Base Yr
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40083-14-R-2706 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0001 Indefinite Quantity Requirements | |||||
| PROVIDE PRICES FOR ENVIRONMENTAL SERVICES - INDEFINITE QUANTITY REQUIREMENTS - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||
| ELINs A001 through A049 | |||||
| EXHIBIT LINE | LINE ITEM | ESTIMATED | UNIT OF | UNIT | EXTENDED |
| ITEM NUMBER | DESCRIPTION | QUANTITY | ISSUE | PRICE | AMOUNT |
| A001 | Contractor shall provide pre-cleaning of surfaces for asbestos. Pre-cleaning shall consist of all labor, material and equipment for HEPA vacuuming and wet wiping of all surfaces within regulated area before any asbestos removal and/or encapsulation takes place within this contract. Refer to Section C and Attachment J for more information. | 15000 | SF | $0.00 |
A002 Contractor shall provide for all labor, material and equipment for the establishment of a negative pressure enclosure. Refer to Section C and Attachment J for more information. Line Item A003 shall be used for cost of Negative Air Machines. 15000 CF $0.00
A003 Contractor shall provide negative air machine(s) for negative pressure enclosure (Line Item A002). Line item includes negative air machines up to 2,000 CFM and shall print pressure differential recordings 24 hrs/day for each day. At least 4 air changes per hour shall be maintained and minimum of -0.02 inches of water column in the negative pressure enclosure. This line item also includes all labor in setting up machines for negative pressure enclosure. Refer to Section C and Attachment J for more information. 6 EA $0.00
A004 Contractor shall provide for the removal of thermal system insulation (TSI) on less than 4” diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glove bag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 350 LF $0.00
A005 Contractor shall provide for the removal of thermal system insulation (TSI) from 4” to 8" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glove bag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 225 LF $0.00
A006 Contractor shall provide for the removal of thermal system insulation (TSI) greater than 8" & up to 16" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glove bag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 50 LF $0.00
A007 Contractor shall provide for the removal of thermal system insulation (TSI) greater than 16" & up to 24" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glove bag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 10 LF $0.00
A008 Contractor shall provide for the removal of thermal system insulation (TSI) from pipe fittings on less than 4" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glove bag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 30 EA $0.00
A009 Contractor shall provide for the removal of thermal system insulation (TSI) from pipe fittings on 4" to 8" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glove bag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 20 EA $0.00
A010 Contractor shall provide for the removal of thermal system insulation (TSI) from pipe fittings greater than 8" & up to 16" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glove bag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 10 EA $0.00
A011 Contractor shall provide for the removal of thermal system insulation (TSI) from pipe fittings greater than 16" & up to 24" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glove bag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 5 EA $0.00
A012 Contractor shall provide for all labor, material and equipment for removal of asbestos floor tile and all associated floor tile mastic. Refer to Section C and Attachment J for more information. 1600 SF $0.00
A013 Contractor shall provide for all labor, material and equipment for removal of asbestos cove base and all associated mastic. Refer to Section C and Attachment J for more information. 250 LF $0.00
A014 Contractor shall provide for all labor, material and equipment for removal of asbestos ceiling tile and associated supporting grid system. Refer to Section C and Attachment J for more information. 600 SF $0.00
A015 Contractor shall provide for all labor, material and equipment for removal of asbestos contaminated insulation above ceiling tile (typically fiberglass insulation in attic space). This line item includes cleaning (HEPA vacuuming and wet wiping) all horizontal surfaces within the space. Space typically includes trusses, beams, wiring, duct work and etc. Refer to Section C and Attachment J for more information. 1200 SF $0.00
A016 Contractor shall provide for all labor, material and equipment for drilling up to 2” diameter holes in transite ceiling. Drill shall be equipped with a drawdown HEPA filtered vacuumed shroud to form a seal around the drilled area. Shaving cream shall be placed on area before drilling begins. Impermeable drop cloths shall be placed on surfaces below all drilling locations. Refer to Section C and Attachment J for more information. 4 20 Holes $0.00
A017 Contractor shall provide for all labor, material and equipment for removal of transite panels. Typical siding panel 3’ by 6’ can be up to 100 lbs. in weight. Panels shall be removed without making friable. Refer to Section C and Attachment J for more information. 270 SF $0.00
A018 Contractor shall provide for all labor, material and equipment for removal of miscellaneous mastics on surfaces. Refer to Section C and Attachment J for more information. 400 SF $0.00
A019 Contractor shall provide for all labor, material and equipment for removal of asbestos cementious material from surfaces. Material is typically used as leveling compound on floors or used as crack filler in walls and floors. Surfaces may include vertical and horizontal surfaces. Refer to Section C and Attachment J for more information. 300 SF $0.00
A020 Contractor shall provide for all labor, material and equipment for removal of transite guttering from buildings. Guttering shall be removed without make friable. Drop cloths shall be used on below surfaces. Refer to Section C and Attachment J for more information. 30 LF $0.00
A021 Contractor shall provide for all labor, material and equipment for removal of window, window frame and associated asbestos caulking around window and window frame. Refer to Section C and Attachment J for more information. 50 SF $0.00
A022 Contractor shall provide for all labor, material and equipment for the removal of asbestos contaminated soil. Soil is typically under docks of buildings in confined spaces and therefore would be removed by hand digging. Refer to Section C and Attachment J for more information. 250 CF $0.00
A023 Contractor shall provide for all labor, material and equipment for the encapsulation of contaminated soil by concrete placement. Contaminated soil is typically under docks of buildings in confined spaces. Space shall be considered contaminated and therefore only Indiana licensed asbestos personnel shall be in the space completing the work. Fiber lock encapsulate shall be applied to all surfaces, including soil, within the space before placement of concrete. A minimum thickness of 2” concrete shall be applied over entire floor surface and given a float finish. Contractor shall caulk/seal any joints/gaps between new concrete and walls or any other joints/gaps needed to provide a complete encapsulate of contaminated soil. Refer to Section C and Attachment J for more information. 600 SF $0.00
A024 Contractor shall provide for all labor, material and equipment for the encapsulation of thermal system insulation (TSI) on less than 4” diameter piping (diameter measurement includes insulation thickness). Encapsulation shall be by the application of Lag Kloth and Lag-Kote around entire circumference of pipe. Refer to Section C and Attachment J for more information. 40 LF $0.00
A025 Contractor shall provide for all labor, material and equipment for the encapsulation of thermal system insulation (TSI) from 4” to 8" diameter piping (diameter measurement includes insulation thickness). Encapsulation shall be by the application of Lag Kloth and Lag-Kote around entire circumference of pipe. Refer to Section C and Attachment J for more information. 30 LF $0.00
A026 Contractor shall provide for all labor, material and equipment for the encapsulation of thermal system insulation (TSI) greater than 8" & up to 16" diameter piping (diameter measurement includes insulation thickness). Encapsulation shall be by the application of Lag Kloth and Lag-Kote around entire circumference of pipe. Refer to Section C and Attachment J for more information. 15 LF $0.00
A027 Contractor shall provide for all labor, material and equipment for the encapsulation of thermal system insulation (TSI) greater than 16" & up to 24" diameter piping (diameter measurement includes insulation thickness). Encapsulation shall be by the application of Lag Kloth and Lag-Kote around entire circumference of pipe. Refer to Section C and Attachment J for more information. 5 LF $0.00
A028 Contractor shall provide for all labor, material and equipment for the encapsulation of surfaces by use of an asbestos penetrating encapsulate. Asbestos penetrating encapsulate shall meet all requirements of UFGS 02 82 16.00 20. Refer to Section C and Attachment J for more information. 100 SF $0.00
A029 Contractor shall provide for all labor, material and equipment for the encapsulation of surfaces by use of an asbestos bridging encapsulate. Asbestos bridging encapsulate shall meet all requirements of UFGS 02 82 16.00 20. Refer to Section C and Attachment J for more information. 100 SF $0.00
A030 Contractor shall provide for all labor, material and equipment for a three chamber hygiene facility for Class I asbestos removal over 25 linear feet or 10 square feet. Hygiene facility shall include a 5 micron filter for any waste water to be discharged. Refer to Section C and Attachment J for more information. 2 EA $0.00
A031 Contractor shall provide for one boom lift for personnel to work in extended heights. Line item shall include any labor and equipment needed for operation and to meet all requirements of EM 385-1-1. Refer to Section C and Attachment J for more information. 5 Day $0.00
A032 Contractor shall provide for one scissor lift for personnel to work in extended heights. Line item shall include any equipment needed for operation and to meet all requirements of EM 385-1-1. Refer to Section C and Attachment J for more information. 14 Day $0.00
A033 Contractor shall provide all labor, material and equipment for pick-up and disposal of asbestos bags from Building 155. Asbestos contaminated material in bags is generated from removal of exterior thermal coating of ordnance items by water jet. Government personnel place this asbestos contaminated material into 20-30 gallon asbestos disposal bags. It is estimated that 40 bags per week are generated for a time period of approximately eight weeks per year. This line includes picking up these bags from B-155 and disposing in accordance with 329 IAC 10-8.2-4. Each bag weighs approximately 50 lbs and contains approximately 6-8 gallons by volume. Refer to Section C and Attachment J for more information. 8 Per 40 Bags $0.00
A034 Contractor shall provide all labor, material and equipment for pick-up and disposal of asbestos contaminated safes and ovens from various buildings. Safes and ovens shall be double wrapped in 6-mil plastic sheet and sealed with duct tape or equivalent. Disposal shall be in accordance with 329 IAC 10-8.2-4. Refer to Section C and Attachment J for more information. 4 CY $0.00
A035 Contractor shall provide all labor, material and equipment for disposal of asbestos contaminated material generated by this contract that is less than one cubic yard. Disposal shall be in accordance with 329 IAC 10-8.2-4. Refer to Section C and Attachment J for more information. 100 CF $0.00
A036 Contractor shall provide all labor, material and equipment for disposal of asbestos contaminated material generated by this contract that is one cubic yard or greater. Disposal shall be in accordance with 329 IAC 10-8.2-4. Refer to Section C and Attachment J for more information. 240 CY $0.00
A037 Contractor shall provide for pre-cleaning of surfaces for lead paint. Pre-cleaning shall consist of all labor, material and equipment for HEPA vacuuming and wet wiping of all surfaces within area before lead paint removal takes place within this contract. All lead paint shall be placed in NSWC Environmental provided drums. Proper disposal of drums will be provided by NSWC Environmental. This ELIN could be used without utilizing ELIN A038 or A039. Refer to Section C and Attachment J for more information. 2000 SF $0.00
A038 Contractor shall provide all labor, material and equipment for removal of loose, flaking lead paint from horizontal and/or vertical surfaces. Media abrasive blasting methods shall not be used. This line item shall include final cleaning (HEPA vacuuming and wet wiping) of all surfaces. All removed paint shall be placed in NSWC Environmental provided drums. Proper disposal of drums will be provided by NSWC Environmental. Refer to Section C and Attachment J for more information. 1200 SF $0.00
A039 Contractor shall provide all labor, material and equipment for removal of all lead paint from horizontal and/or vertical surfaces complete down to substrate. Media abrasive blasting methods shall not be used. This line item shall include final cleaning (HEPA vacuuming and wet wiping) of all surfaces. All removed paint shall be placed in NSWC Environmental provided drums. Proper disposal of drums will be provided by NSWC Environmental. Refer to Section C and Attachment J for more information. 500 SF $0.00
A040 Contractor shall provide all labor, equipment and material for the demo of gypsum board or drywall that has suspected contaminated mold, this includes ceilings and walls. This line item is for demo only. 2400 SF $0.00
A041 Contractor shall provide all labor, equipment and material for the removal of suspected mold growth from concrete or block walls, this includes ceilings. 4200 SF $0.00
A042 Contractor shall provide all labor, equipment and material for the removal or cleaning of the interior of metal duct work that has suspected contaminated mold. 500 LF $0.00
A043 Contractor shall provide all labor, equipment and material for the removal of mold by wet wipe and HEPA vacuum HVAC diffusers. 20 EA $0.00
A044 Contractor shall provide the disposal of all debris include dumpster and transportation for all demo of any suspected contaminated mold. 80 CY $0.00
A045 This ELIN shall be for labor cost that is not covered by other ELINs within this contract. Labor shall be for an Indiana Licensed Asbestos Supervisor. This labor shall be identified by the contractor in the estimate that is provided to the Contracting Officer, which identifies the work to be completed, the material and equipment required and the amount of labor necessary to perform the work. The Labor Unit Price shall include all direct and indirect costs to perform an hour of labor except material. Cost such as profit, field and office overhead, job estimating, job preparation, licenses, permits insurance, furnishing submittals and all other direct and indirect costs associated with performance are all included as part of labor hour unit prices. Labor hours proposed by the contractor are subject to approval by the Contracting Officer. No work under this ELIN shall be performed until proper authorization from the Government has been received. Refer to Section C and Attachment J for more information. 24 LH $0.00
| AO46 | This ELIN shall be for material and equipment that is not already included for completion of other line items within this contract. The contractor will be paid a percentage mark-up of the invoice cost to cover overhead costs associated with providing the material and equipment in addition to the invoice cost for material and equipment. The contractor shall provide copies of the suppliers' quotes for material and equipment with the task order proposal. To determine the invoice cost, the average cost of the quotes received will be used. Exception: If only one supplier can meet the task order requirements (i.e. delivery time or only one supplier of a particular type of material or equipment), then that supplier quote will be used. Contractor must provide copies of at least two other quotes showing that they cannot meet the task order requirements. Note: The amount listed in the exhibit line item is for proposal valuation purposes only and does not necessarily indicate any quantity of material/equipment required by the Government. | 2000 | LS | $0.00 | $2,000.00 |
| 0.00% | % Mark-up on Material Invoice Cost | ||||
| For proposal purposes only, assume the value of the material is $2,000.00 To calculate the amount for ELIN A046 multiplying $2,000.00 by the percent mark-up + 100%. For example, if the percent mark-up is 5% then $2,000.00 X 1.05 = $2,100.00 which is entered in ELIN A041. Insert percentage in Cell B104. |
| A047 | This ELIN shall be for a percentage mark-up (premium) for all work to be completed within a Permit Required Confined Space (PRCS) as defined by EM 385-1-1. Only those tasks that are actually performed within a PRCS shall qualify for this premium. Refer to Section C and Attachment J for more information. | 2000 | LS | $0.00 | $2,000.00 |
| 0.00% | % Mark-up for PRCS Work | ||||
| For proposal purposes only, assume the value of all applicable ELINs is $2,000.00 To calculate the amount of ELIN A047 multiplying $2,000.00 by the percent mark-up + 100%. For example, if the percent mark-up is 5% then $2,000.00 X 1.05 = $2,100.00 which is entered in ELIN A042. Insert percentage in Cell B108. |
| A048 | This ELIN shall be for a percentage mark-up (premium) for all work designated by the Contracting Officer as to be completed outside of regular working hours. Work for this ELIN has to be requested by the Contracting Officer to the contractor. ELIN A048 and ELIN A049 shall not both be utilized on same task order as this ELIN A043 does not require Emergency Service. Only those tasks that are actually performed and completed outside of regular working hours shall qualify for this premium. Refer to Section C and Attachment J for more information. | 2000 | LS | $0.00 | $2,000.00 |
| 0.00% | % Mark-up for After Normal Working Hours Work | ||||
| For proposal purposes only, assume the value of all applicable ELINs is $2,000.00 To calculate the amount of ELIN A048 multiplying $2,000.00 by the percent mark-up + 100%. For example, if the percent mark-up is 5% then $2,000.00 X 1.05 = $2,100.00 which is entered in ELIN A043. Insert percentage in Cell B112. |
| A049 | This ELIN shall be for a percentage mark-up (premium) for all work designated by the Contracting Officer as Emergency Service. This ELIN shall include work outside of regular working hours. ELIN A048 and ELIN A049 shall not both be utilized on same task order. The contractor shall arrive on site no later than two (2) hours after issuance of oral order by Contracting Officer to review project scope. Within one (1) hour of site visit ending, contractor shall submit the marked-up floor layout drawing of area that is required by this contract outlining scope of work to the Contracting Officer. Within two (2) hours of government approval of layout drawing, work shall commence on site. Oral orders arising as a result of emergency situations will be confirmed by issuance of a written Task Order within five (5) business days. Refer to Section C and Attachment J for more information. | 2000 | LS | $0.00 | $2,000.00 |
| 0.00% | % Mark-up for Emergency Service Work | ||||
| For proposal purposes only, assume the value of all applicable ELINs is $2,000.00 To calculate the amount of ELIN A049 multiplying $2,000.00 by the percent mark-up + 100%. For example, if the percent mark-up is 5% then $2,000.00 X 1.05 = $2,100.00 which is entered in ELIN A049. Insert percentage in Cell B116. |
| ESTIMATE TOTAL PRICE: | $8,000.00 |
| (Line Items A001 - A049) |
Option Yr 1
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40083-14-R-2706 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0002 Indefinity Quantity Requirements | |||||
| PROVIDE PRICES FOR ENVIRONMENTAL SERVICES - INDEFINITE QUANTITY REQUIREMENTS - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||
| ELINs B001 through B049 | |||||
| EXHIBIT LINE | LINE ITEM | ESTIMATED | UNIT OF | UNIT | EXTENDED |
| ITEM NUMBER | DESCRIPTION | QUANTITY | ISSUE | PRICE | AMOUNT |
| B001 | Contractor shall provide pre-cleaning of surfaces for asbestos. Pre-cleaning shall consist of all labor, material and equipment for HEPA vacuuming and wet wiping of all surfaces within regulated area before any asbestos removal and/or encapsulation takes place within this contract. Refer to Section C and Attachment J for more information. | 15000 | SF | $0.00 |
B002 Contractor shall provide for all labor, material and equipment for the establishment of a negative pressure enclosure. Refer to Section C and Attachment J for more information. Line Item A003 shall be used for cost of Negative Air Machines. 15000 CF $0.00
B003 Contractor shall provide negative air machine(s) for negative pressure enclosure (Line Item A002). Line item includes negative air machines up to 2,000 CFM and shall print pressure differential recordings 24 hrs/day for each day. At least 4 air changes per hour shall be maintained and minimum of -0.02 inches of water column in the negative pressure enclosure. This line item also includes all labor in setting up machines for negative pressure enclosure. Refer to Section C and Attachment J for more information. 6 EA $0.00
B004 Contractor shall provide for the removal of thermal system insulation (TSI) on less than 4” diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glovebag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 350 LF $0.00
B005 Contractor shall provide for the removal of thermal system insulation (TSI) from 4” to 8" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glovebag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 225 LF $0.00
B006 Contractor shall provide for the removal of thermal system insulation (TSI) greater than 8" & up to 16" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glovebag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 50 LF $0.00
B007 Contractor shall provide for the removal of thermal system insulation (TSI) greater than 16" & up to 24" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glovebag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 10 LF $0.00
B008 Contractor shall provide for the removal of thermal system insulation (TSI) from pipe fittings on less than 4" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glovebag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 30 EA $0.00
B009 Contractor shall provide for the removal of thermal system insulation (TSI) from pipe fittings on 4" to 8" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glovebag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 20 EA $0.00
B010 Contractor shall provide for the removal of thermal system insulation (TSI) from pipe fittings greater than 8" & up to 16" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glovebag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 10 EA $0.00
B011 Contractor shall provide for the removal of thermal system insulation (TSI) from pipe fittings greater than 16" & up to 24" diameter piping (diameter measurement includes insulation thickness). This includes all labor, material and equipment that is associated with the removal including glovebag. Typical piping includes, but not limited to steam, condensate and water line piping. Line item shall include all labor, material and equipment for encapsulating the ends (i.e. Lag Kloth) of thermal system insulation to remain that is adjacent to the removed portion. If non-TSI material is adjacent to what is removed then contractor shall remove non-asbestos material a minimum of 6" back on each side of removal. Refer to Section C and Attachment J for more information. 5 EA $0.00
B012 Contractor shall provide for all labor, material and equipment for removal of asbestos floor tile and all associated floor tile mastic. Refer to Section C and Attachment J for more information. 1600 SF $0.00
B013 Contractor shall provide for all labor, material and equipment for removal of asbestos cove base and all associated mastic. Refer to Section C and Attachment J for more information. 250 LF $0.00
B014 Contractor shall provide for all labor, material and equipment for removal of asbestos ceiling tile and associated supporting grid system. Refer to Section C and Attachment J for more information. 600 SF $0.00
B015 Contractor shall provide for all labor, material and equipment for removal of asbestos contaminated insulation above ceiling tile (typically fiberglass insulation in attic space). This line item includes cleaning (HEPA vacuuming and wet wiping) all horizontal surfaces within the space. Space typically includes trusses, beams, wiring, duct work and etc. Refer to Section C and Attachment J for more information. 1200 SF $0.00
B016 Contractor shall provide for all labor, material and equipment for drilling up to 2” diameter holes in transite ceiling. Drill shall be equipped with a drawdown HEPA filtered vacuumed shroud to form a seal around the drilled area. Shaving cream shall be placed on area before drilling begins. Impermeable drop cloths shall be placed on surfaces below all drilling locations. Refer to Section C and Attachment J for more information. 4 20 Holes $0.00
B017 Contractor shall provide for all labor, material and equipment for removal of transite panels. Typical siding panel 3’ by 6’ can be up to 100 lbs in weight. Panels shall be removed without making friable. Refer to Section C and Attachment J for more information. 270 SF $0.00
B018 Contractor shall provide for all labor, material and equipment for removal of miscellaneous mastics on surfaces. Refer to Section C and Attachment J for more information. 400 SF $0.00
B019 Contractor shall provide for all labor, material and equipment for removal of asbestos cementious material from surfaces. Material is typically used as leveling compound on floors or used as crack filler in walls and floors. Surfaces may include vertical and horizontal surfaces. Refer to Section C and Attachment J for more information. 300 SF $0.00
B020 Contractor shall provide for all labor, material and equipment for removal of transite guttering from buildings. Guttering shall be removed without make friable. Drop cloths shall be used on below surfaces. Refer to Section C and Attachment J for more information. 30 LF $0.00
B021 Contractor shall provide for all labor, material and equipment for removal of window, window frame and associated asbestos caulking around window and window frame. Refer to Section C and Attachment J for more information. 50 SF $0.00
B022 Contractor shall provide for all labor, material and equipment for the removal of asbestos contaminated soil. Soil is typically under docks of buildings in confined spaces and therefore would be removed by hand digging. Refer to Section C and Attachment J for more information. 250 CF $0.00
B023 Contractor shall provide for all labor, material and equipment for the encapsulation of contaminated soil by concrete placement. Contaminated soil is typically under docks of buildings in confined spaces. Space shall be considered contaminated and therefore only Indiana licensed asbestos personnel shall be in the space completing the work. Fiber lock encapsulate shall be applied to all surfaces, including soil, within the space before placement of concrete. A minimum thickness of 2” concrete shall be applied over entire floor surface and given a float finish. Contractor shall caulk/seal any joints/gaps between new concrete and walls or any other joints/gaps needed to provide a complete encapsulate of contaminated soil. Refer to Section C and Attachment J for more information. 600 SF $0.00
B024 Contractor shall provide for all labor, material and equipment for the encapsulation of thermal system insulation (TSI) on less than 4” diameter piping (diameter measurement includes insulation thickness). Encapsulation shall be by the application of Lag Kloth and Lag-Kote around entire circumference of pipe. Refer to Section C and Attachment J for more information. 40 LF $0.00
B025 Contractor shall provide for all labor, material and equipment for the encapsulation of thermal system insulation (TSI) from 4” to 8" diameter piping (diameter measurement includes insulation thickness). Encapsulation shall be by the application of Lag Kloth and Lag-Kote around entire circumference of pipe. Refer to Section C and Attachment J for more information. 30 LF $0.00
B026 Contractor shall provide for all labor, material and equipment for the encapsulation of thermal system insulation (TSI) greater than 8" & up to 16" diameter piping (diameter measurement includes insulation thickness). Encapsulation shall be by the application of Lag Kloth and Lag-Kote around entire circumference of pipe. Refer to Section C and Attachment J for more information. 15 LF $0.00
B027 Contractor shall provide for all labor, material and equipment for the encapsulation of thermal system insulation (TSI) greater than 16" & up to 24" diameter piping (diameter measurement includes insulation thickness). Encapsulation shall be by the application of Lag Kloth and Lag-Kote around entire circumference of pipe. Refer to Section C and Attachment J for more information. 5 LF $0.00
B028 Contractor shall provide for all labor, material and equipment for the encapsulation of surfaces by use of an asbestos penetrating encapsulate. Asbestos penetrating encapsulate shall meet all requirements of UFGS 02 82 16.00 20. Refer to Section C and Attachment J for more information. 100 SF $0.00
B029 Contractor shall provide for all labor, material and equipment for the encapsulation of surfaces by use of an asbestos bridging encapsulate. Asbestos bridging encapsulate shall meet all requirements of UFGS 02 82 16.00 20. Refer to Section C and Attachment J for more information. 100 SF $0.00
B030 Contractor shall provide for all labor, material and equipment for a three chamber hygiene facility for Class I asbestos removal over 25 linear feet or 10 square feet. Hygiene facility shall include a 5 micron filter for any waste water to be discharged. Refer to Section C and Attachment J for more information. 2 EA $0.00
B031 Contractor shall provide for one boom lift for personnel to work in extended heights. Line item shall include any labor and equipment needed for operation and to meet all requirements of EM 385-1-1. Refer to Section C and Attachment J for more information. 5 Day $0.00
B032 Contractor shall provide for one scissor lift for personnel to work in extended heights. Line item shall include any equipment needed for operation and to meet all requirements of EM 385-1-1. Refer to Section C and Attachment J for more information. 14 Day $0.00
B033 Contractor shall provide all labor, material and equipment for pick-up and disposal of asbestos bags from Building 155. Asbestos contaminated material in bags is generated from removal of exterior thermal coating of ordnance items by water jet. Government personnel place this asbestos contaminated material into 20-30 gallon asbestos disposal bags. It is estimated that 40 bags per week are generated for a time period of approximately eight weeks per year. This line includes picking up these bags from B-155 and disposing in accordance with 329 IAC 10-8.2-4. Each bag weighs approximately 50 lbs and contains approximately 6-8 gallons by volume. Refer to Section C and Attachment J for more information. 8 Per 40 Bags $0.00
B034 Contractor shall provide all labor, material and equipment for pick-up and disposal of asbestos contaminated safes and ovens from various buildings. Safes and ovens shall be double wrapped in 6-mil plastic sheet and sealed with duct tape or equivalent. Disposal shall be in accordance with 329 IAC 10-8.2-4. Refer to Section C and Attachment J for more information. 4 CY $0.00
B035 Contractor shall provide all labor, material and equipment for disposal of asbestos contaminated material generated by this contract that is less than one cubic yard. Disposal shall be in accordance with 329 IAC 10-8.2-4. Refer to Section C and Attachment J for more information. 100 CF $0.00
B036 Contractor shall provide all labor, material and equipment for disposal of asbestos contaminated material generated by this contract that is one cubic yard or greater. Disposal shall be in accordance with 329 IAC 10-8.2-4. Refer to Section C and Attachment J for more information. 240 CY $0.00
B037 Contractor shall provide for pre-cleaning of surfaces for lead paint. Pre-cleaning shall consist of all labor, material and equipment for HEPA vacuuming and wet wiping of all surfaces within area before lead paint removal takes place within this contract. All lead paint shall be placed in NSWC Environmental provided drums. Proper disposal of drums will be provided by NSWC Environmental. This ELIN could be used without utilizing ELIN A038 or A039. Refer to Section C and Attachment J for more information. 2000 SF $0.00
B038 Contractor shall provide all labor, material and equipment for removal of loose, flaking lead paint from horizontal and/or vertical surfaces. Media abrasive blasting methods shall not be used. This line item shall include final cleaning (HEPA vacuuming and wet wiping) of all surfaces. All removed paint shall be placed in NSWC Environmental provided drums. Proper disposal of drums will be provided by NSWC Environmental. Refer to Section C and Attachment J for more information. 1200 SF $0.00
B039 Contractor shall provide all labor, material and equipment for removal of all lead paint from horizontal and/or vertical surfaces complete down to substrate. Media abrasive blasting methods shall not be used. This line item shall include final cleaning (HEPA vacuuming and wet wiping) of all surfaces. All removed paint shall be placed in NSWC Environmental provided drums. Proper disposal of drums will be provided by NSWC Environmental. Refer to Section C and Attachment J for more information. 500 SF $0.00
B040 Contractor shall provide all labor, equipment and material for the demo of gypsum board or drywall that has suspected contaminated mold, this includes ceilings and walls. This line item is for demo only. 100 SF $0.00
B041 Contractor shall provide all labor, equipment and material for the removal of suspected mold growth from concrete or block walls, this includes ceilings. 4200 SF $0.00
B042 Contractor shall provide all labor, equipment and material for the removal or cleaning of the interior of metal duct work that has suspected contaminated mold. 100 LF $0.00
B043 Contractor shall provide all labor, equipment and material for the removal of mold by wet wipe and HEPA vacuum HVAC diffusers. 10 EA $0.00
B044 Contractor shall provide the disposal of all debris include dumpster and transportation for all demo of any suspected contaminated mold. 80 CY $0.00
B045 This ELIN shall be for labor cost that is not covered by other ELINs within this contract. Labor shall be for an Indiana Licensed Asbestos Supervisor. This labor shall be identified by the contractor in the estimate that is provided to the Contracting Officer, which identifies the work to be completed, the material and equipment required and the amount of labor necessary to perform the work. The Labor Unit Price shall include all direct and indirect costs to perform an hour of labor except material. Cost such as profit, field and office overhead, job estimating, job preparation, licenses, permits insurance, furnishing submittals and all other direct and indirect costs associated with performance are all included as part of labor hour unit prices. Labor hours proposed by the contractor are subject to approval by the Contracting Officer. No work under this ELIN shall be performed until proper authorization from the Government has been recieved. Refer to Section C and Attachment J for more information. 24 LH $0.00
| BO46 | This ELIN shall be for material and equipment that is not already included for completion of other line items within this contract. The contractor will be paid a percentage mark-up of the invoice cost to cover overhead costs associated with providing the material and equipment in addition to the invoice cost for material and equipment. The contractor shall provide copies of the suppliers' quotes for material and equipment with the task order proposal. To determine the invoice cost, the average cost of the quotes recieved will be used. Exception: If only one supplier can meet the task order requirements (i.e. delivery time or only one supplier of a particular type of material or equipment), then that supplier quote will be used. Contractor must provide copies of at least two other quotes showing that they cannot meet the task order requirements. Note: The amount listed in the exhibit line item is for proposal valuation purposes only and does not necessarily indicate any quantity of material/equipment required by the Government. | 2000 | LS | $0.00 | $2,000.00 |
| 0.00% | % Mark-up on Material Invoice Cost | ||||
| For proposal purposes only, assume the value of the material is $2,000.00 To calculate the amount for ELIN A046 multiplying $2,000.00 by the percent mark-up + 100%. For example, if the percent mark-up is 5% then $2,000.00 X 1.05 = $2,100.00 which is entered in ELIN A041. Insert percentage in Cell B104. |
| B047 | This ELIN shall be for a percentage mark-up (premium) for all work to be completed within a Permit Required Confined Space (PRCS) as defined by EM 385-1-1. Only those tasks that are actually performed within a PRCS shall qualify for this premium. Refer to Section C and Attachment J for more information. | 2000 | LS | $0.00 | $2,000.00 |
| 0.00% | % Mark-up for PRCS Work | ||||
| For proposal purposes only, assume the value of all applicable ELINs is $2,000.00 To calculate the amount of ELIN A047 multiplying $2,000.00 by the percent mark-up + 100%. For example, if the percent mark-up is 5% then $2,000.00 X 1.05 = $2,100.00 which is entered in ELIN A042. Insert percentage in Cell B108. |
| B048 | This ELIN shall be for a percentage mark-up (premium) for all work designated by the Contracting Officer as to be completed outside of regular working hours. Work for this ELIN has to be requested by the Contracting Officer to the contractor. ELIN A048 and ELIN A049 shall not both be utilized on same task order as this ELIN A043 does not require Emergency Service. Only those tasks that are actually performed and completed outside of regular working hours shall qualify for this premium. Refer to Section C and Attachment J for more information. | 2000 | LS | $0.00 | $2,000.00 |
| 0.00% | % Mark-up for After Normal Working Hours Work | ||||
| For proposal purposes only, assume the value of all applicable ELINs is $2,000.00 To calculate the amount of ELIN A048 multiplying $2,000.00 by the percent mark-up + 100%. For example, if the percent mark-up is 5% then $2,000.00 X 1.05 = $2,100.00 which is entered in ELIN A043. Insert percentage in Cell B112. |
| B049 | This ELIN shall be for a percentage mark-up (premium) for all work designated by the Contracting Officer as Emergency Service. This ELIN shall include work outside of regular working hours. ELIN A048 and ELIN A049 shall not both be utilized on same task order. The contractor shall arrive on site no later than two (2) hours after issuance of oral order by Contracting Officer to review project scope. Within one (1) hour of site visit ending, contractor shall submit the marked-up floor layout drawing of area that is required by this contract outlining scope of work to the Contracting Officer. Within two (2) hours of government approval of layout drawing, work shall commence on site. Oral orders arising as a result of emergency situations will be confirmed by issuance of a written Task Order within five (5) business days. Refer to Section C and Attachment J for more information. | 2000 | LS | $0.00 | $2,000.00 |
| 0.00% | % Mark-up for Emergency Service Work | ||||
| For proposal purposes only, assume the value of all applicable ELINs is $2,000.00 To calculate the amount of ELIN A049 multiplying $2,000.00 by the percent mark-up + 100%. For example, if the percent mark-up is 5% then $2,000.00 X 1.05 = $2,100.00 which is entered in ELIN A049. Insert percentage in Cell B116. |
| ESTIMATE TOTAL PRICE: | $8,000.00 |
| (Line Items B001 - B049) |
Option Yr 2
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT #N40083-14-R-2706 |
| EXHIBIT A - CLIN 9000 |
| Line Item 0003 Indefinity Quantity Requirements | |||||
| PROVIDE PRICES FOR ENVIRONMENTAL SERVICES - INDEFINITE QUANTITY REQUIREMENTS - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||
| ELINs C001 through C049 | |||||
| EXHIBIT LINE | LINE ITEM | ESTIMATED | UNIT OF | UNIT | EXTENDED |
| ITEM NUMBER | DESCRIPTION | QUANTITY | ISSUE | PRICE | AMOUNT |
| C001 | Contractor shall provide pre-cleaning of surfaces for asbestos. Pre-cleaning shall consist of all labor, material and equipment for HEPA vacuuming and wet wiping of all surfaces within regulated area before any asbestos removal and/or encapsulation takes place within this contract. Refer to Section C and Attachment J for more information. | 15000 | SF | $0.00 |
C002 Contractor shall provide for all labor, material and equipment for the establishment of a negative pressure enclosure. Refer to Section C and Attachment J for more information. Line Item A003 shall be used for cost of Negative Air Machines. 15000 CF $0.00
C003 Contractor shall provide negative air machine(s) for negative pressure enclosure (Line Item A002). Line item includes negative air machines up to 2,000 CFM and shall print pressure differential recordings 24 hrs/day for each day. At least 4 air changes per hour shall be maintained and minimum of -0.02 inches of water column in the negative pressure enclosure. This line item also includes all labor in setting up machines for negative pressure enclosure.