PRICING_SHEET.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
BOILER TUBE REPLACEMENT, Building 11, Naval Station Great Lakes, Great Lakes, IL
Solicitation number
N40083-13-R-3112
Issued by

About this file

PRICING SHEET

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HRSG #2

ATTACHMENT 1

CLIN 0001

HRSG #2 REPAIRS (ASSUME 5 TUBES)
MATERIAL COSTLABOR HRSWAGES/HRTOTAL WAGESTOTAL MATERIALS
MOBILIZATION (Inclusive of Materials)

INITIAL HYDROSTATIC TESTING

HRSG ACCESS

TUBE REPLACEMENT PER TUBE

ROLLING TUBES (As necessary) PER TUBE

FINAL HYDROSTATIC TESTING

DEMOBILIZATION

DOCUMENTATION

SUBTOTAL
PROFIT/OVERHEAD/BOND
TOTAL COST FOR HRSG #2 REPAIRS

TOTAL FOR THIS WORKSHEET TO ENTERED IN CLIN 01 OF SF1142

HRSG

ATTACHMENT 1

CLIN 0002

IQ HRSG TUBE REPLACEMENTS
MATERIAL COSTLABOR HRSWAGES/HRTOTAL WAGESTOTAL MATERIALS
MOBILIZATION (Inclusive of Materials)

INITIAL HYDROSTATIC TESTING

HRSG ACCESS

TUBE REPLACEMENT PER TUBE

ROLLING TUBES (As necessary) PER TUBE

FINAL HYDROSTATIC TESTING

DEMOBILIZATION

DOCUMENTATION

SUBTOTAL
PROFIT/OVERHEAD/BOND
TOTAL COST FOR HRSG REPAIRS
TOTAL FOR THIS WORKSHEET TO ENTERED IN CLIN 02 OF SF1142

BOILER 4

ATTACHMENT 1

CLIN 0002

BOILER #4 TUBE REPLACEMENT
MATERIAL COSTLABOR HRSWAGES/HRTOTAL WAGESTOTAL MATERIALS
MOBILIZATION (Inclusive of Materials)

INITIAL HYDROSTATIC TEST

BOILER ACCESS

DUTCHMEN TUBE REPLACEMENT PER TUBE

TUBE PLUGGING PER TUBE

TUBE ROLLING PER TUBE

FINAL HYDROSTATIC TEST

DEMOBILIZATION

DOCUMENTATION

SUBTOTAL
PROFIT/OVERHEAD/BOND
TOTAL COST FOR BOILER 4 TUBE REPLACEMENT
TOTAL FOR THIS WORKSHEET TO ENTERED IN CLIN 02 OF SF1142

File details come from the government source that posted it. Updated .