IDIQ_Interior_Deck_package.pdf

PDF 61 KB Posted

Attached to
Interior Decks Services Federal contract opportunity
Solicitation number
N40027-14-R-0009
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Interior Deck Work Package SSP-705-14

View the file

Other files for this federal contract opportunity

Other files attached to Interior Decks Services, newest first.
File Type Posted
N40027-14-R-0009 _Interior_Deck_Services_Amendment_0004.pdf PDF
ELINs_(revised_20_Mar_2014).xls XLS spreadsheet
N40027-14-R-0009 _Interior_Deck_Services_Amendment_0003.pdf PDF
ELINs.xls XLS spreadsheet
N40027-14-R-0009 _Interior_Decks_IDIQ _SSP-705-14_Solicitation.pdf PDF
N40027-14-R-0009 _Interior_Deck_Services_Amendment_0001.pdf PDF
N40027-14-R-0009 _Interior_Deck_Services_Amendment_0002.pdf PDF
CDRLs_(DD_Form_1423).pdf PDF
FBO_Solicitation_SSP_705-14_Upload_Document.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAYPORT, FLORIDA 32228−0158

SERMC

P. O. Box 280158

IDIQ SERMC (IDIQ−)

SERM−705−14SPECIFICATION NUMBER: SSP:

DEPARTMENT OF THE NAVY

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

DATE PREPARED

01 JAN 2014

BUILDING: IDIQ SERMC(IDIQ−) SSP−705−14

I N D E X

PLANNED WORK

009−01

009−02

009−03

009−04

009−05

009−06

009−07

009−08

009−10

009−18

009−19

009−20

009−21

009−23

009−24

009−29

009−34

009−35

ITEM NO.

07−NOV−13

29−JUL−11

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

17−JAN−13

07−NOV−13

29−JUL−11

17−JAN−13

29−JUL−11

17−JAN−13

29−JUL−11

17−JAN−13

17−JAN−13

29−JUL−04

17−JAN−13

07−NOV−13

DATE

General Criteria; accomplish

Environmental Compliance Reports for Material Usage at

Naval Facilities; provide

Toxic and Hazardous Substances; control

Quality Management System; provide

Temporary Accesses; provide

Maintaining Protection and Cleanliness from Non−Radioactive

Operations; accomplish

Confined Space Entry, Certification, Fire Prevention and

Housekeeping; accomplish

Fire Protection at Contractor’s Facility; accomplish

Shipboard Asbestos−Containing Material (ACM); control

Magnetic Material; control

Provisioning Technical Documentation (PTD); provide

Government Property; control

Logistics and Technical Data; provide

Interferences; remove and install

Authorization, Control, Isolation, Blanking, and Tagging

Requirements; accomplish

Asbestos−Free Pipe Hanger Liner Material; install

Fire Protection of Unmanned Vessels at Contractor’s

Facility; provide

Confined Space Entry, Certification, Fire Prevention

Utilizing Military Fire Watches, and Housekeeping;

accomplish

TITLE

CATEGORY I. FY−14 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE

ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY TO THIS CONTRACT.

PLANNED WORK

009−39

009−40

009−59

009−60

009−61

009−64

009−65

009−67

009−69

009−70

009−72

009−73

009−74

009−77

009−79

009−80

009−81

009−82

009−83

19−JUL−07

29−JUL−11

29−JUL−11

07−NOV−13

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

29−JUL−11

17−JAN−13

Technical Manual Contract Requirement (TMCR) for New

Technical Manuals for Commercial Equipment/ Component;

provide

Requirements for Contractor Cranes, Multi−Purpose Machines and Material Handling Equipment at Naval Facilities;

accomplish

Organotin Antifouling Material; control

Schedule and Associated Reports for Availabilities Over 9

Weeks in Duration; provide and manage

Shipboard Use of Fluorocarbons; control

Synthetic Fire−Resistant Hydraulic Fluid; control

Polychlorinated Biphenyls (PCBs); control

Integrated Total Ship Testing; manage

Heavy Weather Plan; provide

Confined Space Entry, Certification, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

Physical Security at Private Contractor’s Facility;

accomplish

Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install

Occupational, Safety and Health Requirements; accomplish

Cofferdam Requirements; accomplish

Government Owned Material (GOM); status reporting

Ship’s Facilities; provide

Compartment Closeout; accomplish

Data Requirements When Installing an Equal Component Vice

Specified Component; provide

Wire Rope Fitting Verification; provide

PLANNED WORK

009−84

009−86

009−87

009−88

009−89

009−93

009−94

009−95

009−97

009−99

009−100

009−101

009−102

009−103

009−106

009−108

009−109

009−110

17−JAN−13

01−AUG−08

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

17−JAN−13

17−JAN−13

17−JAN−13

17−JAN−13

30−JUL−10

17−JAN−13

29−JUL−11

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

29−JUL−11

Accountability of Temporary Fasteners; provide

Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire

Suppressant Halon (H) Materials; accomplish

Chemical Disinfection Procedures; accomplish

Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas−Contaminated

Tanks, Spaces, and Piping; certify

Purchase and Inspection Requirements for Contractor

Furnished Anodes; accomplish

Emergency Planning and Community Right−to−Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

General Environmental Requirements for Work at Contractor’s

Facility; accomplish

Mechanically Attached Fittings (MAF’s) for Piping Systems;

install

Shipbuilding and Ship Repair Operations National Emission

Standard for Hazardous Air Pollutants (NESHAPS) for Surface

Coating Information; provide

Ship Departure Report; provide

Ship’s Stability Process Control Procedure (PCP); maintain

Requirements for Mooring, Entry to and Departure from

Contractor’s Facility; accomplish

Alteration Verification; provide

Weight and Moment Change Data; provide

Work Authorization Form Coordinator (WAFCOR); provide

Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor’s Facility;

accomplish

Special Requirements for Non−SUBSAFE Work on SUBSAFE−

Certified Vessels; accomplish

Special Requirements for Non−Nuclear Work on Nuclear

Vessels; accomplish

PLANNED WORK

009−111

009−112

009−117

009−118

099−08

099−51

099−53

099−55

099−58

099−59

099−60

099−61

099−74

099−100

07−NOV−13

29−JUL−11

17−JAN−13

17−JAN−13

13−MAY−13

19−FEB−13

31−JAN−12

31−JAN−12

23−OCT−08

13−MAY−13

27−JAN−09

13−MAY−13

25−JAN−11

Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

Prevention of Radiographic−Inspection Ionizing−Radiation

Hazards; accomplish

AEGIS Light Off (ALO) Support for AEGIS Weapons Systems

Assessments (AWSA); provide

CG Deck Loading; accomplish

Temporary Fire Protection Services for Naval Station

Mayport Availabilities; accomplish

Non−Hazardous Liquid Waste Removal Operations at Naval

Station Mayport; accomplish

Temporary Hazardous Material (HM)/Hazardous Waste

(HW)/Satellite Accumulation Point (SAP) Storage Units for

Ship’s Force Use; provide

Cleaning and Pumping; accomplish (CMAV)

Heavy Weather Plan for Naval Station Availabilities;

provide

Cancelled 17 JAN 2013

General Environmental Requirements for Naval Station

Mayport Availabilities; accomplish

Temporary Hazardous Material (HM)/Hazardous Waste

(HW)/Satellite Accumulation Point (SAP) Storage Units for

Ship’s Force Use at Contractor’s Facility; provide

General Safety Requirements; accomplish

FFG Stability; maintain

PLANNED WORK

009−09

009−11

009−12

009−13

009−14

009−15

009−16

009−17

009−22

009−25

009−26

009−27

009−28

009−30

009−31

009−32

009−33

009−36

009−37

ITEM NO.

07−NOV−13

17−JAN−13

07−NOV−13

17−JAN−13

17−JAN−13

17−JAN−13

29−JUL−11

07−NOV−13

17−JAN−13

17−JAN−13

17−JAN−13

07−NOV−13

29−JUL−11

29−JUL−11

07−NOV−13

07−NOV−13

29−JUL−11

30−JUL−10

DATE

Process Control Procedure (PCP); provide and accomplish

Insulation and Lagging Requirements; accomplish

Welding, Fabrication, and Inspection Requirements;

accomplish

Meters; repair and certify calibration

Gages and Thermometers; repair and certify calibration

Rotating Machinery; balance

Electronic Equipment; repair

Rotating Electrical Equipment; repair

Shipboard Electric Cable; test

Structural Boundary Test; accomplish

Deck Covering Requirements; accomplish

Material Identification and Control (MIC) for Level I

Systems; accomplish

Cancelled 30 JUL 2010

Boiler Sample Tubes; inspect

Boiler Waterjet Cleaning; accomplish

Cleaning and Painting Requirements; accomplish

Rotating Electrical Equipment; rewind

Controller; repair

General Procedures for Woodwork; accomplish

TITLE

CATEGORY II. FY−14 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB

ORDER

PLANNED WORK

009−38

009−41

009−42

009−43

009−44

009−45

009−46

009−47

009−48

009−49

009−50

009−51

009−52

009−53

009−54

009−55

009−56

009−57

009−58

009−62

009−63

17−JAN−13

19−JUL−07

19−JUL−07

17−JAN−13

07−NOV−13

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

29−JUL−11

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

30−JUL−10

30−JUL−10

29−JUL−11

17−JAN−13

17−JAN−13

29−JUL−11

29−JUL−11

Boiler, Catapult Accumulator and Reboiler Dry Lay−up;

accomplish

Technical Manual Contract Requirement (TMCR) for a

Topically Structured Technical Manual; provide

Technical Manual Contract Requirement (TMCR) for Updating

Technical Manuals; provide

Light−Off Assessment (LOA) Support for Steam Propulsion

System; provide

Light−Off Assessment (LOA) Support for Gas Turbine

Propulsion System; provide

Tapered Plug Valve; repair

Butterfly Valve, Synthetic and Metal Seated; repair

Gate Valve; repair

Pressure Seal Bonnet Valve; repair (shop)

Pressure Seal Bonnet Valve; repair (in−line)

Horizontal Swing Check Valve; repair

Globe, Globe Angle, and Globe Stop Check Valve; repair

Relief Valve; repair

Bolted Bonnet Steam Valve; repair (shop)

Bolted Bonnet Steam Valve; repair (in−line)

Regulating/Reducing Valve; repair

Main Propulsion Boiler Wet Lay−Up; accomplish

Reduction Gear Security Requirements; accomplish

Pump and Driver Shaft Alignment; accomplish

Boiler Handhole and Manhole Seats and Plates; inspect

Lubricating Oils and Hydraulic Fluids; analyze

PLANNED WORK

009−66

009−68

009−71

009−75

009−76

009−78

009−85

009−90

009−91

009−92

009−96

009−98

009−104

009−105

009−107

009−113

009−114

009−115

009−116

099−77

17−JAN−13

29−JUL−11

17−JAN−13

29−JUL−11

29−JUL−11

07−NOV−13

19−JUL−07

07−NOV−13

07−NOV−13

29−JUL−11

29−JUL−11

30−JUL−10

29−JUL−11

17−JAN−13

17−JAN−13

07−NOV−13

07−NOV−13

07−NOV−13

29−JUL−11

19−FEB−13

Light−Off Assessment (LOA) Support for Diesel Propulsion

System; provide

Bolted Bonnet Valve; repair

Testing Requirements for Piping Systems; accomplish

Circuit Breaker; repair

Waveguide and Transmission Line Temporary Lay−Up, Pressurization, and Purging; accomplish

Passive Countermeasures System (PCMS) Material

Repair/Installation Requirements; accomplish

Government Sponsored Planning Yard/Configuration Data

Manager (CDM) On−Site Representative Facility; provide

Technical Representative; provide

Propeller In−Place Inspection; accomplish

Resilient Mount; remove and install

Ball Valve; repair

Monel Fasteners; inspect

Vibration Testing and Analysis; accomplish

Thermal Sprayed Coatings for Machinery Component Repair;

accomplish

Piping System Cleanliness (Non−Nuclear); accomplish

Rotating Electrical Equipment with Sealed Insulation

Systems (SIS); rewind

Mold Remediation; accomplish

Bearing Rebabbitting; accomplish

Auxiliary and Waste Heat Boiler Sodium Nitrate Wet

Layup; accomplish

Requirements When Accomplishing Shipboard Work Using a

Government Installed Cofferdam; accomplish

PLANNED WORK

077−11−001

634−11−001

634−11−002

634−11−003

634−11−004

634−11−005

634−11−006

634−11−007

634−11−008

634−11−009

ITEM NO.

Hazardous Waste Produced on Naval Vessels; control

Carpet; remove existing and install new

Electrical Grade Matting; remove existing and install new

Cosmetic Polymeric Deck Covering Epoxy Quartz, Epoxy Flake, or Epoxy Marble System; remove existing and install new.

Cosmetic Polymeric Deck Covering Urethane Flake System;

remove existing and install new

Unglazed Porcelain Tile System; remove existing and install new

Wear Resistant Deck Tile; remove existing and install new

High Durability Deck Paint; remove existing and install new

Cosmetic Polymeric (Type III) Deck Covering System; remove existing and install new.

Deck Covering; remove existing

TITLE______________

LWT FILE NO: 077−002 ITEM NO: 077−11−0011 of 6

IDIQ SERMC (IDIQ−) 077−11−001ITEM NO:

28−705COAR:

077−002

17 JUL 2010REVISED:

LWT FILE NO: NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0050

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

Throughout the Ship

Not Applicable

Location of Work:

Identification:

2.1

2.2

2.3

2.4

Resource Conservation and Recovery Act (RCRA)

Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

Applicable Hazardous Waste Manifest Form

10 U.S.C. 7311

Hazardous Waste Produced on Naval Vessels; control

Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

Complete documentation required by 2.1 and 2.2, using EPA or delegated

When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental

Protection Agency (EPA) or delegated state environmental agency identification number.

Manage and transport for Navy disposal, Navy−generated hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the

SUPERVISOR.

Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

1.1

1.2

1.3

Title:

3.1.1

3.1.2

3.1.3

3.1

3.2

LWT FILE NO: 077−002 ITEM NO: 077−11−0012 of 6

BUILDING:

state environmental agency identification number in accordance with 2.4.

If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state.

After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the

Documentation related to hazardous waste generated solely by the physical actions of Ship’s Force or Navy employees (termed Navy−Generated

Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR’S concurrence with the categorization of the waste as Navy− generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor−Generated Hazardous

Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law. Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co−Generated

Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law.

When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR’s concurrence with the categorization of the wastes as co−generated before completion of the manifest.

Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

IDIQ SERMC (IDIQ−)

3.2.1

3.2.2

3.2.3

3.3

LWT FILE NO: 077−002 ITEM NO: 077−11−0013 of 6 contractor generator identification number issued for the site where his main facilities are located.

If, for availabilities at a contractor−owned or controlled facility, the

Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

AMOUNT

TYPE NAVY CO−GENERATED CONTRACTOR

Acid Solutions (may include N/A N/A N/A spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze) N/A N/A N/A

Sodium Hydroxide N/A N/A N/A

Cleaning Solvents N/A N/A 10 Gals

Sodium Phosphates (Tri, Bi, N/A N/A N/A or Mono)

Fluorocarbons N/A N/A N/A

Morpholine N/A N/A N/A

Sodium Chromates N/A N/A N/A

Hydrazine N/A N/A N/A

Methyl Ethyl Ketone N/A N/A N/A

Spent Abrasive Blast Material N/A N/A N/A

(contaminated with a known hazardous waste)

Trichloroethane N/A N/A N/A

IDIQ SERMC (IDIQ−)

3.4

3.5

LWT FILE NO: 077−002 ITEM NO: 077−11−0014 of 6

Miscellaneous Chemicals N/A N/A 10 Lbs

(Ignitable)

Miscellaneous Chemicals N/A N/A N/A

(Corrosive)

Miscellaneous Chemicals N/A N/A N/A

(TCLP Toxic)

Miscellaneous Chemicals N/A N/A N/A

(Reactive)

Oil (Synthetic) N/A N/A N/A

Paints (Enamel, Latex, N/A N/A 100 lbs

Epoxy, thinners, oil based, rubber paint, non−skid, lacquer, remover, varnishes)

Paints (May include lead, N/A N/A 5 lbs cadmium, or chrome)

Paint Strippers (phenols, N/A N/A N/A lead, chromium)

Sludge (Contaminated with N/A N/A N/A a known hazardous waste)

Wool Felt (contaminated N/A N/A N/A with chromium and PCB’s)

Ventilation Debris/Residue

(Heavy Metals, e.g., cadmium chromium) N/A N/A N/A

Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.

Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non−hazardous, or did not exist.

3.7.1

3.6

3.7

LWT FILE NO: 077−002 ITEM NO: 077−11−0015 of 6

NOTES4.

Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to

Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in

3.5 may be neutralized, recycled, or otherwise removed from the requirements of

Subtitle C of 2.1. Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

Hazardous wastes are determined by one or more of the following methods:

The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.

The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

Chemical analysis which shows that the material characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity

Characteristic Leachate Procedure − TCLP) exceed the limits for that material in

40 CFR 261.20 Subpart C.

Reference to a Material Safety Data Sheet (MSDS), or

Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.7.1.1

3.7.2

4.1.1

4.2.1

4.2.2

4.2.3

3.8

4.1

4.2

LWT FILE NO: 077−002 ITEM NO: 077−11−0016 of 6

GOVERNMENT FURNISHED MATERIAL (GFM)5.

5.1

5.2

5.3

Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB’s (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

4.3

LWT FILE NO: 634−004 ITEM NO: 634−11−0011 of 2

IDIQ SERMC (IDIQ−) 634−11−001ITEM NO:

28−705COAR:

634−004

20 APR 2006REVISED:

LWT FILE NO: NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0040

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

(As Per Delivery Order)

(Quantity As Per Delivery Order)

5.1

5.2

Location of Work:

Identification:

2.1 Standard Items

Carpet; remove existing and install new

Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.

Accomplish the requirements of 009−26 of 2.1, including Attachment E, at locations listed in 1.2.

Provide color samples of carpet to ship’s force via the SUPERVISOR for selection.

The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.

1. None.

LLTM

PUSH MATERIAL

1.1

3.1

LWT FILE NO: 634−004 ITEM NO: 634−11−0012 of 2

5.3

1. None.

1. None.

KITTED MATERIAL :

LWT FILE NO: 634−004 ITEM NO: 634−11−0021 of 2

IDIQ SERMC (IDIQ−) 634−11−002ITEM NO:

28−705COAR:

634−004

20 APR 2006REVISED:

LWT FILE NO: NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0043

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

(As Per Delivery Order)

(Quantity As Per Delivery Order)

5.1

5.2

Location of Work:

Identification:

2.1 Standard Items

Electrical Grade Matting; remove existing and install new

Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.

Accomplish the requirements of 009−26 of 2.1, including Attachment D, at locations listed in 1.2.

Provide color samples of matting to ship’s force via the SUPERVISOR for selection.

The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.

1. None.

LLTM

PUSH MATERIAL

1.1

3.1

LWT FILE NO: 634−004 ITEM NO: 634−11−0022 of 2

5.3

1. None.

1. None.

LWT FILE NO: 634−004 ITEM NO: 634−11−0031 of 2

IDIQ SERMC (IDIQ−) 634−11−003ITEM NO:

28−705COAR:

634−004

20 APR 2006REVISED:

LWT FILE NO: NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0045

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

(As Per Delivery Order)

(Quantity As Per Delivery Order)

5.1

5.2

Location of Work:

Identification:

2.1 Standard Items

Cosmetic Polymeric Deck Covering Epoxy Quartz, Epoxy Flake, or Epoxy

Marble System; remove existing and install new.

Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.

Accomplish the requirements of 009−26 of 2.1, including Attachment C for

Type I, Class One, 2, or 3 deck covering, at locations listed in 1.2.

Provide color and pattern samples of Cosmetic Polymeric Decking to ship’s force via the SUPERVISOR for selection.

The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.

1. None.

LLTM

PUSH MATERIAL

1.1

3.1

LWT FILE NO: 634−004 ITEM NO: 634−11−0032 of 2

5.3

1. None.

1. None.

LWT FILE NO: 634−004 ITEM NO: 634−11−0041 of 2

IDIQ SERMC (IDIQ−) 634−11−004ITEM NO:

28−705COAR:

634−004

20 APR 2006REVISED:

LWT FILE NO: NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0042

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

(As Per Delivery Order)

(Quantity As Per Delivery Order)

5.1

5.2

Location of Work:

Identification:

2.1 Standard Items

Cosmetic Polymeric Deck Covering Urethane Flake System; remove existing and install new

Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.

Accomplish the requirements of 009−26 of 2.1, including Attachment C for

Type II, Class 2 deck coverings, at locations listed in 1.2.

Provide color samples of Cosmetic Polymeric Decking to ship’s force via the SUPERVISOR for selection.

The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.

1. None.

LLTM

PUSH MATERIAL

1.1

3.1

LWT FILE NO: 634−004 ITEM NO: 634−11−0042 of 2

5.3

1. None.

1. None.

LWT FILE NO: 634−004 ITEM NO: 634−11−0051 of 2

IDIQ SERMC (IDIQ−) 634−11−005ITEM NO:

28−705COAR:

634−004

20 APR 2006REVISED:

LWT FILE NO: NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0044

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

(As Per Delivery Order)

(Quantity As Per Delivery Order)

5.1

5.2

Location of Work:

Identification:

2.1 Standard Items

Unglazed Porcelain Tile System; remove existing and install new

Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.

Accomplish the requirements of 009−26 of 2.1, including Attachment A, at locations listed in 1.2.

Provide color samples of tile to ship’s force via the SUPERVISOR for selection.

The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.

1. None.

LLTM

PUSH MATERIAL

1.1

3.1

LWT FILE NO: 634−004 ITEM NO: 634−11−0052 of 2

5.3

1. None.

1. None.

LWT FILE NO: 634−004 ITEM NO: 634−11−0061 of 2

IDIQ SERMC (IDIQ−) 634−11−006ITEM NO:

28−705COAR:

634−004

20 APR 2006REVISED:

LWT FILE NO: NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0047

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

(As Per Delivery Order) square feet in locations as designated by the SUPERVISOR

Not Applicable

5.1

5.2

Location of Work:

Identification:

2.1 Standard Items

Wear Resistant Deck Tile; remove existing and install new

Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.

Accomplish the requirements of 009−26 of 2.1, including Attachment B, at locations listed in 1.2.

Provide color samples of Tile to ship’s force via the SUPERVISOR for selection.

The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.

1. None.

LLTM

PUSH MATERIAL

1.1

3.1

LWT FILE NO: 634−004 ITEM NO: 634−11−0062 of 2

5.3

1. None.

1. None.

ITEM NO: 634−11−0071 of 2

IDIQ SERMC (IDIQ−) 634−11−007ITEM NO:

28−705COAR:

NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0046

SCOPE

REFERENCES

REQUIREMENTS

1.

2.

3.

1.2.1

1.3.1

(As Per Delivery Order)

Quantity As Per Delivery Order)

Location of Work:

Identification:

(V)(G) "FINAL INSPECTION"

2.1 Standard Items

High Durability Deck Paint; remove existing and install new

Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.

Accomplish the requirements of 009−32 of 2.1, including Table 3, line

22, Column A in locations listed in 1.2.

Accomplish the requirements of 009−32 of 2.1, including Table 3, line

27, Column A in locations listed in 1.2.

Accomplish the requirements of 009−32 of 2.1, including Table 3, line

22, in locations listed in 1.2.

Accomplish the requirements of 009−32 of 2.1, including Table 3, line

27, in locations listed in 1.2.

Accomplish the requirements of 009−32 of 2.1, including Table 2, Line 16, Columns B and E.

Accomplish the requirements of 009−32 of 2.1, including Table 2, Line 38, Columns B and E.

1.1

3.3.1

3.1

3.2

3.3

3.4

3.5

ITEM NO: 634−11−0072 of 2

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

4.

5.

5.1

5.2

5.3

Accomplish a visual inspection of the completely installed and cured deck covering system.

Provide color samples of Tile to ship’s force via the SUPERVISOR for selection.

1. None.

1. None.

1. None.

LLTM

PUSH MATERIAL

KITTED MATERIAL

IDIQ SERMC (IDIQ−)

3.6

LWT FILE NO: 634−004 ITEM NO: 634−11−0081 of 2

IDIQ SERMC (IDIQ−) 634−11−008ITEM NO:

28−705COAR:

634−004

20 APR 2006REVISED:

LWT FILE NO: NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0048

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

(As Per Delivery Order)

(Quantity As Per Delivery Order)

5.1

5.2

Location of Work:

Identification:

2.1 Standard Items

Cosmetic Polymeric (Type III) Deck Covering System; remove existing and install new.

Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.

Accomplish the requirements of 009−26 of 2.1, including Attachment C for

Type III cosmetic polymeric deck covering, at locations listed in 1.2.

Provide color samples of Cosmetic Polymeric Type III Decking to ship’s force via the SUPERVISOR for selection.

The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.

1. None.

LLTM

PUSH MATERIAL

1.1

3.1

LWT FILE NO: 634−004 ITEM NO: 634−11−0082 of 2

5.3

1. None.

1. None.

LWT FILE NO: 634−004 ITEM NO: 634−11−0091 of 2

IDIQ SERMC (IDIQ−) 634−11−009ITEM NO:

28−705COAR:

634−004

20 APR 2006REVISED:

LWT FILE NO: NONECMP:

BELIVEAUPLANNER:

BUILDING:

PCN: SERM−0049

SCOPE

REFERENCES

REQUIREMENTS

NOTES

GOVERNMENT FURNISHED MATERIAL (GFM)

1.

2.

3.

4.

5.

1.2.1

1.3.1

(As Per Delivery Order)

(Quantity As Per Delivery Order)

5.1

5.2

Location of Work:

Identification:

2.1 Standard Items

Deck Covering; remove existing

Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.

Accomplish the requirements of 009−26 of 2.1, paragraph 3.1 through 3.5, at locations listed in 1.2.

The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.

1. None.

1. None.

LLTM

PUSH MATERIAL

1.1

3.1

LWT FILE NO: 634−004 ITEM NO: 634−11−0092 of 2

5.3

1. None.

File details come from the government source that posted it. Updated .