-3800, attention: Lorna Tribby.
Quotes consist of the following information which must be completed and submitted:
1) SF 33 (complete block 15 (include e-mail address)
2) Pages 2-4
3) Exhibit A - ELINS
4) Updated Representations and Certifications, and
5) Technical Information as required in FAR
Within 10 calendar days after award, contractor is required to submit a certificate of insurance (Management and Administration Section, Item #2.3.4).
Section C - Description/Specifications/Statement of Work
0100000 – General Information Spec Item Title Description 1 General Information The intention of this solicitation is to obtain all labor, supplies, materials, equipment, transportation, facilities, utilities, supervision and management; unless otherwise specified; required to provide Asbestos & Lead Services, including but not limited to abatement, encapsulation, removal and disposal of asbestos containing material, removal of lead paint, remediation of mold, and incidental work, via an Indefinite Delivery Indefinite Quantity (IDIQ) type contract at Naval Support Activity, Crane, IN.
The accomplishment of this work effort will be via an Indefinite Delivery Indefinite Quantity (IDIQ) Requirement Contract (FAR 16.503) for supplies or services specified and effective for the period stated in the schedule and any accompanying exhibits. Work items for this IDIQ contract are identified in the schedule and any accompanying exhibits. The IDIQ quantities of supplies and service specified in accompanying exhibits and the schedule as identified quantities are estimates only and may be ordered by issuance of separate task orders. Indefinite quantity line items may be ordered in quantities that are less than or greater than the estimated quantities stated in the schedule. The Government is not obligated to order from the contractor those services that are currently being performed under other contracts or services currently under warranty or including credit card purchases.
EXHIBIT LINE ITEMS: This price shall be obtained by entering the proposed unit price for each line item listed in the Exhibit Line Item Schedule, multiplying it by the estimated quantity, and entering the mathematical extension in the subtotal column. The Exhibit Line Schedule must be submitted as part of the price proposal. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the extended proposal and the total recomputed accordingly. If the Offeror provides a total amount for a contract item but fails to enter the unit price, the amount divided by the specified quantity will be held to be the intended unit price.
This solicitation will be evaluated on the Offeror’s technical submission and price quotation. As a result of this Request for Proposal, the Offeror determined to be the best in ability and value to the Government will be awarded this contract. The basis of evaluation will be low price technically acceptable.
This contract will be for a base period of one (1) 12-month period, and four (4) 12-month option periods.
Offeror’s are invited and expected to inspect the site(s) where services are to be performed and satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
The Government Point of Contact is Lorna Tribby, 812-854-6021, Building 2516. Please e-mail all questions concerning the specification to Lorna Tribby at lorna.tribby@navy.mil mailto:lorna.tribby@navy.mil
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Naval Support Activity (NSA) Crane, IN via a indefinite delivery-indefinite quantity (IDIQ). The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff – N/A Annex 4 Public Safety – N/A Annex 5 Air Operations – N/A Annex 6 Port Operations – N/A Annex 7 Ordnance – N/A Annex 8 Range Operations – N/A Annex 9 Health Care Support – N/A Annex 10 Supply – N/A Annex 11 Personnel Support – N/A Annex 12 Morale, Welfare and Recreation Support – N/A Annex 13 Galley – N/A Annex 14 Housing – N/A Annex 15 Facilities Support – N/A Annex 16 Utilities – N/A Annex 17 Base Support Vehicles and Equipment – N/A Annex 18 Environmental
1.2 Project Location The work shall be performed at various locations throughout NSA Crane.
1.3 Acquisition of
Additional Work
The Government reserves the right to acquire additional services within this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the indefinite delivery indefinite quantity provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.4 Background Information The installation is an industrial operation with 10 tenant activities with approximately 64,000 acres of woods, grass land and industrial areas, with 412 miles of roadway and 130 miles of railroad, surrounded by Martin, Daviess, Greene and Lawrence Counties in Southern Indiana.
1.5 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Section J. However, offerors are encouraged to visit the project site during the site visit for offerors and to assess the nature of work and conditions under which work is to be performed.
1.6 Climate Patterns The local climate is typical for Midwest United States.
1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.8 Navy Approach to
Service Contracting
The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.
The Navy also supports the following principles:
1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.
Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.
Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).
1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.
Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Firm Fixed-Price (FFP) requirements.
Specification item 4 will always contain the Indefinite Delivery-Indefinite Quantity (IDIQ) requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 4 standards apply to all IDIQ specification items.
Specification Item 4.1 is applicable to all 4.1 subordinate specification items. Specification Items 4.2 and 4.3 are not considered subordinate to
4.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 4 of Annexes 3 through 18.
1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.11 Technical Proposal
Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
Spec Item Title 2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Partnering
2.3.2.1 Contract Partnering Level C
2.3.2.2 Contract Partnering Administration
2.3.2.3 Contract Partnering Session Attendees
2.3.3 Permits and Licenses
2.3.4 Insurance
2.3.4.1 Certificate of Insurance
2.3.4.2 Minimum Insurance Amounts
2.3.5 Protection of Government Property
2.3.6 Government Information Technology (IT) System
2.3.7 Instructions, Directives, and References
2.3.8 Invoicing Procedures
2.3.9 Forms
2.3.10 Cost Account Code (CAC) Reporting
2.4 Government-Furnished Property, Materials and Services
2.4.1 Government-Furnished Facilities (GFF)
2.4.2 Government-Furnished Utilities
2.4.3 Government-Furnished Materials (GFM)
2.4.4 Government-Furnished Equipment (GFE)
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Service Interruptions
2.6.6 Computerized Maintenance Management Systems (CMMS)
2.6.7 Quality Management System (QMS)
2.6.7.1 Quality Management (QM) Plan
2.6.7.2 Quality Inspection and Surveillance
2.6.7.3 Quality Inspection and Surveillance Reports
2.6.8 Property Management Plan
2.6.9 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.2 Employee Requirements
2.7.2.1 Employee Appearance
2.7.2.2 Employee Conduct
2.7.2.3 Identification as Contractor Employee
2.7.2.4 Removal of Employees
2.7.2.5 Proof of Legal Residency
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 One-Day Passes
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.7 Security Clearances
2.8.8 Trustworthiness Security – Navy Contract/Task Orders
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Occupational Risk and Compliance Plans and Programs
2.9.3.1 Abrasive Blasting Plan
2.9.3.2 Access/Haul Road Plan
2.9.3.3 Alcohol and Drug Abuse Prevention Plan
2.9.3.4 Asbestos Abatement Plan
2.9.3.5 Confined Space Program
2.9.3.6 Critical Lift Plan
2.9.3.7 Demolition Survey and Plan
2.9.3.8 Emergency Response Plans
2.9.3.9 Excavation/Trenching Plan
2.9.3.10 Fall Prevention and Protection Plan
2.9.3.11 Fire Prevention Program
2.9.3.12 Floating Plant Severe Weather Precaution Plan and Marine Emergency Plan
2.9.3.13 Hazardous Energy Control Program
2.9.3.14 Health Hazard Control Program and Hazard Communication Program
2.9.3.15 Heat/Cold Stress Monitoring Plan
2.9.3.16 Lead Compliance Plan
2.9.3.17 Radiation Safety Program
2.9.3.18 Respiratory Protection Program
2.9.3.19 Site Sanitation Plan
2.9.3.20 Temporary Facility Layout Plan
2.9.3.21 Underground Emergency Rescue Plan
2.9.4 Accident and Damage Reporting
2.9.4.1 Accident Reporting Notification
2.9.5 Fire Protection
2.9.6 Monthly On-Site Labor Report
2.9.7 OSHA Citations and Violations
2.9.8 Safety Inspections and Monitoring
2.9.9 Safety Certification
2.9.10 Safety Apparel on Jobsites
2.10 ECATTS and Environmental Management System (EMS)
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 ODS Requirements for Refrigerant Recycling
2.10.2.2 Non-Hazardous Waste Disposal
2.10.2.3 Hazardous Waste Disposal
2.10.2.4 Spill Prevention, Containment, and Clean-up
2.10.2.5 Hazardous Material Management
2.10.2.6 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.7 Noise Control
2.10.2.8 Salvage
2.10.2.9 Asbestos Containing Material (ACM)
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 FFP Work Procedures
2.14.1 Notification to the Government for Work Above the FFP Limitations
2.14.2 FFP Exhibit Line Item Numbers (ELINs)
2.14.3 Common Output Level Standards (COLS) Options
2.14.3.1 Option to Change COLS at Contract Award
2.14.3.2 Option to Change COLS at Exercise of an Option Period
2.15 IDIQ Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 IDIQ Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Material and Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.3 IDIQ ELINS
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and Acronyms Definitions and Acronyms are listed in J-0200000-01.
2.2 General Information
2.2.1 Government Regular
Working Hours The Government's regular working hours are from 0630-1700, five days per week, Monday through Friday, except observed Federal holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise.
Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to Contractor
Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours to the KO for approval at least seven calendar days prior to requested day.
2.2.2 Wage Determinations Wage determinations are included in J-0200000-02.
2.2.3 Requirements Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 4.1 would apply to spec items 4.1.1, 4.1.2, 4.1.2.1 and so on.
2.3 General Administrative
Requirements
2.3.1 Required Conferences and
Meetings
The Contractor shall be required to attend administrative and coordination contract pre-start meeting. The Contractor shall also be required to attend a site visit meeting with the Contracting Officer for each Task Order.
2.3.2 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
A project’s characteristics determine the process level to be used. As such the following partnering level applies to this contract: Contract Partnering Level C
2.3.2.1 Contract Partnering Level
C
This level of partnering discusses partnering concepts and benefits and should become a part of the pre-performance conference. The senior Government and Contractor stakeholders present will jointly host the partnering sessions. The partners will determine the frequency of the follow-on sessions. The partnering sessions should be held at locations agreed to by the partners.
2.3.2.2 Contract Partnering
Administration Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. The initial session must be scheduled as soon as possible after award of the contract. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.
Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions.
These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
For more information concerning Partnering refer to NAVFACINST 11013.40, which can be viewed in the Government’s Contracts Office.
2.3.2.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President *Contract/Project Manager *Supervisor/Superintendent *Quality Manager Safety Manager
2.3.3 Permits and Licenses The Contractor shall obtain all required permits, licenses, medical/respirator documentation and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The contractor shall have an Indiana Asbestos Contractors license. An Indiana Licensed Asbestos Project Supervisor shall be on project site at all times while work is being performed. All workers shall have an Indiana Asbestos Worker license. All annual medical examination documentation and respirator fit testing shall also be provided before work is performed.
All workers shall have attended and provide a certificate for Lead Safety Training completion for any lead removal projects. The Contractor shall submit copies of permits, licenses, and medical and respirator fit documentation per Section F. Copies of renewed licenses, medical and respirator documentation shall be submitted to Contracting Officer prior to expiration.
2.3.4 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-05, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.3.4.1 Certificate of Insurance The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.4.2 Minimum Insurance
Amounts The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law
2.3.5 Protection of Government
Property During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.6 Government Information
Technology (IT) System
N/A
2.3.7 Instructions, Directives, and References
The contractor, all employees and all subcontractors shall become acquainted with and obey all station regulations, including fire, traffic, safety, security regulations and applicable Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other directives, instructions. A copy of the Contractors Operations Manual is available in J-0200000-07.
2.3.8 Invoicing Procedures Invoicing procedures are identified in J-0200000-04.
2.3.9 Forms Refer to Section F and Section J for all forms referenced.
2.3.10 Cost Account Code (CAC)
Reporting N/A
2.4 Government-Furnished
Property, Materials and Services
In accordance with FAR 52.245, GOVERNMENT PROPERTY and NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government may furnish or make available to the Contractor certain Government-owned facilities, utilities, materials, and equipment for use in connection with this contract. The government will provide by use of a complete and separate contract, asbestos air sampling services. See Section C for more information.
2.4.1 Government-Furnished
Facilities (GFF)
The government will not provide office space or operational facilities to the contractor.
2.4.2 Government-Furnished
Utilities
The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor. Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines.
Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions.
Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
2.4.3 Government-Furnished
Materials (GFM)
The government will not provide materials to the contractor.
2.4.4 Government-Furnished
Equipment (GFE)
The government will not provide equipment to the contractor.
2.5 Contractor-Furnished
Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government.
Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples or Manufacturer’s Data Cut Sheets of Materials used in this contract. Material Safety Data Sheets (MSDS) shall be provided to the KO for government approval before any material is brought on base.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and Work Status Reports shall be provided when requested by the KO. A status report of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference.
The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.
2.6.4 Deliverables Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in
Section F.
2.6.5 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.
2.6.6 Computerized
Maintenance Management Systems (CMMS)
N/A
2.6.7 Quality Management
System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:
• Accurate documentation of work processes, procedures, and output measures.
• A systematic procedure for assessing compliance with performance objectives and standards.
• Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
• Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.7.1 Quality Management
(QM) Plan
The Contractor shall develop and submit a QM Plan per Section F.
The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.
2.6.7.2 Quality Inspection and
Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions.
The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.
2.6.7.3 Quality Inspection and
Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.8 Property Management
Plan
N/A
2.6.9 System and Equipment
Replacement
N/A
2.7 Personnel Requirements The Contractor shall comply with the personnel requirements stated below.
2.7.1 Key Personnel Identify appropriate key personnel as sub-sets below.
The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.
The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.
2.7.1.1 Project Manager (PM) The Contractor shall provide a PM who has relevant experience at a comparable level of responsibility in projects of similar size, scope and complexity. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM shall be an Indiana Licensed Asbestos Project Designer and have completed a Lead Safety Course. The PM shall provide his/her annual medical examination and respirator fit documentation along with asbestos license and Lead Safety course certificate.
2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met. The Quality Manager shall be an Indiana Licensed Asbestos Project Supervisor and have completed a Lead Safety Course. The Quality Manager shall provide his/her annual medical examination and respirator fit documentation along with asbestos license and Lead Safety course certificate.
2.7.1.3 Site Safety and Health
Officer (SSHO)
The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:
The SSHO shall have satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past, and have completed the OSHA 30-hour construction safety class or equivalent within the last three years. The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience. The SSHO shall be respirator fit and be able to enter asbestos contaminated spaces.
2.7.2 Employee Requirements The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Competent personnel shall be provided as required. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures. See Spec Item 2.3.3 for other requirements.
2.7.2.1 Employee Appearance The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All
Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
2.7.2.2 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
2.7.2.3 Identification as
Contractor Employee
Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
2.7.2.4 Removal of Employees The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.
2.7.2.5 Proof of Legal Residency No employee or representative of the Contractor will be admitted to the site of work unless satisfactory proof of U.S. Citizenship is furnished.
2.8 Security Requirements The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.
2.8.1 Employee Listing The Contractor shall maintain a current Employee List and submit per Section F. The list shall include employee’s name, address, position and Indiana asbestos licensure held (if applicable).
2.8.2 Vehicles The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.
2.8.3 Passes and Badges All Contractor employees shall obtain the required employee and vehicle passes. The Contractor employees must be able to obtain N- CAC in accordance with security requirements. Each employee shall wear the Government issued badge over the front of the outer clothing. Immediately report instances of lost or stolen badges to the KO. When an employee leaves the contractor’s service, the contractor shall immediately contact RapidGate and the employee’s badge shall be returned to the contractor the same day.
2.8.4 Access to Installation All contract employees are required to be badged through the Non- Common Access Card (N-CAC) Contractors/Vendors Program (i.e.
RapidGate). RapidGate includes enrollment, registration, background vetting, screening, issuance of credentials, and electronic validation of credentials at the contractor’s expense through a designated independent contractor NCAC service provider. Credentials (badges) will be issued every five years and access privileges will be reviewed/renewed on an annual basis. RapidGate information can be found at the following web site: http://rapidgate.com. All costs associated with RapidGate shall be the responsibility of the http://rapidgate.com/ contractor.
2.8.4.1 One-Day Passes All badge requests, other than RapidGate, shall be a one day pass.
Requests for one day passes shall be submitted to the KO at least 2 days prior to base access. Submission of identification credentials for verification and undergoing a criminal screening/background check are required for one day passes.
2.8.5 Access to Buildings The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas.
Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.
2.8.6 Access Arrangements The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.
2.8.7 Security Clearances The Contractor shall obtain all required corporate and personnel Security Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.
2.8.8 Trustworthiness Security –
Navy Contract/Task Orders
N/A
2.9 Contractor Safety Program The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and Public Law 91-596, Occupational Safety and Health Act.
2.9.1 Accident Prevention Plan
(APP)
The Contractor shall develop and implement a site Accident Prevention Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site.
The APP shall follow the format and include all elements addressed in Appendix A of EM 385-1-1. The APP shall incorporate Activity Hazard Analyses (AHAs) and Occupational Risk and Compliance Plans and Programs that are relevant to the site specific hazards and controls for each activity and type of work that may be encountered in the performance of this contract.
The Contractor shall submit an APP for acceptance per Section F.
The Contractor shall review, update, and submit revisions to the APP whenever a change in work conditions, hazards, or activities occur.
Submittal of the APP shall include Activity Hazard Analyses (AHAs) and Occupational Risk and Compliance Plans and Programs as specified below.
2.9.2 Activity Hazard Analysis
(AHA)
The Contractor shall prepare Activity Hazard Analyses (AHAs) for all applicable common recurring work activities performed under this contract. AHAs for recurring work shall be submitted with the APP for initial review by the government and address each ELIN in the contract. AHAs shall also be submitted for each task order. These AHAs shall be for each ELIN on the task order and be site specific.
AHAs shall be submitted and approved by government before work may commence.
AHAs shall follow format of Figure 1-2 of EM 385-1-1 and shall explain the following as detailed in the EM 385-1-1:
• The steps of the service process;
• Identify potential hazards that exist as a result of the
Contractor’s service process within the environment;
• Measures or plans of actions to safely remove potential hazards away from people in and around the service process and environment;
• Specific materials and equipment necessary to safely remove potential hazards away from people in and around the service process and environment;
• Inspection requirements to assure service activity is safe; and
• Training of service personnel to be aware of potential hazards and measures or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .