FY21 Paving IDIQ Specs.pdf
PDF 3 MB Posted
- Attached to
- Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
- Solicitation number
- N40080-21-R-7608
About this file
This document provides specifications for an Indefinite Delivery Indefinite Quantity (IDIQ) contract for paving services at various locations within the Naval Facilities Engineering Command (NAVFAC) Washington area of responsibility. The contract has a maximum value of $75 million over a base year and four one-year options. It is set aside 100% for small businesses defined as having less than $39.5 million in annual revenue according to NAICS code 237310 for highway, street, and bridge construction. The solicitation will use the Lowest Price Technically Acceptable source selection process. All amendments, drawings and specifications will be posted to the Beta SAM website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0002 - PAVING IDIQ.pdf | ||
| Revised 32 11 20.pdf | ||
| AMENDMENT 0001 - PAVING IDIQ.pdf | ||
| ATTACHMENT C -Construction Experience Form.pdf | ||
| ATTACHMENT D -PAST PERFORMANCE QUESTIONNAIRE.pdf | ||
| Surety Form.pdf | ||
| ATTACHMENT A - IDIQ PAVING NAVFAC WASHINGTON ELINs.xlsx | XLSX spreadsheet | |
| PAVING IDIQ SOLICITATION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAVING IDIQ SPECIFICATIONS N40080-21-R-7608
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 82 00 ASBESTOS REMEDIATION
DI VI SI ON 03 - CONCRETE
03 01 00 REHABILITATION OF CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 16.70 COLD-MIX REUSED ASPHALT PAVING
32 01 16.71 COLD MILLING ASPHALT PAVING
32 01 17.61 SEALING CRACKS IN ASPHALT PAVING
32 01 17.62 PAVING FABRIC INTERLAYER
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 01 29.61 PARTIAL DEPTH PATCHING OF RIGID PAVING
32 11 20 SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES FOR FLEXIBLE PAVEMENTS
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 11 26 HOT-MIX BITUMINOUS BASE COURSE FOR ROADS AND STREETS
32 11 33 CEMENT STABILIZED BASE COURSE AT AIRFIELDS AND ROADS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 ASPHALT PAVING FOR AIRFIELDS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 12 36.13 ASPHALTIC SEAL AND FOG COATS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
PROJECT TABLE OF CONTENTS Page 1
FACILITIES
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY
PAVEMENTS
32 15 00 AGGREGATE SURFACING
32 17 23 PAVEMENT MARKINGS
32 92 19 SEEDING
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 01 30.16 TV INSPECTION OF SEWER PIPELINES
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
This is a Regional Indefinite Quantity Contract to provide new paving, paving repair and replacement of various types of pavement including preparations associated with paving repair and replacement. Other incidental type work associated with paving repair and replacement is included and may be ordered for industrial, commercial, and residential locations indicated within each task order. The Government contemplates one contract award with 9 administration offices resulting from this solicitation. The contract will be for Federal Activities in the National Capitol Region (NCR). Each PWD and ROICC will administer the work they order.
The bid schedule contains the Annual aggregate estimated total of quantities for the contract. The Contractor shall furnish all labor, materials, equipment, tools, transportation, supervision, safety, surveys, scoping, layout work, engineering and management necessary to fulfill the requirements of this contract and each task order in a timely manner, with safety as a priority and quality work as the final product.
1.1.2 Location
Work may be ordered and administered by any of the three Bases throughout the Region with the NCR. Each Base has a Facilities Engineering acquisition Division Director (FEAD) or Resident Officer In-Charge of Construction (ROICC) that will order and administer the task order and inspect the work within their areas. Each base will process invoices for their orders.
1.2 PERIOD OF PERFORMANCE
The contract term, base year shall be for a period of 12 months commencing after Notice of Award. The Government has the option to extend the term of the contract for up to four (4) additional 12 month periods, for a term not to exceed Sixty (60) Months total, in accordance with FAR 52.217-9 "Option To Extend The Term of the Contract" referenced in Section I.
1.3 SPECIFICATIONS AND STANDARDS
The specifications and standards referenced in this project specification, including addenda, amendments, and errata listed, will govern in all cases where references thereto are made. In case of differences between these specifications or standards, and this project specification or its accompanying drawings, this project specification and its accompanying drawings will govern to the extent of such differences. Otherwise, the reference specifications and standards will apply. The requirement for packaging, packing, marking, and preparation for shipment or delivery included in the referenced specifications will apply only to materials and equipment that are furnished directly to the Government and not to
SECTION 01 11 00 Page 1 materials and equipment that are to be furnished and installed by the Contractor.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 CONTRACTOR ACCESS AND USE OF PREMISES
1.1.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.1.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.1.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.
Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.
1.1.1.2.1 Registration for DBIDS
Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:
a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .
d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other
SECTION 01 14 00 Page 1 assessments.
e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.
1.1.1.2.2 DBIDS Eligibility Requirements
Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.
The Government is the final authority.
1.1.1.2.3 DBIDS Notification Requirements
a. Immediately report instances of lost or stolen badges to the Contracting Officer.
b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
1.1.1.2.4 One-Day Passes
Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.
1.1.1.3 NCACS Identification Badges and Installation Access
Application for and use of badges will be as directed. Obtain access to the installation by participating in the Navy Commercial Access Control System (NCACS), or by obtaining passes each day from the Base Pass and Identification Office. Costs for obtaining passes through the NCACS are the responsibility of the Contractor. One-day passes, issued through the Base Pass and Identification Office, will be furnished without charge.
Furnish a completed EMPLOYMENT ELIGIBILITY VERIFICATION (DHS FORM I-9) form for all personnel requesting badges. This form is available at http://www.uscis.gov/portal/site/uscis by searching or selecting Employment Verification (Form I-9) . Immediately report instances of lost or stolen badges to the Contracting Officer.
a. NCACS Program: NCACS is a voluntary program in which Contractor personnel who enroll, and are approved, are subsequently granted
SECTION 01 14 00 Page 2 access to the installation for a period up to one year, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit.
The Government performs background screening and credentialing.
Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued NCACS participation and installation access privileges. Under the NCACS program, no commercial vehicle inspection is required, other than for Random Anti-Terrorism Measures (RAM) or in the case of an elevation of Force Protection Conditions (FPCON). Information on costs and requirements to participate and enroll in NCACS is available at http://www.rapidgate.com or by calling 1-877-727-4342. Contractors should be aware that the costs incurred to obtain NCACS credentials, or costs related to any means of access to a Navy Installation, are not reimbursable. Any time invested, or price(s) paid, for obtaining NCACS credentials will not be compensated in any way or approved as a direct cost of any contract with the Department of the Navy.
b. One-Day Passes: Participation in the NCACS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation.
The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the NCACS.
1.1.1.4 Additional Badge Requirements - NAS Patuxent River
Identification badges will be issued to the Contractor and his employees in accordance with the Naval Air Station Security Regulations. A copy of the security regulations may be obtained from the security office. All badges must be returned or accounted for to the department of Public Safety's Pass and Identification Office upon expiration of the badge or contract, or termination of the employee.
1.1.1.5 Employee List
The Contractor must provide to the Contracting officer, in writing, the names of two designated representatives authorized to request personnel and vehicle passes for employees and subcontractor's employees prior to commencement of work under this contract. The Contractor must adhere to the requirements of "Important Clarifications - Contractors - How to Gain Access," dated 31 October 1995, in obtaining access to the Naval Air Station complex for the life of the contract. A copy of these requirements will be provided at the preconstruction meeting.
1.1.1.6 Personnel Entry Approval
Failure to obtain entry approval will not affect the contract price or time of completion.
1.1.1.7 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The
SECTION 01 14 00 Page 3
Contracting Officer will identify designated smoking areas.
1.1.2 Working Hours
Regular working hours will consist of an 8 1/2 hour period established by the Contracting Officer, between Monday through Friday, excluding Government holidays.
1.1.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
1.1.4 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to IT systems, water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed airare considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to 8 hours. This time limit includes time for deactivation and reactivation.
d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
1.2 SECURITY REQUIREMENTS
Security Requirements may vary from base to base. After award, contractors must meet with the Contracting Offices Authorized Representative at each base to discuss each base special Security Requirements.
1.2.1 Naval Air Station (NAS), Patuxent River, MD
Foreign Nationals: The Contractor is responsible for notifying the Contracting Officer, at least five days in advance, of any foreign nationals coming into a restricted area so that proper clearance and escort procedures may be initiated.
1.2.2 Naval Observatory(NOBSY), Washington, DC, Quarters "A"
Provide full name, date of birth, and social security number of all
SECTION 01 14 00 Page 4 employees and representatives of the Contractor who need access to the Quarters "A" compound to the Contracting Officer at least 7 days in advance of the date on which access is desired. The Contractor will be advised should any of the proposed employees not meet security requirements for access to the Quarters "A" compound. For individual cases, access to the Quarters "A" compound can occasionally be obtained with a 4-hour advance notice; however, the Contracting Officer reserves the right to utilize the full 7 days should he determine it necessary.
a. Personal identification: Before entering the Quarters "A" compound, all persons must furnish personal identification and receive a badge furnished by the Government. Badges must be worn so they are clearly visible at all times. Return badges to the issuing office when leaving the Quarters "A" compound.
b. Security processing: Allow for a processing period of 15 minutes as employees enter the Quarters "A" compound at the beginning of each workday. All materials entering or in the Quarters "A" compound will be subject to search.
1.2.3 Naval Surface Warfare Center (NSWC), Dahlgren, VA
A copy of the security regulations may be obtained from the security office of the station.
1.2.4 Naval Surface Warfare Center (NSWC), Indian Head, MD
No employee or representative of the Contractor will be admitted to the work site unless he furnishes satisfactory proof that he is a citizen of the United States or is specifically authorized admittance by the OICC.
a. Identification Badges - A list of all employees to be engaged in the performance of work must be furnished to the Security Department. In the event employees are hired or discharged, a corrected list of employees must be furnished reflecting the change in personnel.
Identification badges for the Contractor and his employees must be furnished by the Security Department, Indian Head Division, Naval Surface Warfare Center, Indian Head, MD. Immediately report instances of lost or stolen badges to the Contracting Officer. Upon completion of the contract or termination of the service of any employee, the Contractor must return the badges to the Security Pass Office.
Compliance with this requirement is mandatory and certification thereof to the Contracting Officer is required prior to submitting final invoices. Failure to return badges will hold up Contractor's final payment.
b. Vehicles and Equipment - In addition to other conditions and requirements set forth hereinbefore, attention is invited to the fact that vehicles and equipment admitted to the Indian Head Division, Naval Surface Warfare Center, Indian Head, MD will be required to meet standards established be the Station Safety Department. The vehicular and equipment conditions must satisfactorily meet the following provisions:
(1) Steering mechanism must be satisfactory and safe condition.
(2) Horns and warning devices must be operable.
(3) Windshield wipers must be satisfactory in place, clean and
SECTION 01 14 00 Page 5 unbroken.
(4) Rearview mirrors must be satisfactory in place, clean and unbroken.
(5) General body conditions: Body must be satisfactory tight including fenders, bumpers, doors and latches thereto, and other parts which might become dislocated during travel.
(6) Lights: All lights required by the type of vehicle/equipment in use must be functional with satisfactory bulbs and lenses.
(7) Exhaust Systems: Exhaust systems must be completely functional with no leaks.
(8) Fuel system must be free of leaks and show no evidence of loss of fuel or fumes.
(9) Brakes: All brakes must be functional and give evidence of the ability to halt the loaded vehicles within safe distances.
(10) Tires need not be new but must contain sufficient tread to indicate safety at operating speed with vehicle loaded.
(11) Electric Wiring: All wiring must be completely insulated as required, and in cases considered appropriate, waterproofing of wiring is required.
(12) Motors must be reasonably clean from excess grease, dust, and dirt, and if required must be steam cleaned to the satisfaction of the inspection personnel.
(13) Where applicable, inspection will include other such items as gauges, thermometers, controls, relief valves, piping, mechanical locks, limit switches, connectors, and other safety related devices associated with vehicles and equipment admitted to the Station.
1.2.5 NSS, Washington, DC
The station is a secured facility:
a. Application: Furnish to the Contracting Officer a list showing, for employees and representatives to be engaged at the site, the name, address, date and place of birth, social security number, and, for anyone who is not a United States citizen, an alien registration number. Update the list with each addition and deletion to such engagement.
b. Passes and badges: Each individual engaged at the site must obtain a temporary pass each day. Car passes will be issued for parking on the station. The Contractor must allow 15 minutes for this procedure at the beginning of each day. Additionally, the Contractor must expect to lose 25 crew hours over the duration of the contract due to delays in obtaining an escort while working in the inner compound. For the purpose of definition, a crew is defined as the size of the Contractor's workforce during any given workday. (If the Contractor has a crew of 10 men delayed 30 minutes on a given day, the delay period is one-half crew hour). Such delays will be at no additional cost to the Government.
SECTION 01 14 00 Page 6
1.2.6 Naval Research Laboratory (NRL), Washington, DC
The Contractor is working in highly secured areas. Furnish notice to the Contracting Officer 30 days prior to working in these areas.
1.2.7 Marine Corps Base Quantico (MCBQ), Quantico, VA
All Contractor and its employees performing services on Marine Corps Base, Quantico (MCBQ) requiring physical access to the installation must be properly screened. Screening consists of identity proofing and vetting in accordance with the standards set forth in Marine Corps Base Order 4200.3 (28 JUL 10). The Contractor must request a copy of this policy from the Contracting Officer.
Hangars 2102 and 2103 are secured areas. The Contractor must comply with established security requirements:
1.2.8 Naval Support Facility, Thurmont, MD
The station is a secured facility. The Contractor must comply with established security requirements.
1.3 CITIZENSHIP REQUIREMENTS
Contractor employees and representatives performing work under this contract are required to be United States citizens or legal aliens authorized to work in the United States.
1.3.1 Foreign Nationals
The Contractor is responsible for notifying the Contracting Officer, at least 5 days in advance, of any foreign nationals coming into a restricted area so that proper clearance and escort procedures may be initiated.
1.4 SPECIAL SECURITY REQUIREMENTS
All Commercial vehicles entering the worksite will be subject to a search, which will include all vehicle compartment and transported containers.
Contractors should expect that such searches may result in delays averaging 40 to 60 minutes or longer depending upon the day of the week and time of day. Contractors must coordinate diligently for perishable deliveries such as concrete and bituminous material.
1.5 SPECIAL SCHEDULING FOR OCCUPIED BUILDINGS
The Contractor may be working around existing buildings, which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 7
SECTION 01 14 00 Page 8
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
11/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 1110-1-8 (2016) Construction Equipment Ownership and Operating Expense Schedule
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Schedule of Prices; G
1.3 SCHEDULE OF PRICES
1.3.1 Data Required
Within 15 calendar days of notice of award, prepare and deliver to the Contracting Officer a Schedule of Prices (construction Contract) as directed by the Contracting Officer. Schedule of Prices must have cost summarized and totals provided for each construction category. Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices. Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.
1.3.2 Payment Schedule Instructions
Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer.
1.4 CONTRACT MODIFICATIONS
In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the
EP 1110-1-8 .
SECTION 01 20 00 Page 1
1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT
1.5.1 Content of Invoice
Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment shall include the documents listed below.
a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.
b. The Estimate for Voucher/ Contract Performance Statement on NAVFAC Form 4330/54 furnished by the Government. Use NAVFAC Form 4330, unless otherwise directed by the Contracting Officer, on NAVFAC Contracts when a Monthly Estimate for Voucher is required.
c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.
d. Monthly Work-hour report.
e. Updated Construction Progress Schedule and tabular reports required by the contract.
f. Contractor Safety Self Evaluation Checklist.
g. Updated submittal register.
h. Solid Waste Disposal Report.
i. Certified payrolls.
j. Updated testing logs.
k. Other supporting documents as requested.
1.5.2 Submission of Invoices
If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.
Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each
SECTION 01 20 00 Page 2 monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.
1.5.3 Final Invoice
a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.
b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.
c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.
1.6 PAYMENTS TO THE CONTRACTOR
Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.
1.6.1 Obligation of Government Payments
The obligation of the Government to make payments required under the provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR 32.503-6 Suspension or Reduction of Payments:
a. Reasonable deductions due to defects in material or workmanship;
b. Claims which the Government may have against the Contractor under or in connection with this Contract;
c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and
d. Failure to maintain accurate "as-built" or record drawings in accordance with FAR 52.236.21.
1.6.2 Payment for Onsite and Offsite Materials
Progress payments may be made to the Contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:
a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
SECTION 01 20 00 Page 3
b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.
c. Materials to be considered for progress payment prior to installation must be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Prices requirement of this Contract.
Requests for progress payment consideration for such items must be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 Payments Under Fixed-Price Construction Contracts have been met.
d. Materials are adequately insured and protected from theft and exposure.
e. Provide a written consent from the surety company with each payment request for offsite materials.
f. Materials to be considered for progress payments prior to installation must be stored either in Hawaii, Guam, Puerto Rico, or the Continental United States. Other locations are subject to written approval by the Contracting Officer.
g. Materials in transit to the job site or storage site are not acceptable for payment.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 4
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
11/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
View Location Map
Progress and Completion Pictures
1.3 VIEW LOCATION MAP
Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.
1.4 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten different viewpoints selected by the Contractor unless otherwise directed by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures.
Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file.
Include a date designator in file names. Photographs provided are for unrestricted use by the Government.
1.5 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 Liability, SECTION 01 30 00 Page 1 during the entire period of performance under this contract. Provide other insurance coverage as required by State law.
1.5.1 Additional Insurance Requirements
a. Before commencing work under this contract, the Contractor shall certify obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective (1) for such period as the laws of the State in which this contract is to be performed prescribe or (2) until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
b. The Contractor shall insert the substance of this clause, including this paragraph b., in subcontracts under this contract that require work on a Government installation and shall make copies available to the Contracting Officer upon request.
1.6 SUPERVISION
1.6.1 Superintendent Qualifications
Provide project superintendent with a minimum of 7 years experience in construction with at least 4 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
1.6.2 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of Contract work.In addition, if a Quality Control (QC) representative is required on the Contract, then that individual must also have fluent English communication skills.
1.6.3 Duties
The project superintendent is primarily responsible for managing subcontractors and coordinating day-to-day production and schedule adherence on the project. The superintendent is required to attend Red Zone meetings, partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.
1.6.4 Non-Compliance Actions
The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to ensure timely completion.
Furthermore, the Contracting Officer may issue an order stopping all or
SECTION 01 30 00 Page 2 part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
1.7 PRECONSTRUCTION MEETING
Immediately after award , prior to commencing any IDQ task order work at the site, coordinate with the Contracting Officer a time and place to meet for the Preconstruction Meeting . The meeting must take place within 35 calendar days after award of the contract, but prior to commencement of any work at the site. The purpose of this meeting is to discuss and develop a mutual understanding of the administrative requirements of the Contract including but not limited to: daily reporting, invoicing, value engineering, safety, base-access, outage requests, hot work permits, schedule requirements, quality control, schedule of prices or earned value report, shop drawings, submittals, cybersecurity, prosecution of the work, government acceptance, final inspections and contract close-out.
Contractor must present and discuss their basic approach to scheduling the construction work and any required phasing.
1.7.1 Attendees
Contractor attendees must include the Project Manager, Superintendent, Site Safety and Health Officer (SSHO), Quality Control Manager and major subcontractors.
1.8 PARTNERING
To most effectively accomplish this Contract, the Contractor and Government must form a cohesive partnership with the common goal of drawing on the strength of each organization in an effort to achieve a successful project without safety mishaps, conforming to the Contract, within budget and on schedule. The partnering team must consist of personnel from both the Government and Contractor including project level and corporate level leadership positions. Key Personnel from the supported command, end user, NAVFAC, PWD, FEAD/ROICC, Contractor, key subcontractors and the Designer of Record are required to participate in the Partnering process. The initial partnering session shall be attended by principles of the company, superintendent, QC manager, project manager, main subcontractors, FEAD’s, PMEB’s, Government project managers/engineering technicians and the contracting officers. For the follow on partnering sessions, the senior Government representative and senior Contractor representative present will jointly host the follow on partnering sessions and invite people as necessary. For the initial partnering session, the participants shall bear their own costs for meals, lodging, and transportation associated with partnering.
1.9 CONTRACTOR FURNISHED ITEMS
Contractor shall provide all facilities, equipment, materials, labor and services to perform the requirements of this contract per task order.
a. Government Approval of Materials: The Government reserves the right to specifically disapprove any item. All materials, supplies, parts and equipment shall be identified by the Contracting Officer on each task order. All materials, supplies, parts, and equipment furnished by the Contractor shall conform to the specifications. Items not included on these specifications shall be of acceptable industrial grade and
SECTION 01 30 00 Page 3 quality, equal to or better than the manufacturer's original, and compatible with existing systems.
b. Quality of Materials: The Contractor shall provide new material when providing minor construction or alteration services. The Contractor shall provide new parts and components when providing repair services as described herein. All parts shall be equal or exceed the quality of the original part being replaced. If the original manufacturer has updated the quality of parts for current production, parts supplied under this contract shall equal or exceed the updated quality. The Contractor shall dispose of all replaced parts and material. When material, equipment, and components selected for work items already accomplished do not meet the specifications set forth in this contract, the Contractor shall, at no cost to the Government, remove replace, and/or rework material, equipment, components so that compliance with the Government's requirements are satisfied.
c. Test: All test, field test, demolition plans, safety plans, and shop drawings as outlined in all specifications shall be provided at no additional cost to the Government.
1.10 MOBILIZATION
Contractor shall mobilize to the jobsite within 60 calendar days of contract award. Mobilize is defined as having equipment AND having a physical presence of at least one person from the contractor's team on the jobsite.
1.11 WARRANTY
Contract clause FAR 52.246-21 "WARRANTY OF CONSTRUCTION" (MAR 1984) is the minimum warranty that is applicable to work that will be ordered. FAR 52.246-21 "WARRANTY OF CONSTRUCTION" (MAR 1984) can be, and will be superseded when special equipment, material, design, or workmanship is furnished/ performed by the Contractor, or any sub-contractor, or supplier at any tier. Some examples of work, services, or supplies that will be superseded are: Example 1: When products such as roofing shingles are supplied as say 30 year shingles, the manufacturer's warranty of their products will apply. Example 2: If the Government request warranties greater than those indicated in FAR 52.246-21, or the warranties given by manufacturer's are greater than those indicated in FAR 52.246-21, the Government will consider such warranties to be part of the task order. The Government may accept warranties given by the Contractor in each task order, or negotiate none standard warranties as the Government's requirements call for additional warranties. Non-standard warranties are warranties greater than those given by the manufacturer or those greater than those given in FAR 52.246-21.
1.12 GENERAL ADMINISTRATIVE REQUIREMENTS
1.12.1 Directives
Applicable Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other directives, instructions, and regulations shall apply.
1.12.2 Fire Prevention
The Contractor and his employees shall know how to turn in a fire alarm.
SECTION 01 30 00 Page 4
The Contractor shall handle and store all combustible supplies, materials, waste and trash in a manner that prevents fire or hazard to persons, facilities, and material. Contractor employees operating critical equipment shall be trained to properly respond during a fire alarm.
1.12.3 Disposal
Debris, rubbish and non-usable material resulting from the work under this contract shall be disposed of off of Government property. The Contractor shall inform the Contracting Officer of any hazardous waste found during his course of work.
1.12.4 Safety Requirements And Reports
a. Prior to commencing work, the Contractor shall meet with the Contracting Officer to discuss and develop mutual understandings concerning the Contractor's administration of a Safety Program.
b. The Contractor's workspace may be periodically inspected for OSHA and Navy violations. Abatement of violations will be the responsibility of the Contractor. The Contractor shall assist inspectors from the Safety Office and federal or state OSHA offices if a complaint is filed. The Contractor shall pay promptly any fines levied by federal or state OSHA offices.
c. The Contractor shall report to the Contracting Officer exposure data and all accidents resulting in death, trauma, or occupational disease within 24 hours of their occurrence or as indicated in the EM-385.
e. Only emergency medical care is available in Government facilities to Contractor employees who suffer on-the-job injury or disease. Care will be rendered under the conditions and at the rates in effect at the time of treatment. The Contractor shall reimburse the Base Medical Center Collection Agent promptly upon receipt of statement.
f. The Contractor shall provide to the Contracting Officer the name or names of the responsible supervisory person or persons authorized to act for the contractor.
1.12.5 Identification Of Contractor Vehicles
The Contractor shall display on each of his vehicles the company name in a manner and size that is clearly visible. All vehicles shall display a valid state license plate and safety inspection sticker. Contractor vehicles operated on Government property shall be maintained in good repair.
1.12.6 Permits
The Contractor shall, without additional expense to the Government, obtain all appointments, licenses, and permits required to perform work under this contract. The Contractor shall comply with all applicable federal, state, and local laws. Evidence of such permits and licenses shall be provided to the Contracting Officer before work commences and at other times as requested by the Contracting Officer.
1.12.7 Contractor's Daily Report
The Contractor shall submit a "Daily Report to Inspector" Form NAVFAC
SECTION 01 30 00 Page 5
4330/34 by 10:00 a.m. the following work day. The forms shall be completed daily and delivered to the Contracting Officer. Data to be included on the form is workers by classification, the move-on and move-off of construction equipment furnished by the prime and subcontractor or furnished by the Government, and material and equipment delivered to the site of installation of work. One daily report per job in progress is required.
1.12.8 Work Schedule
The Contractor shall arrange his work so as not to interfere with the normal occurrence of Government business. All work schedules shall be submitted to and approved by the Contracting Officer prior to the start of each Task Order. The Contractor shall not change approved work schedules without the prior consent of the Contracting Officer. Deviation from the work schedule is permissible only when approved by the Contracting Officer. For all unscheduled work the Contractor shall obtain the Contracting Officer's approval.
1.12.9 Scoping for Utilities
The Contractor shall be responsible for scoping all utilities where digging/excavating is to be part of a job plan. The contractor shall, without additional expense to the Government, provide scoping for utilities. All damage to utilities will be repaired or replaced at the contractors’ expense.
1.12.10 Damage to Lawn Areas and Pavement
a. Protection: All lawns, plants, trees, shrubbery's and pavement adjacent to the construction work or used by the Contractor shall be protected against heavy traffic, machinery, spillage and misuse. This applies to all possible weather conditions.
b. Repairs: If at any time during the progress of the contract the Contractor causes any pavement, lawns, planting, etc., to be damaged, rutted, or worn areas within the area the Contractor is working, it shall be the Contractors responsibility to replace, band or restore the damage as approved by the Contracting Officer at no additional cost the Government.
1.12.11 Materials and Equipment to be Salvaged
All material and equipment which are removed or disconnected, and are not indicated or specified for reuse, shall become the property of the Contractor and shall be removed from the site by the Contractor at no additional charge to the Government.
1.12.12 Government Purchase Card Program
The contractor is required to offer IQ pre-priced line item services to authorized Government personnel when they are ordering the work directly via the Government Purchase Card (GPC) program. When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.
The contractor agrees to accept and process electronically submitted GPC orders for IQ services, including those orders issued through the DoD EMALL. The DoD EMALL is a U.S. Government (USG) owned and operated
SECTION 01 30 00 Page 6 web-based ordering system that enables any Department of Defense (DoD) or Federal activity to search for and order goods and services. Authorized GPC users will receive approved accounts on DoD EMALL to view and order IQ line items. The current list of GPC users authorized to place orders with the contractor for services will be furnished by letter to the contractor from the Contracting Officer.
The contractor is required to receive electronic IQ orders from the DoD EMALL using 128-bit encrypted email. The contractor agrees to purchase, install, and utilize the most recent version of PGP Personal software, or a comparable solution, for the purpose of decrypting order notification emails from the DoD EMALL.
The contractor shall post updates on order delivery schedule and performance to the DoD EMALL in a timely manner.
The contractor shall track quantities and report total ordered quantity in DOD EMALL and approved DD 1155’s by line item number each month and year-to-date. The report shall be due to the Contracting Officer by the fifth day of each succeeding month.