AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide the follow ing: (1) Extend the Request for Quote from COB 8 March 2023 to 8:00 AM (EST) 15
March 2023, (2) Responses to RFIs received, (3) Change the Period of Performance to no more than 180 calendar days.
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Mar-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008023Q8831
X 9B. DATED (SEE ITEM 11)
13-Feb-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Mar-2023
CODE
PUBLIC WORKS DEPARTMENT
FEAD
P.O. BOX 1855
BLDG. 2004 BARNETT AVE.
QUANTICO VA 22134
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
dotty.medel1@navy.milEMAIL:(703) 784-5083TEL:
DOTTY MEDEL / CONTRACT SPECIALIST
N4008023Q8831
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RESPONSES TO RFIS RECEIVED
Question1: Please provide the specification for the 1/16" epoxy floor finish.
Answer: Please refer to UFC 3-190-06 and references found therein.
Question2: The walkway dimension length is shown as approximately 152". Please confirm that the walkway is to be replaced from the exterior of the building, through the first, unused chamber, and then replace and reconfigure the
2nd walkway located in the chamber with the actual tank in it. New walkway in this chamber to fit around the new tank.
Answer: I do not understand what is meant by "replaced from the exterior of the building". Only the walkway inside of the chamber containing the tank is to be replaced.
Question3: In the chamber outside of the chamber with the sulfate tank there is an existing sump pump in an existing pit. In the solicitation the 5.4 demolition of this sump pump has been crossed out however the new work
10.2.4 references supporting new sump pit piping. Please describe what work will take place, if any, at the sump pit and existing sump pump.
Answer: Overflow pipping running from the filler pipe to the sump pit is to be replaced. The all new piping that runs above the floor shall be supported every 40 inches of length. Existing sump pumps are to remain.
Question4: The existing lifting bolts on the precast roof panels have been cut off and temporary attachments will need to be installed as part of the removal. Please confirm that professional engineer will be required to provide lifting hardware design as part of the lift plan for these panels.
Answer: The Contractor shall provide their own engineering services to provide lifting hardware design as part of the lift plan.
Question5: Please confirm that the crane needed to remove these concrete roof panels and for the removal of the old tank and installation of the new tank will require sixty (60) day notice in order to set up in the flight line path.
Answer: It will take at least 45 days for approval of the crane waiver.
Question 6: Please confirm the both cells floors and walls up to 2' are to be coated or is just the cell where the tank is located is to be coated.
Answer: The floors and walls in both cells are to be coated.
Question7: The outside wood platform attached to the building appears to be where the driver will stand when filling the tank? There is no work currently in the scope of work for anything on this walkway. Please confirm if replacement of the deck boards are to be added to this scope of work.
Answer: No, replacement of the wood platform is not included in the scope of work.
Question8: Inside the first chamber, before entering the chamber housing the tank to be replaced, there is an existing sump pump that does not appear to be operational (float was up and pump was not on). Please confirm if replacement of this pump is to be added to the scope of work.
Answer: No, replacement of the sump pump is outside the scope of this project.
Question9: The Wage Determination is shown as 'Service Contract' which are not applicable to the construction of the new walkway, installation of new tank, demolition of old tank. Please provide the construction Wage
Determination to be used for this task order.
Answer. See Attachment A - Wage Determination - Davis Bacon.
Question10: Please confirm whether a Bid Guarantee is required for this Solicitation?
Answer: Yes, Bid guarantee will be required.
Question11: Please confirm whether a Payment and Performance Bond will be required after award.
Answer. Yes, Payment and Performance Bond will be required after award.
Question12: We are asking for the original submittal data and drawings on the existing tank. This is necessary so that we provide a new tank that exactly matches the existing tank to be demolished.
Answer: See Attachment B - Drawing for the existing tank
Attachment C - Concept Drawing for the Alum Feed System
Question13: There are no drawings for the work in the documents. The scope of work indicates and describes a new access platform. Is the contractor required to design & PE Seal this work as part of the materials to be provided and installed?
Answer: We don’t think contract is required to design and PE seal as part of the materials to be provided and installed. However, contractor will need to have in-house capability to procure proper materials meeting industrial standards and construct new access platform meeting applicable industrial standards and UFGS-05 50 13 requirements. For example, contractor will need to use non-corrosive, chemical (alum) resistant and properly sized anchors, fasteners, and other hardware that are used for access platform and tank saddles fixed/anchored on the floor/walls.
Contractor are required to provide submittals/construction plans to FEAD construction manager and MCBQ SMEs
(Engineering/Utilities) and get approval before ordering materials and constructing them.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
Ryan F Spencer
Engineering Technician
703-784-3416 ryan.f.spencer@usmc.mil
Public Works Branch
Marine Corps Base Quantico
Bldg. 2004 Barnett Ave
Quantico, VA 22134-0327
Date: 22 August 2022
Subject: Replace Aluminum Sulfate Bulk Storage Tank at Wastewater Treatment Plant
Location: Building 2089K, MCB Quantico eProject WON 1726240; PWB# 2022022; ACQR# 5974439
The following items define the scope/statement of work and general approach to the completion of the above referenced project. Revisions, if any, are in bold and eliminations from previous proposal are in strike thorough
(thus not included as a part of this scope of work).
SCOPE OF WORK
1. Background:
On 30 November 2021 the aluminum sulfate (Alum) bulk storage tank located at the MCB Quantico wastewater treatment plant shifted position after receiving a full 4,000 gallon load resulting in damage which caused the tank to leak all its contents into its containment vault, building 2089K. The purpose of this project is to replace the existing alum tank with a new unit.
2. Period of Performance: 120 Calendar Days from NTP by NAVFAC KO.
3. Construction General Conditions:
3.1. All work to be completed at Building 2089K, Quantico, VA 22134.
3.2. Contractor is responsible for all means, methods, supervision and coordination to produce a quality finished product. Time is of the essence, and this project shall be given due consideration and staffing.
The contractor must provide all equipment, material, and labor necessary to complete scope of work, described herein.
3.3. Any discrepancy between the scope of work (SOW) and actual job conditions found during the project progress should be immediately reported to the CM/ET in writing.
3.4. In the case of inconsistencies, the contractor shall contact the CM, identify the inconsistency, and seek guidance. Contractor is responsible for providing any requests for information (RFI) in writing to the
NAVFAC CM in order to clarify any and all portions of the work that may be in question.
3.5. Contractor agrees to warrant work for a period of 365 calendar days from the date of acceptance by
NAVFAC. Warranty will be furnished in writing and must accompany Contractor’s final invoice.
3.6. Materials. All materials required for the entire project shall meet industry standards, shall be new, free from all defects, of the best grade and quality, and entirely satisfactory for the purpose intended and shall be furnished in sufficient quantities to prevent delay.
3.7. Construction Performance Period: no more than 120 180 calendar days. All work will be conducted during normal working hours. Regular Working Hours. The government’s regular (normal) working hours are from 0700 to 1630, Mondays through Fridays, except (a) federal holidays and (b) other days specifically designated by the Contracting Officer. Federal holidays are New Year’s Day, Martin Luther
King Jr. Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans
Day, Thanksgiving Day and Christmas Day.
3.8. The Contractor must be aware that Quantico MCB is a controlled access installation, and as a result requires photographic identification and the potential of vehicle inspection in order to gain entrance onto the installation. Detention, delay, and or other challenges presented to the contract as a result of this fact are the sole responsibility of the contractor.
3.9. Work shall be carried out on consecutive days and completed within the aforementioned contract performance period.
3.10. The Contractor is to comply with local noise ordinances.
3.11. Safety in accordance with the Contractor’s Safety Program. The Contractor will furnish three copies of their safety program to the NAVFAC CM and/or ET upon request (a copy of this plan will be held by the
CM and the Quantico MCB Safety Office). The contractor shall be responsible for safety of employees, and Government employees within the work site premises during all operations in accordance with all
Government safety requirements and guidance (EM-385-1-1) including the contractor providing and supervising the appropriate use of all personal protective equipment.
3.12. Any incident involving injury to Contractor’s employees or property damage must be immediately reported to the NAVFAC CM and ET as well as the Quantico MCB Safety Office.
3.13. Safety Requirements and Reports. During the performance of work under this contract, the Contractor shall strictly adhere to Environmental Protection Agency Regulations (EPA), Federal Occupational Safety and Health Regulations (OSHA), U.S. Army Corps of Engineers Safety and Health Handbook (EM-385-1-
1), as well as all applicable state and local requirements.
3.14. Fire Protection. The Contractor shall handle and store all combustible supplies, materials, waste and trash in a manner that prevents fire hazards to persons, facilities, and materials. Contractor must coordinate with the COR or KO to receive hot work permits from the Quantico MCB Fire Department.
3.15. Environmental Protection.
3.15.1. The contractor shall comply with all applicable federal, state, and local laws, and with the regulations and standards. All environmental protection matters shall be coordinated with the KO.
Inspection of any of the facilities operated by the Contractor may be accomplished by PWB
Environmental Division and/or Safety personnel, or authorized officials on a no-notice basis at any time.
3.15.2. In event a regulatory agency assesses a monetary fine against the Government for violations caused by Contractor negligence, the Contractor shall reimburse the Government for the amount of that fine and other costs. The Contractor shall also clean up any oil spills that result from the
Contractor’s operations. The Contractor shall comply with the instructions from the Quantico MCB
Industrial Hygienist with respect to avoidance of conditions which create a nuisance or which may be hazardous to the health of military of civilian personnel.
3.15.3. Air Program. Coatings must comply with VOC limits in 9 VAC 5-45, Article 5. Mastic texture coatings are limited to 300 grams VOC per liter of product. Primers, sealers, and undercoats are limited to 200 grams VOC per liter of product.
3.15.4. The contractor shall provide a list of all Hazardous Materials to be used on the Post and a MSDS shall be provided for each material listed.
3.16. Before completion of work each day, the Contractor shall secure all supplies, materials and equipment.
Contractor shall also remove all scrap, debris, etc. and dispose off-post, unless otherwise directed elsewhere in this SOW and leave the job site in a clean, orderly and safe manner each day.
3.17. Disposal.
3.17.1. Debris, rubbish, hazardous waste and unusable material resulting from the work under this contract shall be disposed of by the Contractor legally and in compliance with all regulations as may pertain at his expense off of Government property.
3.17.2. All recyclable materials; aluminum and metal cans, glass bottles and jars, plastic bottles, newspapers, cardboard, high grade paper, mixed paper, scrap metal, scrap lumber, pavement debris, and vegetation wastes shall be segregated, removed from the Post, and disposed of in accordance with Department of Defense recycling and solid waste management regulations.
3.17.3. Hazardous waste must be disposed of in accordance with the Resource Conservation and
Recovery Act.
3.17.3.1. Hazardous Materials: Projects that are under contract: Materials that are contractor procured must be removed from base once job has been completed. You are not to leave it behind. A list of all Hazardous Materials USED for the project must be reported to NREA once job has been completed (list may be faxed to (703)784-4953). SDS (MSDS) must be kept on hand at all times and produced when requested.
3.17.4. To ensure compliance with EO 13514 waste diversion guidance, the contractor shall use the
Construction Waste Management Report form to report the disposal of all recyclable materials, debris, rubbish, hazardous waste and unusable material resulting from the work under this contract through the CM/ET to NREA Solid Waste Program Manager. A copy of the report can be obtained from the NREA Solid waste manager.
3.18. Permits: The Contractor shall, without additional expense to the Government, obtain all appointments, licenses, and permits required for the prosecution of the work. The Contractor shall comply with all applicable federal, state, and local laws. Evidence of such permits and licenses shall be provided to the
KO before work commences.
3.19. Notwithstanding any other provisions of this scope of work (SOW), the Contractor shall comply with applicable rules, laws, regulations and policies, in effect at Quantico MCB, and all US laws.
3.20. Contractor shall ensure they comply with any and all additional provisions as applicable to contractors working at Quantico MCB. The contractor is presumed to be fully aware and have full knowledge of any and all policies, procedures and requirements to work on this installation, and is to seek clarification on any specific provision that they are unclear about from the COR if this is not the case.
3.21. All Government design manual standards, the United Facilities Criteria (as posted on www.wbdg.org), the latest edition of the International Building Code (IBC) 2006, (inclusive of Section 1025, “Emergency
Escape and Rescue”), and other applicable industry standards, or better, are to be complied with unless otherwise stated. The Authority Having Jurisdiction for the applicability of any and all code provisions is the FEAD and Quantico MCB PWB.
3.22. Smoking will be prohibited anywhere on the Base so designated on Government property and at all times in such locations, smoking will be permitted in designated areas.
3.23. Work shall be completed in one construction phase.
3.24. Contractor will have access to all work areas at one time.
3.25. Contractor will be allowed to use Government restrooms; however, the Contractor will ensure they are cleaned after use to the satisfaction of the CM.
3.26. Government will provide a location convenient to the work for a temporary site storage container, if determined necessary.
3.27. Contractor will provide protection to all areas adjoining or within the area of the work that are not to be affected or damaged.
3.28. The contractor is fully and totally responsible for the condition of the work and the work site en masse until the work is formally accepted by the government. As a consequence, the contractor may be required to execute rework until such time as formal acceptance of the work is made by the government.
3.29. Contractor shall repair any and all damaged items as a result of his efforts not included in this SOW, to their original condition or better.
3.29.1. On-going site cleanup and final site restoration is required in this contract. Routine cleanup of the project will encompass all areas used by the contractor during construction.
3.29.2. The contractor will be held responsible to repair any damage to the structures, the site and/or property as part of this contract to the satisfaction of the Government.
3.29.3. If the work requires any shutdown or disruption of any utility/service outside of the immediate area of the work/the area under the contractor’s control, the Contractor shall provide at least 14 days’ notice prior to making any such disruption and follow any and all procedures provided by the PWB for such disruptions. To the extent possible, the contractor must note on his schedule planned shutdowns or disruptions that will be required as a part of the work (inclusive of timeframe and any logical connections to other tasks of the work).
3.30. The Contractor shall coordinate any oversized deliveries with the CM/ET in order to allow access to the installation through the proper gate.
3.31. Contractor is required to visit the site prior to submission of a proposal. Contractor is responsible and will execute such measurements and calculations to determine the quantities required to execute the work described herein for bidding, construction estimating, and work execution. The Government will make no guarantee or other confirmation of the applicable quantities, the Contractor makes these determinations at their own risk.
3.32. POC’s for project:
2.33.1 Location/Bldg. – Mr. Paul Redden; (571) 660-0842; paul.redden@usmc.mil
2.33.2 PWB Utilities POC- Mr. Ryan Spencer; (703) 784-3416; ryan.f.spencer@usmc.mil
4. Government Provided Items:
4.1. None.
5. Selective Demolition:
5.1. Remove existing bulk storage alum tank and dispose of off-site
5.2. Demolish existing metal walkway within the cell containing the bulk alum tank including metal guardrail and access ladder
5.3. Demolish all inlet, outlet, overflow and vent pipes, valves, couplers associated with the alum tank
5.4. Demolish existing piping within the empty cell including within the sump pit; plug sump piping leaving building
5.5. Demolish existing steel tank support saddles
5.6. Demolish existing pipe supports and hangers
5.7. All demolished materials shall be collected and disposed of off-site
6. Architectural Work:
6.1. Construct new galvanized steel elevated walkway within the alum tank cell
6.1.1. New walkway length shall span the width of the alum tank cell (approximately 152”) and shall be
42” wide
6.1.2. Walkway shall be constructed of galvanized steel 1”x 1/8” bar grate
6.1.3. Walkway shall be equipped with a 42” high tubular steel safety handrail, painted yellow
6.1.3.1. Handrail shall span the total length of the walkway and terminate at the walls on both ends
6.1.4. Walkway shall be equipped with a 20” wide access ladder extending down to floor level and painted yellow with safety chain spanning the railing opening
6.1.5. Walkway structural support shall be constructed of steel and painted to resist corrosion
6.1.6. Walkway and access ladder shall be fastened securely to the cell floor
6.2. The floors in both cells shall be coated with epoxy to a thickness of 1/16”
6.3. All cell walls shall be epoxy coated from floor level extending to 2 feet above floor level
7. Civil Work:
7.1. None
8. Structural Work:
8.1. Existing concrete panel roof covering the cell containing the alum tank shall be removed to facilitate existing tank removal and installation of the new tank
8.1.1. Roof panels are approximately 14’9” in length, 7’ in width and 8” in thickness; 3 panels must be removed to access alum tank cell. Roof panels shall be stored alongside the chain link fence adjacent to the project site after removal
8.1.2. Spaces between panels and supporting walls shall be cleaned of existing caulking prior to their removal
8.1.3. Metal guardrail shall be removed prior to removing roof panels
8.2. Panels shall be reinstalled after the new tank has been installed
8.2.1. Original gap clearance between adjacent cell panels shall be maintained when panels are reinstalled to ensure sufficient support from structure walls
8.2.2. Gaps between reinstalled panels and existing panels shall be filled with polyurethane caulking to a depth of 6 inches to ensure water tightness
8.2.3. Gaps between reinstalled panels and exterior supporting walls shall be sealed with polyurethane caulking to make weatherproof
8.2.4. Metal guardrail shall be reinstalled once roof panels have been reinstalled
9. Mechanical Work:
9.1. None
10. Plumbing Work:
10.1. Install new 4680 gallon horizontal fiberglass alum bulk storage tank
10.1.1. Tank shall be 96” in diameter, 165” in length
10.1.2. Tank shall be furnished with tank straps and carbon steel support saddles from the manufacturer and painted by the contractor prior to installation within the tank cell. Fiberglass tank saddles may be used if approved by the tank manufacturer.
10.1.3. Tank shall be installed with the same lateral clearances from the cell walls as the existing tank
10.1.4. Tank shall be fabricated so that the manway is accessible from one of the access hatches in the concrete roof panels
10.1.5. New tank saddles shall be aligned and fastened to the cell floor according to tank manufacturer’s instructions prior to installation of tank
10.1.6. Tank shall be hydro tested after all plumbing connections have been made
10.2. Install new 4” vent, 2” outlet, 2” overflow, 2” inlet pipes and inlet pipe hose coupler to the new tank and connect into existing system
10.2.1. All new pipes and fittings shall be CPVC
10.2.2. Install new 2” CPVC ball valve from tank outlet
10.2.2.1. Valve shall be designed specifically for chemical handling
10.2.2.2. Valve shall be positioned in close proximity to new walkway and equipped with an extended handle that allows for easy actuation from walkway
10.2.3. Replace 2” ball valve and piping within alum tank cell sump pit
10.2.4. All outlet, overflow, and sump pit piping shall be supported from the floor every 40 inches of length and at elbows
11. Electrical Work:
11.1. Install new ultrasonic level sensor on tank
11.1.1. Connect new sensor to existing monitoring system and test for proper functioning
11.2. Replace existing level sensors in sump pits within both cells
11.3. Furnish and install a standalone, battery-powered 90% tank full alarm for delivery driver warning to be located near the exterior fill pipe. Level sensor shall be rated for use in chemicals and able to operate at a temperature of at least 200 degrees Fahrenheit.
12. General work:
12.1. Contractor shall power wash the walls and floors of both cells with water prior to applying epoxy coating; wastewater shall be recovered and grit and solids shall be disposed of off-site. Contractor shall coordinate with the plant supervisor for draining water from the cells.
12.2. Sump pits shall be cleared of debris
12.4. The contractor will be responsible for coordinating all work with NAVFAC, PWB and FMS plant personnel. All outages will be coordinated in advance with NAVFAC, PWB and FMS plant personnel.
12.5. The contractor shall develop and submit a waste management plan identifying all recyclable materials and disposal methods. All removals shall be disposed of and hauled offsite on a daily basis. All items removed shall become the property of the contractor and shall be disposed of per the waste management plan. All items which are not in direct support of the contract and to be stored on site by the contractor shall be removed from the job site immediately. Hazmat abatement has not been identified and included in this scope of work. The contractor shall develop and submit a waste management plan identifying all recyclable materials and disposal methods. Noise restrictions in this area will not apply.
13. Construction/Product Submittals: The contractor will certify that submittals meet the requirements of the plans, specifications, and the above SOW. The Contractor shall allow for no less than 14 calendar days for submittal review by the government. THE CONTRACTOR SHALL NOT BE PERMITTED TO INSTALL
ANY AND ALL ITEMS WITHOUT AN APPROVED SUBMITTAL MATCHING WHAT IS TO BE
INSTALLED IN ALL RESPECTS. Submittal Logs will be provided. Shop drawings, product data, and samples will be submitted for all equipment and materials related to the project (written submittals will be sent in hard-copy form as well as electronically in Adobe Acrobat readable format to the COR):
End of Scope of Work
(End of Summary of Changes)