About this file
Interior Deck Work Package SSP-705-14
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N40027-14-R-0009 _Interior_Deck_Services_Amendment_0004.pdf | ||
| ELINs_(revised_20_Mar_2014).xls | XLS spreadsheet | |
| N40027-14-R-0009 _Interior_Deck_Services_Amendment_0003.pdf | ||
| ELINs.xls | XLS spreadsheet | |
| N40027-14-R-0009 _Interior_Decks_IDIQ _SSP-705-14_Solicitation.pdf | ||
| N40027-14-R-0009 _Interior_Deck_Services_Amendment_0001.pdf | ||
| N40027-14-R-0009 _Interior_Deck_Services_Amendment_0002.pdf | ||
| CDRLs_(DD_Form_1423).pdf | ||
| FBO_Solicitation_SSP_705-14_Upload_Document.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAYPORT, FLORIDA 32228−0158
SERMC
P. O. Box 280158
IDIQ SERMC (IDIQ−)
SERM−705−14SPECIFICATION NUMBER: SSP:
DEPARTMENT OF THE NAVY
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
DATE PREPARED
01 JAN 2014
BUILDING: IDIQ SERMC(IDIQ−) SSP−705−14
I N D E X
PLANNED WORK
009−01
009−02
009−03
009−04
009−05
009−06
009−07
009−08
009−10
009−18
009−19
009−20
009−21
009−23
009−24
009−29
009−34
009−35
ITEM NO.
07−NOV−13
29−JUL−11
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
17−JAN−13
07−NOV−13
29−JUL−11
17−JAN−13
29−JUL−11
17−JAN−13
29−JUL−11
17−JAN−13
17−JAN−13
29−JUL−04
17−JAN−13
07−NOV−13
DATE
General Criteria; accomplish
Environmental Compliance Reports for Material Usage at
Naval Facilities; provide
Toxic and Hazardous Substances; control
Quality Management System; provide
Temporary Accesses; provide
Maintaining Protection and Cleanliness from Non−Radioactive
Operations; accomplish
Confined Space Entry, Certification, Fire Prevention and
Housekeeping; accomplish
Fire Protection at Contractor’s Facility; accomplish
Shipboard Asbestos−Containing Material (ACM); control
Magnetic Material; control
Provisioning Technical Documentation (PTD); provide
Government Property; control
Logistics and Technical Data; provide
Interferences; remove and install
Authorization, Control, Isolation, Blanking, and Tagging
Requirements; accomplish
Asbestos−Free Pipe Hanger Liner Material; install
Fire Protection of Unmanned Vessels at Contractor’s
Facility; provide
Confined Space Entry, Certification, Fire Prevention
Utilizing Military Fire Watches, and Housekeeping;
accomplish
TITLE
CATEGORY I. FY−14 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE
ITEMS THAT ARE STRUCK OUT ON THIS INDEX DO NOT APPLY TO THIS CONTRACT.
PLANNED WORK
009−39
009−40
009−59
009−60
009−61
009−64
009−65
009−67
009−69
009−70
009−72
009−73
009−74
009−77
009−79
009−80
009−81
009−82
009−83
19−JUL−07
29−JUL−11
29−JUL−11
07−NOV−13
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
29−JUL−11
17−JAN−13
Technical Manual Contract Requirement (TMCR) for New
Technical Manuals for Commercial Equipment/ Component;
provide
Requirements for Contractor Cranes, Multi−Purpose Machines and Material Handling Equipment at Naval Facilities;
accomplish
Organotin Antifouling Material; control
Schedule and Associated Reports for Availabilities Over 9
Weeks in Duration; provide and manage
Shipboard Use of Fluorocarbons; control
Synthetic Fire−Resistant Hydraulic Fluid; control
Polychlorinated Biphenyls (PCBs); control
Integrated Total Ship Testing; manage
Heavy Weather Plan; provide
Confined Space Entry, Certification, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
Physical Security at Private Contractor’s Facility;
accomplish
Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install
Occupational, Safety and Health Requirements; accomplish
Cofferdam Requirements; accomplish
Government Owned Material (GOM); status reporting
Ship’s Facilities; provide
Compartment Closeout; accomplish
Data Requirements When Installing an Equal Component Vice
Specified Component; provide
Wire Rope Fitting Verification; provide
PLANNED WORK
009−84
009−86
009−87
009−88
009−89
009−93
009−94
009−95
009−97
009−99
009−100
009−101
009−102
009−103
009−106
009−108
009−109
009−110
17−JAN−13
01−AUG−08
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
17−JAN−13
17−JAN−13
17−JAN−13
17−JAN−13
30−JUL−10
17−JAN−13
29−JUL−11
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
29−JUL−11
Accountability of Temporary Fasteners; provide
Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire
Suppressant Halon (H) Materials; accomplish
Chemical Disinfection Procedures; accomplish
Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas−Contaminated
Tanks, Spaces, and Piping; certify
Purchase and Inspection Requirements for Contractor
Furnished Anodes; accomplish
Emergency Planning and Community Right−to−Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
General Environmental Requirements for Work at Contractor’s
Facility; accomplish
Mechanically Attached Fittings (MAF’s) for Piping Systems;
install
Shipbuilding and Ship Repair Operations National Emission
Standard for Hazardous Air Pollutants (NESHAPS) for Surface
Coating Information; provide
Ship Departure Report; provide
Ship’s Stability Process Control Procedure (PCP); maintain
Requirements for Mooring, Entry to and Departure from
Contractor’s Facility; accomplish
Alteration Verification; provide
Weight and Moment Change Data; provide
Work Authorization Form Coordinator (WAFCOR); provide
Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor’s Facility;
accomplish
Special Requirements for Non−SUBSAFE Work on SUBSAFE−
Certified Vessels; accomplish
Special Requirements for Non−Nuclear Work on Nuclear
Vessels; accomplish
PLANNED WORK
009−111
009−112
009−117
009−118
099−08
099−51
099−53
099−55
099−58
099−59
099−60
099−61
099−74
099−100
07−NOV−13
29−JUL−11
17−JAN−13
17−JAN−13
13−MAY−13
19−FEB−13
31−JAN−12
31−JAN−12
23−OCT−08
13−MAY−13
27−JAN−09
13−MAY−13
25−JAN−11
Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage
Prevention of Radiographic−Inspection Ionizing−Radiation
Hazards; accomplish
AEGIS Light Off (ALO) Support for AEGIS Weapons Systems
Assessments (AWSA); provide
CG Deck Loading; accomplish
Temporary Fire Protection Services for Naval Station
Mayport Availabilities; accomplish
Non−Hazardous Liquid Waste Removal Operations at Naval
Station Mayport; accomplish
Temporary Hazardous Material (HM)/Hazardous Waste
(HW)/Satellite Accumulation Point (SAP) Storage Units for
Ship’s Force Use; provide
Cleaning and Pumping; accomplish (CMAV)
Heavy Weather Plan for Naval Station Availabilities;
provide
Cancelled 17 JAN 2013
General Environmental Requirements for Naval Station
Mayport Availabilities; accomplish
Temporary Hazardous Material (HM)/Hazardous Waste
(HW)/Satellite Accumulation Point (SAP) Storage Units for
Ship’s Force Use at Contractor’s Facility; provide
General Safety Requirements; accomplish
FFG Stability; maintain
PLANNED WORK
009−09
009−11
009−12
009−13
009−14
009−15
009−16
009−17
009−22
009−25
009−26
009−27
009−28
009−30
009−31
009−32
009−33
009−36
009−37
ITEM NO.
07−NOV−13
17−JAN−13
07−NOV−13
17−JAN−13
17−JAN−13
17−JAN−13
29−JUL−11
07−NOV−13
17−JAN−13
17−JAN−13
17−JAN−13
07−NOV−13
29−JUL−11
29−JUL−11
07−NOV−13
07−NOV−13
29−JUL−11
30−JUL−10
DATE
Process Control Procedure (PCP); provide and accomplish
Insulation and Lagging Requirements; accomplish
Welding, Fabrication, and Inspection Requirements;
accomplish
Meters; repair and certify calibration
Gages and Thermometers; repair and certify calibration
Rotating Machinery; balance
Electronic Equipment; repair
Rotating Electrical Equipment; repair
Shipboard Electric Cable; test
Structural Boundary Test; accomplish
Deck Covering Requirements; accomplish
Material Identification and Control (MIC) for Level I
Systems; accomplish
Cancelled 30 JUL 2010
Boiler Sample Tubes; inspect
Boiler Waterjet Cleaning; accomplish
Cleaning and Painting Requirements; accomplish
Rotating Electrical Equipment; rewind
Controller; repair
General Procedures for Woodwork; accomplish
TITLE
CATEGORY II. FY−14 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB
ORDER
PLANNED WORK
009−38
009−41
009−42
009−43
009−44
009−45
009−46
009−47
009−48
009−49
009−50
009−51
009−52
009−53
009−54
009−55
009−56
009−57
009−58
009−62
009−63
17−JAN−13
19−JUL−07
19−JUL−07
17−JAN−13
07−NOV−13
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
29−JUL−11
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
30−JUL−10
30−JUL−10
29−JUL−11
17−JAN−13
17−JAN−13
29−JUL−11
29−JUL−11
Boiler, Catapult Accumulator and Reboiler Dry Lay−up;
accomplish
Technical Manual Contract Requirement (TMCR) for a
Topically Structured Technical Manual; provide
Technical Manual Contract Requirement (TMCR) for Updating
Technical Manuals; provide
Light−Off Assessment (LOA) Support for Steam Propulsion
System; provide
Light−Off Assessment (LOA) Support for Gas Turbine
Propulsion System; provide
Tapered Plug Valve; repair
Butterfly Valve, Synthetic and Metal Seated; repair
Gate Valve; repair
Pressure Seal Bonnet Valve; repair (shop)
Pressure Seal Bonnet Valve; repair (in−line)
Horizontal Swing Check Valve; repair
Globe, Globe Angle, and Globe Stop Check Valve; repair
Relief Valve; repair
Bolted Bonnet Steam Valve; repair (shop)
Bolted Bonnet Steam Valve; repair (in−line)
Regulating/Reducing Valve; repair
Main Propulsion Boiler Wet Lay−Up; accomplish
Reduction Gear Security Requirements; accomplish
Pump and Driver Shaft Alignment; accomplish
Boiler Handhole and Manhole Seats and Plates; inspect
Lubricating Oils and Hydraulic Fluids; analyze
PLANNED WORK
009−66
009−68
009−71
009−75
009−76
009−78
009−85
009−90
009−91
009−92
009−96
009−98
009−104
009−105
009−107
009−113
009−114
009−115
009−116
099−77
17−JAN−13
29−JUL−11
17−JAN−13
29−JUL−11
29−JUL−11
07−NOV−13
19−JUL−07
07−NOV−13
07−NOV−13
29−JUL−11
29−JUL−11
30−JUL−10
29−JUL−11
17−JAN−13
17−JAN−13
07−NOV−13
07−NOV−13
07−NOV−13
29−JUL−11
19−FEB−13
Light−Off Assessment (LOA) Support for Diesel Propulsion
System; provide
Bolted Bonnet Valve; repair
Testing Requirements for Piping Systems; accomplish
Circuit Breaker; repair
Waveguide and Transmission Line Temporary Lay−Up, Pressurization, and Purging; accomplish
Passive Countermeasures System (PCMS) Material
Repair/Installation Requirements; accomplish
Government Sponsored Planning Yard/Configuration Data
Manager (CDM) On−Site Representative Facility; provide
Technical Representative; provide
Propeller In−Place Inspection; accomplish
Resilient Mount; remove and install
Ball Valve; repair
Monel Fasteners; inspect
Vibration Testing and Analysis; accomplish
Thermal Sprayed Coatings for Machinery Component Repair;
accomplish
Piping System Cleanliness (Non−Nuclear); accomplish
Rotating Electrical Equipment with Sealed Insulation
Systems (SIS); rewind
Mold Remediation; accomplish
Bearing Rebabbitting; accomplish
Auxiliary and Waste Heat Boiler Sodium Nitrate Wet
Layup; accomplish
Requirements When Accomplishing Shipboard Work Using a
Government Installed Cofferdam; accomplish
PLANNED WORK
077−11−001
634−11−001
634−11−002
634−11−003
634−11−004
634−11−005
634−11−006
634−11−007
634−11−008
634−11−009
ITEM NO.
Hazardous Waste Produced on Naval Vessels; control
Carpet; remove existing and install new
Electrical Grade Matting; remove existing and install new
Cosmetic Polymeric Deck Covering Epoxy Quartz, Epoxy Flake, or Epoxy Marble System; remove existing and install new.
Cosmetic Polymeric Deck Covering Urethane Flake System;
remove existing and install new
Unglazed Porcelain Tile System; remove existing and install new
Wear Resistant Deck Tile; remove existing and install new
High Durability Deck Paint; remove existing and install new
Cosmetic Polymeric (Type III) Deck Covering System; remove existing and install new.
Deck Covering; remove existing
TITLE______________
LWT FILE NO: 077−002 ITEM NO: 077−11−0011 of 6
IDIQ SERMC (IDIQ−) 077−11−001ITEM NO:
28−705COAR:
077−002
17 JUL 2010REVISED:
LWT FILE NO: NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0050
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
Throughout the Ship
Not Applicable
Location of Work:
Identification:
2.1
2.2
2.3
2.4
Resource Conservation and Recovery Act (RCRA)
Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103
Applicable Hazardous Waste Manifest Form
10 U.S.C. 7311
Hazardous Waste Produced on Naval Vessels; control
Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
Complete documentation required by 2.1 and 2.2, using EPA or delegated
When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental
Protection Agency (EPA) or delegated state environmental agency identification number.
Manage and transport for Navy disposal, Navy−generated hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the
SUPERVISOR.
Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
1.1
1.2
1.3
Title:
3.1.1
3.1.2
3.1.3
3.1
3.2
LWT FILE NO: 077−002 ITEM NO: 077−11−0012 of 6
BUILDING:
state environmental agency identification number in accordance with 2.4.
If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state.
After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the
Documentation related to hazardous waste generated solely by the physical actions of Ship’s Force or Navy employees (termed Navy−Generated
Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR’S concurrence with the categorization of the waste as Navy− generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor−Generated Hazardous
Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law. Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co−Generated
Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law.
When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR’s concurrence with the categorization of the wastes as co−generated before completion of the manifest.
Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
IDIQ SERMC (IDIQ−)
3.2.1
3.2.2
3.2.3
3.3
LWT FILE NO: 077−002 ITEM NO: 077−11−0013 of 6 contractor generator identification number issued for the site where his main facilities are located.
If, for availabilities at a contractor−owned or controlled facility, the
Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.
Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO−GENERATED CONTRACTOR
Acid Solutions (may include N/A N/A N/A spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) N/A N/A N/A
Sodium Hydroxide N/A N/A N/A
Cleaning Solvents N/A N/A 10 Gals
Sodium Phosphates (Tri, Bi, N/A N/A N/A or Mono)
Fluorocarbons N/A N/A N/A
Morpholine N/A N/A N/A
Sodium Chromates N/A N/A N/A
Hydrazine N/A N/A N/A
Methyl Ethyl Ketone N/A N/A N/A
Spent Abrasive Blast Material N/A N/A N/A
(contaminated with a known hazardous waste)
Trichloroethane N/A N/A N/A
IDIQ SERMC (IDIQ−)
3.4
3.5
LWT FILE NO: 077−002 ITEM NO: 077−11−0014 of 6
Miscellaneous Chemicals N/A N/A 10 Lbs
(Ignitable)
Miscellaneous Chemicals N/A N/A N/A
(Corrosive)
Miscellaneous Chemicals N/A N/A N/A
(TCLP Toxic)
Miscellaneous Chemicals N/A N/A N/A
(Reactive)
Oil (Synthetic) N/A N/A N/A
Paints (Enamel, Latex, N/A N/A 100 lbs
Epoxy, thinners, oil based, rubber paint, non−skid, lacquer, remover, varnishes)
Paints (May include lead, N/A N/A 5 lbs cadmium, or chrome)
Paint Strippers (phenols, N/A N/A N/A lead, chromium)
Sludge (Contaminated with N/A N/A N/A a known hazardous waste)
Wool Felt (contaminated N/A N/A N/A with chromium and PCB’s)
Ventilation Debris/Residue
(Heavy Metals, e.g., cadmium chromium) N/A N/A N/A
Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
Submit one legible copy, in hard copy or electronic media, of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non−hazardous, or did not exist.
3.7.1
3.6
3.7
LWT FILE NO: 077−002 ITEM NO: 077−11−0015 of 6
NOTES4.
Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to
Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in
3.5 may be neutralized, recycled, or otherwise removed from the requirements of
Subtitle C of 2.1. Inclusion of these substances in the waste listed in 3.5 does not preclude the contractor from taking action consistent with 2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2. Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
Hazardous wastes are determined by one or more of the following methods:
The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
Chemical analysis which shows that the material characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity
Characteristic Leachate Procedure − TCLP) exceed the limits for that material in
40 CFR 261.20 Subpart C.
Reference to a Material Safety Data Sheet (MSDS), or
Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.7.1.1
3.7.2
4.1.1
4.2.1
4.2.2
4.2.3
3.8
4.1
4.2
LWT FILE NO: 077−002 ITEM NO: 077−11−0016 of 6
GOVERNMENT FURNISHED MATERIAL (GFM)5.
5.1
5.2
5.3
Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB’s (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
4.3
LWT FILE NO: 634−004 ITEM NO: 634−11−0011 of 2
IDIQ SERMC (IDIQ−) 634−11−001ITEM NO:
28−705COAR:
634−004
20 APR 2006REVISED:
LWT FILE NO: NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0040
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
(As Per Delivery Order)
(Quantity As Per Delivery Order)
5.1
5.2
Location of Work:
Identification:
2.1 Standard Items
Carpet; remove existing and install new
Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.
Accomplish the requirements of 009−26 of 2.1, including Attachment E, at locations listed in 1.2.
Provide color samples of carpet to ship’s force via the SUPERVISOR for selection.
The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.
1. None.
LLTM
PUSH MATERIAL
1.1
3.1
LWT FILE NO: 634−004 ITEM NO: 634−11−0012 of 2
5.3
1. None.
1. None.
KITTED MATERIAL :
LWT FILE NO: 634−004 ITEM NO: 634−11−0021 of 2
IDIQ SERMC (IDIQ−) 634−11−002ITEM NO:
28−705COAR:
634−004
20 APR 2006REVISED:
LWT FILE NO: NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0043
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
(As Per Delivery Order)
(Quantity As Per Delivery Order)
5.1
5.2
Location of Work:
Identification:
2.1 Standard Items
Electrical Grade Matting; remove existing and install new
Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.
Accomplish the requirements of 009−26 of 2.1, including Attachment D, at locations listed in 1.2.
Provide color samples of matting to ship’s force via the SUPERVISOR for selection.
The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.
1. None.
LLTM
PUSH MATERIAL
1.1
3.1
LWT FILE NO: 634−004 ITEM NO: 634−11−0022 of 2
5.3
1. None.
1. None.
LWT FILE NO: 634−004 ITEM NO: 634−11−0031 of 2
IDIQ SERMC (IDIQ−) 634−11−003ITEM NO:
28−705COAR:
634−004
20 APR 2006REVISED:
LWT FILE NO: NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0045
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
(As Per Delivery Order)
(Quantity As Per Delivery Order)
5.1
5.2
Location of Work:
Identification:
2.1 Standard Items
Cosmetic Polymeric Deck Covering Epoxy Quartz, Epoxy Flake, or Epoxy
Marble System; remove existing and install new.
Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.
Accomplish the requirements of 009−26 of 2.1, including Attachment C for
Type I, Class One, 2, or 3 deck covering, at locations listed in 1.2.
Provide color and pattern samples of Cosmetic Polymeric Decking to ship’s force via the SUPERVISOR for selection.
The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.
1. None.
LLTM
PUSH MATERIAL
1.1
3.1
LWT FILE NO: 634−004 ITEM NO: 634−11−0032 of 2
5.3
1. None.
1. None.
LWT FILE NO: 634−004 ITEM NO: 634−11−0041 of 2
IDIQ SERMC (IDIQ−) 634−11−004ITEM NO:
28−705COAR:
634−004
20 APR 2006REVISED:
LWT FILE NO: NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0042
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
(As Per Delivery Order)
(Quantity As Per Delivery Order)
5.1
5.2
Location of Work:
Identification:
2.1 Standard Items
Cosmetic Polymeric Deck Covering Urethane Flake System; remove existing and install new
Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.
Accomplish the requirements of 009−26 of 2.1, including Attachment C for
Type II, Class 2 deck coverings, at locations listed in 1.2.
Provide color samples of Cosmetic Polymeric Decking to ship’s force via the SUPERVISOR for selection.
The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.
1. None.
LLTM
PUSH MATERIAL
1.1
3.1
LWT FILE NO: 634−004 ITEM NO: 634−11−0042 of 2
5.3
1. None.
1. None.
LWT FILE NO: 634−004 ITEM NO: 634−11−0051 of 2
IDIQ SERMC (IDIQ−) 634−11−005ITEM NO:
28−705COAR:
634−004
20 APR 2006REVISED:
LWT FILE NO: NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0044
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
(As Per Delivery Order)
(Quantity As Per Delivery Order)
5.1
5.2
Location of Work:
Identification:
2.1 Standard Items
Unglazed Porcelain Tile System; remove existing and install new
Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.
Accomplish the requirements of 009−26 of 2.1, including Attachment A, at locations listed in 1.2.
Provide color samples of tile to ship’s force via the SUPERVISOR for selection.
The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.
1. None.
LLTM
PUSH MATERIAL
1.1
3.1
LWT FILE NO: 634−004 ITEM NO: 634−11−0052 of 2
5.3
1. None.
1. None.
LWT FILE NO: 634−004 ITEM NO: 634−11−0061 of 2
IDIQ SERMC (IDIQ−) 634−11−006ITEM NO:
28−705COAR:
634−004
20 APR 2006REVISED:
LWT FILE NO: NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0047
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
(As Per Delivery Order) square feet in locations as designated by the SUPERVISOR
Not Applicable
5.1
5.2
Location of Work:
Identification:
2.1 Standard Items
Wear Resistant Deck Tile; remove existing and install new
Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.
Accomplish the requirements of 009−26 of 2.1, including Attachment B, at locations listed in 1.2.
Provide color samples of Tile to ship’s force via the SUPERVISOR for selection.
The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.
1. None.
LLTM
PUSH MATERIAL
1.1
3.1
LWT FILE NO: 634−004 ITEM NO: 634−11−0062 of 2
5.3
1. None.
1. None.
ITEM NO: 634−11−0071 of 2
IDIQ SERMC (IDIQ−) 634−11−007ITEM NO:
28−705COAR:
NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0046
SCOPE
REFERENCES
REQUIREMENTS
1.
2.
3.
1.2.1
1.3.1
(As Per Delivery Order)
Quantity As Per Delivery Order)
Location of Work:
Identification:
(V)(G) "FINAL INSPECTION"
2.1 Standard Items
High Durability Deck Paint; remove existing and install new
Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.
Accomplish the requirements of 009−32 of 2.1, including Table 3, line
22, Column A in locations listed in 1.2.
Accomplish the requirements of 009−32 of 2.1, including Table 3, line
27, Column A in locations listed in 1.2.
Accomplish the requirements of 009−32 of 2.1, including Table 3, line
22, in locations listed in 1.2.
Accomplish the requirements of 009−32 of 2.1, including Table 3, line
27, in locations listed in 1.2.
Accomplish the requirements of 009−32 of 2.1, including Table 2, Line 16, Columns B and E.
Accomplish the requirements of 009−32 of 2.1, including Table 2, Line 38, Columns B and E.
1.1
3.3.1
3.1
3.2
3.3
3.4
3.5
ITEM NO: 634−11−0072 of 2
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
4.
5.
5.1
5.2
5.3
Accomplish a visual inspection of the completely installed and cured deck covering system.
Provide color samples of Tile to ship’s force via the SUPERVISOR for selection.
1. None.
1. None.
1. None.
LLTM
PUSH MATERIAL
KITTED MATERIAL
IDIQ SERMC (IDIQ−)
3.6
LWT FILE NO: 634−004 ITEM NO: 634−11−0081 of 2
IDIQ SERMC (IDIQ−) 634−11−008ITEM NO:
28−705COAR:
634−004
20 APR 2006REVISED:
LWT FILE NO: NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0048
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
(As Per Delivery Order)
(Quantity As Per Delivery Order)
5.1
5.2
Location of Work:
Identification:
2.1 Standard Items
Cosmetic Polymeric (Type III) Deck Covering System; remove existing and install new.
Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.
Accomplish the requirements of 009−26 of 2.1, including Attachment C for
Type III cosmetic polymeric deck covering, at locations listed in 1.2.
Provide color samples of Cosmetic Polymeric Type III Decking to ship’s force via the SUPERVISOR for selection.
The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.
1. None.
LLTM
PUSH MATERIAL
1.1
3.1
LWT FILE NO: 634−004 ITEM NO: 634−11−0082 of 2
5.3
1. None.
1. None.
LWT FILE NO: 634−004 ITEM NO: 634−11−0091 of 2
IDIQ SERMC (IDIQ−) 634−11−009ITEM NO:
28−705COAR:
634−004
20 APR 2006REVISED:
LWT FILE NO: NONECMP:
BELIVEAUPLANNER:
BUILDING:
PCN: SERM−0049
SCOPE
REFERENCES
REQUIREMENTS
NOTES
GOVERNMENT FURNISHED MATERIAL (GFM)
1.
2.
3.
4.
5.
1.2.1
1.3.1
(As Per Delivery Order)
(Quantity As Per Delivery Order)
5.1
5.2
Location of Work:
Identification:
2.1 Standard Items
Deck Covering; remove existing
Coordinate with Ship’s Force Point of Contact (SFPOC) within 48 hours of delivery order start date a schedule for accomplishment of work in spaces listed in each delivery order.
Accomplish the requirements of 009−26 of 2.1, paragraph 3.1 through 3.5, at locations listed in 1.2.
The requirements of paragraph 3.5.1 of 009−26 do not apply to this contract.
1. None.
1. None.
LLTM
PUSH MATERIAL
1.1
3.1
LWT FILE NO: 634−004 ITEM NO: 634−11−0092 of 2
5.3
1. None.
File details come from the government source that posted it. Updated .