N3943025R0022 -WFI CONUS Region 4 RFI 1.docx
DOCX document 14 KB Posted
- Solicitation number
- N39430-25-R-0022
About this file
This document is a Request for Information (RFI) for a Navy contract opportunity for Waterfront Facilities Inspection and Assessment in CONUS Region 4. The solicitation (N39430-25-R-0022) is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract for architect-engineer services covering the Northwest Area (including Alaska) and Pacific U.S. Territories such as American Samoa, Micronesia, Guam, Midway Island, Wake Island, Johnston Atoll, Baker Island, and the Northern Mariana Islands.
The RFI provides clarification on submission requirements, including that: 1) only projects with a Period of Performance end date after January 2022 will be considered, 2) electronic submissions must be emailed to specified points of contact, with a DoD SAFE link available for large files if needed, and 3) separate RFIs must be submitted for each CONUS region, even though the regions involve similar work. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command, with no specific award date mentioned in the provided documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3943025R0022 -WFI CONUS Region 4 RFIs and Answers.docx | DOCX document | |
| Attachment 4 - QASP Region 4.docx | DOCX document | |
| Attachment 1 - SF330.pdf | ||
| Attachment 3 - WFI SAES Region 4.pdf | ||
| WFI CONUS Region 4 SynopsisSolicitation_Final.pdf | ||
| Attachment 2 - NAVFAC PPQ Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N39430-25-R-0022 – WATERFRONT FACILITIES INSEPCTION AND ASSESSMENT, CONUS Region 4
RFI #1
04 September 2025
1. Criterion 1 – Specialized Experience:
Please confirm that projects included in Section F with Period of Performance (PoP) end dates, including modifications, after January 2022 meet the submission requirements. Specifically, could the Government please clarify if the referenced contract period of performance date to be listed in Section F is intended to mean the “Est. Ultimate Completion Date/Last Date to Order” or the “Estimated/Actual Completion Date?”
Government Response:
The Government does not want projects submitted that are older than January 2022. So starting from January 2022 for projects submitted.
1. Submission:
Please clarify the authorized platform or system to be used for one (1) electronic submission Please confirm that hard copies of the SF-330 are not to be included
Government Response:
Electronic submission shall be completed by emailing to the POCs listed within the SynopsisSolicitation. If an interested firm is unable to provide their submission via email due to file size constraints, they shall request a DoD SAFE link to provide their submission prior to the response due date from the POCs listed on this notice.
Confirmed. SF-330 hard copies are not required to be included
1. Can you confirm whether RFIs submitted for one CONUS region will be applicable to all CONUS regions, or must separate RFIs be submitted per region?
Government Response:
Although the CONUS regions are for the same work but different areas, they shall be handled as the separate contract requirements that they are. So separate RFIs must be submitted per region.
File details come from the government source that posted it. Updated .