N3904026Q5666 Attachment 8 - QASP.docx
DOCX document 99 KB Posted
- Attached to
- Overhaul - Barrier Boat
- Solicitation number
- N3904026Q5666
About this file
This is a Quality Assurance Surveillance Plan (QASP) for the overhaul of a 30-foot Barrier Boat (Hull 30BB0701) at Portsmouth Naval Shipyard. The QASP is a template document that establishes the systematic framework for monitoring and evaluating contractor performance throughout the contract execution period. It does not address specific products or services required; rather, it defines how the Government will assess whether the contractor meets contractual requirements for the barrier boat overhaul work detailed in the associated Statement of Work.
The QASP designates specific Government personnel responsible for surveillance activities, including the Contracting Officer, Contract Specialist, Contracting Officer's Representative (Jonathan Copp), and Technical Point of Contact. It establishes seven surveillance methods: direct observation, periodic inspection, user surveys, validated user complaints, 100% inspection, periodic sampling, and progress meetings. Performance will be rated on a five-point scale (Exceptional, Very Good, Satisfactory, Marginal, and Unsatisfactory) across eight evaluation areas: technical quality, schedule/timeliness, management/business relations, small business subcontracting, regulatory compliance, and other specified areas. The COR is responsible for documenting performance in status reports and the Contractor Performance Assessment Ratings System (CPARS), with marginal or unsatisfactory performance to be communicated within five business days and potentially resulting in a Contract Discrepancy Report and Corrective Action Plan requirement. This is a firm-fixed-price contract set aside for small businesses with a three-month completion timeline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Code 420 Contract Status Report Contracting and Logistics Department Portsmouth Naval Shipyard Kittery, ME 03904
Quality Assurance Surveillance Plan Contracting and Logistics Department Portsmouth Naval Shipyard Kittery, ME 03904
QUALITY ASSURANCE SURVEILLANCE PLAN
30-Foot Barrier Boat Overhaul (Hull 30BB0701) Contracting and Logistics Department, Portsmouth Naval Shipyard (PNSY)
Contract/Task Order Number: Overhaul Services for Barrier Boat 30BB0701 Contractor’s name: [Insert Contractor Name] (hereafter referred to as the contractor).
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place?
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government will coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the Contracting Officer (KO) and Government officials implementing surveillance activities.
The following Federal Acquisition Regulation (FAR) clauses apply to this contract's surveillance and enforcement:
· FAR 52.246-4 Inspection of Services – Fixed-Price
· FAR 52.232-1 Payments.
· FAR 52.232-25 Prompt Payment.
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities:
· Contracting Officer (KO) - The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract/task order terms, and safeguard the interests of the United States in the contractual relationship. The KO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract/task order. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
· Assigned KO: [Insert Name/Title, e.g., Sharon Hall]
· Telephone/Email: [Insert Contact Information]
· Contract Specialist (CS) - Assists the KO in executing administrative functions and coordinating with the program office.
· Assigned CS: [Insert Name, e.g., Danielle M. Quinn]
· Telephone/Email: [Insert Contact Information]
· Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract/task order and shall ensure proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The COR’s specific duties are delineated in the COR Appointment Letter.
· Assigned COR: Jonathan Copp]
· Telephone: (207) 994-0701
· Email: Jonathan.t.copp2.civ@us.navy.mil]
· Technical Point of Contact (TPOC) - Assisting technical personnel providing deck-plate oversight and evaluation of specific deliverables.
· Assigned TPOC: [Insert Name/Title]
3. CONTRACTOR REPRESENTATIVES:
See the contract for the current contractor’s representative and Program Manager.
Contractor Program Manager: [Insert Name]
Telephone/Email: [Insert Contact Information]
4. PERFORMANCE STANDARDS:
Performance standards define required levels of service. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards. Performance standards and associated Acceptable Quality Levels (AQLs) are defined in the Performance Requirements Summary Table (QASP Matrix) attached to this document.
5. METHODS OF QA SURVEILLANCE:
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. The surveillance method applicable to each performance standard is listed in the QASP Matrix below.
Regardless of the surveillance method, the COR shall always contact the contractor's representative when a defect is identified and inform the representative of the specifics of the problem. The COR shall also document any identified defects in the COR’s Status Report to the KO.
· DIRECT OBSERVATION: Includes on-site inspections and can be performed periodically or through $100%$ surveillance (e.g., witnessing hydrostatic and air tests, checking vehicle markings).
· PERIODIC INSPECTION: Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled or unscheduled, as required (e.g., bi-weekly/monthly check-ins).
· USER SURVEY: Combines elements of validated user complaints and random sampling.
· VALIDATED USER/CUSTOMER COMPLAINTS: Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated by the COR.
· 100% INSPECTION: Evaluates all outputs. Most applicable to written deliverables, critical tests, and safety/security parameters (e.g., review of test results, certification of lifting slings, and safety checklists).
· PERIODIC SAMPLING: Variation of random sampling. However, sample is only taken when a deficiency is suspected.
· PROGRESS OR STATUS MEETINGS: Periodic evaluations of progress and operational hurdles.
· ANALYSIS OF CONTRACTOR’S PROGRESS REPORTS / SYSTEMS: Evaluate work logs, weekly manhour reservation trackers, and CDRL submittals.
6. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used in accordance with CPARS guidelines:
· Exceptional - Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
· Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.
· Satisfactory - Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
· Marginal - Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
· Unsatisfactory - Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
7. DOCUMENTING PERFORMANCE.
General Documentation The COR shall document performance in the COR Status Report to the KO, and shall document performance annually in the Contractor Performance Assessment Ratings System (CPARS).
MARGINAL / UNSATISFACTORY PERFORMANCE
When unacceptable performance occurs, the COR shall inform the KO and the contractor within five (5) days. This will normally be via email unless circumstances necessitate verbal communication. In any case, the COR shall document the discussion, place it in the COR File, and include it as an attachment to the COR’s Status Report.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and send it to the KO for approval. Once approved, the COR shall send the CDR to the contractor's representative with a copy to the KO.
The contractor shall acknowledge receipt of the CDR in writing within two (2) business days. The CDR shall specify if the contractor is required to prepare a Corrective Action Plan (CAP) to document how the contractor shall correct the unacceptable performance and avoid a recurrence, and the timeline for submission.
8. EVALUATION AREAS
During performance, the COR will assess the following evaluation areas:
1) Technical/Quality of Product or Service (Quality)
2) Cost Control (Not required for Fixed Price type contracts/task orders)
3) Schedule/Timeliness (Schedule)
4) Management or Business Relations (Management)
5) Small Business Subcontracting (Only applicable to requirements that contain FAR 52.219-9 Small Business Subcontracting Plan)
6) Regulatory Compliance
7) Other (Specify up to three additional evaluation areas that are unique to the contract/task order, or that cannot be captured elsewhere in the evaluation. For example, if contract/task order includes award fee, a separate evaluation area should be included for award fee)
9. RATINGS
The COR shall use the ratings to evaluate and document performance as defined in the Department of Defense (DoD) Guidance for the Contractor Performance Assessment Reporting System (CPARS), if applicable.
10. FREQUENCY OF MEASUREMENT.
During contract, the COR shall take periodic measurements, as specified in the AQL column of the PRST, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
Quality Assurance Surveillance Plan image1.png
File details come from the government source that posted it. Updated .